This is a pre-construction checklist template used by the VA for construction contracts. The document outlines mandatory procedures and requirements that must be acknowledged and completed before work begins on a federal construction project.

The checklist covers eleven primary areas of contract administration. Authority is vested solely in the Contracting Officer, with the VA Project Manager serving as the Contracting Officer's Representative (COR) for technical supervision and inspection but lacking authority to make changes to contract amount or time. Contractors must submit a Schedule of Costs within 10 calendar days of receiving the Notice to Proceed, including identification of work to be performed by the contractor's own workforce to meet a 15% requirement per FAR 52.236-1. A progress chart in bar graph format showing anticipated work installation versus elapsed contract time is also required within 10 calendar days. Monthly payments are made by the VA based on completed work from the approved Schedule of Costs, with invoices submitted to Austin, Texas and payment due within 14 days per the Prompt Payment Act. The contractor must provide daily logs identifying laborers, supervisors, and work branches for payroll verification, submit samples and shop drawings as directed, and post wage rates prominently at the work site. Change proposals exceeding $1,000 require itemized labor and material cost breakdowns, subcontractor lists, and overhead and profit percentages. The VA Safety Officer has authority to stop work for serious safety violations. Subcontractors must be submitted on Form SF 1413 and are subject to CO approval based on prior performance history. All contractor correspondence must include the contract number, project title, and project name. The checklist requires signatures from the Contracting Officer, Project Manager, and Contractor acknowledging understanding of these requirements.

View the file

Other files

File Type Posted
36C25226R0013 0001.docx DOCX document
36C25226R0013_1.docx DOCX document
S02 Att 1j. OIT Horizontal Cable Requirements.pdf PDF
S02 Att 10 Financial Disclosure 578-26-007.docx DOCX document
S02 Att 1i. Contractor Parking.pdf PDF
S02 Att 4 Pre-construction Risk Assessment.pdf PDF
S02 Att 1f. Dig Permit SOP Form.pdf PDF
S02 Att8 VAAR 852.219-75 Certification 578-26-007.docx DOCX document
S02 Att 11 Subcontractor Info Consent 578-26-007.docx DOCX document
S02 Att 1m. Infection Control Barrier Sample.pdf PDF
S02 Att 5 Schedule of Services.pdf PDF
S02 Att 1e. Cutting Welding and Other Hot Work.pdf PDF
S02 Att 1 SOW 578-26-007 IDIQ Cabling 2025.08.12.docx DOCX document
S02 Att 1d. Safety and Health During Construction Activities.pdf PDF
S02 Att 1h. Contractor Badging - Fingerprint Request Form 2025 (1).pdf PDF
S02 Att 12 Seasonal Influenza Vaccination Program 2020.08.10.pdf PDF
S02 Att 1a. Hines VA Campus Site Plan.pdf PDF
S02 Att 1l. Asbestos Survey Glossary when applicable.pdf PDF
S02 Att 9 Contractor EMR Safety Info 578-26-007.docx DOCX document
S02 Att 1h. Contractor Badging - Fingerprint Request Form 2025.pdf PDF
S02 Att 1b. Hines Underground Utility Plan.pdf PDF
S02 Att 1k. Fire Protection Code Reviews.pdf PDF
36C25226R0013_2.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-CONSTRUCTION CHECKLIST

PROJECT: __________________________________________________

DATE: ____________________ CONTRACT: _____________________

1. AUTHORITY OF GOVERNMENT PERSONNEL.

☐ a. The Contracting Officer is the only person authorized to bind the U.S.

Government, and then only to the extent of the authority invested in him/her by the appointment.

☐ b. The VA Project Manager is designated as the Contracting Officer's representative for the purpose of technical supervision and acceptance. The VA Project Manager is responsible for the inspection of the work called for in the contract schedules, including related specifications and contract terms regarding on-site work requirements. Pursuant to the delegation of authority (attached), the Project Manager does not have the authority to make changes to the contract in amount or time.

☐ c. The VA Project Manager for this project is _________________

☐ d. No other office or individual has the authority to act in any manner on behalf of the U.S. Government in the performance of this contract. The VA Project Manager will refer any changes or questions regarding this contract to the Contracting Officer.

2. CONTRACT PROGRESS SCHEDULES AND REPORTS:

☐ a. The Contractor shall submit a schedule of cost to the Contracting Officer within 10 calendar days after date of receipt of the Notice to Proceed.

The approved cost schedule will be one of the bases for determining progress payments for work completed. In accordance with FAR 52.236-1, Performance of Work by the Contractor, the schedule must indicate what portion(s) of the work the contractor intends to perform with his/her own workforce to meet the 15% requirement.

☐ b. The Contractor shall submit a progress chart, with in l O calendar days after issuance of a Notice to Proceed, which indicates the anticipated installation of work versus the elapsed contract time, which shall be represented in the form of a bar graph. The starting date of the schedule shall be the date of the Notice to Proceed and the ending date shall be the original contract completion date.

☐ c. Submittals, samples, and shop drawings. Project Engineer will explain distribution procedures

3. PAYMENT REQUESTS:

☐ a. Payments shall be made monthly by the VA according to the value of completed work from the Contractor's approved Schedule of Costs. All invoices should be submitted to Austin Texas as outlined in the contract. In accordance with the Prompt Payment Act, the fourteen (14) day timeframe for payment shall commence on the date a proper invoice is received by the CO. Included with the pay request shall be the payroll sheets for the Contractor and Subcontractors.

4. PROTECTION OF SURROUNDING AREA:

☐ a. In performing this contract, the Contractor shall provide for protecting the lives and health of employees and other persons, preventing damage to property, materials, supplies, equipment and avoiding work interruptions.

☐ b. Any damage caused by the Contractor or his personnel will be restored and repaired at the expense of the Contractor.

5. DAILY LOGS:

☐ a. The Contractor shall provide the VA Project Manager with daily logs.

Project Engineer will explain frequency. The daily log shall identify the number of laborers, supervisors and each branch of work and will be used to verify payrolls submitted.

6. SAFETY:

☐ a. The VA Safety Officer has the authority to stop work if a serious safety violation is being committed.

7. CHANGES:

☐ a. The Contracting Officer (CO), from information furnished by the COTR may, by a written order, make changes to the drawings and/or specifications that are within the general scope of the contract. No other person is authorized to make revisions, changes, or deletions from the contract.

☐ b. Proposals for changes in work shall be submitted to the Contracting Officer according to the requirements contained in Clauses 52.243-4 and 852.236-88 of the General Conditions. Proposals more than $1,000 must include:

1. Itemized breakdown of labor and material costs.

2. List of subcontractors performing the work.

3. Overhead & Profit percentages.

☐ c. Change Orders (Proceed Orders): There may be some instances (as described in Clause 52.343-4 of the General Conditions) where the need to proceed with a change in work is necessary. In these cases, written authorization will be issued by the Contracting Officer (CO) to proceed with the work. An equitable adjustment will be negotiated within 30 calendar days.

8. SUBCONTRACTORS:

☐ a. The Contractor shall submit a list of subcontractors which will include names and addresses and the nature of work involved (SF 1413). The Contracting Officer reserves the right to disapprove any proposed Subcontractor who has had prior record of unsatisfactory work at this site, or any Federal or non-Federal Agency.

9. LABOR STANDARDS PROVISONS AND PAYROLLS:

☐ a. A copy of the rates and wages shall be posted by the Contractor in a prominent place at the work site.

☐ b. Apprentices will be permitted to work only under a Bona Fide apprenticeship program. Concurrent with or prior to the first payroll listing, certificates of apprenticeship from a recognized council shall be submitted to the Contracting Officer.

10. CORRESPONDENCE:

a. All correspondence from the Contractor shall bear:

☐ (1) Contract Number

☐ (2) Project Title

☐ (3) Project Name

11. OTHER TOPICS SPECIFIC TO THIS PROJECT:

{Signature of Contracting Officer, (CO) Date

Signature of Project Manager, (COR) Date

Signature of Contractor Date:

PROJECT:
DATE:
CONTRACT:
c The VA Project Manager for this project is:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 1:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 2:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 3:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 4:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 5:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 6:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 7:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 8:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 9:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 10:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 11:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 12:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 13:
11 OTHER TOPICS SPECIFIC TO THIS PROJECT 14:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off

File details come from the government source that posted it. Updated .