This file is a testing and device location specification document for fire alarm system maintenance at the Richard L. Roudebush VA Medical Center. The document details specific work items across multiple buildings and locations, identifying fire detection and alarm devices requiring testing and maintenance in compliance with NFPA 72-2025 standards.

The scope encompasses testing requirements for fire alarm components distributed across the RLR Campus, including smoke detectors, pull stations, speaker/strobes, heat detectors, strobes, control panels, tamper switches, waterflow switches, door holders, dual monitoring monitors, duct detectors, monitoring modules with relays, and supervisory devices. Testing locations include Building sections 5, 6, 19, and 23, plus a New Building 5 and Vivarium. The New Building 5 contains the most extensive device inventory with 76 total devices, including 1 control panel, 3 tamper switches, 1 waterflow switch, 26 speaker/strobes, 7 strobes, 1 ceiling strobe, 10 smoke detectors, 10 pull stations, 2 door holders, 3 dual monitoring monitors, 2 duct detectors, and 1 monitoring module. All devices are referenced against specific NFPA 72-2025 table requirements (primarily Tables 14.4.3.2 with corresponding device categories). The site visit for inspection is scheduled for October 7, 2026, at 10:00 AM EDT at Building 5, with quotes due October 21, 2026, at 10:00 AM EDT.

View the file

Other files

File Type Posted
36C25027Q0009 0003.docx DOCX document
Testing Block 7.8-10-07-2026.xlsx XLSX spreadsheet
Site visit sign in 10.7.2026.pdf PDF
36C25027Q0009 0002.docx DOCX document
Table 7.1.3 example only.xlsx XLSX spreadsheet
Testing Block-One-10-07-2026.xlsx XLSX spreadsheet
RFI Response-10-15-2026.docx DOCX document
ATTACHMENT II - Instructions for VAAR 852.219-75 UPDATED.docx DOCX document
RFI Form.docx DOCX document
36C25027Q0009 0001.docx DOCX document
36C25027Q0009.docx DOCX document
ATTACHMENT II - Instructions for VAAR 852.219-75.docx DOCX document
ATTACHMENT I - SCA.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

7.0 - SPECIFIC WORK ITEMS SUMMARY & LOCATION PAGE
RLR Campus
7.1 - 7.7 Device location and quantities
BuildingSectionDevices TypeTesting RequirementsLocation# of
EOCNFPATableDevices
57.2.1Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.2.12
57.2.2Speaker/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.2.11
67.3.1Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.3.13
67.3.2Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.3.23
67.3.3Speaker/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.3.32
197.4.1Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.4.12
197.4.2Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.4.22
197.4.3Heat Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.4.33
197.4.4Speaker/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.4.44
197.4.5Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.4.52
237.5.1Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.5.12
237.5.2Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.5.22
New Bldg 57.6.1Control Panel02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.6.11
New Bldg 57.6.2Tamper Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.6.23
New Bldg 57.6.3Waterflow Switches02.03.05 EP 0272-2025 Table 14.4.3.2 (17)(10)(a) & (17)(11)7.6.31
New Bldg 57.6.4Speaker/Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.6.426
New Bldg 57.6.5Ceiling Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.6.51
New Bldg 57.6.6Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.6.67
New Bldg 57.6.7Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.6.710
New Bldg 57.6.8Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.6.810
New Bldg 57.6.9Door Holders02.03.05 EP 0472, 2025, Table 14.4.3.2 (22)7.6.92
New Bldg 57.6.10Dual Monitoring Monitors02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.6.103
New Bldg 57.6.11Duct Detectors02.03.05 EP 0372, 2025, Table 14.4.3.2 (17)7.6.112
New Bldg 57.6.12Monitoring Module with relay02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.6.121
Vivarium7.7.1Supervisory Devices02.03.05 EP 0572, 2025, Table 14.4.3.2 (4)7.7.11
Vivarium7.7.2Smoke Detectors02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.7.25
Vivarium7.7.3Pull Stations02.03.05 EP 0372-2025, Table 14.4.3.2 (17)7.7.32
Vivarium7.7.4Strobes02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.7.43
Vivarium7.7.5Horn/Strobe02.03.05 EP 0472-2025, Table 14.4.3.2 (22)7.7.52