This is Amendment 0005 to Solicitation 36C25227R0001, issued by the Department of Veterans Affairs Great Lakes Acquisition Center on November 13, 2026. The amendment extends the proposal submission deadline to November 23, 2026, at 10:00 a.m. CST and addresses two vendor Requests for Information (RFIs) related to past performance experience requirements and base bid scope clarifications for a bathroom renovation project at the VA Illiana Health Care System in Danville, Illinois.

In response to RFI 27, the Government revised Section 5.2.4 to allow offerors to demonstrate construction experience in a healthcare environment using the past five years of performance history, increasing the requirement from three years. In response to RFI 28, the Government clarified that the base bid shall include replacement of up to two feet of existing stud wall framing at all existing perimeter and interior walls. Additionally, contractors must include a $25,000 allowance in their bids to address any deteriorated or unsuitable wall or floor substrates exposed during demolition work. Any removal, protection, repair, restoration, and infectious barriers of existing finishes on the opposite side of affected walls will be addressed during construction if required. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
Attachment 13 -Metpar Care and Maintenance - 09-29-2026.pdf PDF
Attachment 14 - Metpar Line Card Tri-Fold Brochure - 09-29-2026.pdf PDF
Attachment 6 - Danville VA 2019 Asbestos Reinspection Drawings Rev. 1.pdf PDF
Attachment 12- Metpar Warranty Information - 09-29-2026.pdf PDF
Attachment 7 - 00 01 10 - Table of Contents.pdf PDF
Attachment 3- Site visit October 6.pdf PDF
Attachment 15 - Metpar Black Core Phenolic Color Chart - 09-29-2026 (1).pdf PDF
Attachment 4 - Project 550-25-108 - Asbestos HazMat 65 Submission - Feb. 2025.pdf PDF
Attachment 2 Site visit September 29.pdf PDF
Attachment 9- Parking map2023.pdf PDF
Attachment 8 - Bid RFI Drawings.pdf PDF
Attachment 5 - Danville VAMC - Asbestos Reinspection Report - 2018 Final.pdf PDF
Attachment 11- Acoustical Ceiling Hold Clip Selection.pdf PDF
Attachment 10 -09 91 00 - Painting.pdf PDF
Attachment 16 - Metpar Master Catalog - 09-29-2026.pdf PDF
36C25227R0001 0004.docx DOCX document
Attachment 1 - Contractor Surety Limitations.docx DOCX document
S06 0001 36C25227R0001 Att8_S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S06 0001 36C25227R0001 Att2_S02 SOL_Att02 Contractor General Information.docx DOCX document
S06 0001 36C25227R0001 Att7_S02 SOL_Att07_SEED PROJECT WD IL20260002 9-20-26.pdf PDF
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire (1).docx DOCX document
S06 0001 36C25227R0001 Att5_S02 SOL_Att05_SEED PROJECT Specs.pdf PDF
S06 0001 36C25227R0001.pdf PDF
S02 36C25227R0001 0002 2026.10.20_full.pdf PDF
S06 0001 36C25227R0001 Att6_S02 SOL_Att06_SEED PROJECT Drawings.pdf PDF
S06 0001 36C25227R0001 Att1_S02 SOL_Att01 SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
36C25227R0001 0003.docx DOCX document
S02_36C25227R0001_for_550_MATOC-RB.pdf PDF
S02 SOL_Att07_SEED PROJECT WD IL20250002 05.1.2026.pdf PDF
S02 SOL_Att05 SEED PROJECT Specs.pdf PDF
S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S02 SOL_Att01_SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
S02 SOL_Att02 Contractor General Information.docx DOCX document
36C25227R0001_2.docx DOCX document
S02 SOL_Att06 SEED PROJECT Drawings.pdf PDF
S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S02 SOL_Att03 Sub-contractor Info Consent.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER

IS ISSUED

PURSUANT TO:

Specify authority)

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT

ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office , appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 11- -2026 550-27-1-6985-0001 550-27-1-6991-0001 (Seed) Per Task Orders 36C252 Department of Veterans Affairs 36C252 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs 36C252 Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25227R0001 09-21-2026

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 11-23-2026 10:00 CST X 0 (Zero)

AMENDMENT 000

. Contractors need not sign and return amendments; HOWEVER, you must acknowledge them on the SF -1442, This Amendment responds to RFI s and 28 Starting on page 2.

Kristi Kluck Contracting Officer

SOLICITATION 36C25227R0001

AMENDMENT 0005

DATE 11/13/2026

Amendment 0005 hereby incorporates the following clarifications/change(s) into the solicitation package:

I. Vendor questions:

RFI # 27.0 Not applicable.

27.1Q: “In Section 5.2.4 in the instructions - the Government states "Offeror shall have a minimum of 3 years’ experience performing construction in a health care environment. " As a result, can the Government allow offerors to submit past performance within the last 5 years in order to demonstrate experience greater than 3 years?”

27.1A: 5 years is enough time to demonstrate capabilities. Therefore, Section 5.2.4 is changed to "Offeror shall have a minimum of 5 years’.

RFI # 28.0 Not applicable.

28.1Q: Please clarify the intended base-bid requirements. Specifically, are bidders required to include the replacement of up to 2 feet of existing stud wall framing at all existing perimeter and interior walls, or is all stud framing replacement to be excluded from the base bid and addressed separately if deteriorated or unsuitable conditions are discovered?

28.1A: VA Response: Regarding stud replacement. Please assume the replacement of up to 2 feet of existing stud wall framing at all existing perimeter and interior walls. Regarding where demolition exposes other (non-stud) deteriorated or unsuitable wall/floor substrates, all contractors should include a $25,000 allowance in the bid. Regarding existing finishes on the opposite side of the affected walls. If any removal, protection, repair, restoration, and infectious barriers of these areas are required, they will be addressed during construction.

The proposal due date is Monday, November 23, 2026, at 10:00 a.m. CST (Chicago, WI - local time)