36C25619R0042_0003.docx
DOCX document 111 KB Posted
- Attached to
- Install Roll Down Gates for Garages Federal contract opportunity
- Solicitation number
- 36C25619R0042
About this file
36C25619R0042 0003
View the file
Other files for this federal contract opportunity
Show all 50
Install Roll Down Gates for Garages has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
06-19-2019
629-18-102 36C520 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 leslie.robinson@va.gov 504-507-4160 36C520 Department of Veterans Affairs Gulf Coast Veterans Health Care System Network Contracting Office 16 400 Veterans Avenue Biloxi MS 39531 To all Offerors/Bidders
36C25619R0042 04-26-2019
X x X
** HOUR & DATE for Receipt of Offers is EXTENDED to:
X
THE PURPOSE OF THIS AMENDMENT IS AS FOLLOW:
1) To extend the date that proposals are due through July 31, 2019 @ 4:30 PM CDT.
2) To extend the Questions and Answers period through July 15, 2019 @ 4:30 PM CDT.
3) To provide a revised Statement of Work dated July 5, 2019.
4) To add Roll Down Gates Addeudum I; and to add clarification for questions asked during the site visit; 05/30/2019.
LESLIE ROBINSON
CONTRACTING OFFICER
Statement of Work for Southeast Louisiana Veterans Health Care System Roll Down Gates for Garages July 5, 2019 - Revised
1. General Information
1.1. The Southeast Louisiana Veterans Health Care System located at 2400 Canal Street, New Orleans, LA 70119 has an urgent requirement for installation of roll down gates for our parking garages. The gates will encase the vehicular entrances and are intended to provide an additional level of security for our site.
1.2. Project Title
1.2.1. Roll Down Gates and Bollards for Garages.
2. Scope of Work
2.1. The vendor/installer will provide all materials, supplies, tools and manpower to install roll up grille doors and removable bollards to block vehicular access to the parking garages. The vendor shall field verify all dimensions. The bollards will be priced as an alternate to the roll up grill doors.
2.2. Needed per perspective vendor site visit and walk-through:
2.2.1. Install (3) three motorized roll up grille doors at the Staff Garage located on Rocheblave Street. One on the north side measuring approximately 25’-6” wide by 12’-6” high. One at the center measuring approximately 50’-0” wide by 10’-5” high. One on the south side measuring approximately 28’-6” wide by 12’-6” high.
2.2.2. Install (3) three roll up grille doors at the Patient Garage located on S. Galvez Street. One on the north side measuring approximately 27’-0” wide by 10’-5” high. One at the center measuring approximately 34’-0” wide x 12’-1” high. One on the south side measuring approximately 12’-0” x 12’-3”.
2.2.2.1. Government will provide locking mechanism for this item.
All work shall be performed by personnel specifically qualified and trained to install roll up grille doors. Evidence of all required licenses, as well as documentation of qualifications of personnel, shall be provided to the Contracting Officer (CO) prior to award of contract.
2.3. In lieu of the roll up grille doors, the VA will entertain an alternate price for installing structural, removable bollards in the pavement area in front of the staff and patient garages.
2.3.1. There will be 26 removable bollards at the Staff Garage and 20 removable bollards at the Patient Garage. Layout will be coordinated in the field.
2.3.2. The scope shall include saw cutting of the pavement, removal of concrete and debris, excavating for the new bollard sleeves, installing new compacted fill to 95% dry proctor, placement of new paving and reinforcement doweled into existing and finishing of concrete to match existing.
2.3.3. The bollards shall be placed at 4’-8” on center and laid out in accordance with attached documents. The specifications and bollard shop drawings are attached for reference.
3. Period of Performance
3.1 The contractor shall complete the task within ninety (90) calendar days of receipt of award. To occur on or around September 1, 2018.
4. Key Personnel 6 .1 The Contractor shall submit a list of the points of contact for VA’s account pertaining to testing and inspections. Submission shall include the person’s name, phone number, email and address for correspondence. For all work completed, the Contractor shall submit proof of elevator inspection and testing certification for the inspector completing the work.
5. Place of Performance
8.1 The work shall initially be performed at the New Orleans VA Medical Center 2400 Canal St., New Orleans, Louisiana. Work shall occur at the Patient Garage located on S. Galvez Street and at the Staff Garage located on S. Rocheblave Street.
COR Authority
10.1 In no event is the Contracting Officer’s Representative (COR) empowered to change any of the terms and conditions of the contract. All changes, to any section of this contract, shall be made only by the CO pursuant to a properly executed modification. The types of actions within the purview of the COR’s authority are to ensure that the Contractor performs the technical requirements of the contract, and to notify the CO of any deficiencies observed. A Letter of Designation shall be issued to the COR and a copy shall be sent to the Contractor at the time of contract kickoff meeting or post-award conference setting forth in full the responsibilities and limitations of the COR.
6. Hours of Work
11.1 Normal operational hours for the VA facilities are from 7:30 a. m. – 4:30 p. m, Monday through Friday, exclusive of Federal Holidays. All work can be included during this time. Access to the garages must be maintained at all time. The contractor can be allowed to work on weekends with special permission. Requests must be made at least 7 days in advance.
7. General Requirements
7.1. The Contractors shall furnish all labor, transportation, equipment, materials, tools, supplies, supervision, incidental engineering, and management required fabricate and install the roll up grille doors listed in accordance with TJC, ANSI, ASME and NFPA requirements.
7.2. The contractor shall provide all material necessary to fabricate the roll up grille doors.
7.2.1. The contractor shall provide, at a minimum the following roll up grille doors:
7.2.1.1.1. Shall adhere to the dimensions noted in the provided drawing.
7.2.1.1.1.1. Contractor shall still be responsible for field verifying all measurements.
7.2.1.1.2. No fewer than 6 roll up grille doors shall be provided.
7.2.1.1.3. Roll up grill doors shall be painted black to match color of existing fencing on the campus. Contractor shall color match existing paint.
7.2.1.1.4. Roll up grill doors shall be metal, mesh with openings approximately 9” x 2”.
7.2.1.1.5. All posts and bracing shall be installed by the contractor.
7.2.1.1.6. At no point may a gap exist between end posts and adjacent walls.
7.2.1.1.7. All roll down grille doors shall sit flush against their associated posts, the underside of the beams and the floor.
7.2.1.1.8. Total height from finished floor to the underside of the beams vary and shall be field verified by the contractor.
7.2.1.1.8.1. Height to be field verified by the vendor.
7.2.1.1.9. Modifications will be required to the curbs to allow the bottoms of the roll down grille doors rest flush on the existing sidewalks and driveways. This will involve saw cutting the existing curb and /or sidewalk as required and patching the concrete as required to provide a finished matching surface with the abutting pavement. The length of concrete (curb and/or sidewalk) to be removed varies at each door location from a minimum of 0 inches to a maximum of 32 inches.
7.2.1.1.10. Existing utilities, signage and bracing are located in the vicinity of the proposed locations of the roll down grille doors. The contractor shall install the gates to minimize the impacts to these features. If the lights/signage over the entrances and exits have to be relocated to accommodate the gate hood, the preference is to move the light/signage above the hood (if possible). Alternatively, provide a hood capable of supporting the light/signage and mount to lights/signage to the hood. All required conduit shall be installed in a manner that will not interfere with the operation of the gate. Lights/signage shall include, but not limited to EXIT, ENTRANCE, ENTER, OPEN, and overhead PVS clearance marker.
7.2.1.1.11. Hoods shall be formed to fit contour of end brackets and shall be constructed of sheet steel with a minimum thickness of 0.0239 inches (thicker as required if the contractor elects to mount lights/signage on the hood).
7.2.1.1.12. Electric motors with cut reduction gears, steel chain sprockets, magnetic brake, overload protection, brackets, push button controls, and accessories necessary for proper operation including emergency manual power shall be provided. The operator shall be designed so the motor can be removed without disturbing the limit-switch timing and without affecting emergency manual operators. The emergency manual operation shall be by chain-gear mechanism. The chain shall extend to within 3 feet of the floor and have a maximum opening and closing force of 25 lbf. The motor shall be single phase, high starting torque, reversible type, of sufficient horsepower to operate the door in both directions from any position and have a travel speed of 8 inches per second.
7.2.1.1.13. Provide three button type, push button switch on interior, unless noted to be key activated, with buttons marked, OPEN, CLOSE, and STOP.
7.2.1.1.14. Provide fail safe safety device at the bottom bar of electrically operated doors to immediately stop, reverse and fully open upon contacting obstructions. DO NOT use safety device as a limit switch.
7.2.1.1.15. Locate anchors and inserts for guides, brackets, motors, switches, hardware and other accessories accurately. The garages are constructed of precast concrete members with varying dimensions and locations of connection plates. The contractor shall field verify the locations of these connections and coordinate the fasteners required to install the gates and supporting steel to avoid any conflicts with the embedded steel connection plates. Additionally, the concrete walls at the Staff garage run the full length of the opening. The concrete walls at the Patient Garage do not extend the full height of the openings. At both locations, the concrete walls are non-structural walls. The contractor shall design the steel framing to accommodate these field conditions. The concrete walls on the Staff Garage and Patient Garage are approximately 9 inches and 9-1/4 inches thick, respectively. It is further noted that the concrete spandrel beam at the center opening of the Staff Garage is lower than the bottom elevation of the two adjacent openings. The contractor shall design the gates accordingly for the actual opening dimensions.
9. Travel The contractor is responsible for providing transportation/travel for all materials, supplies, personnel and all items needed for the duration of this contract unless stated otherwise elsewhere.
10. Protection of Person and Property
| 10.1 | The Government shall provide access to the facilities as necessary for services to commence. The VA Engineering, Safety or Police Services will also provide notification of any systems outages, testing or downtime to affected VA staff. |
| 10.3 | Removing Employees for Misconduct or Security Reasons. The Government may, at its sole discretion, direct the contractor to remove any contractor employee from U.S. VA/VHA facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under any Contract awarded. The Contracting Officer will provide the contractor with a written explanation to support any request to remove an employee. |
11. Protection of Person and Property
11.1 The contractor expressly undertakes’, both directly and through its subcontractor(s), to take every precaution at all times for the protection of persons and property, including Medical Center employees and property and its own.
11.2 The contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work.
11.3 The contractor shall continuously maintain adequate protection of all work from damage and shall protect the Medical Center property from injury of loss arising in connection with this contract. The contractor shall make good any such damage, injury or loss, except as may be by agents or employees of the Medical Center.
11.4 In an emergency affecting the safety or life of individuals, or of the work, or of adjoining property, the contractor, without special instruction or authorization from the Medical Center, is hereby permitted to act, at the contractor's discretion, to prevent such threatened loss or injury. Also, should the contractor, in order to prevent threatened loss or injury, be instructed or authorized to act by the Medical Center, he shall so act, without appeal. Any additional compensation or extension of time claimed by the contractor on account of any emergency work shall be determined by mutual agreement.
Roll Down Gates for Garages ADDENDUM 1 July 5, 2019 Install Removable Structural Bollards in-Lieu-of Roll Down Gates This addendum 1 shall include an alternate price for the complete furnishing and installation of approximately 46 removable, structural bollards in accordance with the documents attached to the file for the roll down gates.
In addition to the documents already posted for the roll down gates these additional documents are available for your use in pricing the addendum alternate price:
1. 32_39_50__ 010 – Rated, fixed, removable, stand alone foundation bollards. K4/M30 Bollards.
2. 32_39_50 – Construction Specifications for Site Security Equipment.
3. 03_30_01 – Construction Specifications for Cast-In-Place Concrete.
4. Contract drawing LL110.
5. Contract drawing LL112.
6. Contract drawing LL115.
Proposed Bollard Location - Employee Parking Garage (002).
7. See attached document: Proposed Bollard Location - Visitor's Parking Gara.
End of Addendum 1.
Install Roll Down Gates for Garages
Solicitation Number: 36C25619R0042 Agency: Department of Veterans Affairs Office: VA Gulf Coast Veterans Health Care System Location: Department of Veterans Affairs Gulf Coast Veterans Health Care System Questions/Clarifications
1. Will the VA provide a designated laydown area for materials? If so, where is the laydown area located? Laydown area is limited. The VA will provide a laydown space on the first floor of each garage for small tools and equipment. Materials for construction will be delivered each day and installed that day.
2. Can the VA provide the exact brand/spec and number of bollards needed for the alternative bid as well as the exact location to install? This information will be posted in an addendum.
3. Will qualified traffic control personnel be needed for traffic safety or will signs/flag waver be feasible to direct traffic away from the work area? A qualified traffic control safety person will be required when working directly in the traffic lanes. Cones and barricades shall be used around the work areas.
4. Steel will be needed to mount the roll down gates to the garage. Will the mounting hardware need to be painted a specific color? Use galvanized steel with stainless mounting bolts to mount to the garage structure, not painted.
5. Spec requires grills with metal/mesh. Will products with aluminum rods be acceptable? (See product brochure attached.) The attached brochure represents typical commercial storefront applications not applicable to vehicular traffic. Aluminum will be acceptable as long as the gate can withstand the impact of large vehicles including trucks.
6. Will signage be allowed to be moved in a uniform manner in order to accommodate exterior mounted door? It will be advantageous to the government to exterior mount the doors. It would be more advantageous to the VA if the roll down gates were mounted on the inside of the overhead beam thus avoiding relocation of the numerous signs. Conduit and junction boxes on the inside of the overhead beam would have to be relocated to accommodate the gate housing. Vertical gate rails would be mounted to the slab inside the garage and anchored at the base and to the overhead beam.
7. Is there any procedure for patch work? Patch work will be needed if signs are allowed to be moved where electrical lines were previously drilled in the concrete spans. Patch work on the overhead beam would be minimal if the housing were to be mounted on the inside of the beam.
8. Please identify the location and distance to the electrical panel where the new roll down doors will tie into the system. Please do this for both garages.
Please see attached PDF’s of electrical drawings for the two parking garages.
9. Please verify that the designated electrical panels has enough empty space to tie in the three doors required for the Rocheblave garage and the Galvez garage.
What are the proposed electrical requirements and how many circuits will be required. This question must be answered before verification of electrical service.
10. Please identify the location of the onsite storage for this project.
On-site storage is limited. Space will be made available for tool job boxes and welding machine in each garage. Materials for installation will be delivered to the job on a daily basis for installation that day.
11. Will Schedule 40 pipe filled with concrete suffice as a protection bollard for the new gates where they are exposed to traffic damage?
No. Use steel pipe filled with concrete. Pipe shall be painted to match existing bollard color. Galvanized steel angles frame bolted to the concrete can be used as a protective barricade subject to VA approval.
12. Will gpr be required for each hole or cut into existing concrete?
Not necessary unless bollard is located close to under slab utilities.
13. Has the specs been provided for the removable bollards?
Steel bollard to match existing on-site with filled concrete core.
14. Has the location for the removable bollards been selected?
Please see attached files for proposed bollard locations. Actual location to be determined based on existing structural/foundation site conditions.
15. If external models are chosen for the roll down gates is the VA okay with removal and relocation of the existing garage signage?
Removal of any signage, conduit, cameras or other devices must be coordinated with the VA. Provide a representative plan of affected area and proposed solution. Subject to VA approval.
16. Will the VA allow the option of weekend work or evenings if the contractor determines it is required to complete the installation?
Coordinate with CO and COR.
17. Will doors be categorized by style or type(interior, exterior, jamb) when comparing cost benefits of one bid to another? Each door style has both benefits and drawback for service, looks and longevity, will the bids be compared on best value or the lowest bid price is the winner?
Lowest Price Technically Acceptable.
18. Will the VA provide a designated laydown area for materials? If so, where is the laydown area located?
a. Laydown area is limited. The VA will provide a laydown space on the first floor of each garage for small tools and equipment. Materials for construction will be delivered each day and installed.
19. Can the VA provide the exact brand/spec and number of bollards needed for the alternative bid as well as the exact location to install?
a. This information will be posted in an addendum.
20. Will qualified traffic control personnel be needed for traffic safety or will signs be feasible to direct traffic away from the work area?
a. A qualified traffic control safety person will be required when working directly in the traffic lanes. Cones and barricades shall be used around the work areas.
21. Steel will be needed to mount the roll down gates to the garage. Will the mounting hardware need to be painted a specific color?
a. Use galvanized steel with stainless mounting bolts to mount to the garage structure, not painted.
22. Spec requires grills with metal/mesh. Will products with aluminum rods be acceptable? (See product brochure attached.)
a. Aluminum will be acceptable as long as the gate can withstand the impact of large vehicles.
23. Roll down gates come in aluminum, clear anodized, or bronze. Are either of these finishes acceptable?
a. Aluminum or clear anodized will be acceptable. Product sample to be provided for approval by VA CO/COR.