This reflected ceiling plan and federal contract opportunity document provide details for an upgrade of terminal units project at the Cincinnati VA Medical Center. The reflected ceiling plan outlines the scope of work to remove and replace existing acoustical ceiling tiles and grids in various rooms on the second floor with new 24"x24" tiles and grid at the previous ceiling height. It includes general ceiling notes, drawing legends, and specific room notes. The related federal contract opportunity is solicitation number 36C25021B0125 for project number 539-21-111 to upgrade terminal units, with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 listed as the agency. No other salient details are provided regarding pricing, response dates, or awardees.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD
T
T
T
T
T
T T T
T T T
T T
T
T
T
T T
T
T T T
T
T
T
T
T T
T T
T
T
T
Stair 10 S*2*10
Lab B211
Recep.
A202
Imaging Recep.
A201
Stor.
A202A
Digital Chest Rm.
A203
Dressing Rm.
A203A
Speech Pathlgy.
A204
Rehab Care Line
A205
Man Rehab Care Line
A206
Staff A207
Occupational Therapy
A208
EMG Lab A209
Rehab Exam A210
Rehab Exam A211
Elec.
A212
HAC
A213
Staff Tlt.
A214PT Storage
A215 Hydrotheraphy
A216
Exam/Treatment / Exercise
Room A217
Physical Ther.
Supervisor A218
Adl. Clinic A208A
EMG Lab A209A
Elec.
A217A
Corridor C*2*2
Light Box Room A215B
SCI Exam A215A
Stor.
A218A
Stair 2 S*2*2
Oxygen Storage
A221
Therapy Supervisor
A222 Ante Room
A223
Stor.
A210A
Equip Wash A222B
Compressor Room A222D
Equipment Storage and Testing A228A
Storage A228B
Eto. Room B208A
Mech A228C
Office A230
Dressing Rm.
A227B Office A231
LKRS.
A227A Shower
A227
Elec.
A225B
Service Lobby A225
Trash Chute A225A
Lounge A226Training
Room A224
HAC
A225C
Office A232
Nuclear Med. Sec.
C200
Waiting C201
Reading C202
Work Rm.
C203
CAT Scan Room C204
Gamma Camera
C205
Uptake Prep Bay
C204A
Uptake Area C204B
Uptake Prep Room
C204C
PET/CT
Scanner
C204D
Echo Room C252
Echo Room C251
Echo Rm C250
Cath Lab C216O
Stor.
C216P
I.V. Prep Rm.
C207
Elec.
C209
Control Room C204E
Tlt.
C204F Tele.
C208
File Rm.
C200B
Chief Off.
C200A
Reading Rm.
C250A
Chief Off.
C200C
Break Room A240Stair 1
S*2*1
Signal Closet
A239
M. Tlt.
A236
Tlt.
A235
G.P.
Radiography
A242
Control A243
Storage A243A
Stair 5 S*2*5
Reading Room A245
Gamma Camera
C210
Hot Lab C212
Stor.
C213
X-Ray Room A246
Control A246A
Clos A243B Clos
A243C
Ultrasound A266
Corridor C*2*1
Elec.
A246B
Corridor C*2*3
Viewing A256
Reading Room A257
Reading Room A258
Adm.
A259
Chief Radiology
A260
Adm. Asst.
A261
Off.
A262
Resident Reading Room A263
Reading Room A264
Reading Room A262A
Tlt.
A260A
Pat. Rm.
A266B
Ultrasound A265
Stor A255 Tlt.
A253B
Break Rm.
A253
Elec.
A253A
HAC
A254
Digital Radiography
A252
Control A252A
Student Off.
A251
Office A251B
Patient Toilet A249C
Control A249B
BE
Fluororoom
A249
Storage A249A
Work Rm.
A250A
Cl. Supp.
A296
Clean Equipment
A295
Sig. Clos.
A250Clean
Supply Room A251A
M. Lkrs.
A270
Tlt.
A270A
Staff Lounge
A269 F. Lkrs.
A271
Tlt.
A271A
Conf.
A272
RN
Manager
A273
Elec.
A275
HAC
A274
On Call A276
Tlt.
A276A
Stair 9 S*2*9
Off.
A268
Off.
A267
Pat. Room A280
Pat. Room A281
Pat. Room A282
Pat Rm.
Pressure
A283
Pat Rm.
Neg.
Pressure A284
Pat Rm.
Neg.
Pressure A285
Pat. Rm.
Neg.
Pressure A286
Pat. Rm A287
Pat. Rm.
A288
Pat. Rm.
Neg.
Pressure A289
Pat. Rm.
A290
Pat. Rm.
A291
Pat. Rm.
A292
Grieve/ Consult.
A293
Off.
A298
Meds.
A277
Nurse Station
A279
Staff Tlt.
A297
Lin.
A294
G.P.
Radiography
A248
Tlt.
A248A
Trans.
A248B
Soil.
A278
Stair 4 S*2*4
Anatomic Pathology
Gross Room B215
Cytology B216
Special Staining
B217
Histology Processing
B218
Supervisor B219
Histology B220
Sig. Clos.
B221
Tele.
B222
Off.
B223
Sec.
B224
Operatory B225
Operatory B226
Dental Lab B227
Stor.
B228
Dental Operatory
B229
Dental Hygeine
B230
Oral Surg.
B231
Dental X Ray Room
B232
Corridor C*2*24
Lab Office
B235TB/ MYC
Lab B210B
TB/ MYC.
Lab
B210C
ISO
B210D ISO
B210E
Lab B211A
Cold Rm.
B211B
Ante A235A
Dispatch Area A236A
Clean Supplies
B201
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202A
F. Lkrs.
B203
Dir. Off.
B205
Off.
B207A
Elec.
B206
Corridor C*2*17
Off.
B207B
Off.
B207C
Pathology Off.
B209
Micro Reading
B208
Break Room B210
HAC
B204
Corridor C*2*5
Corridor C*2*4
Stair 3 S*2*3
Waiting Rm.
B224A
Oral Surg.
B231A
Stor.
B233B
Elec.
B233C
Off.
B235A
Tele.
B221C
Office B234A
Lab B234C
Off.
B234D
Cancer Registry
B234E
Chief B234F
Off.
B234G
Corridor C*2*7
Prep Rm.
C214
Control C215
Cardiac Cath Lab
C216
Tlt.
C217
Waiting C218 Stair 6
S*2*6
Tele.
C220
Stor.
C221
Elec.
C222
Lockers C223
Lab Lounge C224
Hemo Stor.
C225
Mech.
C226
Lkrs.
C228
Chemistry Hemotology
Lab C229
Blood Draw C230
Blood Bank C231
Storage C232
HAC
C234
Storage C235
Conference Rm.
C236
Off.
C237
Break Rm.
C238
HAC
C239
Off.
C240
Off.
C241
Off.
C242
Off.
C243
Off.
C244
Stor.
C245
Exam C246
EKG Rm.
C247
Tlt.
C248
Corridor C*2*6
Scope Wash C216A
Soil Ut.
C216B
Clean Linen C216C
Observ.
C216D
Transfer C216E
Radiology Spec Rm.
C216F
Scrub Area C216G
Cath Lab C216H
Control C216I
Equip C216J
Prep Mon C216K
Sterile Supply C216L
Vestibule C216M
Bone Density Lab
C211
Tlt.
C216Q
Corridor C*2*8
Tlt.
C214A
CT
Scanner
C214B
Sec.
C229A
Off.
C229B
Off.
C229C
Chief Off.
C229D
Clos C229E
Files C229F
Mech.
C229I
Special Chem.
C229J
Toxicology C229K
Tele C229L
Elec.
C229M
Stor.
C229N
Shwr C228ATlt.
C228B
Off.
C229G
Off.
C229H
Soiled Ut.
C229O
Cold Stor.
C229P
Stair 8 S*2*8
Womens C2001 Mens
C2003
Elec.
C2004
Blood Draw C2005
Work Rm.
C2007
HAC
C2008
Exam C2009
Intake C2010
Exam C2011
Stor.
C2012
Exam C2013
Stor.
C2014
Exam C2015
Exam C2016
Exam C2017
Exam C2018
Exam C2019
Waiting Alcove C2020
Exam C2021
Exam C2023
Exam C2025
Tlt.
C2027
Gas Stor C2029
Lin.
C2031
Supply C2033
Staff Tlt.
C2035
Soil C2037
Exam C2039
Tlt.
C2041
Exam C2043
Exam C2044
Exam C2045
Exam C2047 Exam
C2048
Exam C2049
Exam C2051
Exam C2052
Exam C2053
Exam C2054
Exam C2055
Exam C2056
Signal C2057
Office C2059 Reception
C2063
Storage C2067
Exam C2069
Exam C2071
Exam C2072
Exam C2073
Exam C2074
Exam C2075
Exam C2076
Exam C2077
Work Alcove C2078
Work Alcove C2079
Exam C2080
Exam C2081
Exam C2082
Lin C2036
Break Rm.
C2038
Soiled Utility A299
Elec.
A239A
Corridor C*2*25
Corridor C*2*12
Vestibule C216R
Utility Room B229A
Office B235B
Waiting C2061
Mech B208B
Stair C229R
Closet C216R
Office A208A
Dressing Room A2002
Toilet A2002B
Women Staff A2003
Men Staff A2004
Elec.
A2006
Signal A2005
PACS
Read A2008
Storage A2010
Clean Supply A2011
CT Room #2
A2013
CT Control A2014
CT Room #1
A2016
CT Office A2019
Toilet A2018
CT Prep A2017
Storage A2020
Office A2022
IR Reading A2024
Toilet A2024A
Storage A2026
MRI
Equipment
A2001B
Equipment Storage
A2023
S.P.
Equipment
A2021
Special Procedures
A2015
MRI
Component
A2007
MRI Room A2001A
MRI
A2001
MRI EMS
A2025
Adm.
Equip.
A2016A
Corridor C*2*15
Stair 11 S*2*11
Chage Area
A2002A
S.P.
Control A2009
Waiting A2000
Women's Restroom
C223A
Waiting C206
Corridor C*2*9
Corridor C*2*16
Corridor C*2*18
Corridor C*2*19
Corridor C*2*14
Corridor C*2*20
Corridor C*2*11
Corridor C*2*13
Corridor C*2*23
Corridor C*2*21
Mechanical C232A
Corridor C*2*1
Corridor C*2*5
7' - 10" 7' - 8"
7' - 5"
7' - 9"
7' - 9"
7' - 2"
7' - 11"
7' - 2"
7' - 4"
7' - 8"
8' - 0"
8' - 0"
8' - 3"
8' - 3"
8' - 0"
7' - 4"
7' - 8"
8' - 3"
7' - 11"
Lab B234B
Off.
B233
Off.
B233A
7' - 10" 8' - 2"
8' - 2" 7' - 11"
8' - 0"
8' - 0"
8' - 0"8' - 0"8' - 0"
8' - 0"
7' - 4"
1 1
11111
8' - 0"
8' - 2"
8' - 0"
7' - 5"
BID ITEM #3
BID ITEM #2
8' - 0"
7' - 8"
7' - 8"
7' - 8"
G E N E R A L C E I L I N G N O T E S
A. ALL CEILINGS SHALL BE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
B. ALL CEILING HEIGHTS SHOWN ON REFLECTED CEILING PLAN ARE PLUS-OR-MINUS (+/-).
CONTRACTOR SHALL DOCUMENT ALL EXISTING CEILING HEIGHTS PRIOR TO CONSTRUCTION
AND MATCH EXISTING HEIGHTS WITH NEW CEILINGS.
C. ANY ACOUSTICAL CEILING TILES THAT ARE DAMAGED DURING CONSTRUCTION SHALL BE
REPLACED.
D. ALL EXISTING LIGHTS SHALL REMAIN UNLESS NOTED OTHERWISE. SUPPORT DURING
REMOVAL OF CEILING AND REINSTALL IN THE SAME LOCATION.
E. SEE MECHANICAL DRAWINGS FOR MECHANICAL SCOPE.
F. CONTRACTOR SHALL TEMPORARILY SUPPORT ALL EXISTING CEILING ITEMS DURING CEILING
REPLACEMENT.
G. CONTRACTOR SHALL COORDINATE CEILING WORK WITH OTHER TRADES.
H. CONTRACTOR IS RESPONSIBLE FOR QUANTIFYING ALL CEILING DEVICES FOR REMOVAL AND
REINSTALLATION.
I. CONTRACTOR SHALL ASSUME THERMOSTATS ARE PLACED ON CLAY MASONRY TILE WALLS.
J. BUILDING 1 IS FULLY SPRINKLERED WITH AN AUTOMATIC WET PIPE FIRE PROTECTION
SYSTEM. CONTRACTOR SHALL PRESUME UP TO 15% OF THE SPRINKLER HEADS ON EACH
FLOOR IN THE SCOPE OF THIS PROJECT WITHIN THE AREA(S) OF WORK SHOWN WILL BE
REMOVED AND REPLACED TO AVOID CONFLICT WITH NEW CEILING GRID. NEW FIRE
SPRINKLER PIPING SHALL BE PROVIDED AS NECESSARY FOR SERVICE TO NEW SPRINKLER
HEADS. DESIGN, INSTALLATION, AND TESTING SHALL MEET THE REQUIREMENTS OF NFPA 13
LATEST EDITION, VA FIRE PROTECTION MANUAL, AND ALL STATE AND LOCAL CODES.
K. PLACEMENT OF EXISTING LIGHTING FIXTURES ARE INCLUDED ON THE ARCHITECTURAL RCP
SHEETS FOR GENERAL REFERENCE AND SHOULD NOT BE USED FOR REINSTALLATION
LOACATIONS OF THE FIXTURES. CONTRACTOR SHALL DOCUMENT LOCATION AND
ORIENTATION OF ALL CEILING-MOUNTED DEVICES /EQUIPMENT INCLUDING BUT NOT LIMITED
TO LIGHTING FIXTURES, CAMERAS, OCCUPANCY SENSORS, WAPS, SIGNAGE, ETC VIA DIGITAL
PHOTOGRAPHS PRIOR TO CEILING REMOVAL. PHOTOGRAPHS SHALL BE TAKEN TO INCLUDE
ADEQUATE BACKGROUND/CONTEXT INFORMATION FOR ACCURATE DEVICE/EQUIPMENT RE-
INSTALLATION, ORGANIZED ON A FLOOR-BY-FLOOR AND ROOM-BY-ROOM BASIS, AND BE
MADE AVAILABLE TO THE COR, ENGINEER, AND ALL TRADES UPON REQUEST.
D R A W I N G L E G E N D
T
THERMOSTAT. CONCEAL RACEWAY IN WALL TO THERMOSTAT LOCATION.
COORDINATE WITH MECHANICAL DRAWINGS. EXISTING CONCEALED
RACEWAYS ASSOCIATED WITH THERMOSTATS MAY BE RE-USED. REPAIR AND
PATCH WALL AS NECESSARY TO ACHIEVE FLUSH AND SMOOTH TRANSITION TO
ADJACENT WALL FACE. PAINT ENTIRE WALL TO MATCH ADJACENT WALL
FINISH.
2' X 2' ACCOUSTICAL TILE CEILING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
UPGRADE TERMINAL
UNITS
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A T
U s
B c a rt e r.
d a n ie l0
.r v t
/1 /2
:5
:1
P M
AC142
SECOND FLOOR REFLECTED
CEILING PLAN
08/31/2021 PQ CD
CINCINNATI, OH
539-21-111100% CONSTRUCTION
DOCUMENTS
1/16" = 1'-0"
SECOND FLOOR REFLECTED CEILING PLAN
1616637 EXPIRES 12/31/21
PATRICK R. QUINN
D R A W I N G N O T E S :
1 REMOVE AND REPLACE EXISTING ACOUSTICAL CEILING TILE AND GRID WITH NEW 24"X24" ACOUSTICAL CEILING
GRID AND TILES AT PREVIOUS CEILING HEIGHT.
2 TEMPORARY PARTITION (1/G002) SHALL BE ERECTED PRIOR TO WORK IN THIS AREA. SEAL ACCORDING TO ICRA
REQUIREMENTS.
3 SEAL DOOR ACCORDING TO ICRA REQUIREMENTS
4 REMOVE CROSS TEES AND ACOUSTICAL TILE AS NECESSARY FOR INSTALLATION OF MECHANICAL EQUIPMENT.
PROTECT MAIN BEAMS AND WALL ANGLES DURING NEW WORK. RE-INSTALL GRID AND ACOUSTIC TILE AT
CONCLUSION OF MECHANICAL WORK.
5 REMOVE EXISTING PLASTER CEILING. INSTALL 24"X24" ACOUSTICAL CEILING GRID AND TILES AT PREVIOUS
CEILING HEIGHT.
Revisions: Date:
AMENDMENT 2 10/20/2021
| Sheets |
| AC142 - SECOND FLOOR REFLECTED CEILING PLAN |
File details come from the government source that posted it. Updated .