This document is a Table of Contents for the Department of Veterans Affairs VHA Master Specifications for the VA Danville Renovate B103 PRRTP Bathrooms Project (Project #550-25-108) located at VA Illiana Health Care System, 1900 E. Main St., Danville, IL 61832, dated 06-01-24.

The specifications are organized into 28 divisions covering all aspects of the bathroom renovation project. Division 00 includes special sections and general requirements such as fire and safety control, infection control, work scheduling, job meetings, project schedules, shop drawings, electronic submittals, and construction waste management. Division 02 addresses existing conditions including demolition and abatement of asbestos and lead-based paint. Divisions 03 through 28 specify requirements for concrete, metals, wood/plastics/composites, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, communications, and electronic safety and security systems. Notable sections include ceramic/porcelain tiling (09 30 13), plumbing fixtures (22 40 00 dated 05-24), toilet compartments and accessories (10 21 13, 10 28 00), interior lighting (26 51 00 dated 03-24), and nurse call and code blue systems (27 52 23). The specifications reference various VA standard technical requirements with effective dates ranging from 2011 to 2024, providing comprehensive guidance for all construction and renovation activities required for the bathroom project.

View the file

Other files

File Type Posted
Attachment 13 -Metpar Care and Maintenance - 09-29-2026.pdf PDF
Attachment 14 - Metpar Line Card Tri-Fold Brochure - 09-29-2026.pdf PDF
Attachment 6 - Danville VA 2019 Asbestos Reinspection Drawings Rev. 1.pdf PDF
Attachment 12- Metpar Warranty Information - 09-29-2026.pdf PDF
Attachment 3- Site visit October 6.pdf PDF
Attachment 15 - Metpar Black Core Phenolic Color Chart - 09-29-2026 (1).pdf PDF
Attachment 4 - Project 550-25-108 - Asbestos HazMat 65 Submission - Feb. 2025.pdf PDF
Attachment 2 Site visit September 29.pdf PDF
Attachment 9- Parking map2023.pdf PDF
Attachment 8 - Bid RFI Drawings.pdf PDF
Attachment 5 - Danville VAMC - Asbestos Reinspection Report - 2018 Final.pdf PDF
Attachment 11- Acoustical Ceiling Hold Clip Selection.pdf PDF
Attachment 10 -09 91 00 - Painting.pdf PDF
Attachment 16 - Metpar Master Catalog - 09-29-2026.pdf PDF
36C25227R0001 0004.docx DOCX document
Attachment 1 - Contractor Surety Limitations.docx DOCX document
S06 0001 36C25227R0001 Att8_S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S06 0001 36C25227R0001 Att2_S02 SOL_Att02 Contractor General Information.docx DOCX document
S06 0001 36C25227R0001 Att7_S02 SOL_Att07_SEED PROJECT WD IL20260002 9-20-26.pdf PDF
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire (1).docx DOCX document
S06 0001 36C25227R0001 Att5_S02 SOL_Att05_SEED PROJECT Specs.pdf PDF
S06 0001 36C25227R0001.pdf PDF
S02 36C25227R0001 0002 2026.10.20_full.pdf PDF
S06 0001 36C25227R0001 Att6_S02 SOL_Att06_SEED PROJECT Drawings.pdf PDF
S06 0001 36C25227R0001 Att1_S02 SOL_Att01 SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
36C25227R0001 0003.docx DOCX document
S02_36C25227R0001_for_550_MATOC-RB.pdf PDF
S02 SOL_Att07_SEED PROJECT WD IL20250002 05.1.2026.pdf PDF
S02 SOL_Att05 SEED PROJECT Specs.pdf PDF
S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S02 SOL_Att01_SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
S02 SOL_Att02 Contractor General Information.docx DOCX document
36C25227R0001_2.docx DOCX document
S02 SOL_Att06 SEED PROJECT Drawings.pdf PDF
S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S02 SOL_Att03 Sub-contractor Info Consent.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Danville Renovate B103 PRRTP Bathrooms Project # 550-25-108

VA Illiana Health Care System 06-01-24

1900 E. Main St., Danville, IL 61832

00 01 10 – Table of Contents - 1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 01 10 Fire and Safety Control(FSS) 11-25

01 01 10 1 Hour Construction Smoke Barrier 11-25

01 01 10 IC Infection Control 11-25

01 12 16 Work Schedule 11-25

01 12 17 Job Meetings 11-25

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24

01 33 23 Shop Drawings, Product Data, and Samples 11-23

01 33 24 Electronic Submittals 11-25

01 35 26 Safety Requirements for Major Projects 05-24

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 00 (Short-Form) Cast-in-Place Concrete 01-19

DIVISION 04 – MASONRY – NOT USED

DIVISION 05 – METALS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 16 63 Cementitious Sheathing 01-21

06 20 00 Finish Carpentry 01-21

00 01 10 – Table of Contents - 2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 00 Sheet Waterproofing 01-21

07 60 00 Flashing and Sheet Metal 01-21

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 71 00 Door Hardware 03-24

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 51 00 Acoustical Ceilings 12-18

09 91 00 Painting

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 21 13 Toilet Compartments 01-21

10 21 23 Cubicle Curtain Tracks 01-21

10 26 00 Wall and Door Protection 01-21

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS –

12 32 00 Manufactured Wood Casework

12 36 00 Countertops

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

DIVISION 14– CONVEYING EQUIPMENT – NOT USED-

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23

22 05 19 Meters and Gages for Plumbing Piping 09-20

00 01 10 – Table of Contents - 3

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

22 40 00 Plumbing Fixtures 05-24

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

03-23

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 31 00 HVAC Ducts and Casings 03-23

23 34 00 HVAC Fans 03-23

23 37 00 Air Outlets and Inlets 03-23

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 51 00 Interior Lighting 03-24

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 10 00 Control, Communication and Signal Wiring 06-15

27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 31 00 Fire Detection and Alarm 10-11