Cast_In_Place.pdf

PDF 151 KB Posted

Attached to
Install Roll Down Gates for Garages Federal contract opportunity
Solicitation number
36C25619R0042
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

Cast In Place

View the file

Other files for this federal contract opportunity

Other files attached to Install Roll Down Gates for Garages, newest first.
File Type Posted
36C25619C0123-000.docx DOCX document
36C25619R0042-0005000.docx DOCX document
36C25619R0042-0004000.docx DOCX document
36C25619R0042_0003.docx DOCX document
00157-LL115-Patient_Visitor_Parking.pdf PDF
Proposed_Bollard_Location_-_Employee_Parking_Garage_(002).pdf PDF
00154-LL112-Patient_Visitor_Parking.pdf PDF
Proposed_Bollard_Location_-_Visitor's_Parking_Garage.pdf PDF
Removable_Stand_Alone_Foundation_Bollards_APPROVED.pdf PDF
00152-LL110-Staff_Parking.pdf PDF
36C25619R0042-0002000.docx DOCX document
36C25619R0042-0001000.docx DOCX document
36C25619R0042-010.pdf PDF
36C25619R0042-037.pdf PDF
36C25619R0042-003.pdf PDF
36C25619R0042-025.pdf PDF
36C25619R0042-038.pdf PDF
36C25619R0042-031.pdf PDF
36C25619R0042-016.pdf PDF
36C25619R0042-014.pdf PDF
36C25619R0042-027.pdf PDF
36C25619R0042-004.docx DOCX document
36C25619R0042-039.pdf PDF
36C25619R0042-006.docx DOCX document
36C25619R0042-024.pdf PDF
36C25619R0042-030.pdf PDF
36C25619R0042-008.pdf PDF
36C25619R0042-023.pdf PDF
36C25619R0042-034.pdf PDF
36C25619R0042-019.pdf PDF
36C25619R0042-011.doc DOC document
36C25619R0042-020.pdf PDF
36C25619R0042-013.pdf PDF
36C25619R0042-015.docx DOCX document
36C25619R0042-017.pdf PDF
36C25619R0042-018.pdf PDF
36C25619R0042-021.pdf PDF
36C25619R0042-007.pdf PDF
36C25619R0042-005.xlsx XLSX spreadsheet
36C25619R0042-009.pdf PDF
36C25619R0042-035.pdf PDF
36C25619R0042-002.docx DOCX document
36C25619R0042-026.pdf PDF
36C25619R0042-036.pdf PDF
36C25619R0042-022.pdf PDF
36C25619R0042-033.pdf PDF
36C25619R0042-029.pdf PDF
36C25619R0042-012.docx DOCX document
36C25619R0042-032.pdf PDF
36C25619R0042-000.docx DOCX document
Show all 50

Install Roll Down Gates for Garages has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100342.00 SLVHCS REPLACEMENT MEDICAL CENTER PROJECT

WP-8

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-1 CAST-IN-PLACE CONCRETE (SS)

SECTION 03 30 01 - CAST-IN-PLACE CONCRETE (SITE STRUCTURES)

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section specifies cast-in-place structural concrete for the following items for site work:

1. Pile caps for paving and site structures.

2. Grade beams for paving and site structures

3. Light pole bases.

4. Foundations for masonry site walls.

5. All formed site concrete with form material and finishing as specified under Section 32 13 15, Architectural Site Concrete for work indicated on the MATREIALS PLAN of Landscape Drawings.

a. Steps

b. Walls

c. Water feature

6. Concrete Paving and curbs: Pavement work includes colored concrete and special finishing as specified under Section 32 13 15, Architectural Site Concrete for work indicated on the MATERIALS PLAN of Landscape Drawings.

1.2 RELATED WORK:

A. Concrete paving, curbs, and walks: Section 32 05 23, Cement and Concrete for Exterior Improvements.

B. Finishes, form materials, additives, quality control, and execution requirements for concrete paving, curbs, curb ramps, walls, steps, and water feature indicated on the MATERIALS PLAN of Landscape Drawings: Section 32 13 15, Architectural Site Concrete.

C. Water Feature Coping: Section 06 12 14, Ultra High Performance Concrete Panels.

D. Materials testing and inspection during construction: Section 01 45 29, TESTING

LABORATORY SERVICES.

E. Section 01 74 19 - CONSTRUCTION WASTE MANAGEMENT.

1.3 TOLERANCES:

A. Formwork: ACI 117, except the elevation tolerance of formed surfaces before removal of shores is (+0 inch) and (±-1/8 inch).

B. Reinforcement Fabricating and Placing: ACI 117, except that fabrication tolerance for bar sizes Nos. 10, 13, and 16 (Nos. 3, 4, and 5) (Tolerance Symbol 1 in Fig. 2.1(a), ACI, 117) used as column ties or stirrups is +0 mm (+0 inch) and -13 mm (-1/2 inch) where gross bar length is less than 3600 mm (12 feet), or +0 mm (+0 inch) and -20 mm (-3/4 inch) where gross bar length is 3600 mm (12 feet) or more.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-2 CAST-IN-PLACE CONCRETE (SS)

C. Cross-Sectional Dimension: ACI 117, except tolerance for thickness of slabs 12 inches or less is +20 mm (+3/4 inch) and - 6 mm (-1/4 inch). Tolerance of thickness of beams more than 300 mm (12 inch) but less than 900 mm (3 feet) is +20 mm (+3/4 inch) and -10 mm (-3/8 inch).

D. Slab Finishes: ACI 117, Section 4.5.6, F-number method in accordance with ASTM E1155, except as follows:

1. Test entire slab surface, including those areas within (10 feet) of construction joints and vertical elements that project through slab surface.

2. Maximum elevation change which may occur within (10 feet) of any column or wall element is 6 mm (0.25 inches).

3. Allow sample measurement lines that are perpendicular to construction joints to extend past joint into previous placement no further than 1500 mm (5 feet).

4. ± 1/8 inch finish grade tolerance.

1.4 REGULATORY REQUIREMENTS:

A. ACI SP-66 – ACI Detailing Manual.

B. ACI 318 - Building Code Requirements for Reinforced Concrete.

C. ACI 301 – Standard Specifications for Structural Concrete.

1.5 SUBMITTALS:

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and

SAMPLES.

B. Shop Drawings:

1. Reinforcing Steel

2. Mock-ups

C. Mill Test Reports:

1. Reinforcing Steel.

2. Cement.

D. Manufacturer's Certificates and Product Data:

1. Abrasive aggregate.

2. Air-entraining admixture.

3. Chemical admixtures, including chloride ion content.

4. Waterproof paper for curing concrete.

5. Liquid membrane-forming compounds for curing concrete.

6. Non-shrinking grout.

7. Liquid hardener.

8. Waterstops.

9. Expansion joint filler.

10. Adhesive binder.

E. Testing Agency for Concrete Mix Design: Approval request including qualifications of principals and technicians and evidence of active participation in program of Cement and Concrete Reference Laboratory (CCRL) of National Institute of Standards and Technology and copy of report of latest CCRL, Inspection of Laboratory.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-3 CAST-IN-PLACE CONCRETE (SS)

F. Test Report for Concrete Mix Designs: Trial mixes including water-cement ratio curves, concrete mix ingredients, and admixtures.

1.6 DELIVERY, STORAGE, AND HANDLING:

A. Conform to ACI 304. Store aggregate separately for each kind or grade, to prevent segregation of sizes and avoid inclusion of dirt and other materials.

B. Deliver cement in original sealed containers bearing name of brand and manufacturer, and marked with net weight of contents. Store in suitable watertight building in which floor is raised at least 300 mm (1 foot) above ground. Store bulk cement and fly ash in separate suitable bins.

C. Deliver other packaged materials for use in concrete in original sealed containers, plainly marked with manufacturer's name and brand, and protect from damage until used.

1.7 PRE-CONCRETE CONFERENCE:

A. General: At least 15 days prior to submittal of design mixes, conduct a meeting to review proposed methods of concrete construction to achieve the required results.

B. Agenda: Includes but is not limited to:

1. Submittals.

2. Coordination of work.

3. Availability of material.

4. Concrete mix design including admixtures.

5. Methods of placing, finishing, and curing.

6. Finish criteria required to obtain required flatness and levelness.

7. Timing of floor finish measurements.

8. Material inspection and testing.

C. Attendees: Include but not limited to representatives of Contractor; subcontractors involved in supplying, conveying, placing, finishing, and curing concrete; manufacturer; admixture manufacturers; Resident Engineer; Consulting Engineer; Architect, Landscape Architect, Department of Veterans Affairs retained testing laboratories for concrete testing and finish (F-number) verification.

D. Minutes of the meeting: Contractor shall take minutes and type and distribute the minutes to attendees within five days of the meeting.

E. See 32 13 15 for Pre-Construction Meeting.

1.8 MOCK-UP:

A. In addition to the other specified samples and tests, construct a mock-up using the materials, reinforcing, forming system and construction methods proposed for use in exposed architectural concrete.

B. Construct the mock-up with at least a 2.5 m by 2.5 m (8 feet by 8 feet) exposed surface and suitable foundations. Include the following where applicable: Control joints, reglets, recesses or other typical architectural details.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-4 CAST-IN-PLACE CONCRETE (SS)

C. Before casting the mock-up, submit full detailed Shop Drawings of the mock-up formwork for review by the Architect. Perform all necessary preliminary tests to ensure that concrete used for the mock-up will exactly match the approved sample in color and texture.

D. Perform the surface treatment proposed for use on one or more areas not less than 300 mm by 300 mm (1 foot by 1 foot) on the back side of the mock-up to establish the texture of finish required by the Architect. Repeat as required until a sample satisfactory to the Architect has been obtained.

E. Treat the finished front surface of the mock-up to produce a uniform appearance similar in every respect to the approved sample area.

F. The completed mock-up shall be inspected by the Architect. Failure of the mock-up to match the approved sample will require the construction of further mock-ups until approval is obtained. Remove rejected mock-ups immediately.

G. Mock-ups are required at Architectural Site Concrete items. Refer to Section 32 13 15 –

ARCHITECTURAL SITE CONCRETE.

H. Maintain the approved mock-ups in good condition at the job site until all architectural concrete surfaces have been completed and approved by the Architect. Remove the mock-up from the site after completion of the above. Accepted mock-ups can be part of completed work.

1.9 APPLICABLE PUBLICATIONS:

A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only.

B. American Concrete Institute (ACI):

117-06.....................................Tolerances for Concrete Construction and Materials 211.1-02..................................Selecting Proportions for Normal, Heavyweight, and Mass

Concrete 214R-02 ..................................Evaluation of Strength Test Results of Concrete 301-05.....................................Structural Concrete 304R-2000 ..............................Guide for Measuring, Mixing, Transporting, and Placing

Concrete 305R-06 ..................................Hot Weather Concreting 306R-(2002)............................Cold Weather Concreting 308R-(2001)............................Standard Practice for Curing Concrete 309R-05 ..................................Guide for Consolidation of Concrete 31808 ......................................Building Code Requirements for Reinforced Concrete and

Commentary 347R-04 ..................................Guide to Formwork for Concrete SP-66-04.................................ACI Detailing Manual 303.1-97………………………..Standard specification for Cast-in-Place Architectural Concrete.

C. American National Standards Institute and American Hardboard Association (ANSI/AHA):

A135.4-2004 ...........................Basic Hardboard

D. American Society for Testing and Materials (ASTM):

A82/A82M-07..........................Steel Wire, Plain, for Concrete Reinforcement A185/185M-07 ........................Steel Welded Wire Fabric, Plain, for Concrete Reinforcement

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-5 CAST-IN-PLACE CONCRETE (SS)

A615/A615M-08......................Deformed and Plain Billet-Steel Bars for Concrete Reinforcement

A653/A653M-07......................Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

A706/A706M-06......................Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement

A767/A767M-05......................Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement

A996/A996M-06......................Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement

C31/C31M-08 .........................Making and Curing Concrete Test Specimens in the field C33-07 ....................................Concrete Aggregates C39/C39M-05 .........................Compressive Strength of Cylindrical Concrete Specimens C94/C94M-07 .........................Ready-Mixed Concrete C143/C143M-05 .....................Slump of Hydraulic Cement Concrete C150-07 ..................................Portland Cement C171-07 ..................................Sheet Materials for Curing Concrete C172-07 ..................................Sampling Freshly Mixed Concrete C173-07... ...............................Air Content of Freshly Mixed Concrete by the Volumetric Method C192/C192M-07 .....................Making and Curing Concrete Test Specimens in the Laboratory C231-08 ..................................Air Content of Freshly Mixed Concrete by the Pressure Method C260-06 ..................................Air-Entraining Admixtures for Concrete C309-07 ..................................Liquid Membrane-Forming Compounds for Curing Concrete C494/C494M-08 .....................Chemical Admixtures for Concrete C496-06 ..................................Splitting Tensile Strength of Cylindrical Concrete Specimens C618-08 ..................................Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Concrete C666/C666M-03 .....................Resistance of Concrete to Rapid Freezing and Thawing C881/C881M-02 .....................Epoxy-Resin-Base Bonding Systems for Concrete C1107/1107M-07 ....................Packaged Dry, Hydraulic-Cement Grout (Non-shrink) C1315-08 ………………………………… Liquid Membrane-Forming Compounds Having

Special Properties for Curing and Sealing Concrete D1751-04 ................................Preformed Expansion Joint Filler for Concrete Paving and

Structural Construction (Non-extruding and Resilient Bituminous Types)

D4397-02 ................................Polyethylene Sheeting for Construction, Industrial and Agricultural Applications

E1155-96(R2008) ...................Determining FF Floor Flatness and FL Floor Levelness Numbers

E. Concrete Reinforcing Steel Institute (CRSI):

Handbook 2008

PART 2 – PRODUCTS:

2.1 FORMS:

A. Wood: PS 20 free from loose knots and suitable to facilitate finishing concrete surface specified; tongue and grooved.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-6 CAST-IN-PLACE CONCRETE (SS)

B. Plywood: PS-1 Exterior Grade B-B (concrete-form) 16 mm (5/8 inch), or 20 mm (3/4 inch) thick for unlined contact form. B-B High Density Concrete Form Overlay optional.

C. Metal for Concrete Rib-Type Construction: Steel (removal type) of suitable weight and form to provide required rigidity.

D. Permanent Steel Form for Concrete Slabs: Corrugated, ASTM A653, Grade E, and Galvanized, ASTM A653, G90. Provide venting where insulating concrete fill is used.

E. Corrugated Fiberboard Void Boxes: Double faced, completely impregnated with paraffin and laminated with moisture resistant adhesive, size as shown. Design forms to support not less than 48 KPa (1000 psf) and not lose more than 15 percent of their original strength after being completely submerged in water for 24 hours and then air dried.

F. APA High Density Overlay (HDO) plywood (3/4” thickness). Required for Architectural Site Concrete.

G. Form Ties: Develop a minimum working strength of 13.35 kN (3000 pounds) when fully assembled. Ties shall be adjustable in length to permit tightening of forms and not have any lugs, cones, washers to act as spreader within form, nor leave a hole larger than 20 mm (3/4 inch) diameter, or a depression in exposed concrete surface, or leave metal closer than 40 mm (1 1/2 inches) to concrete surface. Wire ties not permitted. Cutting ties back from concrete face not permitted.

1. Form ties are not permitted for exposed Architectural Site Concrete work. Refer to 32 13

15.

2.2 MATERIALS:

A. Portland Cement: ASTM C150 Type I or II.

B. Fly Ash: ASTM C618, Class C or F including supplementary optional requirements relating to reactive aggregates and alkalis, and loss on ignition (LOI) not to exceed 5 percent.

C. Coarse Aggregate: ASTM C33.

1. Size 67 or Size 467 may be used for footings and walls over 300 mm (12 inches) thick.

2. Coarse aggregate for applied topping, encasement of steel columns, and metal pan stair fill shall be Size 7.

3. Maximum size of coarse aggregates not more than one-fifth of narrowest dimension between sides of forms, one-third of depth of slabs, nor three-fourth of minimum clear spacing between reinforcing bars.

D. Fine Aggregate: ASTM C33. Fine aggregate for applied concrete floor topping shall pass a 4.75 mm (No. 4) sieve, 10 percent maximum shall pass a 150 μm (No. 100) sieve.

E. Mixing Water: Fresh, clean, and potable.

F. Admixtures:

1. Water Reducing Admixture: ASTM C494, Type A and not contain more chloride ions than are present in municipal drinking water.

2. Water Reducing, Retarding Admixture: ASTM C494, Type D and not contain more chloride ions than are present in municipal drinking water.

3. High-Range Water-Reducing Admixture (Superplasticizer): ASTM C494, Type F or G, and not contain more chloride ions than are present in municipal drinking water.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-7 CAST-IN-PLACE CONCRETE (SS)

4. Non-Corrosive, Non-Chloride Accelerator: ASTM C494, Type C or E, and not contain more chloride ions than are present in municipal drinking water. Admixture manufacturer must have long-term non-corrosive test data from an independent testing laboratory of at least one year duration using an acceptable accelerated corrosion test method such as that using electrical potential measures.

5. Air Entraining Admixture: ASTM C260.

6. Prohibited Admixtures: Calcium chloride, thiocyanate or admixtures containing more than

0.05 percent chloride ions are not permitted.

7. Certification: Written conformance to the requirements above and the chloride ion content of the admixture prior to mix design review.

8. See 32 13 15 for required and prohibited additives for Architectural Site Concrete.

9. Waterproofing Admixture:

a. Xypex Admix C-1000.

b. The concrete waterproofing admixture shall be of the cementitious crystalline type that chemically controls and permanently fixes a non-soluble crystalline structure throughout the capillary voids of the concrete.

c. The design shall include the use of the crystalline waterproofing repair materials that generate a non-soluble crystalline formation in the concrete.

d. The concrete crystalline waterproofing admixture shall be specifically formulated as a concrete admixture.

e. The dosage rate for the Xypex Admix C-1000 shall be 3% by weight of cement.

f. Crack Bridging Capability: Requirement: Crystalline Waterproofing shall be capable of sealing static cracks up to 1/64”.

10. Shrinkage Inhibiting Admixture: Shrinkage reducing admixture shall be Tetraguard manufactured by Master Builders (Basis-of-Design Product or Pre-Bid approved equal).

Dosage rate shall be in accordance with manufacturer’s recommendations for the designated use, but not less than 1.5 gal./yd.

G. Polyethylene sheet: ASTM D4397, (6 mil and 15 mil).

H. Reinforcing Steel: ASTM A615, or ASTM A996, deformed, grade as shown.

I. Welded Wire Fabric: ASTM A185.

J. Reinforcing Bars to be Welded: ASTM A706.

K. Galvanized Reinforcing Bars: ASTM A767.

L. Supports, Spacers, and Chairs: Types which will hold reinforcement in position shown in accordance with requirements of ACI 318 except as specified.

M. Expansion Joint Filler: ASTM D1751.

N. Sheet Materials for Curing Concrete: ASTM C171.

O. Liquid Membrane-forming Compounds for Curing Concrete: ASTM C309, Type I, with fugitive dye. Compound shall be compatible with scheduled surface treatment, such as paint and resilient tile, and shall not discolor concrete surface.

P. Abrasive Aggregate: In accordance with Section 32 13 15 – ARCHITECTURAL SITE

CONCRETE REQUIREMENTS.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-8 CAST-IN-PLACE CONCRETE (SS)

Q. Penetrating Sealer: High penetration silane sealer providing minimum 95 percent screening per National Cooperative Highway Research Program (NCHRP) No. 244 standards for chloride ion penetration resistance. Requires moist (non-membrane) curing of slab.

Q. Non-Shrink Grout:

1. ASTM C1107, pre-mixed, produce a compressive strength of at least 18 MPa at three days and 35 MPa (5000 psi) at 28 days. Furnish test data from an independent laboratory indicating that the grout when placed at a fluid consistency shall achieve 95 percent bearing under a 1200 mm x 1200 mm (4 foot by 4 foot) base plate.

2. Where high fluidity or increased placing time is required, furnish test data from an independent laboratory indicating that the grout when placed at a fluid consistency shall achieve 95 percent under an 450 mm x 900 mm (18 inch by 36 inch) base plate.

R. Adhesive Binder: ASTM C881.

1. Polyvinyl Chloride Waterstop: CRD C572.

2. Rubber Waterstops: CRD C513.

3. Bentonite Water Stop: Flexible strip of bentonite 25 mm x 20 mm (1 inch by 3/4 inch), weighing 8.7 kg/m (5.85 lbs. per foot) composed of Butyl Rubber Hydrocarbon (ASTM D297), Bentonite (SS-S-210-A) and Volatile Matter (ASTM D6).

4. Porous Backfill: Crushed stone or gravel graded from 25 mm to 20 mm (1 inch to 3/4 inch).

5. Synthetic Fibers: Monofilament or fibrillated polypropylene fibers for secondary reinforcing of concrete members. Use appropriate length and 0.9 kg/m3 (1.5 lb. per cubic yard). Product shall have a UL rating.

6. Epoxy Joint Filler: Two component, 100 percent solids compound, with a minimum shore D hardness of 50.

7. Bonding Admixture: Non-rewettable, polymer modified, bonding compound.

2.3 CONCRETE MIXES:

A. Mix Designs: Proportioned in accordance with Section 5.3, "Proportioning on the Basis of Field Experience and/or Trial Mixtures" of ACI 318.

1. If trial mixes are used, make a set of at least 6 cylinders in accordance with ASTM C192 for test purposes from each trial mix; test three for compressive strength at 7 days and three at 28 days.

2. Submit a report of results of each test series, include a detailed listing of the proportions of trial mix or mixes, including cement, fly ash, admixtures, weight of fine and coarse aggregate per m3 (cubic yard) measured dry rodded and damp loose, specific gravity, fineness modulus, percentage of moisture, air content, water-cement -fly ash ratio, and consistency of each cylinder in terms of slump.

3. Prepare a curve showing relationship between water-cement -fly ash ratio at 7-day and 28-day compressive strengths. Plot each curve using at least three specimens.

4. If the field experience method is used, submit complete standard deviation analysis.

5. 15% Fly-ash Maximum.

6. Slag. Not acceptable.

B. After approval of mixes no substitution in material or change in proportions of approval mixes may be made without additional tests and approval of Resident Engineer or as specified.

Making and testing of preliminary test cylinders may be carried on pending approval of cement and fly ash , providing Contractor and manufacturer certify that ingredients used in making test cylinders are the same. Resident Engineer may allow Contractor to proceed with depositing concrete for certain portions of work, pending final approval of cement and fly ash and approval of design mix.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-9 CAST-IN-PLACE CONCRETE (SS)

C. Cement Factor: Maintain minimum cement factors in Table I regardless of compressive strength developed above minimums. Fly ash may be substituted for up to 20 percent of the minimum cement factor at option of Contractor, except fly ash may not be used in concrete designated as architectural concrete.

TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE

Concrete Strength Non-Air-Entrained Air-Entrained Min. 28 Day Comp. Str.

MPa (psi)

Min. Cement kg/m3 (lbs/c. yd)

Max. Water Cement Ratio

Min. Cement kg/m3 (lbs/c. yd)

Max. Water Cement Ratio

35 (5000)1,3 375 (630) 0.45 385 (650) 0.40 30 (4000)1,3 325 (550) 0.55 340 (570) 0.50 25 (3000)1,3 280 (470) 0.65 290 (490) 0.55 25 (3000)1,2 300 (500) * 310 (520) *

1. If trial mixes are used, the proposed mix design shall achieve a compressive strength 8.3 MPa (1200 psi) in excess of f'c. For concrete strengths above 35 Mpa (5000 psi), the proposed mix design shall achieve a compressive strength 9.7 MPa (1400 psi) in excess of f’c.

2. For concrete exposed to high sulfate content soils maximum water cement ratio is 0.44.

* Determined by Laboratory in accordance with ACI 211.1 for normal concrete or ACI

211.2 for lightweight structural concrete.

D. Maximum Slump: Maximum slump, as determined by ASTM C143 with tolerances as established by ASTM C94, for concrete to be vibrated shall be as shown in Table II.

TABLE II - MAXIMUM SLUMP, MM (INCHES)*

Type of Construction Normal Weight

Concrete Lightweight Structural Concrete

Reinforced Footings and Substructure Walls

75mm (3 inches) 75 mm (3 inches)

Slabs, Grade Beams and Reinforced Walls

100 mm (4 inches) 100 mm (4 inches)

* Slump may be increased by the use of the approved high-range water-reducing admixture (superplasticizer). Tolerances as established by ASTM C94. Concrete containing the high-range-water-reducing admixture may have a maximum slump of 225 mm (9 inches). The concrete shall arrive at the job site at a slump of 50 mm to 75 mm (2 inches to 3 inches), and 75 mm to 100 mm (3 inches to 4 inches) for lightweight concrete.

This should be verified, and then the high-range-water-reducing admixture added to increase the slump to the approved level.

E. Air-Entrainment: Air-entrainment of normal weight concrete shall be 2 to 4 percent.. Determine air content by either ASTM C173 or ASTM C231.

F. High early strength concrete, made with Type III cement or Type I cement plus non-corrosive accelerator, shall have a 7-day compressive strength equal to specified minimum 28-day compressive strength for concrete type specified made with standard Portland cement.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-10 CAST-IN-PLACE CONCRETE (SS)

G. Concrete slabs placed at air temperatures below 10 degrees C (50 degrees Fahrenheit) use non-corrosive, non-chloride accelerator. Concrete required to be air entrained use approved air entraining admixture. Pumped concrete, synthetic fiber concrete, architectural concrete, concrete required to be watertight, and concrete with a water/cement ratio below 0.50 use high-range water-reducing admixture (superplasticizer).

H. Durability: Use air entrainment for exterior exposed concrete subjected to freezing and thawing and other concrete shown or specified. Air content as shown in Table III or Table IV.

I. Enforcing Strength Requirements: Test as specified in Section 01 45 29, TESTING LABORATORY SERVICES, during the progress of the work. Seven-day tests may be used as indicators of 28-day strength. Average of any three 28-day consecutive strength tests of laboratory-cured specimens representing each type of concrete shall be equal to or greater than specified strength. No single test shall be more than 3.5 MPa (500 psi) below specified strength. Interpret field test results in accordance with ACI 214. Should strengths shown by test specimens fall below required values, Resident Engineer may require any one or any combination of the following corrective actions, at no additional cost to the Government:

1. Require changes in mix proportions by selecting one of the other appropriate trial mixes or changing proportions, including cement content, of approved trial mix.

2. Require additional curing and protection.

3. If five consecutive tests fall below 95 percent of minimum values given in Table I or if test results are so low as to raise a question as to the safety of the structure, Resident Engineer may direct Contractor to take cores from portions of the structure. Use results from cores tested by the Contractor retained testing agency to analyze structure.

4. If strength of core drilled specimens falls below 85 percent of minimum value given in Table I, Resident Engineer may order load tests, made by Contractor retained testing agency, on portions of building so affected. Load tests in accordance with ACI 318 and criteria of acceptability of concrete under test as given therein.

5. Concrete work, judged inadequate by structural analysis, by results of load test, or for any reason, shall be reinforced with additional construction or replaced, if directed by the Resident Engineer.

2.4 BATCHING AND MIXING:

A. General: Concrete shall be "Ready-Mixed" and comply with ACI 318 and ASTM C94, except as specified. Batch mixing at the site is permitted. Mixing process and equipment must be approved by Resident Engineer. With each batch of concrete, furnish certified delivery tickets listing information in Paragraph 16.1 and 16.2 of ASTM C94. Maximum delivery temperature of concrete is 380C (100 degrees Fahrenheit). Minimum delivery temperature as follows:

Atmospheric Temperature Minimum Concrete Temperature -1. degrees to 4.4 degrees C (30 degrees to 40 degrees F)

15.6 degrees C (60 degrees F.)

-17 degrees C to -1.1 degrees C (0 degrees to 30 degrees F.)

21 degrees C (70 degrees F.)

1. Services of aggregate manufacturer's representative shall be furnished during the design of trial mixes and as requested by the Resident Engineer for consultation during batching, mixing, and placing operations of lightweight structural concrete. Services will be required until field controls indicate that concrete of required quality is being furnished.

Representative shall be thoroughly familiar with the structural lightweight aggregate, Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-11 CAST-IN-PLACE CONCRETE (SS)

adjustment and control of mixes to produce concrete of required quality. Representative shall assist and advise Resident Engineer.

PART 3 – EXECUTION

3.1 FORMWORK:

A. General: Design in accordance with ACI 347 is the responsibility of the Contractor. The Contractor shall retain a registered Professional Engineer to design the formwork, shores, and reshores.

1. Form boards and plywood forms may be reused for contact surfaces of exposed concrete only if thoroughly cleaned, patched, and repaired and Resident Engineer approves their reuse.

2. Provide forms for concrete footings unless Resident Engineer determines forms are not necessary.

3. Corrugated fiberboard forms: Place forms on a smooth firm bed, set tight, with no buckled cartons to prevent horizontal displacement, and in a dry condition when concrete is placed.

B. Treating and Wetting: Treat or wet contact forms as follows:

1. Coat plywood and board forms with non-staining form sealer. In hot weather, cool forms by wetting with cool water just before concrete is placed.

2. Clean and coat removable metal forms with light form oil before reinforcement is placed.

In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.

3. Use sealer on reused plywood forms as specified for new material.

C. Size and Spacing of Studs: Size and space studs, wales and other framing members for wall forms so as not to exceed safe working stress of kind of lumber used nor to develop deflection greater than 1/270 of free span of member.

D. Unlined Forms: Use plywood forms to obtain a smooth finish for concrete surfaces. Tightly butt edges of sheets to prevent leakage. Back up all vertical joints solidly and nail edges of adjacent sheets to same stud with 6d box nails spaced not over 150 mm (6 inches) apart.

E. Lined Forms: May be used in lieu of unlined plywood forms. Back up form lining solidly with square edge board lumber securely screwed to studs with all edges in close contact to prevent bulging of lining. No joints in lining and backing may coincide. Screw abutted edges of sheets to same backing board. Nail lining at not over 200 mm (8 inches) on center along edges and with at least one nail to each square foot of surface area; nails to be 3d blued shingle or similar nails with thin flatheads. Fill and sand screw heads with appropriate filler to achieve smooth surface.

F Wall Form Ties: Locate wall form ties in symmetrically level horizontal rows at each line of wales and in plumb vertical tiers. Space ties to maintain true, plumb surfaces. Provide one row of ties within 150 mm (6 inches) above each construction joint. Space through-ties adjacent to horizontal and vertical construction joints not over 450 mm (18 inches) on center.

1. Tighten row of ties at bottom of form just before placing concrete and, if necessary, during placing of concrete to prevent seepage of concrete and to obtain a clean line. Ties to be entirely removed shall be loosened 24 hours after concrete is placed and shall be pulled from least important face when removed.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-12 CAST-IN-PLACE CONCRETE (SS)

2. Coat surfaces of all metal that is to be removed with paraffin, cup grease or a suitable compound to facilitate removal.

3. Ties not permitted for exposed Architectural Site Concrete. See 32 13 15.

G. Inserts, Sleeves, and Similar Items: Steel strips, anchors, wood blocks, nailing strips, grounds, inserts, wire hangers, sleeves, drains, guard angles, and other items specified as furnished under this and other sections of specifications and required to be in their final position at time concrete is placed shall be properly located, accurately positioned, and built into construction, and maintained securely in place.

1. Install sleeves, inserts and similar items for mechanical services in accordance with drawings prepared specially for mechanical services. Contractor is responsible for accuracy and completeness of drawings and shall coordinate requirements for mechanical services and equipment.

2. Do not install sleeves in grade beams, walls, or pile caps except where shown or permitted by Resident Engineer. Install sleeves in beams, joists, or columns that are not shown, but are permitted by the Resident Engineer, and require no structural changes, at no additional cost to the Government.

3. Minimum clear distance of embedded items such as conduit and pipe is at least three times diameter of conduit or pipe, except at stub-ups and other similar locations.

4. Provide recesses and blockouts in slabs and walls as indicated.

H. Construction Tolerances:

1. Set and maintain concrete formwork to assure erection of completed work within tolerances specified and to accommodate installation of other rough and finish materials.

Accomplish remedial work necessary for correcting excessive tolerances. Erected work that exceeds specified tolerance limits shall be remedied or removed and replaced, at no additional cost to the Government.

2. Permissible surface irregularities for various classes of materials are defined as "finishes" in specification sections covering individual materials. They are to be distinguished from tolerances specified which are applicable to surface irregularities of structural elements.

3.2 PLACING REINFORCEMENT:

A. General: Details of concrete reinforcement in accordance with ACI 318 and ACI 315, unless otherwise shown.

B. Placing: Place reinforcement conforming to CRSI DA4, unless otherwise shown.

1. Place reinforcing bars accurately and tie securely at intersections and splices with 1.6 mm (16 gauge) black annealed wire. Secure reinforcing bars against displacement during the placing of concrete by spacers, chairs, or other similar supports. Portions of supports, spacers, and chairs in contact with formwork shall be made of plastic in areas that will be exposed when building is occupied. Type, number, and spacing of supports conform to ACI 315. Where concrete slabs are placed on ground, use concrete blocks or other non-corrodible material of proper height, for support of reinforcement. Use of brick or stone supports will not be permitted.

2. Lap welded wire fabric at least 1 1/2 mesh panels plus end extension of wires not less than 300 mm (12 inches) in structural slabs. Lap welded wire fabric at least 1/2 mesh panels plus end extension of wires not less than 150 mm (6 inches) in slabs on grade.

3. Splice column steel at no points other than at footings and floor levels unless otherwise shown.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-13 CAST-IN-PLACE CONCRETE (SS)

C. Spacing: Minimum clear distances between parallel bars, except in columns and multiple layers of bars in beams shall be equal to nominal diameter of bars. Minimum clear spacing is 25 mm (1 inch) or 1-1/3 times maximum size of coarse aggregate.

D. Splicing: Splices of reinforcement made only as required or shown or specified. Accomplish splicing as follows:

1. Lap splices: Do not use lap splices for bars larger than Number 36 (Number 11).

Minimum lengths of lap as shown.

2. Welded splices: Splicing by butt-welding of reinforcement permitted providing the weld develops in tension at least 125 percent of the yield strength (fy) for the bars. Welding conform to the requirements of AWS D1.4. Welded reinforcing steel conform to the chemical analysis requirements of AWS D1.4.

a. Submit test reports indicating the chemical analysis to establish weldability of reinforcing steel.

b. Submit a field quality control procedure to insure proper inspection, materials and welding procedure for welded splices.

c. Department of Veterans Affairs retained testing agency shall test a minimum of three splices, for compliance, locations selected by Resident Engineer.

3. Mechanical Splices: Develop in tension and compression at least 125 percent of the yield strength (fy) of the bars. Stresses of transition splices between two reinforcing bar sizes based on area of smaller bar. Provide mechanical splices at locations indicated. Use approved exothermic, tapered threaded coupling, or swaged and threaded sleeve.

Exposed threads and swaging in the field not permitted.

a. Initial qualification: In the presence of Resident Engineer, make three test mechanical splices of each bar size proposed to be spliced. Department of Veterans Affairs retained testing laboratory will perform load test.

b. During installation: Furnish, at no additional cost to the Government, one companion (sister) splice for every 50 splices for load testing. Department of Veterans Affairs retained testing laboratory will perform the load test.

E. Bending: Bend bars cold, unless otherwise approved. Do not field bend bars partially embedded in concrete, except when approved by Resident Engineer.

F. Cleaning: Metal reinforcement, at time concrete is placed, shall be free from loose flaky rust, mud, oil, or similar coatings that will reduce bond.

G. Future Bonding: Protect exposed reinforcement bars intended for bonding with future work by wrapping with felt and coating felt with a bituminous compound unless otherwise shown.

3.3 POLYETHYLENE SHEET:

A. Exterior pile supported concrete slabs shall be placed on a continuous polyethylene sheet.

1. Joints lapped 150 mm (6 inches) and sealed with compatible waterproof pressure-sensitive tape.

2. Patch punctures and tears.

3.4 EXPANSION JOINTS:

A. Clean expansion joint surfaces before installing premolded filler and placing adjacent concrete.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-14 CAST-IN-PLACE CONCRETE (SS)

3.5 PLACING CONCRETE:

A. Preparation:

1. Remove hardened concrete, wood chips, shavings and other debris from forms.

2. Remove hardened concrete and foreign materials from interior surfaces of mixing and conveying equipment.

3. Have forms and reinforcement inspected and approved by Resident Engineer before depositing concrete.

4. Provide runways for wheeling equipment to convey concrete to point of deposit. Keep equipment on runways which are not supported by or bear on reinforcement. Provide similar runways for protection of vapor barrier on coarse fill.

B. Bonding: Before depositing new concrete on or against concrete which has been set, thoroughly roughen and clean existing surfaces of laitance, foreign matter, and loose particles.

1. Preparing surface for applied topping:

a. Remove laitance, mortar, oil, grease, paint, or other foreign material by sand blasting. Clean with vacuum type equipment to remove sand and other loose material.

b. Broom clean and keep base slab wet for at least four hours before topping is applied.

c. Use a thin coat of one part Portland cement, 1.5 parts fine sand, bonding admixture; and water at a 50: 50 ratio and mix to achieve the consistency of thick paint. Apply to a damp base slab by scrubbing with a stiff fiber brush. New concrete shall be placed while the bonding grout is still tacky.

C. Conveying Concrete: Convey concrete from mixer to final place of deposit by a method which will prevent segregation. Method of conveying concrete subject to approval of Resident Engineer.

D. Placing: For special requirements see Paragraphs, HOT WEATHER and COLD WEATHER.

1. Do not place concrete when weather conditions prevent proper placement and consolidation, or when concrete has attained its initial set, or has contained its water or cement content more than 1 1/2 hours.

2. Deposit concrete in forms as near as practicable in its final position. Prevent splashing of forms or reinforcement with concrete in advance of placing concrete.

3. Do not drop concrete freely more than 3000 mm (10 feet) for concrete containing the high-range water-reducing admixture (superplasticizer) or 1500 mm (5 feet) for conventional concrete. Where greater drops are required, use a tremie or flexible spout (canvas elephant trunk), attached to a suitable hopper.

4. Discharge contents of tremies or flexible spouts in horizontal layers not exceeding 500 mm (20 inches) in thickness, and space tremies such as to provide a minimum of lateral movement of concrete.

5. Continuously place concrete until an entire unit between construction joints is placed.

Rate and method of placing concrete shall be such that no concrete between construction joints will be deposited upon or against partly set concrete, after it's initial set has taken place, or after 45 minutes of elapsed time during concrete placement.

6. On bottom of members with severe congestion of reinforcement, deposit 25 mm (1 inch) layer of flowing concrete containing the specified high-range water-reducing admixture (superplasticizer). Successive concrete lifts may be a continuation of this concrete or concrete with a conventional slump.

E. Consolidation: Conform to ACI 309. Immediately after depositing, spade concrete next to forms, work around reinforcement and into angles of forms, tamp lightly by hand, and compact with mechanical vibrator applied directly into concrete at approximately 450 mm (18 inch)

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-15 CAST-IN-PLACE CONCRETE (SS)

intervals. Mechanical vibrator shall be power driven, hand operated type with minimum frequency of 5000 cycles per minute having an intensity sufficient to cause flow or settlement of concrete into place. Vibrate concrete to produce thorough compaction, complete embedment of reinforcement and concrete of uniform and maximum density without segregation of mix. Do not transport concrete in forms by vibration.

1. Use of form vibration shall be approved only when concrete sections are too thin or too inaccessible for use of internal vibration.

2. Carry on vibration continuously with placing of concrete. Do not insert vibrator into concrete that has begun to set.

3.6 HOT WEATHER:

A. Follow the recommendations of ACI 305 or as specified to prevent problems in the manufacturing, placing, and curing of concrete that can adversely affect the properties and serviceability of the hardened concrete. Methods proposed for cooling materials and arrangements for protecting concrete shall be made in advance of concrete placement and approved by Resident Engineer.

3.7 COLD WEATHER:

A. Follow the recommendations of ACI 306 or as specified to prevent freezing of concrete and to permit concrete to gain strength properly. Use only the specified non-corrosive, non-chloride accelerator. Do not use calcium chloride, thiocyanates or admixtures containing more than 0.05 percent chloride ions. Methods proposed for heating materials and arrangements for protecting concrete shall be made in advance of concrete placement and approved by Resident Engineer.

3.8 PROTECTION AND CURING:

A. Conform to ACI 308: Initial curing shall immediately follow the finishing operation. Protect exposed surfaces of concrete from premature drying, wash by rain and running water, wind, mechanical injury, and excessively hot or cold temperatures. Keep concrete not covered with membrane or other curing material continuously wet for at least 7 days after placing, except wet curing period for high-early-strength concrete shall be not less than 3 days. Keep wood forms continuously wet to prevent moisture loss until forms are removed. Cure exposed concrete surfaces as described below. Other curing methods may be used if approved by Resident Engineer.

1. Liquid curing and sealing compounds: Apply by power-driven spray or roller in accordance with the manufacturer’s instructions. Apply immediately after finishing.

Maximum coverage 10m2/L (400 square feet per gallon) on steel troweled surfaces and 7.5m2/L (300 square feet per gallon) on floated or broomed surfaces for the curing/sealing compound.

2. Plastic sheets: Apply as soon as concrete has hardened sufficiently to prevent surface damage. Utilize widest practical width sheet and overlap adjacent sheets 50 mm (2 inches). Tightly seal joints with tape.

3. Paper: Utilize widest practical width paper and overlap adjacent sheets 50 mm (2 inches). Tightly seal joints with sand, wood planks, pressure-sensitive tape, mastic or glue.

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-16 CAST-IN-PLACE CONCRETE (SS)

3.9 REMOVAL OF FORMS:

A. Remove in a manner to assure complete safety of structure after the following conditions have been met.

1. Where structure as a whole is supported on shores, forms for beams and girder sides, columns, and similar vertical structural members may be removed after 24 hours, provided concrete has hardened sufficiently to prevent surface damage and curing is continued without any lapse in time as specified for exposed surfaces.

2. Take particular care in removing forms of architectural exposed concrete to insure surfaces are not marred or gouged, and that corners and arises are true, sharp and unbroken.

B. Control Test: Use to determine if the concrete has attained sufficient strength and curing to permit removal of supporting forms. Cylinders required for control tests taken in accordance with ASTM C172, molded in accordance with ASTM C31, and tested in accordance with ASTM C39. Control cylinders cured and protected in the same manner as the structure they represent. Supporting forms or shoring not removed until strength of control test cylinders have attained at least 70 percent of minimum 28-day compressive strength specified. Exercise care to assure that newly unsupported portions of structure are not subjected to heavy construction or material loading.

3.10 CONCRETE SURFACE PREPARATION:

A. Metal Removal: Unnecessary metal items cut back flush with face of concrete members.

B. Patching: Maintain curing and start patching as soon as forms are removed. Do not apply curing compounds to concrete surfaces requiring patching until patching is completed. Use cement mortar for patching of same composition as that used in concrete. Use white or gray Portland cement as necessary to obtain finish color matching surrounding concrete. Thoroughly clean areas to be patched. Cut out honeycombed or otherwise defective areas to solid concrete to a depth of not less than 25 mm (1 inch). Cut edge perpendicular to surface of concrete.

Saturate with water area to be patched, and at least 150 mm (6 inches) surrounding before placing patching mortar. Give area to be patched a brush coat of cement grout followed immediately by patching mortar. Cement grout composed of one part Portland cement, 1.5 parts fine sand, bonding admixture, and water at a 50:50 ratio, mix to achieve consistency of thick paint. Mix patching mortar approximately 1 hour before placing and remix occasionally during this period without addition of water. Compact mortar into place and screed slightly higher than surrounding surface. After initial shrinkage has occurred, finish to match color and texture of adjoining surfaces. Cure patches as specified for other concrete. Fill form tie holes which extend entirely through walls from unexposed face by means of a pressure gun or other suitable device to force mortar through wall. Wipe excess mortar off exposed face with a cloth.

C. Upon removal of forms, clean vertical concrete surface that is to receive bonded applied cementitious application with wire brushes or by sand blasting to remove unset material, laitance, and loose particles to expose aggregates to provide a clean, firm, granular surface for bond of applied finish.

3.11 CONCRETE FINISHES:

A. Vertical Surface Finishes:

Addendum 01

2/29/2012

5/23/2012 s t u d i o NOVA / S & P 5/21/2012

033001-17 CAST-IN-PLACE CONCRETE (SS)

1. Unfinished areas: Vertical and overhead concrete surfaces exposed in pipe basements, elevator and dumbwaiter shafts, pipe spaces, pipe trenches, above suspended ceilings, manholes, and other unfinished areas will not require additional finishing.

2. Interior and exterior exposed areas finished: Give a grout finish of uniform color and smooth finish treated as follows:

a. After concrete has hardened and laitance, fins and burrs removed, scrub concrete with wire brushes. Clean stained concrete surfaces by use of a hone stone.

b. Apply grout composed of one part of Portland cement, one part fine sand, smaller than a 600 μm (No. 30) sieve. Work grout into surface of concrete with cork floats or fiber brushes until all pits, and honeycombs are filled.

c. After grout has hardened slightly, but while still plastic, scrape grout off with a sponge rubber float and, about 1 hour later, rub concrete vigorously with burlap to remove any excess grout remaining on surfaces.

d. In hot, dry weather use a fog spray to keep grout wet during setting period.

Complete finish of area in same day. Make limits of finished areas at natural breaks in wall surface. Leave no grout on concrete surface overnight.

3. Textured: Finish as specified. Maximum quantity of patched area 0.2 m2 (2 square feet) in each 93 m2 (1000 square feet) of textured surface.

B. Slab Finishes:

1. Monitoring and Adjustment: Provide continuous cycle of placement, measurement, evaluation and adjustment of procedures to produce slabs within specified tolerances.

Monitor elevations of structural steel in key locations before and after concrete placement to establish typical deflection patterns for the structural steel. Determine elevations of cast-in-place slab soffits prior to removal of shores. Provide information to Resident Engineer and floor consultant for evaluation and recommendations for subsequent placements.

2. Set perimeter forms to serve as screed using either optical or laser instruments. For slabs on grade, wet screeds may be used to establish initial grade during strike-off, unless Resident Engineer determines that the method is proving insufficient to meet required finish tolerances and directs use of rigid screed guides. Where wet screeds are allowed, they shall be placed using grade stakes set by optical or laser instruments. Use rigid screed guides, as opposed to wet screeds, to control strike-off elevation for all types of elevated (non slab-on-grade) slabs. Divide bays into halves or thirds by hard screeds.

Adjust as necessary where…