This document outlines control sequences for various mechanical equipment to be installed at the Cincinnati VA Medical Center under project number 539-21-111. Control sequences are specified for VAV terminal units, constant volume terminals, chilled water pumps, two-pipe and four-pipe fan coil units, and VAV terminals with reheating and exhaust. Point lists detail the input and output points required for direct digital control of each system. Notes provide guidance on scope of work between Divisions 23 and 26 and requirements for integration with existing Tridium and Johnson Controls systems. The Department of Veterans Affairs Veterans Health Administration VISN 10 is listed as the agency for this project to upgrade terminal units at the Cincinnati VA Medical Center location.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF.
AIR TERMINAL UNIT CONTROLS
TU
RHC
HWS
HWR
V-1
REHEAT
COIL
AIR
TERMINAL
UNIT
AIR
FLOW
TE
ATU
CONTROLLER
PC
TE
ROOM TEMPERATURE (°F)
SP
VAV BOX CONTROL SEQUENCE
W/DEADBAND
FE
A
IR
F
LO
W
(C F
M
100%
HEATING
MINIMUM
R
EH
EAT FLO
W
VA
V
AI
R
F
LO
W
A. SET POINTS SHALL BE SET AS FOLLOWS:
COOLING 75°F (ADJ)
HEATING 70°F (ADJ)
DEADBAND OF 5°F BETWEEN HEATING AND COOLING SET POINTS WILL BE MAINTAINED.
B. COOLING - ON AN INCREASE IN SPACE TEMPERATURE MODULATE DAMPER OPEN TO
INCREASE AIRFLOW AND MAINTAIN SPACE TEMPERATURE. ON A FURTHER INCREASE IN
SPACE TEMPERATURE MAINTAIN DAMPER AT MAX COOLING CFM.
C. COOLING - ON A DECREASE IN SPACE TEMPERATURE MODULATE DAMPER CLOSED TO
MINIMUM.
D. REHEAT - ON DECREASE IN SPACE TEMPERATURE THE VAV DAMPER WILL CLOSE TO
MINIMUM POSITION. MODULATE THE REHEAT COIL CONTROL VALVE V-1 TO MAINTAIN
SPACE HEATING SETPOINT.
E. HEATING - ON FURTHER DROP IN SPACE TEMPERATURE VALVE V-1 WILL MODULATE TO
MAINTAIN SET POINT AND DAMPER WILL MODULATE TO HEATING AIRFLOW.
F. HEATING - ON AN INCREASE IN SPACE TEMPERATURE MODULATE DAMPER CLOSED TO
MINIMUM POSITION AND MODULATE THE CONTROL VALVE TO CLOSED POSITION.
TU
AIR
TERMINAL
UNIT
AIR
FLOW
ATU
CONTROLLER
CAV BOX CONTROL SEQUENCE
1. CONTROL DAMPER POSITION SHALL REMAIN CONSTANT AIRFLOW AT
MAXIMUM CFM SETPOINT.
2. EACH AIR TERMINAL UNIT SHALL INCLUDE AN AIRFLOW SENSOR FOR
CALCULATING CFM AND A DISCHARGE AIR TEMPERATURE SENSOR.
3. EXTEND 24 VOLT POWER TO THE TERMINAL BOX CONTROLLER FROM
AN EXISITNG OR NEW DDC CONTROL PANEL.
4. DURING UNOCCUPIED MODE, BOX DAMPER SHALL CLOSE COMPLETELY.
CONTROL
DAMPER
FT
C H
R
C H
S
T-2
T-1
PUMP
R-X PMP-C
PMP-S
ZONE
CONTROL
VALVE
PUMP SEQUENCE OF OPERATION
1. BAS SHALL MONITOR PRESSURE IN CHILLED WATER SUPPLY MAIN ASSOCIATED WITH NEW PUMP. PRESSURE TRANSMITTER P-1 SHALL BE MONITORED DURING BALANCING OF FAN COIL UNITS AND SHALL DETERMINE REFERENCE
PRESSURE FOR PUMP CONTROL.
2. IF ALL CHILLED WATER CONTROL VALVES ON THIS LOOP ARE LESS THAN 90% OPEN, PUMP SHALL REMAIN OFF AND
THE ZONE CONTROL VALVE (ZC) SHALL BE OPEN.
3. WHEN ANY CHILLED WATER CONTROL VALVE ON THIS LOOP REACHES 90% OPEN POSITION, THE PUMP SHALL START AND RUN AT MINIMUM SPEED. ZONE CONTROL VALVE (ZC) SHALL CLOSE. WHEN ZONE CONTROL VALVE ZC IS CLOSED, PUMP SPEED SHALL MODULATE TO MAINTAIN PRESSURE DETERMINED AT BALANCING.
4. WHEN ALL CONTROL VALVES ARE 70% OPEN OR LESS THE ZONE CONTROL VLAVE SHALL OPEN AND THE PUMP SHALL
STOP.
5. WHEN PUMP IS AT MINIMUM SPEED AND THE PRESSURE TRANSMITTER IS 5 PSI OR GREATER ABOVE REFERENCE PRESSURE THE ZONE CONTROL VALVE SHALL OPEN AND PUMP SHALL TURN OFF UNLESS A CONTROL VALVE IS 90%
OPEN OR GREATER.
6. PROVIDE COMMAND CONTROL, SPEED CONTROL, AND STATUS INDICATION TO THE BAS SYSTEM GRAPHICS.
7. ALARM BAS IF P-1 IS BELOW PRESSURE DETERMINED AT BALANCING AND PUMP IS OFF.
8. PROVIDE TRENDING IN THE BAS FOR PUMP STATUS AND SPEED, PRESSURE, SUPPLY TEMPERATURE AND RETURN
TEMPERATURE.
PTTT
TT
P-1
ZC
RA
FILTER IN RETURN
GRILLE
FAN
COOLING COIL
TT
T-2
V-1
CHR
CHS
ROOM TEMPERATURE SENSOR, WALL MOUNTED 46" AFF.
T-1
TTFCU BACNET
CONTROLLER
COMMUNICATIONS
BUS TO DDC PANEL
24V POWER SUPPLY
FROM DDC PANEL
FAN COIL SEQUENCE OF OPERATION (COOLING ONLY)
1. FAN COIL UNIT SHALL FUNCTION BASED ON THE FOLLOWING SEQUENCE DURING OCCUPIED MODE AS ESTABLISHED BY THE BAS. INITIAL OCCUPANCY SCHEDULE SHALL BE 7AM-5PM (ADJ.). CONTROL VALVE SHALL BE PRESSURE INDEPENDENT TYPE VALVE WITH LINEAR ACTUATION. COOLING MODE IS WHEN OUTSIDE AIR TEMPERATURE IS ABOVE
55 DEG F (ADJ.).
2. DURING OCCUPIED MODE, FAN SHALL RUN CONTINUOUSLY AT MINIMUM SPEED EQUAL TO CFM INDICATED IN FAN COIL
UNIT SCHEDULE, EXCEPT DURING SECOND STAGE COOLING OPERATION AS DESCRIBED BELOW.
3. FIRST STAGE OF COOLING: FAN SHALL RUN AT MINIMUM SPEED. CONTROL VALVE SHALL MODULATE TO MAINTAIN A 75 DEG F (ADJ.) SPACE TEMPERATURE. WHEN SPACE TEMPERATURE REACHES 77 DEG F (ADJ.) THE SECOND STAGE OF
COOLING SHALL BE INITIATED.
4. SECOND STAGE OF COOLING: INCREASE THE FAN SPEED TO MAXIMUM CFM INDICATED IN FAN COIL UNIT SUBMITTAL.
CONTINUE TO MODULATE THE CHILLED WATER CONTROL VALVE TO MAINTAIN A 75 DEG F (ADJ.) SPACE TEMPERATURE.
MAINTAIN MAXIMUM CFM UNTIL SPACE TEMPERATURE RETURNS TO SET POINT. AT SPACE TEMPERATURE SET POINT
FAN SHALL RETURN TO FIRST STAGE OF COOLING MODE.
5. WHENEVER T-1 IS BELOW SETPOINT, V-1 SHALL BE CLOSED.
6. PROVIDE STATUS INDICATION FOR FAN AND CONTROL VALVE.
7. AN ALARM SHALL BE GENERATED AT THE ECC IF SPACE TEMPERATURE RISES 3 DEG. F (ADJ.) ABOVE SETPOINT, OR IF
COMMAND AND STATUS DO NOT MATCH. DELAY ALARM FOR 60 MINUTES AFTER OCCUPIED MODE BEGINS.
8. PROVIDE TRENDING FOR DISCHARGE AIR TEMPERATURE SENSOR T-2
9. OCCUPANT CONTROL OF SETPOINT VIA WALL THERMOSTAT SHALL BE LIMITED TO PLUS OR MINUS 2 DEGREES OF
SETPOINT (ADJ.) THROUGH THE BAS.
10. DURING UNOCCUPIED MODE, V-1 SHALL REMAIN CLOSED AND FAN SHALL REMAIN OFF IF T-1 IS BELOW UNOCCUPIED
SETPOINT. IF T-1 RISES ABOVE UNOCCUPIED SETPOINT, FAN SHALL START AND REMAIN AT MINIMUM SPEED AND V-1 SHALL MODULATE TO MAINTAIN 80 DEG F (ADJ.) SPACE TEMPERATURE, UNTIL T-1 IS BELOW UNOCCUPIED SETPOINT.
11. OCCUPIED MODE SETPOINT SHALL BE 75 DEG F (ADJ.). UNOCCUPIED MODE SHALL BE 80 DEG F (ADJ.).
12. SAFETY: DRAIN PAN OVERFLOW SWITCH SHALL CLOSE V-1 AND ALARM BAS.
FS
DRAIN PAN
FLOAT SWITCH
FAN COIL SEQUENCE OF OPERATION (COOLING ONLY WITH DDC STEAM CONVECTOR CONTROL)
RA
FILTER IN RETURN
GRILLE
FAN
COOLING COIL
TT
T-2
V-1
CHR
CHS
ROOM TEMPERATURE SENSOR, WALL MOUNTED 46" AFF.
T-1
TTFCU BACNET
CONTROLLER
COMMUNICATIONS
BUS TO DDC PANEL
24V POWER SUPPLY
FROM DDC PANEL
FS
DRAIN PAN
FLOAT SWITCH
STEAM CONVECTOR
(EXISTING TO REMAIN)
LPS(5)
LPR
V-2 (EXIST.
TO REMAIN)
1. FAN COIL UNIT SHALL FUNCTION BASED ON THE FOLLOWING SEQUENCE DURING OCCUPIED MODE AS ESTABLISHED BY THE BAS. INITIAL OCCUPANCY SCHEDULE SHALL BE 7AM-5PM (ADJ.). CONTROL VALVE SHALL BE PRESSURE INDEPENDENT TYPE VALVE WITH LINEAR ACTUATION. COOLING MODE IS WHEN OUTSIDE AIR TEMPERATURE IS ABOVE 55 DEG F (ADJ.). HEATING MODE IS WHEN OUTSIDE AIR TEMPERATURE IS AT OR BELOW 55 DEG F (ADJ.).
2. DURING OCCUPIED MODE, FAN SHALL RUN CONTINUOUSLY AT MINIMUM SPEED EQUAL TO CFM INDICATED IN FAN COIL
UNIT SCHEDULE, EXCEPT DURING SECOND STAGE COOLING OPERATION AS DESCRIBED BELOW.
3. FIRST STAGE OF COOLING: FAN SHALL RUN AT MINIMUM SPEED. CHILLED WATER CONTROL VALVE V-1 SHALL MODULATE TO MAINTAIN A 72 DEG F (ADJ.) SPACE TEMPERATURE. WHEN SPACE TEMPERATURE REACHES 75 DEG F
(ADJ.) THE SECOND STAGE OF COOLING SHALL BE INITIATED.
4. SECOND STAGE OF COOLING: INCREASE THE FAN SPEED TO MAXIMUM CFM INDICATED IN FAN COIL UNIT SUBMITTAL.
CONTINUE TO MODULATE THE CHILLED WATER CONTROL VALVE V-1 TO MAINTAIN A 72 DEG F (ADJ.) SPACE TEMPERATURE. MAINTAIN MAXIMUM CFM UNTIL SPACE TEMPERATURE RETURNS TO SET POINT. AT SPACE
TEMPERATURE SET POINT FAN SHALL RETURN TO FIRST STAGE OF COOLING MODE.
5. COOLING MODE: WHENEVER T-1 IS BELOW SETPOINT, V-1 SHALL BE CLOSED AND FAN SHALL BE OFF.
6. HEATING MODE: WHENEVER T-1 IS BELOW SETPOINT CONVECTOR CONTROL VALVE V-2 SHALL MODULATE TO MAINTAIN
A 70 DEG F (ADJ.) SPACE TEMPERATURE.
7. HEATING MODE: WHENEVER T-1 IS ABOVE SETPOINT, V-2 SHALL BE CLOSED.
8. PROVIDE STATUS INDICATION FOR FAN AND CONTROL VALVES.
9. AN ALARM SHALL BE GENERATED AT THE ECC IF SPACE TEMPERATURE RISES/FALLS 3 DEG. F (ADJ.) ABOVE OR BELOW
SETPOINT, OR IF COMMAND AND STATUS DO NOT MATCH. DELAY ALARM FOR 60 MINUTES AFTER OCCUPIED MODE
BEGINS.
10. PROVIDE TRENDING FOR DISCHARGE AIR TEMPERATURE SENSOR T-2
11. OCCUPANT CONTROL OF SETPOINT VIA WALL THERMOSTAT SHALL BE LIMITED TO PLUS OR MINUS 2 DEGREES OF
SETPOINT (ADJ.) THROUGH THE BAS.
12. DURING UNOCCUPIED MODE, V-1 & V-2 SHALL REMAIN CLOSED AND FAN SHALL REMAIN OFF T-1 SETPOINT SHALL RESET
TO 80 DEG F FOR COOLING AND 68 DEG F FOR HEATING MODES. IF T-1 RISES ABOVE UNOCCUPIED COOLING SETPOINT, FAN SHALL START AND REMAIN AT MINIMUM SPEED AND V-1 SHALL MODULATE TO MAINTAIN 80 DEG F (ADJ.) SPACE TEMPERATURE UNTIL T-1 IS BELOW UNOCCUPIED SETPOINT. IF T-1 FALLS BELOW UNOCCUPIED HEATING SETPOINT V-2 SHALL MODULATE TO MAINTAIN 65 DEG F (ADJ.) SPACE TEMPERATURE UNTIL T-1 IS ABOVE UNOCCUPIED SETPOINT.
13. OCCUPIED MODE COOLING SETPOINT SHALL BE 75 DEG F (ADJ.). UNOCCUPIED MODE COOLING SETPOINT SHALL BE 80
DEG F (ADJ.).
14. OCCUPIED MODE HEATING SETPOINT SHALL BE 70 DEG F (ADJ.). UNOCCUPIED MODE HEATING SETPOINT SHALL BE 65
DEG F (ADJ.).
15. SAFETY: DRAIN PAN OVERFLOW SWITCH SHALL CLOSE V-1 AND ALARM BAS.
RA
FILTER IN RETURN
GRILLE
FAN
COOLING COIL
TT
T-2
V-1
CHR
CHS
ROOM TEMPERATURE SENSOR, WALL MOUNTED 46" AFF.
T-1
TTFCU BACNET
CONTROLLER
COMMUNICATIONS
BUS TO DDC PANEL
24V POWER SUPPLY
FROM DDC PANEL
FAN COIL SEQUENCE OF OPERATION (HEATING AND COOLING)
HEATING COIL
MPS(30)
MPR
V-2
1. FAN COIL UNIT SHALL FUNCTION BASED ON THE FOLLOWING SEQUENCE DURING OCCUPIED MODE AS ESTABLISHED BY THE BAS. INITIAL OCCUPANCY SCHEDULE SHALL BE 7AM-5PM (ADJ.). CONTROL VALVE SHALL BE PRESSURE INDEPENDENT TYPE VALVE WITH LINEAR ACTUATION. COOLING MODE IS WHEN OUTSIDE AIR TEMPERATURE IS ABOVE 55 DEG F (ADJ.). HEATING MODE IS WHEN OUTSIDE AIR TEMPERATURE IS AT OR BELOW 55 DEG F (ADJ.).
2. DURING OCCUPIED MODE, FAN SHALL RUN CONTINUOUSLY AT MINIMUM SPEED EQUAL TO CFM INDICATED IN FAN COIL
UNIT SCHEDULE, EXCEPT DURING SECOND STAGE COOLING OPERATION AS DESCRIBED BELOW.
3. FIRST STAGE OF COOLING: FAN SHALL RUN AT MINIMUM SPEED. CHILLED WATER CONTROL VALVE V-1 SHALL MODULATE TO MAINTAIN A 72 DEG F (ADJ.) SPACE TEMPERATURE. WHEN SPACE TEMPERATURE REACHES 75 DEG F
(ADJ.) THE SECOND STAGE OF COOLING SHALL BE INITIATED.
4. SECOND STAGE OF COOLING: INCREASE THE FAN SPEED TO MAXIMUM CFM INDICATED IN FAN COIL UNIT SUBMITTAL.
CONTINUE TO MODULATE THE CHILLED WATER CONTROL VALVE V-1 TO MAINTAIN A 72 DEG F (ADJ.) SPACE TEMPERATURE. MAINTAIN MAXIMUM CFM UNTIL SPACE TEMPERATURE RETURNS TO SET POINT. AT SPACE
TEMPERATURE SET POINT FAN SHALL RETURN TO FIRST STAGE OF COOLING MODE.
5. COOLING MODE, WHENEVER T-1 IS BELOW SETPOINT, V-1 SHALL BE CLOSED.
6. FIRST STAGE OF HEATING: FAN SHALL RUN AT MINIMUM SPEED. HOT WATER CONTROL VALVE V-2 SHALL MODULATE
TO MAINTAIN A 72 DEG F (ADJ.) SPACE TEMPERATURE. WHEN SPACE TEMPERATURE REACHES 70 DEG F (ADJ.) THE
SECOND STAGE OF HEATING SHALL BE INITIATED.
7. SECOND STAGE OF HEATING: INCREASE THE FAN SPEED TO MAXIMUM CFM INDICATED IN FAN COIL UNIT SUBMITTAL.
CONTINUE TO MODULATE THE HOT WATER CONTROL VALVE V-2 TO MAINTAIN A 72 DEG F (ADJ.) SPACE TEMPERATURE SET POINT. AT SPACE SET POINT THE FAN SHALL RETURN TO FIRST STAGE OF HEATING MODE.
8. HEATING MODE, WHENEVER T-1 IS ABOVE SETPOINT, V-2 SHALL BE CLOSED.
9. PROVIDE STATUS INDICATION FOR FAN AND CONTROL VALVE.
10. AN ALARM SHALL BE GENERATED AT THE ECC IF SPACE TEMPERATURE RISES 3 DEG. F (ADJ.) ABOVE OR BELOW
SETPOINT, OR IF COMMAND AND STATUS DO NOT MATCH. DELAY ALARM FOR 60 MINUTES AFTER OCCUPIED MODE
BEGINS.
11. PROVIDE TRENDING FOR DISCHARGE AIR TEMPERATURE SENSOR T-2
12. OCCUPANT CONTROL OF SETPOINT VIA WALL THERMOSTAT SHALL BE LIMITED TO PLUS OR MINUS 2 DEGREES OF
SETPOINT (ADJ.) THROUGH THE BAS.
13. DURING UNOCCUPIED MODE, V-1 SHALL REMAIN CLOSED AND FAN SHALL REMAIN OFF T-1 SETPOINT SHALL RESET TO
80 DEG F FOR COOLING AND 68 DEG F FOR HEATING MODES. IF T-1 RISES ABOVE UNOCCUPIED COOLING SETPOINT, FAN SHALL START AND REMAIN AT MINIMUM SPEED AND V-1 SHALL MODULATE TO MAINTAIN 80 DEG F (ADJ.) SPACE TEMPERATURE UNTIL T-1 IS BELOW UNOCCUPIED SETPOINT. IF T-1 FALLS BELOW UNOCCUPIED HEATING SETPOINT, FAN SHALL START AND REMAIN AT MINIMUM SPEED AND V-2 SHALL MODULATE TO MAINTAIN 68 DEG F (ADJ.) SPACE
TEMPERATURE UNTIL T-1 IS ABOVE UNOCCUPIED SETPOINT.
14. OCCUPIED MODE COOLING SETPOINT SHALL BE 75 DEG F (ADJ.). UNOCCUPIED MODE COOLING SETPOINT SHALL BE 80
DEG F (ADJ.).
15. OCCUPIED MODE HEATING SETPOINT SHALL BE 70 DEG F (ADJ.). UNOCCUPIED MODE HEATING SETPOINT SHALL BE 65
DEG F (ADJ.).
16. SAFETY: DRAIN PAN OVERFLOW SWITCH SHALL CLOSE V-1 AND ALARM BAS.
FS
DRAIN PAN
FLOAT SWITCH
Two Pipe Fan Coil
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On
Graphic
Discharge Air Temp x x x
Zone Setpoint Adjust x x
Zone Temp x x x
Cooling Valve x x x
Fan Status x x
Zone Override x x x
Fan Start/Stop x x x
Cooling Setpoint x x x
Schedule x
Fan Failure x
Drain Pan Float Switch x x
High Zone Temp x
Low Zone Temp x
Totals 3 1 3 1 1 0 0 1 6 4 8
Total Hardware (8) Total Software (12)
Four Pipe Fan Coil Unit
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On
Graphic
Discharge Air Temp x x x
Zone Setpoint Adjustment x x
Zone Temp x x x
Cooling Valve x x x
Heating Valve x x x
Fan Status x x
Zone Override x x x
Fan Start/Stop x x x
Cooling Setpoint x x x
Heating Setpoint x x x
Schedule x
Fan Failure x
Drain Pan Float Switch x x
High Discharge Air Temp x
High Zone Temp x
Low Zone Temp x
Totals 3 2 3 1 2 0 0 1 8 5 10
Total Hardware (9) Total Software (16)
CONSTANT VOLUME AIR TERMINAL
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On
Graphic
Airflow x x x
Zone Damper x x x
Room Temperature x x x
Airflow Setpoint x x x
Schedule x
Totals 2 1 0 0 1 0 0 1 4 0 4
Total Hardware (3) Total Software (6)
Chilled Water Circulating Pump
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On
Graphic
Chilled Water Bypass Valve x x
Chilled Water Pressure x x x
Chilled Water Return Temp x x x
Chilled Water Supply Temp x x x
Chilled Water Pump VFD Speed x x x
Chilled Water Pump Status x x x
Chilled Water Pump VFD Fault x x x
Chilled Water Pump Start/Stop x x x
Chilled Water Pump Failure x
Chilled Water Pump Running in Hand x
Totals 3 1 3 1 0 0 0 0 6 3 8
Total Hardware (8) Total Software (9)
VARIABLE VOLUME AIR TERMINAL WITH REHEAT
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On
Graphic
Airflow x x x
Zone Damper x x x
Room Temperature x x x
Discharge Air Temperature x x x
Heating Control Valve x x x
Airflow Setpoint x x x
Schedule x
Totals 3 2 0 0 1 0 0 1 6 0 6
Total Hardware (5) Total Software (8)
ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF.
AIR TERMINAL UNIT SUPPLY AND EXHAUST CONTROLS
TU
RHC
HWS
HWR
V-1
REHEAT
COIL
AIR
TERMINAL
UNIT
AIR
FLOW
TE
LAB
TERMINAL
CONTROLLER
PC
TE
ROOM TEMPERATURE (°F)
SP
VAV BOX CONTROL SEQUENCE
W/DEADBAND
A. SET POINTS SHALL BE SET AS FOLLOWS:
COOLING 75°F (ADJ)
HEATING 70°F (ADJ)
DEADBAND OF 5°F BETWEEN HEATING AND COOLING SET POINTS WILL BE MAINTAINED.
B. COOLING - ON AN INCREASE IN SPACE TEMPERATURE MODULATE DAMPER OPEN TO
INCREASE AIRFLOW AND MAINTAIN SPACE TEMPERATURE. ON A FURTHER INCREASE IN
SPACE TEMPERATURE MAINTAIN DAMPER AT MAX COOLING CFM.
C. COOLING - ON A DECREASE IN SPACE TEMPERATURE MODULATE DAMPER CLOSED TO
MINIMUM.
D. REHEAT - ON DECREASE IN SPACE TEMPERATURE THE VAV DAMPER WILL CLOSE TO
MINIMUM POSITION. MODULATE THE REHEAT COIL CONTROL VALVE V-1 TO MAINTAIN
SPACE HEATING SETPOINT.
E. HEATING - ON FURTHER DROP IN SPACE TEMPERATURE VALVE V-1 WILL MODULATE TO
MAINTAIN SET POINT AND DAMPER WILL MODULATE TO HEATING AIRFLOW.
F. HEATING - ON AN INCREASE IN SPACE TEMPERATURE MODULATE DAMPER CLOSED TO
MINIMUM POSITION AND MODULATE THE CONTROL VALVE TO CLOSED POSITION.
G. EXHAUST TERMINAL SHALL MODULATE TO TRACK THE SUPPLY AIRFLOW OFFSET TO
MATCH PROGRAMMED OFFSET.
FE
A
IR
F
LO
W
(C F
M
100%
HEATING
MINIMUM
R
EH
EAT FLO
W
VA
V
AI
R
F
LO
W
TU
EXHAUST
AIR
TERMINAL
UNIT
AIR
FLOW
FE
VARIABLE VOLUME AIR TERMINAL WITH REHEAT AND EXHAUST
Hardware Points Software Points
Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On
Graphic
Supply Airflow x x x
Exhaust Airflow x x x
Room Temperature x x x
Discharge Air Temperature x x x
Supply Damper x x x
Exhaust Damper x x x
Heating Control Valve x x x
Airflow Setpoint x x x
Schedule x
Totals 4 3 0 0 1 0 0 1 8 0 8
Total Hardware (7) Total Software (10)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\j o h n f\
D o c u m e n ts \F
F E
C in c in n a ti
U p g ra d e A
T U s B
M
E P jo h n
.g ru b e rA
Q
P J .r v t
/1 /2
:5
:2
P M
M700
MECHANICAL CONTROLS
08/31/2021 KF JG
CINCINNATI, OH
539-21-111CONSTRUCTION
DOCUMENTS
UPGRADE TERMINAL
UNITS
NTS
VARIABLE VOLUME AIR TERMINAL UNIT CONTROL DIAGRAM
NTS
CONSTANT VOLUME TERMINAL UNIT CONTROLS
NTS
CHILLED WATER CIRCULATING PUMP CONTROLS
NTS
TWO-PIPE FAN COIL UNIT CONTROLS
NTS
TWO-PIPE FAN COIL UNIT CONTROLS WITH
STEAM CONVECTOR CONTROL
NTS
FOUR-PIPE FAN COIL UNIT CONTROLS
NTS
VARIABLE VOLUME AIR TERMINAL UNIT WITH EXHAUST CONTROL
DIAGRAM
1. DIVISION 26 SCOPE OF WORK INCLUDES A POWER SOURCE TO THE MOTOR STARTERS. ALL HVAC
POWER SOURCES REQUIRED BEYOND THESE STARTERS OR BEYOND SOURCES EXPLICITLY SHOWN
ON THE DIVISION 26 DRAWINGS, SHALL BE PROVIDED UNDER THE TEMPERATURE CONTROLS WORK.
THIS SHALL INCLUDE BUT NOT BE LIMITED TO WIRING, CONDUIT, TRANSFORMERS, RELAYS, FUSES, ETC.
2. POINTS SHOWN ARE INTENDED AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM POINTS REQUIRED FOR CONTROL AND MONITORING. ALL INPUT AND OUTPUT POINTS, AND THEIR REQUIRED
INTERFACE AND ACCESSORY HARDWARE, SHALL BE PROVIDED FOR A COMPLETE AND FUNCTION
CONTROL SYSTEM. IF ADDITIONAL POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF
CONTROL SPECIFIED, THESE POINTS, ALONG WITH ADDITIONAL DIRECT DIGITAL CONTROL PANEL(S)
(IF REQUIRED), SHALL ALSO BE PROVIDED.
3. POWER SOURCE FOR ALL “BUILDING CONTROLLERS”, “PROGRAMMABLE EQUIPMENT
CONTROLLERS”, AND FOR ALL CONTROLS SERVING EQUIPMENT THAT IS CONNECTED TO
EMERGENCY POWER, SHALL BE THE “CRITICAL” BRANCH OF THE EMERGENCY POWER SYSTEM.
4. ALL FANS WITH SPEED CONTROL CAPABILITY (VFD, E.C. MOTOR, ETC.) SHALL HAVE SPEED
ADJUSTABLE VIA THE FAN GRAPHIC AT THE ECC.
5. KW USAGE OF ALL VFDs PROVIDED UNDER THIS PROJECT SHALL BE REPORTED TO EXISTING
"EDART" SOFTWARE. COORDINATE WITH VA COR.
6. NEW CONTROLS SHALL BE TRIDIUM, IN ACCORDANCE WITH SPECIFICATION SECTION 23 09 23.
MODIFICATIONS TO THE EXISTING JOHNSON CONTROLS AND AUTOMATED LOGIC SYSTEMS WILL
ALSO BE REQUIRED FOR ANY SCOPE MODIFYING OR REMOVING EXISTING EQUIPMENT, AND SHALL
BE INCLUDED AS PART OF THIS CONTRACT – ALL POINTS, PROGRAMMING, TRENDS, ALARMS,
GRAPHICS, ETC. SHALL BE REMOVED FROM THESE EXISTING CONTROL SYSTEMS FOR ALL
EQUIPMENT THAT IS REMOVED UNDER THIS PROJECT.
CONTROLS GENERAL NOTES
05/20/2021 Revisions: Date:
AMENDMENT 2 10/20/2021
08/31/2021
| Sheets |
| M700 - MECHANICAL CONTROLS |
File details come from the government source that posted it. Updated .