Attachment II - MD105B - FIFTH FLOOR DEMOLITION PLAN - AREA B.pdf

PDF 410 KB Posted

Attached to
Z1DA--Project # 539-21-111 - Upgrade Terminal Units Additional information available on page # 2.
Solicitation number
36C25021B0125
Issued by

About this file

This document package includes a demolition plan drawing and details for a federal construction project along with the associated solicitation information. The demolition plan drawing provides specifications for removing and replacing various HVAC components on the fifth floor of a Veterans Affairs medical center. Key components to be removed and replaced include terminal units, ductwork, control valves, fans, pumps and piping. The work must be conducted after hours or on weekends to avoid disrupting airflow to parts of the fourth floor. The related solicitation is for project number 539-21-111 to upgrade the terminal units at the specified Veterans Affairs location, with responses due on October 1, 2021. The solicitation is designated for the Department of Veterans Affairs Veterans Health Administration VISN 10.

View the file

Other files

File Type Posted
36C25021B0125 0005.docx DOCX document
Attachment II - Amendment No. 5.pdf PDF
Attachment I - Combine Specification Air Terminal Units.pdf PDF
13.54_M700 - MECHANICAL CONTROLS.pdf PDF
JA - DDCASC.pdf PDF
07.03_AC141 - FIRST FLOOR REFLECTED CEILING PLAN.pdf PDF
13.53_M602 - MECHANICAL SCHEDULES.pdf PDF
07.06_AC144 - FOURTH FLOOR REFLECTED CEILING PLAN.pdf PDF
07.08_AC146 - SIXTH FLOOR REFLECTED CEILING PLAN.pdf PDF
07.04_AC142 - SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
36C25021B0125 0004.docx DOCX document
07.05_AC143 - THIRD FLOOR REFLECTED CEILING PLAN.pdf PDF
Appendix B - Hazardous Material Report.pdf PDF
07.07_AC145 - FIFTH FLOOR REFLECTED CEILING PLAN.pdf PDF
QA.pdf PDF
Specs.pdf PDF
07.09_AC147 - SEVENTH FLOOR REFLECTED CEILING PLAN.pdf PDF
36C25021B0125 0003.docx DOCX document
36C25021B0125 0002.docx DOCX document
36C25021B0125 0001.docx DOCX document
Attachment III - MH105B - FIFTH FLOOR HVAC PLAN - AREA B.pdf PDF
Attachment I - Q and A.pdf PDF
Attachment I - Drawings.pdf PDF
Attachment III - DBA WD.pdf PDF
IFB - 36C25021B0125.pdf PDF
Attachment II - Specifications.pdf PDF
36C25021B0125_1.docx DOCX document
Attachment IV - EMR Form.pdf PDF
Attachment VI - J_A x2.pdf PDF
Attachment V - RFI Form.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Med Svc

B501

Office

B503

Office

B504

Office

B518

Office

B517

Office

B516

2 9

AHU-12

12 12

3" C

H S

3" C

H R

3" C

H S

3" C

H R

9" ø

O A

9"ø OA

"ø

O A

Compound Picking

B527

Rolling Storage

B525

Office

B508

Office

B510

Office

B511 Office

B512

Office

B513

Storage

B505H

Office

B505

Conference Rm.

B507

Office

B509

Office

B514

222222

242424242424

101010

101010

22222

26 26

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

C

U s e rs

\d m c c le a ry

\D o c u m e n ts

\S ta n

C V

A M

C

U p g ra d e

A T

U s

B

M E

P c a d

T Y

G

P .r v t

/1 /2

:0

:3

P

M

MD105B

FIFTH FLOOR DEMOLITION PLAN -

AREA B

08/31/2021 JAC DEM

CINCINNATI, OH

539-21-111CONSTRUCTION

DOCUMENTS

UPGRADE TERMINAL

UNITS

1/8" = 1'-0"

FIFTH FLOOR DEMOLITION PLAN - AREA B

D R A W I N G N O T E S :

1 REMOVE EXISTING VERTICAL FLOOR SET INDUCTION UNIT AND ASSOCIATED ACCESSORIES,

SUPPORTS, CONTROLS, ETC. REMOVE EXISTING OUTSIDE AIR DUCT, CHILLED WATER

SUPPLY & RETURN PIPING, AND CONDENSATE DRAIN PIPING THRU FLOOR SLAB - REFER TO

SHEET BELOW FOR CONTINUATION.

2 EXISTING DUCTWORK TO REMAIN.

3 REMOVE EXISTING DUCTWORK TO THIS POINT, CAP AND SEAL AIRTIGHT.

4 REMOVE EXISTING CHILLED WATER BOOSTER PUMP, FOR REPLACEMENT IN NEW WORK.

5 EXISTING OUTSIDE AIR DUCT, CHILLED WATER SUPPLY & RETURN PIPING, AND

CONDENSATE DRAIN PIPING UP THRU FLOOR SLAB TO REMAIN.

6 REMOVE EXISTING AIR DEVICE AND ASSOCIATED DUCTWORK, ACCESSORIES, ETC.

7 REMOVE EXISTING RETURN FAN VFD FOR REPLACEMENT IN NEW WORK.

8 EXISTING SUPPLY FAN VFD TO REMAIN.

9 EXISTING AIR HANDLING UNIT TO REMAIN.

10 EXISTING PIPING TO REMAIN.

11 EXISTING AIR VALVE TO REMAIN. REFER TO MH SERIES SHEET FOR SCOPE OF WORK

ASSOCIATED WITH THIS VALVE.

12 EXISTING FAN COIL UNIT TO REMAIN. REFER TO MH SERIES SHEET FOR SCOPE OF WORK

ASSOCIATED WITH THIS UNIT.

13 EXISTING ABOVE CEILING INDUCTION UNIT AND ASSOCIATED DUCTWORK, ACCESSORIES,

SUPPORTS, CONTROLS, ETC. TO REMAIN. REFER TO MH SERIES SHEET FOR SCOPE OF

WORK ASSOCIATED WITH THIS UNIT.

14 REMOVE EXISTING SINGLE DUCT VAV BOX AND ASSOCIATED DUCTWORK, ACCESSORIES,

SUPPORTS, CONTROLS, ETC.

15 REMOVE EXISTING AHU-12 RETURN FAN FOR REPLACEMENT IN NEW WORK.

16 REMOVE EXISTING AHU-12 STEAM PREHEAT COIL CONTROL VALVE, FOR REPLACEMENT IN

NEW WORK.

17 REMOVE EXISTING AHU-12 CHILLED WATER COIL CONTROL VALVE, FOR REPLACEMENT IN

NEW WORK.

18 REMOVE EXISTING DUCTWORK AND ASSOCIATED SUPPORTS, ACCESSORIES, ETC.

19 EXISTING INLINE HEATING HOT WATER PUMP TO REMAIN.

20 REMOVE EXISTING DUCT TO THIS POINT FOR RECONNECTION IN NEW WORK.

21 REMOVE EXISTING VERTICAL PIPING BACK TO NEAR FLOOR SLAB, FOR RECONNECTION IN

NEW WORK.

22 EXISTING SUPPLY DUCT HEADER TO REMAIN. REMOVE AND CAP EXISTING INLET DUCT

FROM AHU.

23 REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN NEW WORK.

24 EXISTING DUCT - MOUNTED STEAM COIL AND ASSOCIATED DUCTWORK, PIPING,

ACCESSORIES, CONTROLS, ETC. TO REMAIN.

25 CAREFULLY REMOVE EXISTING AVERAGING TYPE DDC TEMPERATURE SENSOR, FOR

REINSTILLATION IN NEW WORK.

26 REMOVE EXISTING STEAM HUMIDIFIER AND AND ASSOCIATED PIPING, ACCESSORIES,

CONTROLS, ETC.

27 REMOVE EXISTING PIPING TO THIS POINT AND CAP.

28 REMOVE EXISTING PIPING AND ASSOCIATED SUPPORTS, ACCESSORIES, ETC.

29 REMOVE EXISTING STEAM PIPING THRU FLOOR SLAB, AND INFILL SLAB OPENING TO MATCH

EXISTING. REFER TO FLOOR PLAN BELOW FOR CONTINUATION.

30 REMOVE EXISTING SHEETMETAL TRANSITION AND PLENUM BOX AT OUTLET OF AHU.

31 BOXED OUT REGION REPRESENTS APPROXIMATE AREA ASSOCIATED WITH 5TH FLOOR

INPATIENT PHARMACY. ALL WORK PERFORMED WITHIN THIS AREA SHALL BE

ACCOMPLISHED USING A HEPA CART. COORDINATE ALL WORK AND SCHEDULING WITH COR.

NKEYPLAN

FIFTH FLOOR

Revisions: Date:

Addendum #1 10/01/2021

G E N E R A L N O T E S :

A DURING PERFORMANCE OF THIS WORK, ANY DISRUPTION OF AIRFLOW TO THE SOUTH

WING ON FOURTH FLOOR (INDICATED BY DASHED BOX) SHALL BE LIMITED TO AFTER-

HOURS (NIGHTS OR WEEKENDS). PROVIDE TEMPORARY COOLING/HEATING AS NOTED,

FOR ANY AIRFLOW DISRUPTION TO THE SOUTH WING REQUIRED DURING NORMAL

BUSINESS HOURS.

Sheets
MD105B - FIFTH FLOOR DEMOLITION PLAN - AREA B
MH105B - FIFTH FLOOR HVAC PLAN - AREA B

File details come from the government source that posted it. Updated .