This is an Asbestos & Hazmat Testing Report for a 65% construction document submission related to bathroom renovation work at VA Illiana Healthcare System in Danville, Illinois (VA Project 550-25-108). The report documents findings from testing conducted on February 7, 2025, by inspector Brett Brumbaugh of Castle Hill Associates.

The testing identified asbestos-containing materials (ACM) requiring removal in both Building 103 and Building 72. In Building 103, approximately 128 mud fittings on domestic water line insulation in restroom pipe chases and ceiling plenums tested positive for 10% chrysotile asbestos. In Building 72, 6 mud fittings in Room 6A storage and 30 linear feet of pipe insulation on steam lines tested positive for chrysotile asbestos, along with 3 window units containing 3% chrysotile asbestos in glazing and caulking. Lead-based paint components were also identified: 9,680 square feet of tan ceramic wall tile in Building 103 restrooms tested positive for lead (13.8-14.7 mg/cm²), and Building 72 contained lead-based paint on 3 window units and 4 doors/frames. The cost estimate for asbestos removal, testing, and lead paint handling totals $24,500.00, including OSHA testing, Virginia VPIH air monitoring, and contractor overhead with prevailing wage rates for Danville, Illinois. The inspector holds a current Illinois Asbestos Inspector License (#100-09972) and EPA Lead Paint Risk Assessor certification (#LBP-R-I216003-1). Laboratory analysis was performed by Eurofins Built Environment Testing Central, LLC (NVLAP Lab Code 600194-0), which is accredited for asbestos fiber analysis to ISO/IEC 17025:2017.

View the file

Other files

File Type Posted
Attachment 13 -Metpar Care and Maintenance - 09-29-2026.pdf PDF
Attachment 14 - Metpar Line Card Tri-Fold Brochure - 09-29-2026.pdf PDF
Attachment 6 - Danville VA 2019 Asbestos Reinspection Drawings Rev. 1.pdf PDF
Attachment 12- Metpar Warranty Information - 09-29-2026.pdf PDF
Attachment 7 - 00 01 10 - Table of Contents.pdf PDF
Attachment 3- Site visit October 6.pdf PDF
Attachment 15 - Metpar Black Core Phenolic Color Chart - 09-29-2026 (1).pdf PDF
Attachment 2 Site visit September 29.pdf PDF
Attachment 9- Parking map2023.pdf PDF
Attachment 8 - Bid RFI Drawings.pdf PDF
Attachment 5 - Danville VAMC - Asbestos Reinspection Report - 2018 Final.pdf PDF
Attachment 11- Acoustical Ceiling Hold Clip Selection.pdf PDF
Attachment 10 -09 91 00 - Painting.pdf PDF
Attachment 16 - Metpar Master Catalog - 09-29-2026.pdf PDF
36C25227R0001 0004.docx DOCX document
Attachment 1 - Contractor Surety Limitations.docx DOCX document
S06 0001 36C25227R0001 Att8_S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S06 0001 36C25227R0001 Att2_S02 SOL_Att02 Contractor General Information.docx DOCX document
S06 0001 36C25227R0001 Att7_S02 SOL_Att07_SEED PROJECT WD IL20260002 9-20-26.pdf PDF
S06 0001 36C25227R0001 Att9_S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S06 0001 36C25227R0001 Att4_S02 SOL_Att04 Past Performance Client Questionnaire (1).docx DOCX document
S06 0001 36C25227R0001 Att5_S02 SOL_Att05_SEED PROJECT Specs.pdf PDF
S06 0001 36C25227R0001.pdf PDF
S02 36C25227R0001 0002 2026.10.20_full.pdf PDF
S06 0001 36C25227R0001 Att6_S02 SOL_Att06_SEED PROJECT Drawings.pdf PDF
S06 0001 36C25227R0001 Att1_S02 SOL_Att01 SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
36C25227R0001 0003.docx DOCX document
S02_36C25227R0001_for_550_MATOC-RB.pdf PDF
S02 SOL_Att07_SEED PROJECT WD IL20250002 05.1.2026.pdf PDF
S02 SOL_Att05 SEED PROJECT Specs.pdf PDF
S02 SOL_Att04 Past Performance Client Questionnaire.docx DOCX document
S02 SOL_Att01_SEED PROJECT SOW Renovate Bathrooms B103 RRTP.pdf PDF
S02 SOL_Att02 Contractor General Information.docx DOCX document
36C25227R0001_2.docx DOCX document
S02 SOL_Att06 SEED PROJECT Drawings.pdf PDF
S02 SOL_Att08 Contractor Safety and EMR.docx DOCX document
S02 SOL_Att09 VAAR 852.219-75 Certification 550-MATOC.docx DOCX document
S02 SOL_Att03 Sub-contractor Info Consent.docx DOCX document
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS & HAZMAT TESTING REPORT FOR 65% SUBMISSION

VA ILLIANA HCS, DANVILLE, IL - RENOVATE BATHROOMS IN B103 PRRTP & B64/72

VA PROJECT 550-25-108

FEBRUARY 2025

Date: February 16, 2025

Items: Summary Results of Asbestos/HazMat Survey, Visual Inspection, Lab Results

Inspector: Brett Brumbaugh, Castle Hill Associates

BUILDING 103

Asbestos Containing Materials Locations Quantity

Pipe insulation mud fittings on domestic water lines

Restroom pipe chases and ceiling plenums in 106B, 106C, 107B, 107C, 136C, 159C, and 160C

~128 fittings

LEAD-BASED PAINT COMPONENTS

Lead Containing Components Locations Quantity

Tan ceramic wall tile Restrooms 106B, 106C, 107B, 107C, 136C, 159C, and 160C

9,680 sf

BUILDING 72

Pipe insulation mud fittings on domestic water lines

Room 6A storage/mech. 6 fittings

Pipe insulation on steam lines Loft above Rooms 6 and 6A 30 linear feet

Window glazing & caulking on metal window units Room 6 and 6A windows 3 window units (5’x6’)

LEAD-BASED PAINT COMPONENTS

Lead Based Paint Components Locations Quantity

Window frames on metal window units (interior and exterior paint)

Rooms 6 and 6A exterior windows 3 window units (5’x6’)

Wood doors and door frames Rooms 5, 6, 6A, and 7 4 doors & frames

ASBESTOS & HAZMAT COST ESTIMATE

Estimator: Brett Brumbaugh

Notes: Based on 2025/26 construction and bidding

EXCLUDES:

• Overtime or shift work.

INCLUDES:

• Bonds, insurance, contractor overhead and profit

• Prevailing wage rates for Danville, IL

Cost Index: Danville, IL

Description Material Quantity Unit Cost Amount

Section 02 82 11

Asbestos Removal Pipe insulation mud fittings 134 75.00 $10,050.00

Pipe insulation on steam lines 30 55.00 $1,650.00

Window glazing on metal window units 3 1000.00 $3,000.00

Asbestos OSHA Testing CPIH (day) 3 1400.00 $4,200.00

Asbestos VA VPIH Air Monitoring (day) 3 1400.00 $4,200.00

Lead Paint Handling OSHA Testing (day) 1 1400.00 $1,400.00

TOTAL COSTS $24,500.00

ASBESTOS & HAZMAT TESTING REPORT

65% SUBMISSION

LOCATION:

VA ILLIANA HCS - DANVILLE, IL

1900 E. MAIN ST.

DANVILLE, IL 61832

PROJECT:

RENOVATE BATHROOMS IN B103 PRRTP & B64/72

VA PROJECT #: 550-25-108

SAMPLING DATE:

FEBRUARY 7, 2022

CONSULTANT:

CASTLE HILL ASSOCIATES, LLC

1197 FARNSWORTH RD., UNIT E

WATERVILLE, OH 46566

567-952-0212 www.CASTLEHILLASSOCIATES.com http://www.castlehillassociates.com/

ASBESTOS & HAZMAT TESTING REPORT FOR 65% SD SUBMISSION

TABLE OF CONTENTS

• ASBESTOS & LEAD PAINT SAMPLING SUMMARY

• ABESTOS BULK SAMPLING DESCRIPTIONS AND LAB RESULTS

• LEAD SAMPLING DESCRIPTIONS AND RESULTS

• ASBESTOS LABORATORY REPORT

• INSPECTOR & ASBESTOS LABORATORY CERTIFICATIONS

ASBESTOS & LEAD TESTING SUMMARY

On February 7, 2025, Brett Brumbaugh performed asbestos and lead-based paint testing in Buildings 103 and 72 at the Danville VA Medical Center in Danville, IL in preparation of the renovations in 8 bathrooms in the buildings.

As part of this inspection, the previous asbestos testing conducted by Castle Hill Associates in 2018 were utilized to assist in developing this report. Castle Hill conducted this survey for the VA and sampled all suspect materials in the building. Asbestos was found during that survey in both buildings.

ASBESTOS INSPECTION FINDINGS

As a result of this inspection, testing, and laboratory analyses, it has been determined that asbestos is present in the renovation areas of B103 and B72 as follows:

water lines

Restroom pipe chases and ceiling plenums in 106B, 106C, 107B, 107C, 136C, 159C, and 160C

~128 fittings water lines

Room 6A storage/mech. 6 fittings

Pipe insulation on steam lines Loft above Rooms 6 and 6A 30 linear feet

Window glazing & caulking on metal window units

Room 6 and 6A windows 3 window units (5’x6’)

LEAD-BASED PAINT COMPONENT FINDINGS

As a result of this inspection and XRF testing, the following lead-based paint components are present in the 2 buildings:

Lead Containing Components Locations Quantity

Tan ceramic wall tile Restrooms 106B, 106C, 107B, 107C, 136C, 159C, and 160C

9,680 sf

Lead Based Paint Components Locations Quantity

Window frames on metal window units (interior and exterior paint)

Rooms 6 and 6A exterior windows 3 window units (5’x6’)

Wood doors and door frames Rooms 5, 6, 6A, and 7 4 doors & frames

CONCLUSIONS/RECOMMENDATIONS

ASBESTOS: The asbestos containing materials identified in the renovation areas in both buildings must be removed by an Illinois licensed Asbestos Contractor in compliance with VA and US EPA asbestos regulations.

LEAD PAINT: Lead-based paint (LBP), lead coating building materials, and Lead-containing paint (LCP) is not required to be removed prior to renovation or demolition. According to the OSHA Lead in Construction Standard (1926.62), anyone who might create a dust by disturbing paint with any concentration of lead are required to conduct an initial exposure assessment of their workers or rely on historical data from a previous project to determine whether the action level (30 ug/m3) for airborne Pb will be exceeded during the project. All other requirements of the OSHA Lead standard would also apply to the contractors who will disturb the paint during renovation or demolition.

Inspector, Brett L. Brumbaugh, REPA, CESCO

State of Illinois Asbestos Inspector - License # 100-09972 EPA Lead Paint Risk Assessor - EPA License # LBP-R-I216003-1

ASBESTOS BULK SAMPLE DESCRIPTIONS & RESULTS

Site: Danville VA Medical Center – Danville, IL

Buildings: Renovate Bathrooms in B103 PRRTP & B72

Project: VA Project 550-25-108

Sampled: February 7, 2025

Inspector: Brett L. Brumbaugh

Analysis: February 13, 2025

Laboratory: Eurofins Built Environment Testing Central, LLC - Naperville, IL

SAMPLE

BLDG. ROOM MATERIAL ASBESTOS CONTENT

1 103 159C restroom Ceramic wall tile grout No Asbestos Detected

2 103 136C restroom Ceramic wall tile grout No Asbestos Detected

3 103 106C restroom Ceramic wall tile grout No Asbestos Detected

4 103 159C restroom Ceramic wall tile adhesive No Asbestos Detected

5 103 136C restroom Ceramic wall tile adhesive No Asbestos Detected

6 103 106C restroom Ceramic wall tile adhesive No Asbestos Detected

7 103 159C restroom Ceramic floor tile grout No Asbestos Detected

8 103 136C restroom Ceramic floor tile grout No Asbestos Detected

9 103 106C restroom Ceramic floor tile grout No Asbestos Detected

10 103 159C restroom 2x4 lay-in ceiling tile No Asbestos Detected

11 103 136C restroom 2x2 lay-in ceiling tile No Asbestos Detected

12 103 106C restroom 2x2 lay-in ceiling tile No Asbestos Detected

13 103 159C restroom Mud fitting of FG insulated water line 10% Chrysotile Asbestos

14 103 136C restroom Mud fitting of FG insulated water line 10% Chrysotile Asbestos

15 103 106C restroom Mud fitting of FG insulated water line 10% Chrysotile Asbestos

16 103 159C restroom Caulking on sink counter No Asbestos Detected

17 103 136C restroom Caulking on sink counter No Asbestos Detected

18 103 106C restroom Caulking on sink counter No Asbestos Detected

19 103 159C restroom Brown cove base and mastic No Asbestos Detected

20 103 136C restroom Brown cove base and mastic No Asbestos Detected

21 103 106C restroom Brown cove base and mastic No Asbestos Detected

22 72 6A-72 storage room Window glazing (interior) 3% Chrysotile Asbestos

23 72 6-72 restroom Window glazing (interior) 3% Chrysotile Asbestos

24 72 6-72 restroom Window glazing (interior) 3% Chrysotile Asbestos

25 72 6A-72 storage room Exterior window frame caulking 3% Chrysotile Asbestos

26 72 6-72 restroom Exterior window frame caulking 3% Chrysotile Asbestos

27 72 6-72 restroom Exterior window frame caulking 3% Chrysotile Asbestos

ASBESTOS LABORATORY REPORT

Approved by:

Laboratory Manager Itzel Cuellar

Report for:

Mr. Brett Brumbaugh, REPA Castle Hill Associates PO Box 283 Waterville, OH 43566

Regarding:

Eurofins Built Environment Testing Central, LLC Project: Danville VAMC; B72 & 103 Renovate Restrooms

EML ID: 3941215

All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the samples as received and tested. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data for sample results with >1% asbestos concentration can be provided when requested.

Eurofins Built Environment Testing Central, LLC ("the Company"), a member of the Eurofins Built Environment Testing group of companies, shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.

Dates of Analysis:

Asbestos PLM: 02-11-2025

Service SOPs: Asbestos PLM (EPA 40CFR App E to Sub E of Part 763 & EPA METHOD 600/R-93-116, SOP EM-AS-S-1267) NVLAP Lab Code 600194-0

EMLab ID: 3941215, Page 1 of 9Eurofins Built Environment Testing Central, LLC

Eurofins Built Environment Testing Central, LLC 1815 West Diehl Road, Suite 800, Naperville, IL 60563

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

Total Samples Submitted: 27 Total Samples Analyzed: 27

Total Samples with Layer Asbestos Content > 1%: 9

Location: 1, Cer. Wall Tile Grout Lab ID-Version‡: 19566949-1

Sample Layers Asbestos Content White Grout ND

Sample Composite Homogeneity: Moderate

Location: 2, Cer Wall Tile Grout Lab ID-Version‡: 19566950-1

Sample Layers Asbestos Content White Grout ND

Sample Composite Homogeneity: Moderate

Location: 3, Cer. Wall Tile Grout Lab ID-Version‡: 19566951-1

Sample Layers Asbestos Content White Grout ND

Sample Composite Homogeneity: Moderate

Location: 4, Cer Wall Tile Glue Lab ID-Version‡: 19566952-1

Sample Layers Asbestos Content Beige Glue with White Compound (Trace) ND

Sample Composite Homogeneity: Moderate

EMLab ID: 3941215, Page 2 of 9Eurofins Built Environment Testing Central, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

Location: 5, Cer Wall Tile Glue Lab ID-Version‡: 19566953-1

Sample Layers Asbestos Content Beige Glue with White Compound (Trace) ND

Sample Composite Homogeneity: Moderate

Location: 6, Cer Wall Tile Glue Lab ID-Version‡: 19566954-1

Sample Layers Asbestos Content Beige Glue with White Compound (Trace) ND

Sample Composite Homogeneity: Moderate

Location: 7, Cer. Floor Tile Grout Lab ID-Version‡: 19566955-1

Sample Layers Asbestos Content White Grout ND

Sample Composite Homogeneity: Moderate

Location: 8, Cer. Floor Tile Grout Lab ID-Version‡: 19566956-1

Sample Layers Asbestos Content White Grout ND

Sample Composite Homogeneity: Moderate

EMLab ID: 3941215, Page 3 of 9Eurofins Built Environment Testing Central, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

Location: 9, Cer. Floor Tile Grout Lab ID-Version‡: 19566957-1

Sample Layers Asbestos Content White Grout ND

Sample Composite Homogeneity: Moderate

Location: 10, 2x2 Ceil Tile Lab ID-Version‡: 19566958-1

Sample Layers Asbestos Content Gray Ceiling Tile with White Surface ND

Composite Non-Asbestos Content: 40% Cellulose 40% Glass Fibers

Sample Composite Homogeneity: Moderate

Location: 11, 2x2 Ceil Tile Lab ID-Version‡: 19566959-1

Sample Layers Asbestos Content Gray Ceiling Tile with White Surface ND

Composite Non-Asbestos Content: 40% Cellulose 40% Glass Fibers

Sample Composite Homogeneity: Moderate

Location: 12, 2x2 Ceil Tile Lab ID-Version‡: 19566960-1

Sample Layers Asbestos Content Gray Ceiling Tile with White Surface ND

Composite Non-Asbestos Content: 40% Cellulose 40% Glass Fibers

Sample Composite Homogeneity: Moderate

EMLab ID: 3941215, Page 4 of 9Eurofins Built Environment Testing Central, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

Location: 13, Mud Fittings on FGI TSI Lab ID-Version‡: 19566961-1

Sample Layers Asbestos Content Gray Insulation 10% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 14, Mud Fittings on FGI TSI Lab ID-Version‡: 19566962-1

Sample Layers Asbestos Content Gray Insulation 10% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 15, Mud Fittings on FGI TSI Lab ID-Version‡: 19566963-1

Sample Layers Asbestos Content Gray Insulation 10% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 16, Sink Counter Caulk Lab ID-Version‡: 19566964-1

Sample Layers Asbestos Content White Caulk ND

Sample Composite Homogeneity: Good

EMLab ID: 3941215, Page 5 of 9Eurofins Built Environment Testing Central, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

Location: 17, Sink Counter Caulk Lab ID-Version‡: 19566965-1

Sample Layers Asbestos Content White Caulk ND

Sample Composite Homogeneity: Good

Location: 18, Sink Counter Caulk Lab ID-Version‡: 19566966-1

Sample Layers Asbestos Content White Caulk ND

Sample Composite Homogeneity: Good

Location: 19, Cove Base Lab ID-Version‡: 19566967-1

Sample Layers Asbestos Content Black Cove Base ND Yellow Adhesive ND

Sample Composite Homogeneity: Moderate

Location: 20, Cove Base Lab ID-Version‡: 19566968-1

Sample Layers Asbestos Content Black Cove Base ND Yellow Adhesive ND

Sample Composite Homogeneity: Moderate

EMLab ID: 3941215, Page 6 of 9Eurofins Built Environment Testing Central, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

Location: 21, Cove Base Lab ID-Version‡: 19566969-1

Sample Layers Asbestos Content Black Cove Base ND Yellow Adhesive ND

Sample Composite Homogeneity: Moderate

Location: 22, Window Glazing Lab ID-Version‡: 19566970-1

Sample Layers Asbestos Content Off-White Window Glazing 3% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 23, Window Glazing Lab ID-Version‡: 19566971-1

Sample Layers Asbestos Content Off-White Window Glazing 3% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 24, Window Glazing Lab ID-Version‡: 19566972-1

Sample Layers Asbestos Content Off-White Window Glazing 3% Chrysotile

Sample Composite Homogeneity: Moderate

EMLab ID: 3941215, Page 7 of 9Eurofins Built Environment Testing Central, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

Location: 25, Window Caulk Lab ID-Version‡: 19566973-1

Sample Layers Asbestos Content Off-White Caulk 3% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 26, Window Caulk Lab ID-Version‡: 19566974-1

Sample Layers Asbestos Content Off-White Caulk 3% Chrysotile

Sample Composite Homogeneity: Moderate

Location: 27, Window Caulk Lab ID-Version‡: 19566975-1

Sample Layers Asbestos Content Off-White Caulk 3% Chrysotile

Sample Composite Homogeneity: Moderate

EMLab ID: 3941215, Page 8 of 9Eurofins Built Environment Testing Central, LLC

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

All components not quantified as asbestos content and non-asbestos content are considered to be non-fibrous matrix components. Matrix components may include, but are not limited to, gypsum, paint, silicate minerals, vinyl, binder, calcium carbonate, tar, and foam.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers were detected. When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is

(866) 871-1984 www.eurofinsus.com/BuiltClient: Castle Hill Associates C/O: Mr. Brett Brumbaugh, REPA Re: Danville VAMC; B72 & 103 Renovate Restrooms

Date of Sampling: 02-07-2025 Date of Receipt: 02-10-2025 Date of Report: 02-13-2025

ASBESTOS PLM REPORT

PROJECT ANALYST AND SIGNATORY REPORT

Project Analyst

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

‡ A "Version" indicated by -"x" after the Lab ID# with a value greater than 1 indicates a sample with amended data. The revision number is reflected by the value of "x".

Analyst: Avery Raica

EMLab ID: 3941215, Page 9 of 9Eurofins Built Environment Testing Central, LLC

PHOTOGRAPHS OF ASBESTOS MATERIALS

Photo 1 Asbestos mud fittings on fiberglass insulated pipes above ceiling tile in

B72

Photo 2

Asbestos mud fittings in B72 6A storage room

Photo 3 Interior window glazing on metal windows in B72

Photo 4 Exterior window caulk on metal windows in B72

LEAD XRF TESTING DATA

LEAD PAINT XRF TESTING DATA AND RESULTS

Danville VA Medical Center – Danville, IL

Renovate Bathrooms in B103 PRRTP & B72

VA Project 550-25-108

Brett Brumbaugh

Viken Detection Model Pb200i - SN 2757

Reading # Bldg. # Room Building Area/Room Component Paint Color Substrate Pb Conc.

mg/cm2 Result

1 103 159C Restroom Wall Tan Ceramic tile 14.7 POSITIVE

2 103 159C Restroom Door Tan Metal 0.1 Negative

3 103 159C Restroom Door frame Tan Metal 0.2 Negative

4 103 159C Restroom Stall divider Tan Metal 0.2 Negative

5 103 159C Restroom Roof truss Red Metal 0.3 Negative

6 103 159C Restroom Floor Tan Ceramic tile 0.1 Negative

7 103 159C Restroom storage Door frame Tan Metal 0.1 Negative

8 103 159C Restroom storage Door Tan Metal 0.2 Negative

9 103 160C Restroom Wall Tan Ceramic tile 14.7 POSITIVE

10 103 160C Restroom Door Tan Metal 0.1 Negative

11 103 160C Restroom Door frame Tan Metal 0.2 Negative

12 103 160C Restroom Stall divider Tan Metal 0.2 Negative

13 103 160C Restroom Roof truss Red Metal 0.3 Negative

14 103 160C Restroom Floor Tan Ceramic tile 0.1 Negative

15 103 136C Restroom Wall Tan Ceramic tile 13.8 POSITIVE

16 103 136C Restroom Door Tan Metal 0.1 Negative

17 103 136C Restroom Door frame Tan Metal 0.2 Negative

18 103 136C Restroom Stall divider Tan Metal 0.2 Negative

19 103 136C Restroom Roof truss Red Metal 0.3 Negative

20 103 136C Restroom Floor Tan Ceramic tile 0.1 Negative

21 103 106C Restroom storage Door frame Tan Metal 0.1 Negative

22 103 106C Restroom storage Door Tan Metal 0.2 Negative

23 103 106C Restroom Wall Tan Ceramic tile 14.2 POSITIVE

24 103 106C Restroom Door Tan Metal 0.1 Negative

25 103 106C Restroom Door frame Tan Metal 0.2 Negative

26 103 106C Restroom Stall divider Tan Metal 0.2 Negative

27 103 106C Restroom Roof truss Red Metal 0.3 Negative

28 103 106C Restroom Floor Tan Ceramic tile 0.1 Negative

29 103 107C Restroom storage Door frame Tan Metal 0.1 Negative

30 103 107C Restroom storage Door Tan Metal 0.2 Negative

31 103 107C Restroom Wall Tan Ceramic tile 14.4 POSITIVE

32 103 107C Restroom Door Tan Metal 0.1 Negative

33 103 107C Restroom Door frame Tan Metal 0.2 Negative

34 103 107C Restroom Stall divider Tan Metal 0.2 Negative

35 103 107C Restroom Roof truss Red Metal 0.3 Negative

36 103 107C Restroom Floor Tan Ceramic tile 0.1 Negative

37 103 106B Restroom Wall Tan Ceramic tile 14.5 POSITIVE

38 103 106B Restroom Door Tan Metal 0.1 Negative

39 103 106B Restroom Door frame Tan Metal 0.2 Negative

40 103 106B Restroom Stall divider Tan Metal 0.2 Negative

41 103 106B Restroom Roof truss Red Metal 0.3 Negative

42 103 106B Restroom Floor Tan Ceramic tile 0.1 Negative

43 103 106B Restroom storage Door frame Tan Metal 0.1 Negative

44 103 107B Restroom storage Door Tan Metal 0.2 Negative

45 103 107B Restroom Wall Tan Ceramic tile 14.1 POSITIVE

46 103 107B Restroom Door Tan Metal 0.1 Negative

47 103 107B Restroom Door frame Tan Metal 0.2 Negative

48 103 107B Restroom Stall divider Tan Metal 0.2 Negative

49 103 107B Restroom Roof truss Red Metal 0.3 Negative

XRF Info:

Inspector:

February 7, 2025

Project Name:

Location:

Project Number:

Date:

LEAD PAINT XRF TESTING DATA AND RESULTS

Danville VA Medical Center – Danville, IL

Renovate Bathrooms in B103 PRRTP & B72

VA Project 550-25-108

Brett Brumbaugh

Viken Detection Model Pb200i - SN 2757

Reading # Bldg. # Room Building Area/Room Component Paint Color Substrate Pb Conc.

mg/cm2 Result

XRF Info:

Inspector:

February 7, 2025

Project Name:

Location:

Project Number:

Date:

50 103 107B Restroom Floor Tan Ceramic tile 0.1 Negative

51 103 107B Restroom storage Door frame Tan Metal 0.1 Negative

52 103 107B Restroom storage Door Tan Metal 0.2 Negative

53 103 107B Restroom Wall Tan Ceramic tile 14.7 POSITIVE

54 103 107B Restroom Door Tan Metal 0.1 Negative

55 72 6A-72 Storage Window frame Tan Metal 7.7 POSITIVE

56 72 6A-72 Storage Window frame (ext.) Tan Metal 8.3 POSITIVE

57 72 6A-72 Storage Block wall Tan Block 0.3 Negative

58 72 6A-72 Storage Concrete wall Tan Concrete 0.4 Negative

59 72 6A-72 Storage Door frame Tan Wood 6.8 POSITIVE

60 72 6A-72 Storage Door Tan Wood 5.7 POSITIVE

61 72 6-72 Restroom Window frame (ext.) Tan Metal 8.3 POSITIVE

62 72 6-72 Restroom Window sill Tan Concrete 0.4 Negative

63 72 6-72 Restroom Stall divider Tan Metal 0.1 Negative

64 72 5-72 Storage Block wall Tan Block 0.3 Negative

65 72 7-72 Locker room Block wall Tan Block 0.2 Negative

66 72 7-72 Locker room Door frame Tan Wood 7.2 POSITIVE

67 72 7-72 Locker room Floor Gray Concrete 0.1 Negative

NOTE: Any XRF reading equal to or greater than 1.0 mg/cm2 is considered to be lead-based paint (LBP) per EPA

NOTE: Any XRF reading greater than 0.0 mg/cm2 is considered to be lead-containing paint (LCP) per OSHA