36C25619R0072-005.pdf
PDF 16 MB Posted
- Attached to
- NRM 580-17-101 Expand - Renovate ER
- Solicitation number
- 36C25619R0072
About this file
36C25619R0072 580-17-101 Project Drawings - Architectural.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25619C0088-000.docx | DOCX document | |
| 36C25619R0072-0003002.pdf | ||
| 36C25619R0072-0003000.docx | DOCX document | |
| 36C25619R0072-0003001.pdf | ||
| 36C25619R0072-0002000.docx | DOCX document | |
| 36C25619R0072-0002001.docx | DOCX document | |
| 36C25619R0072-0001003.pdf | ||
| 36C25619R0072-0001002.pdf | ||
| 36C25619R0072-0001004.pdf | ||
| 36C25619R0072-0001001.pdf | ||
| 36C25619R0072-0001000.docx | DOCX document | |
| 36C25619R0072-003.pdf | ||
| 36C25619R0072-004.pdf | ||
| 36C25619R0072-009.pdf | ||
| 36C25619R0072-013.pdf | ||
| 36C25619R0072-011.pdf | ||
| 36C25619R0072-006.pdf | ||
| 36C25619R0072-008.pdf | ||
| 36C25619R0072-001.docx | DOCX document | |
| 36C25619R0072-010.pdf | ||
| 36C25619R0072-002.docx | DOCX document | |
| 36C25619R0072-012.docx | DOCX document | |
| 36C25619R0072-007.pdf | ||
| 36C25619R0072-000.docx | DOCX document |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
DEMOLITION NOTES
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL
WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS
FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF
DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL
CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION
UNLESS INDICATED OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR
INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE COMPLETION
OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING
DEMOLITION OF ELECTRICAL SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE
IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT
AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE
AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN
ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR
CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES
OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR THAT ARE NOT
IDENTIFIED. SHALL BE REPORTED TO THE CONTRACTING OFFICER.
GENERAL NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR
GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE
DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA.
ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE
COR AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND DETAILS FOR SPECIFIC
PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE
WORK. PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE,
THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM
THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR
ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR
RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR
ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR
PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR
CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF
CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE
SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND
SPECIFICATIONS AS A WHOLE. THE WORK IS TO BE CONSTRUCTED AS A COMPLETE,
INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY
SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY
ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS
OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY
BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT,
THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE
COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO
BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY
INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED
PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR
ORDERING MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES
BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND
DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST
BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR
PRIOR TO PROCEEDING WITH THE WORK.
8. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR
REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR
DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE
RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND
SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS,
SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL
FURNISH ALL NECESSARY PERMITS.
11. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE
OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS
(DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF
THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS
OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR
STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS
DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE
NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF
THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE
INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL
ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK.
ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL
PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY
IS INDICATED IN THE SPECIFICATIONS.
12. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES,
LAWS, SAFETY REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
CL
A & MM ACQUISITION AND MATERIEL MANAGEMENT
A AMPERES
ABA ARCHITECTURAL BARRIERS ACT
AC/HR AIR CHANGES PER HOUR
ACP/APC ACOUSTIC CEILING PANEL/ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AFF ABOVE FINISHED FLOOR
AGG AGGREGATE
AI ACQUISITION AND INSTALLATION
AIDS ACQUIRED IMMUNE DEFICIENCY SYNDROME
AL ALUMINUM
ALT ALTERNATE
APPROX APPROXIMATE(LY)
AR AS REQUIRED
ASPH ASPHALT
AT ACOUSTICAL CEILING TILE
AT (SP) ACOUSTICAL CEILING TILE (WITH SPRAYED PLASTIC FINISH)
AUTO AUTOMATIC
B/O BOTTOM OF
BC BASE CABINET
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
C DEGREE CELSIUS
C/C CENTER TO CENTER
CBOC COMMUNITY BASED OUTPATIENT CLINIC
CC CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CEM CEMENT(ITIOUS)
CFM CUBIC FEET PER MINUTE
CJ CONTROL JOINT
CENTERLINE
CLG CEILING
CLL CONTRACT LIMIT LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CP CARPET (WITHOUT CUSHION BROADLOOM)
CPT CARPET
CRS CORROSION RESISTING STEEL (SS)
CT CERAMIC TILE
CTR CENTER(ED)
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DF DRINKING FOUNTAIN
DG DESIGN GUIDE
DIA DIAMETER
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
DWG(S) DRAWING(S)
E EAST
EA EACH
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EIFS EXTERIOR INSULATION
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EMS ENVIRONMENTAL MANAGEMENT SERVICE
EQ EQUAL
ER EMERGENCY ROOM
ETM EXAM TREATMENT MODULE
ETO ETHYLENE OXIDE GAS
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXT EXTERIOR
F DEGREES FAHRENHEIT
FC FOOT-CANDLE
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FFE FINISH FLOOR ELEVATION
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FLSHG FLASHING
FLUOR FLUORESCENT
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GFI GROUND FAULT CIRCUIT INTERRUPTER
GI GASTROENTEROLOGY
GWB GYPSUM WALLBOARD
GYN GYNECOLOGY
GYP GYPSUM
HAC HOUSEKEEPING AIDS CLOSET
HDWR HARDWARE
HM HOLLOW METAL
HOL HOLLOW
HOR HORIZONTAL
HP HORSEPOWER
HR HOUR
HT HEIGHT
HVAC HEATING, VENTILATING AND AIR CONDITIONING
HVAC HEATING/VENTILATION/AIR CONDITIONING
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
K KELVIN
KW KILOWATT
L/S LANDSCAPE
LAV LAVATORY
LB(S) POUND(S)
LLTS LOCKERS, LOUNGES, TOILETS & SHOWERS
LT LIGHT
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MCS MASTER CONSTRUCTION SPECIFICATIONS
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOHS MOH’S CHEMOSURGERY
MTD MOUNTED
MTL METAL
N NORTH
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NOM NOMINAL
NSF NET SQUARE FEET
NSM NET SQUARE METERS
NTS NOT TO SCALE
O TO O OUT TO OUT
OC ON CENTER
OD OUTSIDE DIAMETER
OOCFM OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT
OPNG OPENING
OPP OPPOSITE
OSD OPEN SITE DRAIN
OVHD OVERHEAD
PCP PORTLAND CEMENT PLASTER
PEB PRE-ENGINEERED BUILDING
PERIM PERIMETER
PG PROGRAM GUIDE
PH PHASE
PJF PREFORMED JOINT FILLER
PL PLASTER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PREP PREPARATION
PSIG POUNDS PER SQUARE INCH GAUGE
PT PRESSURE TREATED
PTD PAINTED
PWR POWER
QT QUARRY TILE
RAD RADIUS
RB RESILIENT BASE
RD ROOF DRAIN
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
RO ROUGH OPENING
RSF RESILIENT SHEET FLOORING
S SOUTH
SB SPLASH BLOCK
SC SPECIAL COATING (HIGH BUILD GLAZED COATING)
SD STANDARD DETAIL
SF SQUARE FEET, SQUARE FOOT
SIM SIMILAR
SOPC SATELLITE OUTPATIENT CLINIC
SPD SUPPLY, PROCESSING AND DISTRIBUTION
SPEC SPECIFICATIONS
SQ SQUARE
SRC SEMI-RESTRICTED CORRIDOR
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TELEC TELECOMMUNICATIONS
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UC URGENT CARE
UFAS UNIFORM FEDERAL ACCESSIBILITY STANDARDS
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
V VOLTS
VA DEPARTMENT OF VETERAN AFFAIRS
VACO VETERANS AFFAIRS CENTRAL OFFICE
VAMC VETERANS AFFAIRS MEDICAL CENTER
VC VA FURNISHED CONTRACTOR INSTALLED
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VHA VETERANS HEALTH ADMINISTRATION
VIF VERIFY IN FIELD
VV VA FURNISHED VA INSTALLED
W WATTS
W WEST
W/ WITH
W/M2 WATTS PER SQUARE METER
W/O WITHOUT
W/SF WATTS PER SQUARE FOOT
W/SM WATTS PER SQUARE METER
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WSF WELDED SEAMLESS FLOORING
WT WEIGHT
WWF WELDED WIRE FABRIC
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:4
A
M
AG001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
GENERAL SYMBOL LEGEND
AMBULATORY CARE (HOSPITAL BASED) ABBREVIATIONS
DocuSign Envelope ID: 1A85FB22-BE7E-4582-928E-4ED6BB7369B6
3/14/2019
STEEL STUDS - SEE WALL
SCHEDULE FOR SIZE AND
HEIGHT
GYP WALL BD - SEE WALL
SCHEDULE FOR QUANTITY,
SIZE, AND TYPE
SEALANT
WALL CONTROL JOINT
SCALE: 3"=1'-0"
VERTICAL CONTROL
JOINT AT 30' O.C. MAX.
UNLESS NOTED
OTHERWISE
INSTALL CONTROL JOINTS AT
GYPSUM BOARD WALLS AND
SOFFITS
16 SQ. INCH MAX AT EACH
OPENING.
RATED GYP WALL BD
ADJACENT ELECTRICAL BOXES - RATED WALLS
SCALE: NTS
SEAL BOXES TIGHT WITH
JOINT COMPOUND
2 FEET MIN.
*MAXIMUM OPENING PER 100 SQ.
FT. IS LIMITED TO 100 SQ.
INCHES*
DATA /
ELEC
BOX
DATA /
ELEC
BOX
*FIRESTOP ALL
PENETRATIONS
WALL PRIORITY PLAN & LEGEND
SCALE: 1-1/2"=1'-0"
2- H
R R
A T
E D
W A
LL
NON-RATED
WALL
RATED WALL
N O
N -R
A T
E D
W
A
LL
1-HR RATED
WALL
2-HR RATED
WALL
1-HR RATED
WALL
ONE (1)
LAYER OF
GYP. BD. AT
1-HR RATED
WALL
HOLLOW METAL FRAME
JAMB STUDS AS
REQUIRED
HIGHER PRIORITY WALL
METAL STUDS AS
PRESCRIBED IN WALL
SCHEDULE
2" M
A X
2" MAX.
CEILING
STEEL STUDS (3 5/8")
UNDERSIDE OF STRUCTURE
GYP WALL BD (5/8")
FLOOR SLAB
SEALANT
*SEAL ALL
PENETRATIONS WITH
SEALANT
CHASE
SCALE: 1-1/2"=1'-0"
ANGLE BRACING TO
STRUCTURE @ 4' O.C
WHERE STUDS ARE
BLOCKED FROM
EXTENDING TO
STRUCTURE.
2.0CH SIMILAR
WITH 2 1/2" STUDS
4.0CH SIMILAR
WITH 4" STUDS
1.0CH SIMILAR
WITH 1 5/8" STUDS
BASE AS SCHEDULED
EXTEND
STUDS TO
STRUCTURE
AND SECURE
STEEL STUDS (3 5/8")
F
IE
L D
V E
R
IF
Y
SCREWS AS REQ'D
BOXED HEADER DETAIL
SCALE: NTS
BOXED HEADER,
SIZE AND GAGE AS
REQ'D
INSERT INSULATION
INTO BOX WHEN
LOCATED ON EXTERIOR
WALL - R VALUE OF
INSULATION TO MATCH
ADJACENT WALL
TRACK PIECE, SIZE
AND GAGE AS
REQ'D. SCREW TO
JAMB AND LINTEL
AS REQ'D
SCREWS AS REQ'D
JAMB, SIZE AND
GAGE AS REQ'D
SUPPORT CLIP W/
SCREWS AS REQ'D
STEEL STUDS - SEE
WALL SCHEDULE
FOR SIZE AND
HEIGHT
GYP WALL BD - SEE
WALL SCHEDULE FOR
QUANTITY, SIZE, AND
TYPE
ACOUSTICAL SEALANT
TYP @ ALL FLOOR
TRACKS.
FLOOR TRACK DETAIL
SCALE: 3"=1'-0"
WALL TILE BASE DETAIL
SCALE: 3"=1'-0"
GYP WALL BD - SEE
WALL SCHEDULE FOR
QUANTITY, SIZE, AND
TYPE
INTEGRAL COVE
BASE
PORCELAIN WALL
TILE
3 5/8" METAL STUD
FRAMING (UNO)
6.0 SIMILAR
WITH 6" STUDS
FLOOR SLAB
FIRE SEALANT
STEEL STUDS (3
5/8") @ 16" ON
CENTER
FIRE RATED GYP
WALL
BD (5/8")
CEILING
*FIRESTOP ALL
PENETRATIONS
4.1 SIMILAR
WITH 4" STUDS
6.1 SIMILAR
WITH 6" STUDS
GLASS FIBER OR
MINERAL WOOL
INSULATION
FIRE SEALANT
FIRE RATED GYP
WALL
BD (5/8")
UNDERSIDE OF FLOOR OR
ROOF ASSEMBLY PER U.L.
DESIGN NUMBER
BASE AS SCHEDULED
EXTEND STUDS
TO STRUCTURE
AND SECURE
ALL PENETRATIONS AND
OPENINGS SHALL HAVE
SMOKE PROOF SEALANT
ALL FIRE DAMPERS
SHALL BE SMOKE
RESISTANT TYPE.
1-HR - SMOKE BARRIER
SCALE: 1-1/2"=1'-0"
PRIORITY 1 - TWO HOUR FIRE AND SMOKE WALL
PRIORITY 2 - TWO HOUR FIRE OR SHAFT WALL
PRIORITY 3 - ONE HOUR FIRE AND SMOKE WALL
PRIORITY 4 - ONE HOUR FIRE WALL
PROVIDE IDENTIFICATION OF ALL FIRE RATED AND/OR SMOKE
PARTITIONS AT NOT MORE THAN 10'-0" ON CENTER ABOVE
CEILINGS WITH 3" HIGH STENCILED BLOCK LETTERING AS
FOLLOWS: "1 HOUR FIRE", "1 HOUR FIRE/SMOKE", "2 HOUR
FIRE", "2 HOUR FIRE/SMOKE", "2 HOUR SHAFT", ETC.
PRIORITY 5 - NON-RATED WALL
A. ALL MECHANICAL SHAFTS SHALL BE FIRE RATED
CONSTRUCTION. AS SHOWN ON PLAN
B. REFER TO FLOOR PLANS SHEET FOR FIRE RATED
AND SMOKE PARTITION LOCATIONS. ALL FIRE &
SMOKE PARTITIONS SHALL EXTEND FROM FLOOR
SLAB TO THE UNDERSIDE OF STRUCTURE - DECK
ABOVE. ALL PENETRATIONS SHALL BE SEALED AND
PROTECTED WITH FIRE RATED SEALANT TO MAINTAIN
THE INTEGRITY OF THE PARTITION.
C. PARTITION INSTALLATION SHALL CONFORM TO
APPLICABLE CODE REQUIREMENTS.
D. WHERE PARTITIONS OF DIFFERENT FIRE RATING
INTERSECT, PARTITION WITH THE HIGHEST PRIORITY
SHALL BE CONTINUOUS PER FOLLOWING PRIORITY
LIST:
E. EXTEND FIRE RATED WALL CONSTRUCTION BEHIND
RECESSED OR BUILT-IN EQUIPMENT SUCH AS FIRE
EXTINGUISHER CABINETS (FEC), ELECTRICAL WATER
COOLERS (EWC), ELECTRIC PANELS, ETC.
F. STAGGER GYPSUM BOARD JOINTS VERTICALLY AND
HORIZONTALLY A MINIMUM OF 16" EACH SIDE OF
PARTITION AT ALL PARTITIONS.
G. PROVIDE TYPE 'X' WATER RESISTANT GYPSUM WALL
BOARD, ON ALL SURFACES, IN ALL TOILETS,
BREAKROOM. PROVIDE TYPE 'X' TILE BACKERBOARD
ON ANY PARTITION SCHEDULED TO BE FINISHED
WITH TILE WORK.
H. PROVIDE ANY STIFFENERS, BRACING, BACK-UP
PLATES AND SUPPORTING BRACKETS REQUIRED FOR
THE INSTALLATION OF ALL FLOOR MOUNTED OR
SUSPENDED MECHANICAL, OR ELECTRICAL
EQUIPMENT.
I. ALL VERTICAL PIPING AND COLUMNS EXPOSED IN
ROOMS SHALL BE FURRED WITH METAL STUDS AND
GWB AND FINISHED TO MATCH ADJACENT WALLS,
U.N.O. EXCEPTIONS: ELEC. CLOSETS, TEL. CLOSETS &
MECH. CLOSETS.
J. WHERE HVAC OR OTHER MECHANICAL, ELECTRICAL
AND PLUMBING ITEMS PENETRATE PARTITIONS,
STUDS SHALL BE BRACED AND FRAMED TO
STRUCTURE AS REQUIRED TO PROVIDE ADEQUATE
SUPPORT. ALL PENETRATIONS THROUGH RATED
WALLS SHALL BE SEALED TO PROVIDE FIRE, SMOKE,
AND/OR ACOUSTICAL ISOLATION OF SPACES WITH
APPROVED FIRE STOP MATERIAL.
K. COORDINATE METAL STUD GAUGE WITH PRE-
APPROVED EQUIPMENT ANCHORAGE. WHERE
DISCREPANCY OCCURS, THE MORE STRINGENT
REQUIREMENT SHALL GOVERN.
L. PROVIDE FIRE SAFING INSULATION AS REQUIRED TO
MAINTAIN THE INTEGRITY OF FIRE RATED
PARTITIONS.
M. PROVIDE REQUIRED FRAMES AND BRACING AROUND
WALL PENETRATIONS.
N. PROVIDE CONTINUOUS ACOUSTICAL SEALANT AT
BOTTOM OF ALL PARTITIONS.
O. SEE WALL TYPES AND FLOOR PLANS FOR SOUND
ATTENUATION BLANKETS LOCATION.
P. THERE SHALL BE NO BACK-TO-BACK ELECTRICAL,
TELEPHONE, OR OTHER OUTLETS, EXCEPT WHERE
SPECIFICALLY SHOWN.
Q. WHERE COLUMN FURRING STUDS EXCEED THE
MANUFACTURER'S RECOMMENDED LIMITING
HEIGHTS, STUDS SHALL BE BRACED BACK TO THE
STRUCTURE AS REQUIRED.
R. METAL STUD SCHEDULE:
UNLESS NOTED OTHERWISE, STRUCTURAL
PROPERTIES LISTED BELOW ARE BASED ON STEEL
STUDS C-SHAPE STUDS AND SHALL HAVE MINIMUM
1-1/4" FLANGE WITH 1/4" RETURN LIPS ON EACH SIDE.
S. ALL STUDS IN THE EMERGENCY DEPARTMENT SHALL
BE 4" 20 GAUGE.
GAUGE
SHAPE/TYPE
C-SHAPE
WIDTH
INTERIOR
MIN. THICKNESS
0.0147"
0.0195"
0.0209"
2-1/2 inch
2-1/2 inch
C-H-SHAPE
C-SHAPE
C-SHAPE
C-SHAPE
1-5/8 inch
3-5/8 inch
4 inch 20 0.0209"C-SHAPE6 inch 20C-SHAPE8 inch
0.0195" 0.0195"
0.0209"
DECK INFILL
SCALE: 1-1/2"=1'-0"
EXISTING HOLE
Ø OF
INTERSTITIAL DECK
EXISTING CONCRETE SLAB
OVER 16"X16" MTL. DECK PATCH
NEW CONCRETE INFILL
INTERSTITIAL DECK
EXISTING CONCRETE SLAB
16"X16" MTL. DECK
PATCH OVER XISTING
DUCT HOLE
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:5
A
M
AG002
WALL PARTITION SCHEDULE
2 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
A
AA
CJ
CJCJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
EJ
EJ
FD
FD
FD
CSWK 9CSWK 9
GP17
TB(3)
TB(22)
HEATING STRIP
FEC
W A
LL
A
AA
21 20.5 20 1515.816171819
E
G
H
I
J
G.3
F.8
F.5
E.8
E.5
64 SF
SOILED
1A-804
121 SF
PSYCH EXAM
1A-796
56 SF
ANTE ROOM
1A-795
116 SF
ISOL (NEG)
EXAM 22
1A-794
81 SF
WHEELCHAIR
SHOWER
1A-808
72 SF
EQUIPMENT
STORAGE
1A-773
39 SF
TLT
1A-768A
99 SF
EXAM 3
1A-768
97 SF
EXAM 4
1A-767
97 SF
EXAM 5
1A-766
50 SF
PAT. TLT
1A-786
42 SF
TOILET
ROOM
1A-793
42 SF
TOILET
ROOM
1A-792
123 SF
ISOL (POS)
EXAM 21
1A-791
50 SF
ANTE
1A-790A
161 SF
LINEN/OXYGEN
1A-772A
Redundant Room
WORK RM
1A-772
90 SF
TRIAGE
1A-761
94 SF
TRIAGE
1A-762
83 SF
TRIAGE
1A-763
60 SF
TRIAGE
1A-759
64 SF
TRIAGE
1A-758
113 SF
TRANSFER
COORDINATORS
1A-802
113 SF
BED
CONTROL
1A-802A
215 SF
VISC ESCORT
1A-800
133 SF
CLERK
WORKROOM
1A-704
165 SF
VIC
1A-705
112 SF
OFFICE
1A-706
112 SF
MEAN'S
TEST.
1A-707
107 SF
MEAN'S
TEST.
1A-708
136 SF
SOC.
WORKER
1A-742
106 SF
OFFICE
1A-743
52 SF
TLT
1A-745
183 SF
MED. DIR
1A-751
103 SF
OFFICE
1A-200E
155 SF
WALK-IN
VESTIBULE
C1A-754
202 SF
POLICE
1A-756
158 SF
AMBULANCE
VESTIBULE
C1A-811
527 SF
ASSISTED
CARE
1A-812
121 SF
MEDS
1A-814
271 SF
CORRIDOR
C1A-810
220 SF
RECEPTION
1A-757
90 SF
CORRIDOR
C1A-764
97 SF
CORRIDOR
C1A-764A
75 SF
TRIAGE
WORK
1A-760
179 SF
CARE
STATION
1A-799
305 SF
REGISTRATION
CLERK
1A-709
86 SF
CORRIDOR
1A-741A
108 SF
CORRIDOR
1A-741B
64 SF
Room 1A-741C
47 SF
STOR. RM
1A-744
372 SF
CORRIDOR
C1A-774
325 SF
STRETCHER
C1A-809
909 SF
ER/URGENT
CARE
WAITING
C1A-703
123 SF
EXAM 24
C1A-795
134 SF
RESUS 25
1A-805
131 SF
RESUS 26
1A-807
Redundant Room
NURSE
CONTROL
C1A-716
409 SF
Care Station 1A-798
442 SF
CORRIDOR
C1A-718
300 SF
CORRIDOR
C1A-719
407 SF
CORRIDOR
C1A-720
305 SF
CORRIDOR
C1A-721 162 SF
Care Station 1A-797
76 SF
EXAM 10
1A-801
74 SF
EXAM 9
1A-803
76 SF
EXAM 8
1A-806
76 SF
EXAM 7
1A-777
80 SF
EXAM 18
1A-790
80 SF
EXAM 17
1A-809
80 SF
EXAM 16
1A-810
73 SF
EXAM 15
1A-811
69 SF
ADMISSIONS
CLERK
1A-775
77 SF
EXAM 11
1A-813
77 SF
EXAM 12
1A-815
77 SF
EXAM 13
1A-816
74 SF
EXAM 14
1A-785
LIMITS OF WORK
01 0103
18.9
ELEVATOR
CHASE
MED.
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:1
A
M
AD101
FIRST FLOOR DEMOLITION PLAN
3 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
01 REMOVE PARTITIONS AS INDICATED ON CONTRACT
DOCUMENTS TO WHERE INDICATED.
02 REMOVE DOOR AND FRAME. TYPICAL UNLESS NOTED
OTHERWISE.
03 REMOVE CASEWORK AND OTHER FIXTURES.
04 MODULAR FURNITURE TO BE DISASSEMBLED AND
PROVIDED TO THE VA FOR FUTURE USE.
05 REMOVE GLASS BLOCK PARTITION.
06 ELEVATOR LOBBY TO REMAIN OPERATIONAL
THROUGHOUT CONSTRUCTION OF PHASE I WORK.
CONTRACTOR SHALL COORDINATE COMPLETION OF
FINISHES IN THE ELEVATOR LOBBY WITH THE C.O.R.
ONCE PHASE 1A WORK IN COMPLETED.
07 REMOVE EXPANSION JOINT COVERS
08 REMOVE CEILINGS AND CEILING MOUNTED FIXTURES
AS INDICATED AND PREPARE FOR NEW WORK. PATCH
ADJACENT SURFACES AS REQUIRED.
09 REMOVE ALL LIGHT FIXTURES AND CONDUIT BACK TO
JUNCTION BOXES, SEE ELECTRICAL DRAWINGS
10 REMOVE ALL DIFFUSERS, GRILL AND CEILING ACCESS
PANELS
11 REMOVE CEILING TILE, GRIDS, WALL TRIM, LIGHT
FIXTURES, DIFFUSERS AND SENSORS IN THE AREA.
SALVAGE AND REUSE IN AREA, TO MATCH EXISTING,
AFTER COMPLETION OF NEW WORK.
12 EXISTING CEILING TO REMAIN.
13 CONFIGURATION/LOCATION OF WALLS TO BE
COORDINATED IN ADVANCE WITH COR AND SAFETY.
ZIPPER WALL TO MAINTAIN EXIT REQUIREMENTS ON
REST OF FLOORS. EXTEND BARRIER TO UNDERSIDE
OF DECK IF ABOVE CEILING WORK IN INVOLVED.
14 STICKY MAT AT ENTRY OF CONSTRUCTION ACCESS
POINT.
15 PORTABLE DUST EXTRACTOR AND AIR SCRUBBER
WITH HEPA FILTRATION SYSTEM.
16 REFER TO INFECTION CONTROL RISK ASSESSMENT
ON SHEET G-103
17 SECURE DOOR / OPENING DURING CONSTRUCTION
18 PROVIDE TEMPORARY PARTITION BARRIER.
0 4 8 16 N O R
TH
TRUE
A. CONTRACTOR TO PROTECT WORK TO REMAIN
FROM DAMAGE DURING DEMOLITION.
B. REMOVE WALLS / PARTITIONS COMPLETELY FROM
FLOOR TO STRUCTURE DECK ABOVE.
C. ALL CONSTRUCTION DEBRIS IS TO BE REMOVED
FROM SITE EACH DAY AND DEPOSED OF PROPERLY
PER CONTRACT REQUIREMENTS.
D. CONTRACTOR TO PROVIDE PROTECTIVE BARRIERS,
WARNING SIGNS AND TEMPORARY PATHWAYS IN
AREAS THAT WILL BE OPERATING DURING THE
CONSTRUCTION PHASE.
E. PROVIDE DUST AND DEBRIS BARRIER IN
ACCORDANCE WITH ICRA REQUIREMENT.
F. CONTRACTOR TO PATCH ANY WORK TO REMAIN
THAT WAS DAMAGED DURING DEMOLITION TO
MATCH EXISTING REMAINING.
G. COORDINATE WITH COR FOR SALVAGE AND
RETURN FOR REUSE OF DOORS, HARDWARE,
FRAMES AND CASEWORK AS REQUIRED.
H. REMOVE SUPPORTS AND BRACKET THAT SECURE
PARTITION FRAMING, CEILING COMPONETS AND
CEILING MOUNTED EQUIPMENT OF ALL WORK TO
BE DEMOLISHED. ENSURE TO NOT DAMAGE ANY
STRUCTURE ELEMENTS OR DECK.
I. CONTRACTOR TO ENSURE TO NOT DAMAGE RATED
SHAFT WALLS OR FIRE / SMOKE RATED PARTITIONS.
ANY RATED WALLS DAMAGED DURING
CONSTRUCTION ARE TO BE REPAIRD PRE RATED
PARTITION REQUIREMENTS.
J. VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING WORK. NOTIFY THE COR OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH
DEMOLITION.
K. DASH AND HATCHED PATTERN REPRESENTS
DEMOLITION WORK.
L. REFER TO MECHANICAL, ELECTRICAL,
COMMUNICATION AND PLUMBING DOCUMENTS
FOR RESPECTIVE DEMOLITION AND NEW WORK
INFORMATION.
M. ALL DEMOLITION WORK SHALL BE PERFORMED
WITH "DUE CARE AND DILIGENCE" IN ORDER TO
PREVENT ARBITRARY DAMAGE OR
INTERRUPTION OF SERVICE OR CONCEALED
UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OF CONDITIONS
LOCATED DIFFERENTLY FROM THAT INDICATED
OF THAT ARE NOT IDENTIFIED SHALL BE REPORTED
TO THE COR.
N. PATCH AND FRAME FIRE PROOFING ON PURLINS AS
REQUIRED IN AREAS WHERE EXISTING WALLS WERE
REMOVED.
# SHEET KEY NOTES:
20.5 20 1515.816171819
G
H
I
J
G.3
F.8
F.5
E.8
E.5
LIMITS OF WORK
18.9
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:4
A
M
AD121
FIRST FLOOR DEMOLITION CEILING
PLAN
4 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION CEILING PLAN
01 REMOVE PARTITIONS AS INDICATED ON CONTRACT
DOCUMENTS TO WHERE INDICATED.
02 REMOVE DOOR AND FRAME. TYPICAL UNLESS NOTED
OTHERWISE.
03 REMOVE CASEWORK AND OTHER FIXTURES.
04 MODULAR FURNITURE TO BE DISASSEMBLED AND
PROVIDED TO THE VA FOR FUTURE USE.
05 REMOVE GLASS BLOCK PARTITION.
06 ELEVATOR LOBBY TO REMAIN OPERATIONAL
THROUGHOUT CONSTRUCTION OF PHASE I WORK.
CONTRACTOR SHALL COORDINATE COMPLETION OF
FINISHES IN THE ELEVATOR LOBBY WITH THE C.O.R.
ONCE PHASE 1A WORK IN COMPLETED.
07 REMOVE EXPANSION JOINT COVERS
08 REMOVE CEILINGS AND CEILING MOUNTED FIXTURES
AS INDICATED AND PREPARE FOR NEW WORK. PATCH
ADJACENT SURFACES AS REQUIRED.
09 REMOVE ALL LIGHT FIXTURES AND CONDUIT BACK TO
JUNCTION BOXES, SEE ELECTRICAL DRAWINGS
10 REMOVE ALL DIFFUSERS, GRILL AND CEILING ACCESS
PANELS
11 REMOVE CEILING TILE, GRIDS, WALL TRIM, LIGHT
FIXTURES, DIFFUSERS AND SENSORS IN THE AREA.
SALVAGE AND REUSE IN AREA, TO MATCH EXISTING,
AFTER COMPLETION OF NEW WORK.
12 EXISTING CEILING TO REMAIN.
13 CONFIGURATION/LOCATION OF WALLS TO BE
COORDINATED IN ADVANCE WITH COR AND SAFETY.
ZIPPER WALL TO MAINTAIN EXIT REQUIREMENTS ON
REST OF FLOORS. EXTEND BARRIER TO UNDERSIDE
OF DECK IF ABOVE CEILING WORK IN INVOLVED.
14 STICKY MAT AT ENTRY OF CONSTRUCTION ACCESS
POINT.
15 PORTABLE DUST EXTRACTOR AND AIR SCRUBBER
WITH HEPA FILTRATION SYSTEM.
16 REFER TO INFECTION CONTROL RISK ASSESSMENT
ON SHEET G-103
17 SECURE DOOR / OPENING DURING CONSTRUCTION
18 PROVIDE TEMPORARY PARTITION BARRIER.
0 4 8 16 N O R
TH
TRUE
A. CONTRACTOR TO PROTECT WORK TO REMAIN
FROM DAMAGE DURING DEMOLITION.
B. REMOVE WALLS / PARTITIONS COMPLETELY
FROM FLOOR TO STRUCTURE DECK ABOVE.
C. ALL CONSTRUCTION DEBRIS IS TO BE REMOVED
FROM SITE EACH DAY AND DEPOSED OF
PROPERLY PER CONTRACT REQUIREMENTS.
D. CONTRACTOR TO PROVIDE PROTECTIVE
BARRIERS, WARNING SIGNS AND TEMPORARY
PATHWAYS IN AREAS THAT WILL BE OPERATING
DURING THE CONSTRUCTION PHASE.
E. PROVIDE DUST AND DEBRIS BARRIER IN
ACCORDANCE WITH ICRA REQUIREMENT, SEE
SHEET G-103 FOR ALL AREAS WHILE UNDER
CONSTRUCTION.
F. CONTRACTOR TO PATCH ANY WORK TO REMAIN
THAT WAS DAMAGED DURING DEMOLITION TO
MATCH EXISTING REMAINING.
G. COORDINATE WITH COR FOR SALVAGE AND
RETURN FOR REUSE OF DOORS, HARDWARE,
FRAMES AND CASEWORK AS REQUIRED.
H. REMOVE SUPPORTS AND BRACKET THAT
SECURE PARTITION FRAMING, CEILING
COMPONETS AND CEILING MOUNTED
EQUIPMENT OF ALL WORK TO BE DEMOLISHED.
ENSURE TO NOT DAMAGE ANY STRUCTURE
ELEMENTS OR DECK.
I. CONTRACTOR TO ENSURE TO NOT DAMAGE
RATED SHAFT WALLS OR FIRE / SMOKE RATED
PARTITIONS. ANY RATED WALLS DAMAGED
DURING CONSTRUCTION ARE TO BE REPAIRD
PRE RATED PARTITION REQUIREMENTS.
CJ
CJCJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
EJ
EJ
FD
CSWK 9CSWK 9
GP17
TB(3)
TB(22)
HEATING STRIP
FEC
W A
LL
20.5 20 1515.816171819
E
G
H
I
J
G.3
F.8
F.5
E.8
E.5
64 SF
SOILED
1A-804
121 SF
PSYCH EXAM
1A-796
56 SF
ANTE ROOM
1A-795
116 SF
ISOL (NEG)
EXAM 22
1A-794
81 SF
WHEELCHAIR
SHOWER
1A-808
72 SF
EQUIPMENT
STORAGE
1A-773
39 SF
TLT
1A-768A
99 SF
EXAM 3
1A-768
97 SF
EXAM 4
1A-767
97 SF
EXAM 5
1A-766
50 SF
PAT. TLT
1A-786
42 SF
TOILET
ROOM
1A-793
42 SF
TOILET
ROOM
1A-792
123 SF
ISOL (POS)
EXAM 21
1A-791
50 SF
ANTE
1A-790A
Redundant Room
WORK RM
1A-772
90 SF
TRIAGE
1A-761
94 SF
TRIAGE
1A-762
83 SF
TRIAGE
1A-763
60 SF
TRIAGE
1A-759
64 SF
TRIAGE
1A-758
113 SF
TRANSFER
COORDINATORS
1A-802
113 SF
BED
CONTROL
1A-802A
215 SF
VISC ESCORT
1A-800
133 SF
CLERK
WORKROOM
1A-704
165 SF
VIC
1A-705
112 SF
OFFICE
1A-706
112 SF
MEAN'S
TEST.
1A-707
107 SF
MEAN'S
TEST.
1A-708
136 SF
SOC.
WORKER
1A-742
106 SF
OFFICE
1A-743
52 SF
TLT
1A-745
183 SF
MED. DIR
1A-751
110 SF
ADMIN. ASST.
1A-750
123 SF
NURSE
1A-749
120 SF
CODER
OFFICE
1A-748 202 SF
CONF ROOM
1A-746
153 SF
BED
CONTROL
1A-711
119 SF
BED
CONTROL
1A-710
103 SF
OFFICE
1A-200E
155 SF
WALK-IN
VESTIBULE
C1A-754
202 SF
POLICE
1A-756
158 SF
AMBULANCE
VESTIBULE
C1A-811
527 SF
ASSISTED
CARE
1A-812
121 SF
MEDS
1A-814
271 SF
CORRIDOR
C1A-810
220 SF
RECEPTION
1A-757
90 SF
CORRIDOR
C1A-764
97 SF
CORRIDOR
C1A-764A
75 SF
TRIAGE
WORK
1A-760
179 SF
CARE
STATION
1A-799
305 SF
REGISTRATION
CLERK
1A-709
86 SF
CORRIDOR
1A-741A
108 SF
CORRIDOR
1A-741B
64 SF
Room 1A-741C
53 SF
COPY
1A-747
47 SF
STOR. RM
1A-744
372 SF
CORRIDOR
C1A-774
325 SF
STRETCHER
C1A-809
909 SF
ER/URGENT
CARE
WAITING
C1A-703
103 SF
INTERVIEW
1A-765
194 SF
CLEAN
1A-734
129 SF
EXAM 11
1A-733
129 SF
EXAM 12
1A-732
51 SF
TOILET
1A-764B
58 SF
BARIATRIC
TOILET
1A-764C
107 SF
SOILED
1A-739
146 SF
EXAM 7
1A-738
146 SF
EXAM 8
1A-737
146 SF
EXAM 9
1A-736
148 SF
EXAM 10
1A-735
135 SF
EXAM 6
1A-728
141 SF
EXAM 5
1A-727
141 SF
EXAM 4
1A-726
106 SF
EQUIPMENT
1A-740
132 SF
EXAM 3
1A-722
337 SF
CARE
STATION
1A-729
109 SF
MEDICATION
ROOM
1A-731
78 SF
ALC
1A-721
61 SF
NOURISHMENT
1A-740A
123 SF
EXAM 24
C1A-795
134 SF
RESUS 25
1A-805
52 SF
STAFF
TOILET
1A-764A
109 SF
EQUIPMENT
1A-725
131 SF
RESUS 26
1A-807
131 SF
STAFF WORK
1A-730
81 SF
ALCOVE
1A-734A
546 SF
CORRIDOR
C1A-712
426 SF
CORRIDOR
C1A-711
250 SF
CORRIDOR
C1A-715
402 SF
CORRIDOR
C1A-714
197 SF
CORRIDOR
C1A-713
EXISTIN
G
EXPAN
SIO
N
JO
IN
T
E X
IS
T
IN
G
X P
A N
S
IO
N
J O
IN
T
FEC
FEC
FEC
FEC
FEC
FEC
CR
CR
CR
CR
CR
CR
CR
CR
CR
PP
PP
PP
Care Station 1A-798
CORRIDOR
C1A-718
CORRIDOR
C1A-719
Care Station 1A-797
305 SF
CORRIDOR
C1A-721
407 SF
CORRIDOR
C1A-720
76 SF
EXAM 10
1A-801
74 SF
EXAM 9
1A-803
76 SF
EXAM 8
1A-806
76 SF
EXAM 7
1A-777
80 SF
EXAM 18
1A-790
80 SF
EXAM 17
1A-809
80 SF
EXAM 16
1A-810
73 SF
EXAM 15
1A-811
69 SF
ADMISSIONS
CLERK
1A-775
77 SF
EXAM 11
1A-813
77 SF
EXAM 12
1A-815
77 SF
EXAM 13
1A-816
74 SF
EXAM 14
1A-785
62 SF
BARIATRIC
TOILET
1A-753
52 SF
TOILET
1A-754
52 SF
TOILET
1A-755
AE301
AE301
AE401
AE403
AE401
AE411
AE411
AE501
AE501
AE501
AE501
AE501
AE501
AE501
139 SF
EXAM 2
1A-723
142 SF
EXAM 1
1A-724
Redundant Room
NURSE
CONTROL
C1A-716
AE401
AE401
7'
- 9
1/ 2"
8 1 /2"
8'
- 0
3' - 1 1/2"
11' - 2 1/2"
1'
- 3
7'
- 9
1/ 2"
6'
- 4
1/ 2"
1'
- 3
6'
- 4
1/ 2"
8"
8'
- 5
1/
2"
8' - 9 1/2"
7' - 10 1/2"
9' - 8"
13' - 9 1/2"
7' - 10"
8' - 1 1/2"
15' - 2"
14' - 10 1/2"
5' - 5 1/2"
6' - 9"
1' - 3"
7' - 1"
5' - 1"
3'
- 2
3'
- 0
5'
- 6
1/ 2"
0"
1 1 /2"
1/
2"
8' - 1 1/2"
10' - 7"
10' - 3 1/2"
10' - 2 1/2"
1/
2"
7"
7 1 /2"
7 1 /2"
1/
2"
A-4
A-5A-5
A-4
EXISITING
PARTITION
A-4A-4
A-4
A-3
AE401
AE401
AE401
1A-793
1A-804
1A -7
1A-790
AE702
LIMITS OF WORK
AE403
18.9
CHASE
ELEVATOR
1A -7
C
1A-731
1A -7
B
1A-739
C 1A
-7
-2
1A -7
1A -7
1A-735
1A-736
1A-737
1A-738
1A -7
1A -7
C 1A
-7
-1
1A -7
-2
C 1A-711
1A -7
-1
1A -7
A
1A-734
1A-725
C A
-7
1A -8
1A-755
1A-754
1A-753
C 1A
-7
1A-724
1A-723
1A-722
1A-740
1A -7
MECHANICAL
1A-764
AE403
6 1 /2"
6 1 /2"
8'
- 8
4'
- 1
1 1 /2"
2'
- 1
1"
3'
- 6
5'
- 0
3'
- 6
8'
- 0
2'
- 7
6 1 /2"
12' - 7 1/2"
3' - 0"
11' - 6"
8' - 6"
8' - 0"
4' - 11 1/2"
3' - 9"
18' - 3 1/2"
7' - 10 1/2"
5' - 8"
3' - 8"
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:5
A
M
AE101
FIRST FLOOR PLAN
5 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN
01 PROVIDE FIRE RATED EXPANSION JOINT ASSEMBLY
IN WALLS WITH SAME RATED CLASSIFICATION.
02 WALLS TO BE UPGRADED TO 1-HOUR FIRE BARRIER
CONSTRUCTION.
03 PATCH, PREPARE AND PAINT PORTION OF WALL.
MATCH WALL TO EXISTING FINISHES.
04 EXISTING ACT TO REMAIN.
05 SALVAGE ACT TO BE REINSTALLED AFTER
CONSTRUCTION, MATCH EXISTING PHASE I,
REINSTALL SALVAGED ACT FROM EXISTING ACT
REMAINING TO NEW WALLS AROUND EMERGENCY
DEPARTMENT AS INDICATED.
06 NEW GYPSUM BOARD SOFFIT ABOVE NURSES
STATION.
07 NEW ACT CEILING IN EMERGENCY DEPARTMENT AS
INDICATED.
A. REFER TO SHEET AE601 FOR ADDITIONAL DOOR
SCHEDULE, ELEVATION AND DETAILS.
B. ALL NEW PARTITION TYPES ARE TYPE A-1 U.N.O.
UNLESS OTHERWISE NOTED. REFER TO SHEET
AE502 FOR ADDITIONAL PARTITION DETAILS.
C. REFER TO DRAWINGS GC102 AND GC103 FOR
CONSTRUCTION PHASE SEQUENCING.
D. ALL WALL TYPES ARE A-1 UNLESS OTHERWISE
NOTED. REFER TO SHEETS AE101 AND AE502 FOR
MORE DETAILS.
E. FURNITURE NOT IN CONTRACT, NIC.
F. REFER TO SHEET A701 AND A702 FOR FINISH
NOTES AND SCHEDULE.
G. ALL DIMENSIONS ARE FROM FACE OF STUD, OR
FACE OF EXISTING WALLS. ANY DIMENSIONS NOT
SHOWN OR DEEMED QUESTIONABLE ARE TO BE
VERIFIED BY ARCHITECT/DESIGNER. DO NOT
SCALE DRAWINGS.
H. SUPPLY CORNER GUARDS AT ALL EXPOSED
EDGES.
0 4 8 16 N O R
TH
TRUE
20.5 20 1515.816171819
G
H
I
J
G.3
F.8
F.5
E.8
E.5
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
8' - 0"
8' - 0"
8' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
7' - 6"
9' - 0"
9' - 0"
9' - 0"
9' - 0"
8' - 0"
8' - 0"
8' - 0"
9' - 0"
AE301
AE301
AE421
AE422
AE421
GC431 4
GC431
AE421
AE421
AE421
AE502
AE421
AE421
9' - 0"
LIMITS OF WORK
SOILED
1A-804
ISOL
(NEG)
EXAM 22
1A-794
TOILET
ROOM
1A-792
ISOL
(POS)
EXAM 21
1A-791
ANTE
1A-790A
INTERVIEW
1A-765
CLEAN
1A-734
EXAM 11
1A-733
EXAM 12
1A-732
TOILET
1A-764B
BARIATRIC
TOILET
1A-764C
SOILED
1A-739
EXAM 7
1A-738
EXAM 8
1A-737
EXAM 9
1A-736
EXAM 10
1A-735
EXAM 6
1A-728
EXAM 5
1A-727
EXAM 4
1A-726
EQUIPMENT
1A-740
EXAM 3
1A-722
EXAM 2
1A-723
EXAM 1
1A-724
CARE
STATION
1A-729
MEDICATION
ROOM
1A-731
ALC
1A-721
NOURISHMENT
1A-740A
RESUS
1A-805
STAFF
TOILET
1A-764A
EQUIPMENT
1A-725
RESUS
1A-807
STAFF
WORK
1A-730
ALCOVE
1A-734A
CORRIDOR
C1A-711
CORRIDOR
C1A-712
CORRIDOR
C1A-713
CORRIDOR
C1A-714
CORRIDOR
C1A-715
BARIATRIC
TOILET
1A-753
TOILET
1A-755
TOILET
1A-754
MECHANICAL
1A-764
9' - 0"
AE422
18.9
04 04
07 07
AE422
9' - 0"
9' - 0"
9' - 0"
2'x4' Acoustical Tile
Access Panel
Lay-in Light
EXP
M M M
MB
Indirect Lay-in Light
Dome Mirror
2'x2' Acoustical Tile
Gypsum Board Ceiling
Specialty Acoustical Ceiling Tile
Recessed Downlight
Ceiling Mounted Light
Pendant Light
Wall Mounted Light
Exit Sign
Wall Washer
Suspended Linear Light 1x4
Suspended Linear Light 2x4
Behavioral Health Dome Mirror
Strip Light
Attic Access Hatch
Supply
Return
Exhaust Air Grill
Linear Supply
Elevation Marker
Image Panel
Specialty Ceiling
Specialty Ceiling
Under Cabinet Light
Sprinkler Head
Recessed Heat Lamp
Crown Molding
CRM-1
Crown Molding
CRM-2
Exposed to Structure
Flexible Track Lighting
Track Lighting
Cubicle Curtain Track
Lift Track
Ceiling Mounted Equipment
8'-0"
Smoke Detector
Radiant Heating Panel
Spot Elevation Tag
Motion Sensor
A.F.F.
1i
1'-0"
A. ACCESS PANELS ARE NOT PERMITTED IN SOFFITS,
CHECK ALL VALVES, FIRE DAMPERS, REHEAT
BOXES, ETC. FOR ACCESS POINTS. ARRANGE FIRE
AND SMOKE DAMPER ACCESS FROM NON-
CORRIDOR SIDE
B. LIGHTS, DIFFUSERS, EXIT SIGNAGE, SPRINKLER
HEADS, AND SMOKE DETECTORS MUST BE
CENTERED IN CEILING PANELS IN WHICH THEY
OCCUR
C. COORDINATE WITH SEPARATE MECHANICAL AND
ELECTRICAL DESIGN PACKAGES FOR CEILING
MOUNTED DEVICES
D. PAINT CUT EDGES OF ACT TO MATCH CEILING TILE
WHERE EXPOSED TO VIEW
E. REVIEW CEILING LAYOUT AS SHOWN AND NOTIFY
COR OF CONFLICTS BEFORE PROCEEDING WITH
CONSTRUCTION
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:2
A
M
AE121
FIRST FLOOR REFLECTED CEILING
PLAN
6 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING PLAN
01 PROVIDE FIRE RATED EXPANSION JOINT ASSEMBLY
IN WALLS WITH SAME RATED CLASSIFICATION.
02 WALLS TO BE UPGRADED TO 1-HOUR FIRE BARRIER
CONSTRUCTION.
03 PATCH, PREPARE AND PAINT PORTION OF WALL.
MATCH WALL TO EXISTING FINISHES.
04 EXISTING ACT TO REMAIN.
05 SALVAGE ACT TO BE REINSTALLED AFTER
CONSTRUCTION, MATCH EXISTING PHASE I,
REINSTALL SALVAGED ACT FROM EXISTING ACT
REMAINING TO NEW WALLS AROUND EMERGENCY
DEPARTMENT AS INDICATED.
06 NEW GYPSUM BOARD SOFFIT ABOVE NURSES
STATION.
07 NEW ACT CEILING IN EMERGENCY DEPARTMENT AS
INDICATED.
0 4 8 16 N O R
TH
TRUE
RCP SYMBOLS
129 SF
EXAM 12
1A-732
131 SF
STAFF WORK
1A-730
141 SF
EXAM 5
1A-727
106 SF
EQUIPMENT
1A-740
250 SF
CORRIDOR
C1A-715
1ST FLOOR
0"
B.O. CLG.
9' - 0"
INTERSTITAL
10' - 2 1/2"
A
-7
C A
-7
A
-7
426 SF
CORRIDOR
C1A-711
402 SF
CORRIDOR
C1A-714
142 SF
EXAM 1
1A-724
197 SF
CORRIDOR
C1A-713
1ST FLOOR
0"
B.O. CLG.
9' - 0"
INTERSTITAL
10' - 2 1/2"
AE502
AE502
Sim
A
-7
B
A
-7
C
A
-7
AE411
Sim
4' - 9"
CRASH
RAIL
BUMPER,
TYPICAL
546 SF
CORRIDOR
C1A-712
SIGNAGE,
REFER TO
SHEETS AE801
AND AE802
ACT
RSF
MODULAR FURNITURE
EXAM ROOM BEYOND
NURSES STATION,
REFER TO AE702 FOR
MILLWORK DESK
DETAILS
E0954
M1801
C A
-7
3'
0"
1'
0"
3'
0"
1'
0"
3'
0"
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S
HANDRAIL
WALL GUARD
BUMPER GUARD
REFER TO PLAN
FOR WALL TYPES.
FINISHED FLOOR
4" RESILIENT BASE
AE301
AE301
1 1/2"
1/
2"
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:3
A
M
AE301
BUILDING SECTION
7 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/4" = 1'-0"
SECTION THROUGH EMERGENCY DEPARTMENT EAST/WEST
Scale: 1/4" = 1'-0"
SECTION THROUGH EMERGENCY DEPARTMENT NORTH/SOUTH
Scale: 3/4" = 1'-0"
HANDRAIL RAIL AND BUMPER GUARD DETAIL
Scale: 3" = 1'-0"
HANDRAIL DETAIL
A. HANDRAIL WALL GUARD COMBINATION IS TO BE
MOUNTED 3'-0" A.F.F. TO TOP OF HANDRAIL.
B. CORNER GUARD PROTECTION IS TO BE MOUNTED
ABOVE THE FLOOR BASE, PER MANUFACTURES
MOUNTING INSTRUCTIONS.
C. SEE SPECIFICATION SECTION 102600, WALL AND
FLOOR PROTECTION FOR ADDITIONAL INFORMATION.
AE4119
135 SF
EXAM 6
1A-728
M1802
A5080
A5075
A5106G
A5180
A-1
9' - 9"
/2
CHAIR
M7405
M4655
A1200
M4200
M4100
F0340
A5106S
AE501
A-1
A-1
A-1
AE411
AE411 4
AE411
337 SF
CARE
STATION
1A-729
131 SF
STAFF WORK
1A-730
F0210 M1801
M1825 M1810
E0954
F0210
F0210
F0210 M1801
M1801
M1801
F0210
M1801 F0210
M1801 F0210
M1801
F0210 M1801
F0210 M1801 F0210 M1801
F0210
M1801
A5075
A5080
CG-1
F2017
9'
0"
14' - 4"
2'
0"
2' - 0"
3' - 6" 4' - 0"
2'
- 8
5"
/2
.0
4' - 9"
MILLWORK
1'
- 7
1'
- 3
1/ 2"
AE501
AE501
AE702
MILLWORK
194 SF
CLEAN
1A-734
M2050B
M2050A
M2050A
M2050B
M2050B M2050B M2050A
M2050A
1A-734
17' - 5"
3'
1/
2"
AE501
AE501
1' - 5 1/2"
A-2
A-2
A-2
A-1
A-2
A-4
A-5
109 SF
MEDICATION
ROOM
1A-731
AE411
AE702
AE702
R6400
A5106S
A5075
A5080
F2010
F2017
M3150
M3150
M3150
M3150
1A -7
ADA
COMPIANT
SINK
REFER TO SHEET
AE702 FOR
CASEWORK
DETAILS
2'
1"
6' - 6"
.0
2' - 7 1/2"
135.00°
4' - 3 1/2"
11' - 9 1/2"
AE702
A-1
A-1
A-1
A-1
A-3
CLEAN
TOILET
BARIATRIC
TOILET
SOILED
EXAM 6
EQUIPMENT
CARE
STATION
MEDICATION
ROOM
NOURISHMENT
STAFF WORK
BARIATRIC
TOILET
TOILET
TOILET
Phase 1A
Phase1B
Calculating...
AE401
AE401
AE401
AE401
AE401
AE401
AE401
AE411 14
TOILET
1A-764B
BARIATRIC
TOILET
1A-764C
BARIATRIC
TOILET
1A-753
TOILET
1A-755
TOILET
1A-754
7 1/2"
6' - 8"6' - 8"
2' - 0"
7'
7"
3'
1/
2"1'
6"
4' - 9"14' - 8"
6'
1/
2" 1'
7"
/2
11' - 5"
1' - 6"
1' - 6"
1' - 3 1/2"
1' - 3 1/2"
6'
3"
1/
2"
6'
3" 7'
5"
1/
2"
8' - 9 1/2"
1' - 6"
1' - 3 1/2"
A5109
A-1
A5109
A5090 A5075
A5080
A4995A4995
A5090
A5200
A5200
A5109A5109
A5075
A5080
1A-753
1A-754
1A-755
E0954
A5080
A5075
A-1
A-1
A-1
A-1
FLOOR MOUNTED
BARIATRIC TOILET
A
-7
B
A
-7
C
A5109
A5200
A5109
A5080
A5075
CRASHRAIL BUMPER, TYP.
A5109
A5200
A5075
A5080
A5200
A5090
A5109
A4995
A5109
AE501
AE501
01 02
A-4
A-4
A-5
A-5
A-5 A-5
A-5
A-4
A-4
A-4
A-1 A-1
A-1
A-5
AE411
AE702
1A-739
F0510F0510
P-505
A5080
A5075
F2000
A-1
A-1
A-1
A-1
A-4
AE411
AE702
AE702
8'
1/
2"
5'
6"
7' - 10" 1A-740
R4750
R6400
A5080
A5075
EQUIPMENT
1A-740
NOURISHMENT
1A-740A
A-1
A-1
A-1 A-2
A-2A-2
A-2
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:4
A
M
AE401
ENLARGED PLANS
8 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/4" = 1'-0"
TYPICAL EXAM ROOM
Scale: 1/4" = 1'-0"
NURSES STATION
Scale: 1/4" = 1'-0"
CLEAN STORAGE
Scale: 1/4" = 1'-0"
MEDICAL SUPPLY
Scale: 3/32" = 1'-0"
ENLARGED PLAN - NORTH EAST 0 84 16 N
O R
TH
TRUE
Scale: 1/4" = 1'-0"
TOILETS
0 2 4 8
NORTH
TRUE
0 2 4 8
NORTH
TRUE
0 2 4 8
NORTH
TRUE
0 2 4 8
NORTH
TRUE
0 2 4 8
NORTH
TRUE
Scale: 1/4" = 1'-0"
SOILED UTILITY ROOM
Scale: 1/4" = 1'-0"
NOURISHMENT / EQUIPMENT
0 2 4 8
NORTH
TRUE
A. REFER TO SHEET AE601 FOR ADDITIONAL DOOR
SCHEDULE, ELEVATION AND DETAILS.
B. ALL NEW PARTITION TYPES ARE TYPE ## U.N.O.
UNLESS OTHERWISE NOTED. REFER TO SHEET
AE502 FOR ADDITIONAL PARTITION DETAILS.
C. REFER TO DRAWINGS GC102 AND GC103 FOR
CONSTRUCTION PHASE SEQUENCING.
D. ALL WALL TYPES ARE A-1 UNLESS OTHERWISE
NOTED. REFER TO SHEETS AE101 AND AE502 FOR
MORE DETAILS.
E. FURNITURE NOT IN CONTRACT, NIC.
F. REFER TO SHEET A701 AND A702 FOR FINISH
NOTES AND SCHEDULE.
G. ALL DIMENSIONS ARE FROM FACE OF STUD, OR
FACE OF EXISTING WALLS. ANY DIMENSIONS NOT
SHOWN OR DEEMED QUESTIONABLE ARE TO BE
VERIFIED BY ARCHITECT/DESIGNER. DO NOT
SCALE DRAWINGS.
H. BARIATRIC TOILETS AT 25 NSF. ONE (1) BARIATRIC
LAVATORY AY 21 NSF. ABA CLEARANCES AND
CIRCULATION ALLOCATED NSF ACCOMODATES
BARIATRIC PATIENTS.
I. WATER COOLERS MUST BE WALL-HUNG SELF-
CONTAINED, ELECTRIC, WHEELCHAIR
ACCESSIBLE HI-LOW UNITS. THE USE OF WATER
BOTTLE FILLER UNITS SHALL BE CONSIDERED
AND EVALUATED BY THE COR. COORDINATE
WITH ELECTRICAL DESIGNER FOR POWER
REQUIREMENTS.
01 WATER CLOSET, WALL HUNG P9150
02 BARIATRIC WATER CLOSET, FLOOR MOUNTED AT
25 NSF
03 LAVATORY, STRAIGHT BACK P3100
04 BARIATRIC LAVATORY AT 21 NSF
05 ELECTRIC HI-LOW WATER COOLER
0 2 4 8
NORTH
TRUE
FD
12' - 11" 14' - 4" 6' - 5" 6'
6"
2'
7'
4"
36' - 6"
7'
MECHANICAL
1A-764
FENCED AREA, ELECTRICAL
1431 SF
MECHANICAL
MECHANICAL
Calculating...
LIMITS OF WORK
AE402
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:4
A
M
AE402
ENLARGED PLANS
9 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/4" = 1'-0"
MECHANICAL BAY 0 2 4 8 N
O R
TH
TRUE
Scale: 1" = 20'-0"
MECHANICAL 0 84 16 N
O R
TH
TRUE
A. REFER TO SHEET AE 601 FOR ADDITIONAL DOOR
SCHEDULE, ELEVATION AND DETAILS.
B. ALL NEW PARTITION TYPES ARE TYPE ## U.N.O.
UNLESS OTHERWISE NOTED. REFER TO SHEET
AE502 FOR ADDITIONAL PARTITION DETAILS.
C. REFER TO DRAWINGS GC 102 - GC103 FOR
CONSTRUCTION PHASE SEQUENCING.
D. ALL WALL TYPES ARE A-1 UNLESS OTHERWISE
NOTED. REFER TO SHEET AE502 FOR DETAILS.
E. FURNITURE NOT IN CONTRACT, NIC.
F. REFER TO SHEET A701 AND 702 FOR FINISH
NOTES AND SCHEDULE.
G. ALL DIMENSIONS ARE FROM FACE OF STUD, OR
FACE OF EXISTING WALLS. ANY DIMENSIONS NOT
SHOWN OR DEEMED QUESTIONABLE ARE TO BE
VERIFIED BY ARCHITECT/DESIGNER. DO NOT
SCALE DRAWINGS.
A A A AAA
SOILED
TOILET
ROOM
ANTE
RESUS 25
RESUS 26
Phase 1A
Phase1B
Phase 2
Calculating...
AE403
AE403
AE403
WORK ROOM
AE4118
134 SF
RESUS 25
1A-805131 SF
RESUS 26
1A-807
A5180
A5180 M4655
A5180
A
-8
A-1
A-3
A-1
E0954
A-3
5'
1/
2" 2'
1/ 2"
3'
1/
2"
23' - 8 1/2"
4' - 10 1/2"
A
-8
HEADWALLEXISTING SMOKE WALL
SOILED
1A-804
AE403
DOOR AND JAMB AS
SCHEDULED, REFER
TO AE106 FOR
INORMATION
EXISTING NON-RATED WALL
(2) LAYERS TYPE 'X'
GYPSUM BOARD
TAPED AND
FINISHED BOTH
LAYERS, UP TO
STRUCTURAL DECK
ABOVE
WORK ROOM
1A-772
EXISITNG DOORS TO REMAIN
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
# SHEET KEY NOTES:
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:5
:5
A
M
AE403
ENLARGED PLANS
10 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
0 84 16 N O R
TH
TRUE
Scale: 3/32" = 1'-0"
ENLARGED PLAN - SOUTH WEST0 2 4 8
NORTH
TRUE
Scale: 1/4" = 1'-0"
RESUSCITATION ROOM
Scale: 1/4" = 1'-0"
SOILED 0 2 4 8
NORTH
TRUE
Scale: 3" = 1'-0"
DETAIL
Scale: 1/4" = 1'-0"
WORK ROOM 0 2 4 8
NORTH
TRUE
EJEJ FD FDFIN END GP17
M1801M1801 M1801 M1801
M1801M1801
F0410
F0210
F0410
F0210
F0410
F0210 F0210
GWB
SOFFIT
FEC
F0210
VCT
RB
ACT
ACT
9'
7'
CRASH
RAIL
BUMPER
AE502
A5180
A5180
TELESCOPIC DOUBLE DOOR
CRASH
RAIL
BUMPER
RSF
ACT
GL-X, TYP.
A5180 EXISTING
HEADWALL
M4655
E0954
CORNER
GUARDRAIL
EXISTING
COUNTER
WITH SS
SINK
CRASH RAIL
BUMPER
EXISTING
HEADWALL
M4655
RSF
E0954
EXISTING
STAINLESS
STEEL
SINK
CORNER
GUARD
CRASH
RAIL
BUMPER
RSF
ACT
PL-SC
A5180
A5075
A5106G
A5106S
M1802
F0340
M4100
M4200
CRASH
RAIL
BUMPER
CORNER
GUARD
P3100
WALL
CASEWORK
RSF 6"
PL-SC
ACT
A1200A1200A1200
F2010
A1200
M7405
M7845
M4200
M4100
F0340
M4655
WALL
MOUNTED, PATIENT
COAT HOOK, TYP. AT
ALL EXAM ROOMS
RSF
PL-SC
ACT
A1107
M7435
F3200
M4655
A1200
M7845
M7405
A1200
CRASH RAIL
BUMPER
PL-SC/GWB-SC
RSF
ACT
A5180
CHAIR
WALL MOUNTED, PATIENT
COAT HOOK, TYP. AT
ALL EXAM ROOMS
A5180
F3200
CHAIR
ACT
TELESCOPIC
DOUBLE DOOR
A1066
A5075
A5080
A5200
A5109
A5200
A5109
WALL
MOUNTED
FIXTURE
P3100
CT
ACT
8'
CT
1' - 6" 1' - 3 1/2"4" 2'
AE702
AE702
R6400
A5080
A5075
2' - 6"2' - 9"2' - 2"
CE050
CS090
C04P0
D0370
RSF
FINISHED
SOFFIT
ACT
SIGNAGE
R4750
AE702
8'
RSF
ACT
A5080
A5075
CT030
P3100
WASTE
RECEPTACLE
2' - 7"1' - 3"
COLUMN
BEYOND
R6400
M3150
A5075
A5080
A5106S
M3150
2' - 6" 1' - 9" 2' - 2"
AE702
AE702
CS090
D0370
CT030
C04P0
ACT
RSF
RSF
AE702
CLOSURE
PANEL
CE050
FINISHED SOFFIT
CLOSURE
PANEL
A5080
A5075
P3100
A5145
WALL
MOUNTED
FIXTURE
CT
ACT
A5109
A5200 A5109
A5090
P103
BASE
A5109A5109
A5090
CT
CT
ACT
S
TAT E O F N E VA
D A
T H
E O
D
ORE JOHN MOW
EN
JRR
EG
ISTERED
No. 7867
A R C H I T E C
T
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
Revisions: Date
Drawing Title
Approved: Mark Landwert - COR
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 5960 Fairview Road, Suite 500
Charlotte, NC 28210
704-887-3500
/1
/2
:2
:3
P
M
AE411
INTERIOR ELEVATIONS
11 20TM HM
HOUSTON VAMC ED
EXPANSION
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd. Houston, TX 77030
March 15, 2019
100% CONSTRUCTION DOCUMENTS
580-17-10116-352
Scale: 1/4" = 1'-0"
NURSES STATION - SOUTH/WEST EXTERIOR
Scale: 1/4" = 1'-0"
NURSES STATION - NORTH/WEST
Scale: 1/4" = 1'-0"
NURSES STATION - NORTH/EAST
Scale: 1/4" = 1'-0"
NURSES STATION - SOUTH/EAST
Scale: 1/4" = 1'-0"
NURSES STATION - SOUTH/WEST INTERIOR
Scale: 1/4" = 1'-0"
RESUSCITATION ROOM - NORTH/EAST - 1A-807
Scale: 1/4" = 1'-0"
RESUSCITATION ROOM - SOUTH/WEST - 1A-807
Scale: 1/4" = 1'-0"
RESUSCTATION ROOM - NORTH/WEST - 1A-807
Scale: 1/4" = 1'-0"
TYPICAL EXAM ROOM - NORTH/WEST
Scale: 1/4" = 1'-0"
TYPICAL EXAM ROOM - NORTH/EAST
Scale: 1/4" = 1'-0"
TYPICAL EXAM ROOM - SOUTH/EAST
Scale: 1/4" = 1'-0"
TYPICAL EXAM ROOM - SOUTH/WEST
Scale: 1/4" = 1'-0"
TYPICAL TOILET SOUTH/EAST
Scale: 1/4" = 1'-0"
NOURISHMENT - 1A-740A
Scale: 1/4" = 1'-0"
SOILED - 1A-739
Scale: 1/4" = 1'-0"
MEDICAL SUPPLY ROOM - 1A-731
Scale: 1/4" = 1'-0"
TYPICAL TOILET SOUTH/WEST
Scale: 1/4" = 1'-0"
TYPICAL TOILET NORTH/EAST
A. REFER TO SHEET AG001 FOR ABBREVIATIONS AND
SYMBOLS.
B. ENTRANCE DOORS TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.