This document contains photographs documenting the setup and installation of air containment and monitoring equipment in a construction area.

Page 1 displays a yellow-framed containment enclosure with labeled components including a manometer (measuring differential pressure at -0.045 inches of water), an Isolated System Leakage Measurement (ILSM) device, a sign-in sheet, Pollution Control Risk Assessment (PCRA) and Infection Control Risk Assessment (ICRA) documentation, danger signs indicating a construction area and hard hat requirement, and an entrance. Page 2 shows a Dwyer DigiMag digital pressure gauge installed on an edge guard, with notation that the polyethylene tubing is connected to the positive side (+) to provide accurate room pressure readings, and that a HEPA filter machine should be blowing air out of the room. Page 3 depicts a Digital Differential Pressure Gauge (model DM1121) mounted on the exterior of the containment enclosure with tubing connections visible.

View the file

Other files

File Type Posted
36C25226R0013 0001.docx DOCX document
36C25226R0013_1.docx DOCX document
S02 Att 1d. Safety and Health During Construction Activities.pdf PDF
S02 Att 1i. Contractor Parking.pdf PDF
S02 Att 1j. OIT Horizontal Cable Requirements.pdf PDF
S02 Att 1 SOW 578-26-007 IDIQ Cabling 2025.08.12.docx DOCX document
S02 Att 1e. Cutting Welding and Other Hot Work.pdf PDF
S02 Att 11 Subcontractor Info Consent 578-26-007.docx DOCX document
S02 Att8 VAAR 852.219-75 Certification 578-26-007.docx DOCX document
S02 Att 10 Financial Disclosure 578-26-007.docx DOCX document
S02 Att 12 Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 Att 1f. Dig Permit SOP Form.pdf PDF
S02 Att 1b. Hines Underground Utility Plan.pdf PDF
S02 Att 1h. Contractor Badging - Fingerprint Request Form 2025.pdf PDF
S02 Att 1c. Pre-Construction Checklist Rev 07.27.2021.pdf PDF
S02 Att 1k. Fire Protection Code Reviews.pdf PDF
S02 Att 1l. Asbestos Survey Glossary when applicable.pdf PDF
S02 Att 9 Contractor EMR Safety Info 578-26-007.docx DOCX document
S02 Att 1h. Contractor Badging - Fingerprint Request Form 2025 (1).pdf PDF
S02 Att 4 Pre-construction Risk Assessment.pdf PDF
S02 Att 1a. Hines VA Campus Site Plan.pdf PDF
S02 Att 5 Schedule of Services.pdf PDF
36C25226R0013_2.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAHINDoyleL Text Box Entrance

VHAHINDoyleL Text Box Manometer

VHAHINDoyleL Text Box

ICRA

VHAHINDoyleL Text Box

PCRA

VHAHINDoyleL Text Box

ILSM

VHAHINDoyleL Text Box Sign-in

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINDoyleL Line

VHAHINSidleB Image

VHAHINSidleB Text Box Dwyer DigiMag Installed on edge guard. Poly is connected to positive side (+) to give accurate reading of room pressure. Hepa filter machine should be blowing out of room.

VHAHINSidleB Image

File details come from the government source that posted it. Updated .