About this file

This is a product accessory guide for Rockfon ceiling tiles and Chicago Metallic suspension systems. The document, dated July 25, 2023, provides detailed specifications and catalog information for installation accessories used with Rockfon stonewool ceiling products. The guide covers nine categories of accessories: hold down clips, suspension system accessories, concealed system accessories, drywall grid accessories, GRG drywall access doors, accessories for islands and baffles, island wall kits, corner caps, and additional accessories.

The hold down clips section presents the primary product offerings, including specifications for nine different clip types designed for various panel thicknesses ranging from 5/8" to 4" panels. The Universal Hold Down Clip (Catalog Number 935.00, Part Number 250348) is highlighted with emphasis, designed for panels up to 3/4" and packaged in cartons of 1,000 pieces weighing 16 pounds each. Other notable offerings include Hold Down Clips for specific panel sizes (3/4" to 1-1/4", 1-1/2", and 2"-4" Facett panels), Butterfly Retention Clips for panels up to 2", and specialized Access Hold Down Clips for 5/8" panels. All products are available through Rockfon's customer service at +1-800-323-7164 or cs@rockfon.com. The guide notes that hold down clips must be installed on cross tee components and are required for fire-rated ceilings on panels weighing less than one pound per square foot.

View the file

Other files

File Type Posted
Attachment 13 -Metpar Care and Maintenance - 09-29-2026.pdf PDF
Attachment 14 - Metpar Line Card Tri-Fold Brochure - 09-29-2026.pdf PDF
Attachment 6 - Danville VA 2019 Asbestos Reinspection Drawings Rev. 1.pdf PDF
Attachment 12- Metpar Warranty Information - 09-29-2026.pdf PDF
Attachment 7 - 00 01 10 - Table of Contents.pdf PDF
Attachment 3- Site visit October 6.pdf PDF
Attachment 15 - Metpar Black Core Phenolic Color Chart - 09-29-2026 (1).pdf PDF
Attachment 4 - Project 550-25-108 - Asbestos HazMat 65 Submission - Feb. 2025.pdf PDF
Attachment 2 Site visit September 29.pdf PDF
Attachment 9- Parking map2023.pdf PDF
Attachment 8 - Bid RFI Drawings.pdf PDF
Attachment 5 - Danville VAMC - Asbestos Reinspection Report - 2018 Final.pdf PDF
Attachment 10 -09 91 00 - Painting.pdf PDF
Attachment 16 - Metpar Master Catalog - 09-29-2026.pdf PDF
36C25227R0001 0004.docx DOCX document
Attachment 1 - Contractor Surety Limitations.docx DOCX document
S06 0001 36C25227R0001 Att8_S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S06 0001 36C25227R0001 Att2_S02 SOL_Att02 Contractor General Information.docx DOCX document
S06 0001 36C25227R0001 Att7_S02 SOL_Att07_SEED PROJECT WD IL20260002 9-20-26.pdf PDF
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire (1).docx DOCX document
S06 0001 36C25227R0001 Att5_S02 SOL_Att05_SEED PROJECT Specs.pdf PDF
S06 0001 36C25227R0001.pdf PDF
S02 36C25227R0001 0002 2026.10.20_full.pdf PDF
S06 0001 36C25227R0001 Att6_S02 SOL_Att06_SEED PROJECT Drawings.pdf PDF
S06 0001 36C25227R0001 Att1_S02 SOL_Att01 SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
36C25227R0001 0003.docx DOCX document
S02_36C25227R0001_for_550_MATOC-RB.pdf PDF
S02 SOL_Att07_SEED PROJECT WD IL20250002 05.1.2026.pdf PDF
S02 SOL_Att05 SEED PROJECT Specs.pdf PDF
S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S02 SOL_Att01_SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
S02 SOL_Att02 Contractor General Information.docx DOCX document
36C25227R0001_2.docx DOCX document
S02 SOL_Att06 SEED PROJECT Drawings.pdf PDF
S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S02 SOL_Att03 Sub-contractor Info Consent.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Part of ROCKWOOL Group

072523 USA and Canada: Tel. +1-800-323-7164 I cs@rockfon.com | rockfon.com

Installation accessories for Rockfon® Stonewool Ceiling Products and Chicago Metallic® Suspension Systems

Rockfon Tile and Suspension Systems Accessory Guide

Sammamish HS, Bellevue, WA

072523 USA and Canada: Tel. +1-800-323-7164 I cs@rockfon.com | rockfon.com 2

Table of Contents Hold Down Clips

Suspension System Accessories

Concealed System Accessories

Drywall Grid Accessories

GRG Drywall Access Doors

Accessories for Islands and Baffles

Island Wall Kits

Corner Caps

Additional Accessories

072523 USA and Canada: Tel. +1-800-323-7164 I cs@rockfon.com | rockfon.com 3

Detail Catalog Number

Rockfon Part Number Description Unit of Measure Carton Quantity

(Pcs.) Weight (lbs.)

490.00 237949 Hold Down Clip for panels up to 3/4" (Black)

CTN 100 2

491.00 237952 Hold Down Clip for panels 3/4" - 1-1/4"(Blue)

CTN 150 2

492.00 237954 Hold Down Clip for 1-1/2" panels (Gray)

CTN 100 2

495.00 260623 Hold Down Clip Kit for 2" – 4" Facett™ Panels

CTN 100 2

935.00 250348 Universal Hold

Down Clip for panels up to 3/4"

CTN 1000 16

426.00 250324 Butterfly Retention Clip for panels up to 1" Panels

CTN 200 15

427.00 250325 Butterfly Retention Clip for 1"- 2" Panels CTN 150 15

425.01 252923 Access Hold Down Clip for 5/8" panels CTN 200 2

820.00 250343 Hold Down Clip for 5/8" panels (Steel) CTN 1000 7

Hold down clips should be installed on cross tee components.

or re rated ceilin s hold down clips are re uired on panels wei hin less than pound per s uare oot.

Hold Down Clips

935.00 250348 Down Clip for panels up to 3/4"

CTN 1000 16