Appendix B - Hazardous Material Report.pdf
PDF 12 MB Posted
- Attached to
- Z1DA--Project # 539-21-111 - Upgrade Terminal Units Additional information available on page # 2.
- Solicitation number
- 36C25021B0125
About this file
This document provides details on a federal solicitation opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Solicitation number 36C25021B0125 seeks offers for project number 539-21-111 to upgrade terminal units, as specified on page 2 of the attached hazardous materials report appendix. The opportunity type is listed as a solicitation. The agency listed is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. No further details are provided on products or services required, pricing terms, response dates, or other salient information.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Survey VA Project: Upgrade Air Terminals
VA Project Number: 539-21-111 Cincinnati VA Medical Center (CVAMC)
3200 Vine Street, Cincinnati, Ohio 45220
March 10, 2021 Terracon Project No. N1207213
Prepared for:
FFE, Inc.
Cincinnati, OH 45246
Prepared by:
Terracon Consultants, Inc.
Cincinnati, Ohio 45226
Terracon Consul tants, Inc., 611 Lunken Park Dr ive, Cincinnat i , OH 45226 P (513) 321-5816 terracon.com
March 10, 2021
FFE, Inc.
110 Boggs Lane, Suite 170 Cincinnati, OH 45246
Attn: Mr. Clint Weekley, PE, CBCP, LEED AP President P: 513-519-5999 (cell) E: clint.weekley@ffe-serv.com
Re: Asbestos Survey Report VA Project: Upgrade Air Terminal Units VA Project No.: 539-21-111 Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220 Terracon Project No. N1207213
Dear Mr. Weekley:
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced renovation project to FFE, Inc. (Client). The purpose of this report is to present the results of an asbestos survey, which was performed at the Cincinnati VA Medical Center (CVAMC) on various days during the month of February of 2021, and in general accordance with our proposal number PN1207213, dated May 13, 2020. We understand that this survey was requested for the purpose of a planned renovation project pertaining to upgrading air terminal units and associated mechanical systems/components at the CVAMC.
Asbestos-containing materials (ACM) were identified as a result of this project-specific survey at the CVAMC. Please refer to the attached report for further detail.
Terracon appreciates the opportunity to provide this service to FFE, Inc. If you have any questions regarding this report, please contact the undersigned at 513-321-5816.
Sincerely, Terracon Consultants, Inc.
Josh Vogel Joseph A. Tussey, CHMM Project Manager Sr. Associate / Group Manager
OH AHES #35291 OH AHES #32388
Project: Upgrade Air Terminal Units CVAMC March 10, 2021 Terracon Project No. N1207213
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 PROJECT DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Visual Assessment
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
4.0 REGULATORY OVERVIEW
5.0 FINDINGS AND RECOMMENDATIONS
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
APPENDIX B ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY
APPENDIX C ASBESTOS ANALYTICAL LABORATORY REPORT
APPENDIX D LICENSES AND CERTIFICATIONS
APPENDIX E SAMPLE & ACM LOCATION DRAWINGS
APPENDIX F PHOTO LOG
Responsive Resourceful Reliable 1
ASBESTOS SURVEY
VA Project: Upgrade Air Terminal Units
VA Project No.: 539-21-111 Cincinnati VA Medical Center (CVAMC)
3200 Vine Street, Cincinnati, Ohio 45220 Terracon Project No. N1207213
March 10, 2021
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey specifically limited to within the boundaries and intent of the planned renovation project entitled “Upgrade Air Terminals Units” at the Cincinnati VA Medical Center (CVAMC). The survey was performed on various days during the month of February of 2021 by United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors who were also certified by the Ohio Environmental Protection Agency (OEPA) as Asbestos Hazard Evaluation Specialists (AHES). Based on Client-provided renovation drawings, accessible building components and areas intended to be impacted by the renovation project were surveyed. Homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).
Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy
(PLM).
1.1 Project Objective
Terracon understand the renovation project pertains to various upgrades of air terminal units and associated mechanical systems/components throughout the CVAMC. Please note that asbestos surveys are required prior to renovation and demolition projects to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (as well as the state NESHAP equivalent).
1.2 Reliance
This report is for the exclusive use of FFE, Inc (Client) for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and the Client. Reliance on this report by the Client and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal and the agreement between Terracon and the Client
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable 2
2.0 PROJECT DESCRIPTION
Terracon understood the renovation project pertains to various mechanical systems/components including upgrades on air terminal units at the CVAMC. Client-provided renovation drawings were used as a “road-map” for this project-specific survey.
3.0 FIELD ACTIVITIES
The survey was conducted by Mr. Lemuel Weyer and Mr. Tyler Stenten, USEPA-accredited asbestos inspectors and OEPA-certified AHES. Copies of their Ohio AHES credentials are attached as Appendix D. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA.
A summary of survey activities is provided below.
3.1 Visual Assessment
Based on a review of Client-provided drawings, survey activities were initiated with visual observation of project-specific accessible areas and accessible building components to be impacted by the renovation project to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.
3.2 Physical Assessment
A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
3.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable 3
Terracon collected a total of 200 bulk samples from 59 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.
3.4 Sample Analysis
Bulk samples were submitted under chain of custody to EMSL Analytical, Inc. (EMSL) of Indianapolis, Indiana for analysis PLM with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. When applicable for friable material samples determined by PLM to have a low asbestos content (<10%), the additional point count (PC) method was utilized.
EMSL is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), accreditation number 200188-0.
The laboratory analytical report is included in Appendix C.
4.0 REGULATORY OVERVIEW
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).
The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding (Transite™), cement panels, glazing, mortar, and grouts.
The Ohio Environmental Protection Agency (OEPA) adopted Chapter 3745-20 of the Ohio Administrative Code and implements the Asbestos NESHAP. The owner or operator must provide the OEPA district office or local air agency with written notification at least 10 business days prior to the commencement demolition projects and prior to removal of friable ACMs in quantities greater than 50 linear or 50 square feet. The OEPA also regulates friable asbestos abatement activities, asbestos personnel training, and issuance of asbestos professional certifications under
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable 4
OAC 3745-22. OEPA audits asbestos abatement projects and responds to public health emergencies where friable ACMs has been released. Please note that per OEPA regulations, non-friable floor tile if broken into pieces four (4) square inches or smaller are considered friable, and thus as a RACM.
The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed
1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
5.0 FINDINGS AND RECOMMENDATIONS
Specific to the subject renovation project areas and components to be impacted based on Client-provided renovation drawings, asbestos was identified by laboratory analysis in samples collected from the following materials:
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity*
White Mudded Fittings Associated with
Fiberglass Pipe Lines in Northwest Hallway in
Area A of the Basement
1.50% Chrysotile by Point Count
(PC)
Good/Non- Friable ~6 LF or 6 Fittings
White Mudded Fittings Associated with
Fiberglass Pipe Line in Hallway to East Entrance to Basement Room B022
0.50% Amosite by PC
Good/Non- Friable ~1 LF or 1 Fitting
Tan Duct Mastic Associated with Duct
Work in Chapel and West Hallway of Area A on the
1st Floor
2% Chrysotile Good/Non- Friable
~150 SF of Duct Mastic
Gray-Brown Duct Mastic Associated with Duct
Work in Room A144 and Area C of 1st Floor (Under
Fiberglass Insulation)
2% Chrysotile Good/Non- Friable
~200 SF of Duct Mastic
Tan Duct Mastic Associated with Duct
Work in Area C and Main Hallway on the 1st Floor
2% Chrysotile Good/Non- Friable
~100 SF of Duct Mastic
Tan Duct Mastic Associated with Duct
Work in Main Hallway of Area B on the 2nd Floor
2% Chrysotile Good/Non- Friable
~150 SF of Duct Mastic
Tan Duct Mastic
Associated with Duct Work in Area C and
Room A246 on the 2nd
Floor 2% Chrysotile Good/Non-
Friable ~75 SF of Duct
Mastic
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable 5
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity*
White Mudded Fittings
Associated with Fiberglass Pipe Lines throughout Area B and Main Elevator Lobby on the 3rd Floor
0.25% Amosite by PC
Good/Non- Friable
~52 LF or 52 Fittings
White Preformed Black Pipe Insulation and Fittings
Associated with Steam Lines in PACU Area and
North Walkway of the Central Hallway on the 3rd
Floor
30% Amosite, 15% Chrysotile
Good/Non- Friable ~90 LF
Tan Duct Mastic Associated with Duct
Work in South Hallway and Adjacent Rooms of Area C of the 3rd Floor
2% Chrysotile Good/Non- Friable
~100 SF of Duct Mastic
White Mudded Fittings
Associated with Fiberglass Pipe Lines in 4th Floor Elevator Lobby and Adjacent Rooms
0.25% Chrysotile by
PC, 0.25%
Amosite by PC
Good/Non- Friable
~18 LF or 18 Fittings
Tan Duct Mastic Associated with Duct
Work throughout Area B of the 4th Floor
2% Chrysotile Good/Non- Friable
~125 SF of Duct Mastic
White Mudded Fittings
Associated with Fiberglass Pipe Lines throughout Area B of the 4th Floor
0.25% Amosite by PC, 0.25% Chrysotile by
PC
Good/Non- Friable
~16 LF or 16 Fittings
White Mudded Fittings
Associated with Fiberglass Water Lines throughout Area B of the 6th Floor
0.75% Amosite by PC
Good/Non- Friable
~14 LF or 14 Fittings
White Mudded Fittings
Associated with Fiberglass Water Lines in Main Elevator Lobby of the 7th Floor
<0.25% Amosite by PC
Good/Non- Friable
~12 LF or 12 Fittings
White Mudded Fittings
Associated with Fiberglass Water Lines in Main Elevator Lobby of the 8th Floor
0.50% Amosite by PC
Good/Non- Friable ~ 6 LF or 6 Fittings
Tan Duct Mastic
Associated with Large Duct Work in the
Crawlspace of Area C of the Basement (Under Fiberglass Insulation)
2% Chrysotile Good/Non- Friable
~ 200 SF of Duct Mastic
Corrugated Paper Pipe Insulation and Mudded
Fittings
Associated with Lines to Heater Units in Rooms
B501, B503, B504, B539, B540, A539, A540, A541 and A542
Assumed (Based on Prior Knowledge of Past Surveys)
Good/Friable ~140 LF
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present. Please note that the quantities listed for duct mastic are Terracon’s opinion of asbestos-containing duct mastic present on ductwork to be impacted by the project, and the quantities listed are not meant to refer to actual square footage of duct surfaces or runs of duct work in linear feet. Additionally, please note that duct mastic is on hard metal ductwork, and in some instances, it may be located under non-asbestos-containing fiberglass insulation.
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable 6
A sample and results summary table is included in Appendix B, the laboratory analytical report is included in Appendix C, drawings indicating sample and ACM locations are included in Appendix E, and example photos of the identified materials are included in Appendix F.
If the identified ACMs will be impacted by the renovation project, such materials will first need to be properly removed, handled, and disposed by a state-licensed abatement contractor in accordance with applicable federal and state EPA asbestos regulations, Occupational Safety and Health Administration (OSHA) asbestos regulations, and per VA abatement project specifications.
It should be noted that inaccessible/concealed suspect materials, other than those identified during this survey, may exist. This survey did not include disassembling equipment or electrical wiring/electrical components as the building was fully active/operational and inspecting/sampling such equipment/materials would representative a safety hazard to the inspector. Should additional suspect materials be uncovered prior to or during renovation activities, those materials must be assumed asbestos-containing until sampled by a state-licensed asbestos inspector and analysis refutes the positive assumption.
6.0 LIMITATIONS/GENERAL COMMENTS
The survey was project-specific and limited to the HVAC/building components indicated on Client-provided drawings to be impacted and within the boundaries of the areas to be renovated. This survey is not meant to be a comprehensive survey of the entire facilities. In addition, Terracon did not perform sampling which required demolition or destructive activities such as knocking large holes in walls, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas/equipment which may pose a health or safety risk to Terracon personnel were not sampled (inspecting/opening energizing equipment, inspecting/sampling electrical wiring and similar components). Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts.
This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by FFE, Inc. for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding quantities, further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
Re sp on si ve Re so ur ce fu l Re lia bl e
AP
PE
N D
IX
A
VA
Pr oj ec t:
U pg ra de Ai rT er m in al U ni ts
VA
Pr oj ec tN o.
:5
-2 1-
C in ci nn at iV
A M ed ic al C en te r( C
VA
M
C
Vi ne
St re et ,C in ci nn at i, O
H
ID
EN
TI
FI
ED
AS
B
ES
TO
S-
C O
NT
AI
N
IN
G M
AT
ER
IA
LS
B Y
HO
M
O G
EN
EO
US
AR
EA
(H
A) HA No
’s
AC
M
De sc rip tio n M at er ia lL oc at io n an d Ty pe As be st os
EP
A
NE
SH
AP
Cl as si fic at io n Co nd iti on
Fr ia bi lit y Es tim at ed Q ua nt ity
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
Pi pe
Li ne s in
N or th w es tH al lw ay in
Ar ea
A of th e
Ba se m en t
1.
C hr ys ot ile by Po in tC ou nt
(P C
R eg ul at ed As be st os
C on ta in in g
M at er ia l (R
AC
M
G oo d/
Fr ia bl e
~6 Li ne ar
Fe et
(L F) or
Fi tti ng s
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
Pi pe
Li ne in H al lw ay to
Ea st
En tra nc e to Ba se m en tR oo m
B0
0.
Am os ite by
PC
N ot
R eg ul at ed by
EP
A
1%
H ow ev er
R eg ul at ed by
O
SH
A G oo d/
Fr ia bl e
~1
LF
or
Fi tti ng
Ta n D uc tM as tic
As so ci at ed w ith D uc tW or k in C ha pe l an d W es tH al lw ay of
Ar ea
A on th e
1st
Fl oo r 2%
C hr ys ot ile C at eg or y
II
N on -F ria bl e G oo d/
N on
Fr ia bl e
~1
Sq ua re Fe et (S
F) of
D uc t M as tic
G ra y-
Br ow n D uc tM as tic
As so ci at ed w ith D uc tW or k in R oo m
A1 an d
Ar ea
C of
1st Fl oo r(
U nd er Fi be rg la ss
In su la tio
n) 2%
C hr ys ot ile C at eg or y
II
N on -F ria bl e G oo d/
N on
Fr ia bl e ~2
SF
of D uc t
M as tic
Ta n D uc tM as tic
As so ci at ed w ith D uc tW or k in Ar ea C an d
M ai n H al lw ay on th e
1st Fl oo r
2% C hr ys ot ile
C at eg or y
II
N on
-F ria bl e
G oo d/ N on
Fr ia bl e
~1
SF
of
D uc t M as tic
-1
Ta n
D uc tM as tic As so ci at ed w ith
D uc tW or k in
M ai n H al lw ay an d N or th
H al lw ay of Ar ea B on th e 2nd
Fl oo r 2%
C hr ys ot ile C at eg or y
II
N on -F ria bl e G oo d/
N on
Fr ia bl e ~1
SF
of D uc t
M as tic
-2
Ta n
D uc tM as tic As so ci at ed w ith
D uc tW or k in
Ar ea
C an d R oo m
A2 on th e 2nd
Fl oo r (U nd er
Fi be rg la ss In su la tio n)
2% C hr ys ot ile
C at eg or y
II
N on
-F ria bl e
G oo d/ N on
Fr ia bl e
~7
SF
of
D uc t M as tic
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
Pi pe
Li ne s th ro ug ho ut
Ar ea
B an d M ai n
El ev at or
Lo bb y on th e
3rd Fl oo r
0.
Am os ite by
PC
N ot
R eg ul at ed by
EP
A
1%
H ow ev er
R eg ul at ed by
O
SH
A
G oo d/ Fr ia bl e ~5
LF
or
Fi tti ng s
W hi te
Pr ef or m ed Bl ac k
Pi pe
In su la tio n an d Fi tti ng s As so ci at ed w ith
St ea m Li ne s in
PA
C U
Ar ea an d
N or th W al kw ay of th e
C en tra lH al lw ay on th e
3rd Fl oo r
Am os ite
C hr ys ot ile R
AC
M
G oo d/ Fr ia bl e ~9
LF
on si ve Re so ur ce fu l Re lia bl e
HA No ’s
AC
M De sc rip tio n
M at er ia lL oc at io n an d
Ty pe
As be st os
EP
A
NE
SH
AP
Cl as si fic at io n
Co nd iti on
Fr ia bi lit y
Es tim at ed
Q ua nt ity
Ta n D uc tM as tic
As so ci at ed w ith D uc tW or k in So ut h
H al lw ay an d
Ad ja ce nt
R oo m s of Ar ea C of th e 3rd
Fl oo r 2%
C hr ys ot ile C at eg or y
II
N on -F ria bl e G oo d/
N on
Fr ia bl e ~1
SF
of D uc t
M as tic
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
Pi pe
Li ne s in
4th Fl oo rE le va to rL ob by an d
Ad ja ce nt
R oo m s
0.
C hr ys ot ile by
PC
,0 .2
5% Am os ite by
PC
(0 .5
To ta l)
N ot
R eg ul at ed by
EP
A
1%
H ow ev er
R eg ul at ed by
O
SH
A
G oo d/ Fr ia bl e ~1
LF
or
Fi tti ng s
Ta n D uc tM as tic
As so ci at ed w ith D uc tW or k th ro ug ho ut Ar ea B of th e 4th
Fl oo r 2%
C hr ys ot ile C at eg or y
II
N on -F ria bl e G oo d/
N on
Fr ia bl e ~1
SF
of D uc t
M as tic
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
Pi pe
Li ne s th ro ug ho ut
Ar ea
B of th e
4th Fl oo r
0.
Am os ite by
PC
,0 .2
5% C hr ys ot ile by
PC
(0 .5
To ta l)
N ot
R eg ul at ed by
EP
A
1%
H ow ev er
R eg ul at ed by
O
SH
A G oo d/
Fr ia bl e
~1
LF
or
Fi tti ng s
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
W at er Li ne s th ro ug ho ut Ar ea B of th e 6t h Fl oo r
0.
Am os ite by
PC
N ot
R eg ul at ed by
EP
A
1%
H ow ev er
R eg ul at ed by
O
SH
A G oo d/
Fr ia bl e
~1
LF
or
Fi tti ng s
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
W at er Li ne s in M ai n
El ev at or
Lo bb y of th e
7th
Fl oo r
<0 .2
5% Am os ite by
PC
N ot
R eg ul at ed by
EP
A
1%
H ow ev er
R eg ul at ed by
O
SH
A
G oo d/ Fr ia bl e ~1
LF
or
Fi tti ng s
W hi te
M ud de d
Fi tti ng s
As so ci at ed w ith Fi be rg la ss
W at er Li ne s in M ai n
El ev at or
Lo bb y of th e
8th
Fl oo r
0.
Am os ite by
PC
N ot
R eg ul at ed by
EP
A
1%
H ow ev er
R eg ul at ed by
O
SH
A
G oo d/ Fr ia bl e ~6
LF
or
Fi tti ng s
Ta n D uc tM as tic
As so ci at ed w ith La rg e
D uc tW or k in
C ra w ls pa ce of Ar ea C of th e Ba se m en t(
U nd er Fi be rg la ss
In su la tio n)
2% C hr ys ot ile
C at eg or y
II
N on
-F ria bl e
G oo d/ N on
Fr ia bl e
~2
SF
of
D uc t M as tic
C or ru ga te d Pa pe rP ip e
In su la tio n an d M ud de d Fi tti ng s
As so ci at ed w ith Li ne s to H ea te rU ni ts in
R oo m s
B5
,B
3, B5
,B
9, B5
,A
9, A
0, A
1, an d A5
As su m ed
(B as ed on
Pr io r Kn ow le dg e of Pa st Su rv ey
s) R
AC
M
G oo d/ Fr ia bl e ~1
LF
*E st im at ed qu an tit ie s lis te d ab ov e ar e ba se d on a cu rs or y fie ld ev al ua tio n, an d ac tu al qu an tit ie s m ay va ry si gn ific an tly ,e sp ec ia lly if
AC
M s ar e pr es en to ut si de of th e pl an ne d re no va tio n ar ea s, an d in hi dd en an d/ or in ac ce ss ib le ar ea s no te va lu at ed as pa rt of th is su rv ey .T hi s is no ta bi dd in g do cu m en ta nd co nt ra ct or s w ou ld be re sp on si bl e fo rd ra w in g th ei ro w n co nc lu si on s re ga rd in g qu an tit ie s pr es en t.
Pl ea se no te th at th e qu an tit ie s lis te d ar e Te rra co n’ s op in io n of as be st os -c on ta in in g du ct m as tic pr es en to n du ct w or k to be im pa ct ed by th e pr oj ec t, an d th e qu an tit ie s lis te d ar e no t m ea nt to re fe rt o ac tu al sq ua re fo ot ag e of du ct su rfa ce s or ru ns of du ct w or k in lin ea rf ee t.
Ad di tio na lly
,p le as e no te th at du ct m as tic is on ha rd m et al du ct w or k, an d in so m e in st an ce s, it m ay be lo ca te d un de rn on
-a sb es to s-co nt ai ni ng fib er gl as s in su la tio n.
on si ve Re so ur ce fu l Re lia bl e
Se e
Ap pe nd ix
B fo ra su m m ar y of sa m pl es co lle ct ed w ith re sp ec tiv e an al yt ic al re su lts
,A pp en di x C fo rt he la bo ra to ry an al yt ic al re po rt, Ap pe nd ix
E fo rs am pl e an d
AC
M lo ca tio n dr aw in gs an d Ap pe nd ix F fo rp ho to ex am pl es of th e ab ov e id en tif ie d m at er ia ls
It sh ou ld be no te d th at in ac ce ss ib le
/c on ce al ed su sp ec tm at er ia ls ,o th er th an th os e id en tif ie d du rin g th is su rv ey
,m ay ex is t.
Th is su rv ey di d no ti nc lu de di sa ss em bl in g eq ui pm en to re le ct ric al w iri ng /e le ct ric al co m po ne nt s as th e bu ild in g w as fu lly ac tiv e/ op er at io na la nd in sp ec tin g/ sa m pl in g su ch eq ui pm en t/m at er ia ls w ou ld re pr es en ta tiv e a sa fe ty ha za rd to th e in sp ec to r.
Sh ou ld ad di tio na ls us pe ct m at er ia ls be un co ve re d pr io rt o or du rin g re no va tio n ac tiv iti es
,t ho se m at er ia ls m us tb e as su m ed as be st os
-c on ta in in g un til sa m pl ed by a st at e-lic en se d as be st os in sp ec to r an d an al ys is re fu te s th e po si tiv e as su m pt io n.
If th e id en tif ie d
AC
M s w ill be im pa ct ed by th e re no va tio n, su ch m at er ia ls w ou ld ne ed to be pr op er ly re m ov ed
,h an dl ed
,a nd di sp os ed in ac co rd an ce w ith ap pl ic ab le fe de ra la nd st at e
EP
A re gu la tio ns
,O cc up at io na lS af et y an d
H ea lth Ad m in is tra tio n
(O S
H A) re gu la tio ns ,a nd pe rV A pr oj ec ts pe ci fic at io ns
Responsive Resourceful Reliable
APPENDIX B
VA Project: Upgrade Air Terminal Units VA Project No.: 539-21-111
Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220
ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY
Sample # Sample Material
Description Sample Location HA Location(s) Results (% / Type of Asbestos)HA # SEQ. #
White Mudded Fittings
Hallway at Room A032
Northwest Hallway in Area A of Basement
1.25% Chrysotile by Point Count (PC)
02 Hallway at Room A031 1.50% Chrysotile by PC
03 Hallway at Room A031 0.75% Chrysotile by PC
White Pipe Encapsulant
At Doorway of A031a Associated with
Fiberglass Pipe Insulation throughout the Basement
None Detected (ND)
05 Center of A047 ND
Southwest Corner of C003 on Pump
System
ND
2’x2’ White Ceiling Tile with Small
Fissures
Hallway at Room A018
Throughout Basement
ND
08 Hallway at Southwest Stairwell ND
09 South End of Southwest Hallway ND
Spray-on Fireproofing
Center of Room A047c
Room A047 and Adjacent Offices
ND
11 Center of Room A047a ND
12 Northeast Corner of
A047 ND
13 Northwest Corner of A047 ND
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
14 Center of A047 ND
15 Center of A047 ND
16 Northwest Corner of A047 ND
White Mudded Fittings
Near Entrance to Room B022
Near East Entrance to Room B022
0.25% Amosite by PC
18 Near Entrance to Room B022 <0.25% Amosite by PC
19 Near Entrance to Room B022 0.50% Amosite by PC
Tan Duct Mastic
Northwest Corner of Chapel Associated with
Chapel Duct Work, and West Hallway on 1st
Floor
2% Chrysotile
21 Hallway at Room B159 2% Chrysotile
22 Hallway at Room B159 2% Chrysotile
2’x2’ White Ceiling Tile with Small
Fissures
Northwest Corner of Chapel
Throughout 1st
Floor
ND
24 South End of West Central Hallway ND
25 Doorway of Room
B144 ND
Spray-On Fireproofing
Northwest Corner of Chapel
Throughout Project Area on
1st Floor
ND
27 Southeast Corner of Chapel ND
28 Middle West Wall of
B163K ND
29 South End of East Central Hallway
ND
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
30 South End of East Central Hallway ND
31 Middle West Wall of
B163K ND
32 Southeast Corner of Chapel ND
Brown Duct Mastic over Fiberglass
Insulation
Hallway at Room B163
Associated with Insulated
Ductwork in East and East Central Hallways, B163 I-L Offices on 1st
Floor
Mastic: ND, Wrap: ND, Insulation: ND
34 Southwest Corner of B163L
Mastic: ND, Wrap: ND, Insulation: ND
35 Middle of East Central Hallway
Mastic: ND, Wrap: ND, Insulation: ND
2’x’4’White Ceiling Tile with Large
Fissures
Room 163K
B163 I-L Offices
ND
37 Room 163L ND
38 Room 163L ND
Gray Duct Mastic
Middle of East Central Hallway
East Central Hallway in Area B on 1st Floor
ND
40 Center of B159 ND
Southeast Corner of Lobby at Room
B141
ND
Tan Duct Mastic over Fiberglass Insulation
East Wall of Room A144 Associated with
Insulated Duct Work on 1st
Floor- Areas A and C
Mastic: ND, Wrap: ND, Insulation: ND
43 Center of Room A144
Mastic: ND, Wrap: ND, Insulation: ND
44 Hallway at Room C126
Mastic: ND, Wrap: ND, Insulation: ND
13 45 Center of Room A144a
Throughout 1st
Floor ND
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
46 2’x2’ White Ceiling Tile with Small
Fissures
Center of Room
A144 ND
47 Entrance to Travel Room Area ND
White Duct Mastic over Fiberglass
Insulation
Center of A144a
Associated with Room A149 Duct
Work
Mastic: ND, Wrap: ND
49 Center of C137a Mastic: ND, Wrap: ND
50 Center of C137a Mastic: ND, Wrap: ND
Gray-Brown Duct Mastic
Center of A149a A144 and Area
C (Under fiberglass
Insulation) on 1st Floor
2% Chrysotile
52 Center of A144 2% Chrysotile
53 Northwest Corner of C128 2% Chrysotile
Tan Duct Mastic
Northeast Corner of A144a Associated with
Duct in 1st Floor Area C and
Main Hallway of 1st Floor
2% Chrysotile
55 Hallway at Room C126 2% Chrysotile
56 Hallway at Room C130 2% Chrysotile
Gray Duct Mastic
Middle North Wall
B162 (Travel Area)
ND
58 Center of B162 ND
59 Center of B162 ND
Tan Duct Mastic
Middle East Side of A217
Physical Therapy Rooms and
Offices, West Hallway, Elevator
Lobby
ND
61 Center of Hallway at A218
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
62 Northwest Corner of Elevator Lobby ND
19-1
63a
2’x’2 White Ceiling Tile with Small
Fissures
Middle East Side of A217
Throughout 2nd
Floor
ND
64a Hallway at A213 ND
65a Hallway at Room B203
ND
20-1
66a
Gray Duct Mastic
At Entrance to A217
Throughout 2nd
Floor North Area A Hallway and
Area B
ND
67a Hallway at Room
B213 ND
68a Hallway at Room
B203 ND
21-1
69a
Gray-Brown Duct Mastic
At Northwest Corner of Elevator
Lobby 2nd Floor
Elevator Lobby
ND
70a Hallway at Room
B218 ND
71a Hallway at Room
B216 ND
22-1
72a
Tan Duct Mastic
Hallway at Room B235
Area B- 2nd
Floor Main Hallway
ND
73a Hallway at Room
B203 ND
74a Room B218 Doorway 2% Chrysotile
19-2
63b
Gray Duct Mastic
Hallway at Room C236
Throughout Area C 2nd Floor
ND
64b Hallway at Room C229a ND
65b Hallway at Room C229a ND
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
20-2
66b
Tan Duct Mastic
Hallway at Room C229b
Throughout Area C and
Room A246 on 2nd Floor
2% Chrysotile
67b Southwest Corner of Room A246 ND
68b Southwest Corner of Room A246 2% Chrysotile
21-2
69b
Tan Duct Mastic
Hallway near B322
Throughout 3rd
Floor Area B
ND
70b Hallway Near Room B308a ND
71b Hallway at Room
B315 ND
22-2
72b
2’x2’ White Ceiling Tile with Small
Fissures
Hallway near B322
Throughout 3rd
Floor
ND
73b North End of North Hallway in Area B ND
74b Southwest Corner of Room B322a ND
Red-Fire Stop Caulking
Double-Doors at West Side of Area
B Throughout 3rd
Floor
ND
76 North End of North Hallway in Area B ND
77 North End of North Hallway in Area B ND
White Mudded Fittings
Hallway at Entrance to B322 Associated with
Fiberglass Pipe Insulation in Area B and
Main Elevator Lobby of 3rd
Floor
Wrap: ND, Insulation:
0.25% Amosite by PC
Hallway at
Doorway to Room B315
Insulation: <0.25% Amosite by PC
Hallway at Room
B327- Main Elevator Lobby
Insulation: 0.25% Amosite by PC
25 81 Gray Duct Mastic Hallway at Room B314
Associated with Duct Work in ND
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
82 Hallway at Room B319d
Area B on 3rd
Floor ND
83 Hallway at Room B319d ND
Red Duct Mastic
Hallway at Room B311
Throughout 3rd
Floor Area B Hallways and
Learning Center
ND
85 Hallway at Room B308
ND
86 Middle East Side of B322a ND
Gray-Brown Duct Mastic
Hallway At Room B308
Throughout Area B on 3rd Floor
ND
88 At Entrance to Room B322 ND
89 At Entrance to Room B322 ND
White Preformed Pipe Insulation and
Fittings
Central Hallway- South of Elevator
Lobby Associated with 3rd Floor Steam Lines in PACU Area leading to
Floor Above
30% Amosite, 15% Chrysotile
Central Hallway- South of Elevator
Lobby
30% Amosite, 15% Chrysotile
Central Hallway- South of Elevator
Lobby
30% Amosite, 15% Chrysotile
Tan Duct Mastic
South End of Hallway at Room
C335 Associated with
Duct Work in Area C – South
Hallway and Adjacent
Offices on the 3rd Floor
2% Chrysotile
94 Hallway at Room C325 2% Chrysotile
95 Hallway at Room C319 2% Chrysotile
30 96 White Mudded
Fittings on Fiberglass Lines
Southwest Corner of Elevator Lobby
Associated with Fiberglass Pipes in 4th
Wrap: ND, Insulation:
<0.25% Amosite by PC, <0.25% Chrysotile by PC
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
97 Hallway at Room A439
Floor Elevator Lobby and Adjacent Rooms
Insulation: 0.25% Amosite by PC, <0.25% Chrysotile by PC
98 Hallway at Room A439
Insulation: 0.25% Amosite by PC, <0.25% Chrysotile by PC
Tan Duct Mastic
Southwest Corner of Elevator Lobby Associated with
Ducts in 4th Floor Elevator Lobby and Northwest
Adjacent Rooms
ND
100 Hallway at Room
B439 ND
101 Hallway at Room
B439 ND
2’x2’ White Ceiling Tile with Small
Fissures
Hallway at Room B439
Throughout 4th
Floor
ND
103 Hallway at Room
B438 ND
104 Hallway at Toom
B421 ND
Tan Duct Mastic
Hallway at Room B438 Associated with
Duct Work throughout
Area B on the 4th Floor
2% Chrysotile
106 Hallway at Room B403a ND
107 At Entrance to B426a ND
Red Fire-Stop Caulking
Entrance to B403b
Throughout Area B on 4th Floor
ND
109 Entrance to B403b ND
110 Entrance to Respiratory Suite ND
111 White Mudded Fittings on
Fiberglass Lines
Hallway at Room B403a
Associated with Fiberglass
Pipes throughout
Area B on the 4th Floor
Insulation: <0.25% Amosite by PC, <0.25% Chrysotile by PC
112 Hallway at Room B426
Insulation: <0.25% Amosite by PC, 0.25% Chrysotile by
PC
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
113 Hallway at Room B427
Wrap: ND, Insulation:
0.25% Amosite by PC, <0.25% Chrysotile by PC
Gray-Brown Duct Mastic
Inside Entrance of B426
Rooms B426, Room B246a and Adjacent
Hallway
ND
115 End of Hallway Near B425 ND
116 End of Hallway Near B425 ND
White Encapsulant Over Fiberglass Lines
Center of Room B420
Throughout Area B of 4th Floor
Encapsulant: ND, Insulation: ND
118 Pipe Chase Closet in Room B420
Encapsulant: ND, Insulation: ND
119 Pipe Chase Closet in Room B420
Encapsulant: ND, Insulation: ND
White Encapsulant over Fiberglass Lines
Pipe Chase Closet in Room A549
Pipe Chase Closet within Room A549
Encapsulant: ND, Insulation: ND
121 Pipe Chase Closet in Room A549
Encapsulant: ND, Insulation: ND
122 Pipe Chase Closet in Room A549 Encapsulant: ND
2’x2’ White Ceiling Tile with Small
Fissures
In Northwest Corner of A549
Throughout Area A of 5th Floor
ND
124 East End of Elevator Lobby ND
125 East End of Elevator Lobby ND
2’x2’ White Ceiling Tile with Small
Fissures
Center of Elevator Lobby
Throughout 6th
Floor
ND
127 Hallway at Room B606
ND
128 Hallway At room
B603 ND
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
Tan Duct Mastic
Hallway at Room B603
Associated with Duct Work in
Area B on the 6th
Floor
ND
South End of
Cardiology Suite Hallway
ND
North End of
Cardiology Suite Hallway
ND
White Mudded Fittings on
Fiberglass Lines
Hallway at Room B603
Associated with Water Lines in
Area B of the 6th
Floor
Wrap: ND, Insulation:
0.75% Amosite by PC
133 Hallway at Room B606
Wrap: ND, Insulation:
0.50% Amosite by PC
Hallway at
Double-Doors to East Suite
Wrap: ND, Insulation:
0.25% Amosite by PC
2’ x 2’ White Ceiling Tile with Small
Fissures
Center of elevator lobby – 7th floor
Throughout 7th floor
ND
North end of east Elevator lobby- 7th floor
ND
137 East end of Area B Hallway – 7th floor ND
Tan Duct Mastic
Middle of South Side of Elevator
Lobby
7th floor - Main Elevator Lobby
ND
Middle of South Side of Elevator
Lobby
ND
Middle of South Side of Elevator
Lobby
ND
White Mudded Fittings on
Fiberglass Pipes
Hallway at room A730 Associated with
Water Lines in Main Elevator
Lobby on the 7th floor
Wrap: ND, Insulation:
<0.25% Amosite by PC
142 Pipe chase in Room A740
Insulation: 0.25% Amosite by PC
143 Pipe chase in Room A740
Wrap: ND, Insulation:
<0.25% Amosite by PC
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
Gray Duct Mastic
Middle north wall in A739a
Associated with Duct Work in
Rooms A739a and A728d
ND
145 Middle north wall in A739a ND
146 Middle north wall in A739a ND
White Pipe Encapsulant
South Side of Pipe Chase
Pipe Chase in Room A740
ND
148 South Side of Pipe Chase ND
149 South Side of Pipe Chase ND
Tan Duct Mastic
Center of Main Elevator lobby
Associated with Duct Work in Main Elevator
Lobby of 8th Floor
ND
151 Hallway Outside Room A845 ND
152 Hallway Outside Room A845 ND
2’ x 2’ White Ceiling Tile with Small
Fissures
Center of Main Elevator Lobby –
8th floor Throughout 8th floor
ND
154 West End of Elevator Lobby ND
155 South Side of Reception Area ND
White Mudded Fittings on
Fiberglass Lines
Center of Main Elevator Lobby Associated with
Water Lines in Main Elevator
Lobby on the 8th
Floor
Insulation: 0.50% Amosite by PC
157 Center of Main Elevator Lobby
Wrap: ND, Insulation:
<0.25% Amosite by PC
158 Center of Main Elevator Lobby
Wrap: ND, Insulation:
0.25% Amosite by PC
51 159 White Pipe Encapsulant
Pipe Chase Closet in Southwest Wing
9th Floor
Associated with Fiberglass Pipes within Pipe
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
Pipe Chase Closet in Southwest Wing
9th Floor
Chase Closet in Southwest Wing of the 9th floor
ND
Pipe Chase Closet in Southwest Wing
9th Floor
ND
2’ x 2’ White Ceiling Tile with Small
Pinholes
At Northwest Entrance
Area B of 8th floor
ND
163 Center of Lobby ND
164 Middle of North Wall ND
Tan Duct Mastic
Middle of Mail Room in Basement
Basement Mail Room (B022A)
ND
166 Middle of Mail Room in Basement ND
167 Middle of Mail Room in Basement ND
Tan Duct Mastic
East End of Duct Work
Associated with Large Ducts in Basement Area C Crawlspace
2% Chrysotile
169 At 45 Degree Turn 2% Chrysotile
170 West End of Duct Area 2% Chrysotile
Tan Duct Mastic
South Entrance to A235a
Associated with Ductwork in SPD on the 2nd Floor
ND
172 South Entrance to A235a ND
173 South Entrance to A235a ND
56 - Corrugated Paper
Pipe Insulation and Mudded Fittings
Associated with Lines to Heater Units in Rooms
B501, B503, B504 B539, Assumed (Based on Prior Knowledge of Past Surveys)
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. # B540, A540, A541 and A542
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
Plaster Walls: Base Coat and Finish Coat
Basement- At Entrance to Morgue
Area
Throughout Building
Base Coat: ND, Finish Coat:
ND
1st Floor- Main
Hallway at Room Women’s Restroom
Base Coat: ND, Finish Coat:
ND
03 2nd Floor- East Side Elevator Lobby
Base Coat: ND, Finish Coat:
ND
04 3rd Floor- At Double Doors to Area B
Base Coat: ND, Finish Coat:
ND
05 4th Floor- East Side of Elevator Lobby
Base Coat: ND, Finish Coat:
ND
5th Floor- Near
Entrance to Pharmacy Area
Base Coat: ND, Finish Coat:
ND
07 6th Floor- East Side of Elevator Lobby
Base Coat: ND, Finish Coat:
ND
08 7th Floor – Near Room A743
Base Coat: ND, Finish Coat:
ND
9th Floor- Northwest Corner of Elevator
Lobby
Base Coat: ND, Finish Coat:
ND
Drywall System:
Drywall and Joint
Compound
Basement- East Elevator Lobby
Throughout Building
Drywall: ND, Joint Compound: ND
1st Floor- Hallway at
Room A123 Drywall: ND, Joint Compound: ND
12 2nd Floor- Northwest Corner of C201
Drywall: ND, Joint Compound: ND
3rd Floor- Near
Southeast Corner of Elevator Lobby
Drywall: ND, Joint Compound: ND
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of
Asbestos)HA # SEQ. #
4th Floor- Area B- Doorway to North
Wing
Drywall: ND, Joint Compound: ND
5th Floor- South
Wall of East Elevator Lobby
Drywall: ND, Joint Compound: ND
6th Floor- South
Wall of Main Elevator South
Drywall: ND, Joint Compound: ND
17 7th Floor – At Entrance to Area B
Drywall: ND, Joint Compound: ND
8th Floor- Northeast Corner Service Elevator Lobby
Drywall: ND, Joint Compound: ND
Spray-On Fireproofing
Basement – East Elevator Lobby
Throughout Building
ND
20 1st Floor- Near Main Entrance Lobby ND
21 2nd Floor – Entrance to Dentistry Area
ND
22 3rd Floor- Center of Elevator Lobby ND
23 4th Floor – Center of Elevator Lobby ND
5th Floor- Near
Entrance to Pharmacy Area
ND
25 6th Floor- East Elevator Lobby
ND
7th Floor- West Side of Main Elevator Lobby
ND
9th Floor – East End of Hallway at Entrance to
Maintenance Area
ND
Inspector Signatures: ________________________ _____________________________ Lem Weyer, OH AHES #36337 Tyler Stenten, OH AHES #35931
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
APPENDIX C
ASBESTOS ANALYTICAL LABORATORY DATA
OrderID: 162103849
OrderID: 162103849
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
APPENDIX D
LICENSES AND CERTIFICATIONS
asbestoslicensing@epa.ohio.gov asbestoslicensing@epa.ohio.gov
Tyler.Stenten@terracon.com https://urldefense.com/v3/__https://www.epa.ohio.gov/dapc/atu/asbestos*179575185-resources__;Iw!!JrcuqBw_IQ!ye2zI16CE5GxLxa_plaztHHkGanxgHMAbkaX4nG16PVJ0YVxnt7 SeTKHfNDN2K-qnYU$ https://urldefense.com/v3/__http://ebiz.epa.ohio.gov__;!!JrcuqBw_IQ!ye2zI16CE5GxLxa_plaztH HkGanxgHMAbkaX4nG16PVJ0YVxnt7SeTKHfNDNIQIz_ek$ asbestoslicensing@epa.ohio.gov asbestoslicensing@epa.ohio.gov
Tyler.Stenten@terracon.com https://urldefense.com/v3/__https://www.epa.ohio.gov/dapc/atu/asbestos*179575185-resources__;Iw!!JrcuqBw_IQ!3Cm-JjG06KMBKt3mNSnGvB7z-vADrd5hMrbVybdDlldUSeZkZhnQWOgZV0fTMhpjKGY$ https://urldefense.com/v3/__http://ebiz.epa.ohio.gov__;!!JrcuqBw_IQ!3Cm- JjG06KMBKt3mNSnGvB7z-vADrd5hMrbVybdDlldUSeZkZhnQWOgZV0fTSca13T4$
March 10, 2021 Terracon Project No. N1207213
Responsive Resourceful Reliable
APPENDIX E
SAMPLE & ACM LOCATION DRAWINGS
Project No. N1207213
Consulting Engineers and Scientists
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
Basement- Area A Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
1Project Manager: Josh Vogel
APR: Joe Tussey
11 08
Asbestos-Containing Mudded Fittings on
Fiberglass Pipes
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
Basement- Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
2Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos-Containing Mudded Fitting on
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
Basement- Area C Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
3Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos-Containing Tan Duct Mastic
Asbestos-Containing White Preformed Block Pipe Insulation and Fittings
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
1st Floor - Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
4Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos- Containing Tan
Duct Mastic
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
1st Floor - Area C Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
5Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos- Containing
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
2nd Floor - Area A Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
6Project Manager: Josh Vogel
APR: Joe Tussey
No Asbestos-Containing Materials associated with this Project found in this Area
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
2nd Floor - Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
7Project Manager: Josh Vogel
APR: Joe Tussey
71 74
Asbestos-Containing Tan
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
2nd Floor - Area C Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
8Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos-Containing Tan Duct Mastic
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
3rd Floor- Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
9Project Manager: Josh Vogel
APR: Joe Tussey
81 70
Asbestos-Containing Mudded Fittings on Fiberglass Pipes
Asbestos-Containing White Preformed Block Pipe Insulation and Fittings
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
3rd Floor- Area C Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
10Project Manager: Josh Vogel
APR: Joe Tussey
95 94 93
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
4th Floor – Area A Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
11Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos-Containing Mudded Fittings on Fiberglass Pipes
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
4th Floor – Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
12Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos-Containing Mudded Fittings on
Fiberglass Pipes
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
5th Floor – Area A Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
13Project Manager: Josh Vogel
APR: Joe Tussey
Assumed Asbestos-Containing Corrugated Paper Pipe
Insulation
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
5th Floor – Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
14Project Manager: Josh Vogel
APR: Joe Tussey
No Samples Collected in this Area
Assumed Asbestos- Containing Corrugated Paper Pipe Insulation
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
6th Floor – Area A Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
15Project Manager: Josh Vogel
APR: Joe Tussey
No Asbestos-Containing Material associated with this Project found in this
Area
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
6th Floor – Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
16Project Manager: Josh Vogel
APR: Joe Tussey
Asbestos-Containing Mudded Fittings on Fiberglass Pipes
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
7th Floor – Area A Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
17Project Manager: Josh Vogel
APR: Joe Tussey
142 147 143 148 144 149
Asbestos-Containing
611 Lunken Park Drive Cincinnati, Ohio 45226
PH. (513) 321-05816
FAX (513) 321-0294
7th Floor – Area B Exhibit
Survey Date: February 2021 Cincinnati VA Medical Center Upgrade Air Terminal Units Project
3200 Vine Street Cincinnati, Ohio 45220
18Project Manager: Josh Vogel
APR: Joe Tussey
Assumed Asbestos- Containing Corrugated Paper Pipe Insulation (Within Wall
Pipe Chase)
611 Lunken Park Drive Cincinnati, Ohio 45226
PH.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .