36C25619R0072-0002001.docx

DOCX document 15 KB Posted

Attached to
NRM 580-17-101 Expand - Renovate ER
Solicitation number
36C25619R0072
Issued by

About this file

36C25619R0072 0002 Revised Price Schedule.docx

View the file

Other files

File Type Posted
36C25619C0088-000.docx DOCX document
36C25619R0072-0003002.pdf PDF
36C25619R0072-0003000.docx DOCX document
36C25619R0072-0003001.pdf PDF
36C25619R0072-0002000.docx DOCX document
36C25619R0072-0001003.pdf PDF
36C25619R0072-0001002.pdf PDF
36C25619R0072-0001004.pdf PDF
36C25619R0072-0001001.pdf PDF
36C25619R0072-0001000.docx DOCX document
36C25619R0072-003.pdf PDF
36C25619R0072-004.pdf PDF
36C25619R0072-009.pdf PDF
36C25619R0072-013.pdf PDF
36C25619R0072-011.pdf PDF
36C25619R0072-006.pdf PDF
36C25619R0072-008.pdf PDF
36C25619R0072-005.pdf PDF
36C25619R0072-001.docx DOCX document
36C25619R0072-010.pdf PDF
36C25619R0072-002.docx DOCX document
36C25619R0072-012.docx DOCX document
36C25619R0072-007.pdf PDF
36C25619R0072-000.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION OF SF 1442 BLOCK # 17 CONTINUED

DESCRIPTION OF WORK: Contractor shall provide all labor, materials, tools, equipment, expertise, administration, supervision and transportation as necessary to renovate and expand the Emergency Department per the design documents. All work shall be done in Building 100 at the Michael E DeBakey Medical Center located at 2002 Holcombe Boulevard, Houston, Texas 77030. All work shall be performed in accordance to the project drawings and specifications. The project period of performance is 365 calendar days regardless of which line item is awarded.

BASIS OF AWARD: A single award will be made on Line Item No. 1, but in the event the offer exceeds the funds available, a single award will be made on Line Item No. 2 through Line Item No. 4, in descending order, based on available funding. Offerors shall provide a total contract price on each line item listed.

LINE ITEM NO. 1: Base - Includes all work as indicated on the drawings and the specifications to renovate and expand the Emergency Department in Building 100. Period of performance is 365 calendar days.

TOTAL NO. 1: $___________________________*

LINE ITEM NO. 2: Deduct # 1 – Contractor shall perform all work except eliminate the switchable glass in the examination rooms in phases 1A, 1B and 2B. Install laminated safety glass. Install cubical curtain on inside of room along sliding door. Period of performance is 365 calendar days.

TOTAL NO. 2 (Base - Deduct 1): $___________________________

LINE ITEM NO. 3: Deduct # 2 – Contractor shall perform all work except Deduct #1 and eliminate work in room 1A-807 Treatment Bay in phase 2B. Period of performance is 365 calendar days.

TOTAL NO. 3 (Base Bid - (Deduct #1 + Deduct #2)): $___________________________

LINE ITEM NO. 4: Deduct # 3 – Contractor shall perform all work except Deduct #1, Deduct #2, and eliminate sliding door system at examination rooms in phase 1A and 1B. Provide cubical curtains in place of door. Provide wall corner protection and frame opening same size as sliding door system for future doors. Period of performance is 365 calendar days.

TOTAL NO. 3 (Base Bid - (Deduct #1 + Deduct #2 + Deduct #3)): $___________________________

*Offeror shall complete a price breakdown by Specification Divisions as shown on page #4

File details come from the government source that posted it.