QA.pdf
PDF 201 KB Posted
- Attached to
- Z1DA--Project # 539-21-111 - Upgrade Terminal Units Additional information available on page # 2.
- Solicitation number
- 36C25021B0125
About this file
This document is an amendment to an invitation for bid for an HVAC controls upgrade project at a Veterans Affairs medical center. The project involves upgrading terminal units and installing a direct digital control system. Key details include specifications being revised to allow the use of BACnet MSTP instead of requiring BACnet IP due to lack of dedicated infrastructure. Phasing information is provided to coordinate work between trades. Clarifications are provided for terminal unit locations and schedules. Insulation requirements on VAV boxes are also clarified. Reflected ceiling plans from a previous amendment are reattached for clarity.
The related federal contract opportunity provides additional context that this is project number 539-21-111 to upgrade terminal units at the VA medical center in Cincinnati, Ohio. The solicitation number is listed as 36C25021B0125 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 2 - AE Upgrade Terminal Units
P a g e 1 | 3
AE UPGRADE TERMINAL UNITS, AMENDMENT - PROJECT FOR THE
VETERANS AFFAIRS MEDICAL CENTER (VAMC)—CINCINNATI, OH
PROJECT NUMBER: 539-21-111
UPDATED SPECIFICATIONS AND EXPLANATION OF REVISIONS
AMENDMENT #2
TO INVITATION FOR BID (IFB) NUMBER
36C25021B0125
IFB AMENDMENT NUMBER – SEE BLOCK 2 CONTRACTING STANDARD FORM 30
QUESTIONS AND ANSWERS
1. Question: 10/8/21 - Specification Section 23-09-23 Page 20 Sub-section 2.3 specifies BACnet IP field devices. In the past BACnet MSTP has been excepted. Since there is no Dedicated BACnet IP infrastructure network in place and will have to be added, can BACnet MSTP be used as a cost savings measure?
Answer: Revisions to Specification DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC, Section 23 09 23 are included in this Amendment.
2. Question: 10/8/21 - The scope of this project has work being done in multiple locations of the hospital.
How will this project be phased?
Answer: Phasing information is provided in Specification Section 01 00 00, “General Requirements 1.6 Operations and Storage Areas, subparagraph J. Phasing.” Coordinate phasing requirements with all trades during construction.
3. Question: 10/8/21 - MH102C Note 1 calls for Exiting Supply new Exhaust Valves (E)VAV23-04, 06, 09, 10B, 10A – These are on MH102C Note 1 calls for Exiting Supply new Exhaust Valves (E)VAV23-04, 06, 09, 10B, 10A – These are on M601 as “Single Duct Air Terminal Unit Schedule”. Are these actually Supply Valves? And are they NEW?
Answer: The supply terminal units listed are existing (traditional) VAV boxes to remain, with controller retrofits.
4. Question: 10/8/21 - If NEW, can you confirm that these are to Pressure Independent Venturi Valves, versus VAV Box Terminal units?
Answer: The terminal units referenced in question #3 are not new. This question is not applicable.
P a g e 2 | 3
5. Question: 10/8/21 - MH102C – Is there a requirement for room pressure monitors?
Answer: Room pressure monitors are not required. Control sequence on sheet M700 specifies airflow offset control.
6. Question: 10/8/21 - MH102C – we see EV23-229. But, we do not see EV23-229-1,2 (which are shown on the Schedule on M602.
Answer: In the schedule on sheet M602, EV23-C229-1 and EV23-C229-2 should be EV23-C236 and EV23- C229, respectively. The location of EV23-C236 should be C236.
7. Question: 10/8/21 - Per the spec section 23 36 00 2.2 C.1 the VAV boxes should have a foil faced rigid insulation. The spec also calls for this insulation to be fully encapsulated and faced with perforated metal or coated. Will the foil facing specified count as the coating required to prevent material detachment by the air stream?
Answer: The foil facing on the insulation counts as the coating to prevent material detachment so long as it fully encapsulates all insulation edges.
8. Abatement Report: Report has been attached to this Amendment for review.
GENERAL
The following changes, additions, or deletions shall be made to the following documents as indicated, and all other conditions shall remain the same:
1. DRAWINGS
Item Number 1:
On sheet AC147 SEVENTH FLOOR REFLECTED CEILING PLAN, O/T Office A731, ceiling in this room changed to existing to remain.
2. DRAWINGS
Item Number 2:
On sheet M700, MECHANICAL CONTROLS, Note No.3 in the “CONTROLS GENERAL NOTES” should read:
POWER SOURCE FOR ALL “BUILDING CONTROLLERS”, “PROGRAMMABLE EQUIPMENT CONTROLLERS”, AND FOR ALL CONTROLS SERVING EQUIPMENT THAT IS CONNECTED TO EMERGENCY POWER, SHALL BE THE
“CRITICAL” BRANCH OF THE EMERGENCY POWER SYSTEM.
3. DRAWINGS
Item Number 3:
P a g e 3 | 3
On sheet M602 MECHANICAL SCHEDULES, Single Duct Air Terminal Unit Schedule (EXHAUST) is revised for locations C236 and C229.
4. DRAWINGS
Item Number 3:
Reflected Ceiling plans that were revised in Amendment No. 1 have been included in this Amendment for clarity.
1. AC141 FIRST FLOOR REFLECTED CEILING PLAN
2. AC142 SECOND FLOOR REFLECTED CEILING PLAN
3. AC143 THIRD FLOOR REFLECTED CEILING PLAN
4. AC144 FOURTH FLOOR REFLECTED CEILING PLAN
5. AC145 FIFTH FLOOR REFLECTED CEILING PLAN
6. AC146 SIXTH FLOOR REFLECTED CEILING PLAN
7. AC147 SEVENTH FLOOR REFLECTED CEILING PLAN
ATTACHMENTS
Updated Drawings:
AC141 FIRST FLOOR REFLECTED CEILING PLAN
AC142 SECOND FLOOR REFLECTED CEILING PLAN
AC143 THIRD FLOOR REFLECTED CEILING PLAN
AC144 FOURTH FLOOR REFLECTED CEILING PLAN
AC145 FIFTH FLOOR REFLECTED CEILING PLAN
AC146 SIXTH FLOOR REFLECTED CEILING PLAN
AC147 SEVENTH FLOOR REFLECTED CEILING PLAN
M602 MECHANICAL SCHEDULES
M700 MECHANICAL CONTROLS
Updated Specifications:
DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 23 09 23. Specification re-issued in its entirety for clarity.
Honeywell Siemens JCI Sole Source Justification_Upgrade ATU.
Reports:
Abatement Report Dated March 10, 2021.