This is a testing and inspection requirements document for fire alarm and suppression systems at the Richard L. Roudebush VA Medical Center. The file specifies detailed device locations, quantities, and testing requirements across multiple campus locations including the RLR Campus main facility, a New Building 5, a Vivarium facility, and a Cold Springs Road remote site. Testing requirements are organized by equipment category and reference NFPA 72-2025, NFPA 90A-2025, NFPA 25-2025, and NFPA 101-2025 standards with specific table references for compliance validation.

The RLR Campus main facility requires testing of 3,282 individual devices across 29 device categories, including smoke detectors (684 units), speakers/strobes (717 units), pull stations (226 units), duct detectors (284 units), strobes (253 units), releasing devices (192 units), heat detectors (34 units), and specialized equipment such as fire pump monitoring devices, damper controls, pre-action systems, elevators, and kitchen hood connections. New Building 5 contains 76 devices across 12 categories including control panels, strobes, speakers, smoke detectors, and duct detectors. The Vivarium facility requires testing of 13 devices, and the Cold Springs Road location requires testing of 64 devices including pull stations, smoke detectors, heat detectors, waterflow switches, supervisory devices, strobes, and communicators. All testing requirements are documented with effective dates of October 7, 2026, and align with specific NFPA standards applicable to fire alarm system maintenance and periodic inspection protocols.

View the file

Other files

File Type Posted
36C25027Q0009 0003.docx DOCX document
Table 7.1.3 example only.xlsx XLSX spreadsheet
Testing Block 7.8-10-07-2026.xlsx XLSX spreadsheet
Site visit sign in 10.7.2026.pdf PDF
36C25027Q0009 0002.docx DOCX document
Testing Block-7.1-7.6-10-07-2026.xlsx XLSX spreadsheet
RFI Response-10-15-2026.docx DOCX document
ATTACHMENT II - Instructions for VAAR 852.219-75 UPDATED.docx DOCX document
RFI Form.docx DOCX document
36C25027Q0009 0001.docx DOCX document
ATTACHMENT II - Instructions for VAAR 852.219-75.docx DOCX document
36C25027Q0009.docx DOCX document
ATTACHMENT I - SCA.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

7.0 - SPECIFIC WORK ITEMS SUMMARY & LOCATION PAGE
RLR Campus
7.1 - Devices location and quantities
BuildingSectionDevices TypeTesting RequirementsLocation# of
EOCNFPATableDevices
One7.1.1Supervisory Devices02.03.05 EP 0172-2025, Table 14.4.3.20(17)(10)(b-g)7.1.14
One7.1.2Duct Detectors02.03.05 EP 0372, 2025, Table 14.4.3.2 (17)7.1.2142
One7.1.3Heat Detectors02.03.05 EP 0372, 2025, Table 14.4.3.2 (17)7.1.334
One7.1.4Pull Stations02.03.05 EP 0372, 2025, Table 14.4.3.2 (17)7.1.4226
One7.1.5Smoke Detectors02.03.05 EP 0372, 2025, Table 14.4.3.2 (17)7.1.5684
One7.1.6Releasing Devices02.03.05 EP 0472, 2025, Table 14.4.3.2 (22)7.1.6192
One7.1.7Speakers02.03.05 EP 0472, 2025, Table 14.4.3.2 (22)7.1.7150
One7.1.8Speakers/ Strobes02.03.05 EP 0472, 2025, Table 14.4.3.2 (22)7.1.8717
One7.1.9Strobes02.03.05 EP 0472, 2025, Table 14.4.3.2 (22)7.1.9253
One7.1.10Communicators02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.1.101
One7.1.11Monitoring Devices02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.1.117
One7.1.12Duct Detectors02.03.05 EP 1972,Table 14.4.3.2 (17)(7)€7.1.12142
One7.1.13Fan Shutdown Operation02.03.05 EP 1990A, 2025, 6.4.17.1.1374
One7.1.14Damper Controls02.03.05 EP 1890A, 2025, 5.4.8,80-2025 19.5,105-2025, 7.6.27.1.144
One7.1.15Protected Master Fire Alarm Panel02.01.34 EP 027.1.153
One7.1.16Batteries02.01.34 EP 10101-2025 18/19.3.47.1.1686
One7.1.17Kitchen Hoods02.01.34 EP 10101-2025 18/19.3.47.1.176
One7.7.18Power Supplies02.01.34 EP 10101-2025 18/19.3.47.7.1847
One7.1.19Programmable Relays02.01.34 EP 10101-2025 18/19.3.47.1.191
One7.1.20Remote Test Switch02.01.34 EP 10101-2025 18/19.3.47.1.203
One7.1.21Special Controls02.01.34 EP 10101-2025 18/19.3.47.1.2114
One7.1.22Elevators02.01.05 EP 07101-2025 18/19.3.47.1.2229
One7.1.23Pre-Action System02.01.34 EP 10101-2025 18/19.3.47.1.231
One7.1.24Tamper Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.1.24158
One7.1.25Waterflow Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.1.25140
One7.1.26Fire Pump Power02.03.05 EP 1125-2025 8.3.37.1.261
One7.1.2Fire Pump Running02.03.05 EP 1125-2025 8.3.37.1.21
One7.1.28Fire Pump Trouble02.03.05 EP 1125-2025 8.3.37.1.281
One7.1.29Riser Drain Test02.03.05 EP 1125-2025 8.3.37.1.297

10/07/2026

Sheet2

7.0 - SPECIFIC WORK ITEMS SUMMARY & LOCATION PAGE
RLR Campus
7.1 - 7.7 Device location and quantities
BuildingSectionDevices TypeTesting RequirementsLocation# of
EOCNFPATableDevices
57.2.1Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.2.12
57.2.2Speaker/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.2.11
67.3.1Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.3.13
67.3.2Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.3.23
67.3.3Speaker/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.3.32
197.4.1Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.4.12
197.4.2Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.4.22
197.4.3Heat Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.4.33
197.4.4Speaker/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.4.44
197.4.5Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.4.52
237.5.1Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.5.12
237.5.2Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.5.22
New Bldg 57.6.1Control Panel02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.6.11
New Bldg 57.6.2Tamper Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.6.23
New Bldg 57.6.3Waterflow Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.6.31
New Bldg 57.6.4Speaker/Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.6.426
New Bldg 57.6.5Ceiling Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.6.51
New Bldg 57.6.6Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.6.67
New Bldg 57.6.7Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.6.710
New Bldg 57.6.8Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.6.810
New Bldg 57.6.9Door Holders02.03.05 EP 0472, 2025, Table 14.4.3.2 (22)7.6.92
New Bldg 57.6.10Dual Monitoring Monitors02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.6.103
New Bldg 57.6.11Duct Detectors02.03.05 EP 0372, 2025, Table 14.4.3.2 (17)7.6.112
New Bldg 57.6.12Monitoring Module with relay02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.6.121
Vivarium7.7.1Supervisory Devices02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.7.11
Vivarium7.7.2Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.7.25
Vivarium7.7.3Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.7.32
Vivarium7.7.4Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.7.43
Vivarium7.7.5Horn/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.7.52

Old 7.8

7.0 - SPECIFIC WORK ITEMS SUMMARY & LOCATION PAGE
Cold Springs Road Location
7.8 - Device location and quantities
BuildingSectionDevices TypeTesting RequirementsLocation# of
EOCNFPATableDevices
97.8.1Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.8.18
97.8.2Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.8.213
97.8.3Heat Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.8.32
97.8.4Waterflow Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.8.44
97.8.5Supervisory Devices02.03.05 EP 0172-2025, Table 14.4.3.20(17)(10)(b-g)7.8.54
97.8.6Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.8.64
97.8.7Horn/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.8.715
97.8.8Communicators02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.8.81

New 7.8

7.0 - SPECIFIC WORK ITEMS SUMMARY & LOCATION PAGE
Cold Springs Road Location
7.8 - Device location and quantities
BuildingSectionDevices TypeTesting RequirementsLocation# of
EOCNFPATableDevices
97.8.1Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.7.18
97.7.2Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.7.213
97.7.3Heat Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.7.32
97.7.4Waterflow Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.7.44
97.7.5Supervisory Devices02.03.05 EP 0172-2025, Table 14.4.3.20(17)(10)(b-g)7.7.54
97.7.7Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.7.64
97.7.7Horn/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.7.715
97.7.8Communicators02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.7.81