S02 Att 1m. Infection Control Barrier Sample.pdf
PDF 2 MB Posted
- Attached to
- Z1DZ--578-26-007-FY26 Network Cable Installation
- Solicitation number
- 36C25226R0013
About this file
This document contains photographs documenting the setup and installation of air containment and monitoring equipment in a construction area.
Page 1 displays a yellow-framed containment enclosure with labeled components including a manometer (measuring differential pressure at -0.045 inches of water), an Isolated System Leakage Measurement (ILSM) device, a sign-in sheet, Pollution Control Risk Assessment (PCRA) and Infection Control Risk Assessment (ICRA) documentation, danger signs indicating a construction area and hard hat requirement, and an entrance. Page 2 shows a Dwyer DigiMag digital pressure gauge installed on an edge guard, with notation that the polyethylene tubing is connected to the positive side (+) to provide accurate room pressure readings, and that a HEPA filter machine should be blowing air out of the room. Page 3 depicts a Digital Differential Pressure Gauge (model DM1121) mounted on the exterior of the containment enclosure with tubing connections visible.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAHINDoyleL Text Box Entrance
VHAHINDoyleL Text Box Manometer
VHAHINDoyleL Text Box
ICRA
VHAHINDoyleL Text Box
PCRA
VHAHINDoyleL Text Box
ILSM
VHAHINDoyleL Text Box Sign-in
VHAHINDoyleL Line
VHAHINDoyleL Line
VHAHINDoyleL Line
VHAHINDoyleL Line
VHAHINDoyleL Line
VHAHINSidleB Image
VHAHINSidleB Text Box Dwyer DigiMag Installed on edge guard. Poly is connected to positive side (+) to give accurate reading of room pressure. Hepa filter machine should be blowing out of room.
VHAHINSidleB Image
File details come from the government source that posted it. Updated .