07.04_AC142 - SECOND FLOOR REFLECTED CEILING PLAN.pdf

PDF 1 MB Posted

Attached to
Z1DA--Project # 539-21-111 - Upgrade Terminal Units Additional information available on page # 2.
Solicitation number
36C25021B0125
Issued by

About this file

This reflected ceiling plan and federal contract opportunity document provide details for an upgrade of terminal units project at the Cincinnati VA Medical Center. The reflected ceiling plan outlines the scope of work to remove and replace existing acoustical ceiling tiles and grids in various rooms on the second floor with new 24"x24" tiles and grid at the previous ceiling height. It includes general ceiling notes, drawing legends, and specific room notes. The related federal contract opportunity is solicitation number 36C25021B0125 for project number 539-21-111 to upgrade terminal units, with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 listed as the agency. No other salient details are provided regarding pricing, response dates, or awardees.

View the file

Other files

File Type Posted
36C25021B0125 0005.docx DOCX document
Attachment II - Amendment No. 5.pdf PDF
Attachment I - Combine Specification Air Terminal Units.pdf PDF
13.54_M700 - MECHANICAL CONTROLS.pdf PDF
JA - DDCASC.pdf PDF
07.03_AC141 - FIRST FLOOR REFLECTED CEILING PLAN.pdf PDF
13.53_M602 - MECHANICAL SCHEDULES.pdf PDF
07.06_AC144 - FOURTH FLOOR REFLECTED CEILING PLAN.pdf PDF
07.08_AC146 - SIXTH FLOOR REFLECTED CEILING PLAN.pdf PDF
36C25021B0125 0004.docx DOCX document
07.05_AC143 - THIRD FLOOR REFLECTED CEILING PLAN.pdf PDF
Appendix B - Hazardous Material Report.pdf PDF
07.07_AC145 - FIFTH FLOOR REFLECTED CEILING PLAN.pdf PDF
QA.pdf PDF
Specs.pdf PDF
07.09_AC147 - SEVENTH FLOOR REFLECTED CEILING PLAN.pdf PDF
36C25021B0125 0003.docx DOCX document
36C25021B0125 0002.docx DOCX document
36C25021B0125 0001.docx DOCX document
Attachment II - MD105B - FIFTH FLOOR DEMOLITION PLAN - AREA B.pdf PDF
Attachment III - MH105B - FIFTH FLOOR HVAC PLAN - AREA B.pdf PDF
Attachment I - Q and A.pdf PDF
Attachment I - Drawings.pdf PDF
Attachment III - DBA WD.pdf PDF
IFB - 36C25021B0125.pdf PDF
Attachment II - Specifications.pdf PDF
36C25021B0125_1.docx DOCX document
Attachment IV - EMR Form.pdf PDF
Attachment VI - J_A x2.pdf PDF
Attachment V - RFI Form.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

T

T

T

T

T

T T T

T T T

T T

T

T

T

T T

T

T T T

T

T

T

T

T T

T T

T

T

T

Stair 10 S*2*10

Lab B211

Recep.

A202

Imaging Recep.

A201

Stor.

A202A

Digital Chest Rm.

A203

Dressing Rm.

A203A

Speech Pathlgy.

A204

Rehab Care Line

A205

Man Rehab Care Line

A206

Staff A207

Occupational Therapy

A208

EMG Lab A209

Rehab Exam A210

Rehab Exam A211

Elec.

A212

HAC

A213

Staff Tlt.

A214PT Storage

A215 Hydrotheraphy

A216

Exam/Treatment / Exercise

Room A217

Physical Ther.

Supervisor A218

Adl. Clinic A208A

EMG Lab A209A

Elec.

A217A

Corridor C*2*2

Light Box Room A215B

SCI Exam A215A

Stor.

A218A

Stair 2 S*2*2

Oxygen Storage

A221

Therapy Supervisor

A222 Ante Room

A223

Stor.

A210A

Equip Wash A222B

Compressor Room A222D

Equipment Storage and Testing A228A

Storage A228B

Eto. Room B208A

Mech A228C

Office A230

Dressing Rm.

A227B Office A231

LKRS.

A227A Shower

A227

Elec.

A225B

Service Lobby A225

Trash Chute A225A

Lounge A226Training

Room A224

HAC

A225C

Office A232

Nuclear Med. Sec.

C200

Waiting C201

Reading C202

Work Rm.

C203

CAT Scan Room C204

Gamma Camera

C205

Uptake Prep Bay

C204A

Uptake Area C204B

Uptake Prep Room

C204C

PET/CT

Scanner

C204D

Echo Room C252

Echo Room C251

Echo Rm C250

Cath Lab C216O

Stor.

C216P

I.V. Prep Rm.

C207

Elec.

C209

Control Room C204E

Tlt.

C204F Tele.

C208

File Rm.

C200B

Chief Off.

C200A

Reading Rm.

C250A

Chief Off.

C200C

Break Room A240Stair 1

S*2*1

Signal Closet

A239

M. Tlt.

A236

Tlt.

A235

G.P.

Radiography

A242

Control A243

Storage A243A

Stair 5 S*2*5

Reading Room A245

Gamma Camera

C210

Hot Lab C212

Stor.

C213

X-Ray Room A246

Control A246A

Clos A243B Clos

A243C

Ultrasound A266

Corridor C*2*1

Elec.

A246B

Corridor C*2*3

Viewing A256

Reading Room A257

Reading Room A258

Adm.

A259

Chief Radiology

A260

Adm. Asst.

A261

Off.

A262

Resident Reading Room A263

Reading Room A264

Reading Room A262A

Tlt.

A260A

Pat. Rm.

A266B

Ultrasound A265

Stor A255 Tlt.

A253B

Break Rm.

A253

Elec.

A253A

HAC

A254

Digital Radiography

A252

Control A252A

Student Off.

A251

Office A251B

Patient Toilet A249C

Control A249B

BE

Fluororoom

A249

Storage A249A

Work Rm.

A250A

Cl. Supp.

A296

Clean Equipment

A295

Sig. Clos.

A250Clean

Supply Room A251A

M. Lkrs.

A270

Tlt.

A270A

Staff Lounge

A269 F. Lkrs.

A271

Tlt.

A271A

Conf.

A272

RN

Manager

A273

Elec.

A275

HAC

A274

On Call A276

Tlt.

A276A

Stair 9 S*2*9

Off.

A268

Off.

A267

Pat. Room A280

Pat. Room A281

Pat. Room A282

Pat Rm.

Pressure

A283

Pat Rm.

Neg.

Pressure A284

Pat Rm.

Neg.

Pressure A285

Pat. Rm.

Neg.

Pressure A286

Pat. Rm A287

Pat. Rm.

A288

Pat. Rm.

Neg.

Pressure A289

Pat. Rm.

A290

Pat. Rm.

A291

Pat. Rm.

A292

Grieve/ Consult.

A293

Off.

A298

Meds.

A277

Nurse Station

A279

Staff Tlt.

A297

Lin.

A294

G.P.

Radiography

A248

Tlt.

A248A

Trans.

A248B

Soil.

A278

Stair 4 S*2*4

Anatomic Pathology

Gross Room B215

Cytology B216

Special Staining

B217

Histology Processing

B218

Supervisor B219

Histology B220

Sig. Clos.

B221

Tele.

B222

Off.

B223

Sec.

B224

Operatory B225

Operatory B226

Dental Lab B227

Stor.

B228

Dental Operatory

B229

Dental Hygeine

B230

Oral Surg.

B231

Dental X Ray Room

B232

Corridor C*2*24

Lab Office

B235TB/ MYC

Lab B210B

TB/ MYC.

Lab

B210C

ISO

B210D ISO

B210E

Lab B211A

Cold Rm.

B211B

Ante A235A

Dispatch Area A236A

Clean Supplies

B201

F. Tlt.

B203A

M. Lkrs.

B202

Slide Stor.

B202A

F. Lkrs.

B203

Dir. Off.

B205

Off.

B207A

Elec.

B206

Corridor C*2*17

Off.

B207B

Off.

B207C

Pathology Off.

B209

Micro Reading

B208

Break Room B210

HAC

B204

Corridor C*2*5

Corridor C*2*4

Stair 3 S*2*3

Waiting Rm.

B224A

Oral Surg.

B231A

Stor.

B233B

Elec.

B233C

Off.

B235A

Tele.

B221C

Office B234A

Lab B234C

Off.

B234D

Cancer Registry

B234E

Chief B234F

Off.

B234G

Corridor C*2*7

Prep Rm.

C214

Control C215

Cardiac Cath Lab

C216

Tlt.

C217

Waiting C218 Stair 6

S*2*6

Tele.

C220

Stor.

C221

Elec.

C222

Lockers C223

Lab Lounge C224

Hemo Stor.

C225

Mech.

C226

Lkrs.

C228

Chemistry Hemotology

Lab C229

Blood Draw C230

Blood Bank C231

Storage C232

HAC

C234

Storage C235

Conference Rm.

C236

Off.

C237

Break Rm.

C238

HAC

C239

Off.

C240

Off.

C241

Off.

C242

Off.

C243

Off.

C244

Stor.

C245

Exam C246

EKG Rm.

C247

Tlt.

C248

Corridor C*2*6

Scope Wash C216A

Soil Ut.

C216B

Clean Linen C216C

Observ.

C216D

Transfer C216E

Radiology Spec Rm.

C216F

Scrub Area C216G

Cath Lab C216H

Control C216I

Equip C216J

Prep Mon C216K

Sterile Supply C216L

Vestibule C216M

Bone Density Lab

C211

Tlt.

C216Q

Corridor C*2*8

Tlt.

C214A

CT

Scanner

C214B

Sec.

C229A

Off.

C229B

Off.

C229C

Chief Off.

C229D

Clos C229E

Files C229F

Mech.

C229I

Special Chem.

C229J

Toxicology C229K

Tele C229L

Elec.

C229M

Stor.

C229N

Shwr C228ATlt.

C228B

Off.

C229G

Off.

C229H

Soiled Ut.

C229O

Cold Stor.

C229P

Stair 8 S*2*8

Womens C2001 Mens

C2003

Elec.

C2004

Blood Draw C2005

Work Rm.

C2007

HAC

C2008

Exam C2009

Intake C2010

Exam C2011

Stor.

C2012

Exam C2013

Stor.

C2014

Exam C2015

Exam C2016

Exam C2017

Exam C2018

Exam C2019

Waiting Alcove C2020

Exam C2021

Exam C2023

Exam C2025

Tlt.

C2027

Gas Stor C2029

Lin.

C2031

Supply C2033

Staff Tlt.

C2035

Soil C2037

Exam C2039

Tlt.

C2041

Exam C2043

Exam C2044

Exam C2045

Exam C2047 Exam

C2048

Exam C2049

Exam C2051

Exam C2052

Exam C2053

Exam C2054

Exam C2055

Exam C2056

Signal C2057

Office C2059 Reception

C2063

Storage C2067

Exam C2069

Exam C2071

Exam C2072

Exam C2073

Exam C2074

Exam C2075

Exam C2076

Exam C2077

Work Alcove C2078

Work Alcove C2079

Exam C2080

Exam C2081

Exam C2082

Lin C2036

Break Rm.

C2038

Soiled Utility A299

Elec.

A239A

Corridor C*2*25

Corridor C*2*12

Vestibule C216R

Utility Room B229A

Office B235B

Waiting C2061

Mech B208B

Stair C229R

Closet C216R

Office A208A

Dressing Room A2002

Toilet A2002B

Women Staff A2003

Men Staff A2004

Elec.

A2006

Signal A2005

PACS

Read A2008

Storage A2010

Clean Supply A2011

CT Room #2

A2013

CT Control A2014

CT Room #1

A2016

CT Office A2019

Toilet A2018

CT Prep A2017

Storage A2020

Office A2022

IR Reading A2024

Toilet A2024A

Storage A2026

MRI

Equipment

A2001B

Equipment Storage

A2023

S.P.

Equipment

A2021

Special Procedures

A2015

MRI

Component

A2007

MRI Room A2001A

MRI

A2001

MRI EMS

A2025

Adm.

Equip.

A2016A

Corridor C*2*15

Stair 11 S*2*11

Chage Area

A2002A

S.P.

Control A2009

Waiting A2000

Women's Restroom

C223A

Waiting C206

Corridor C*2*9

Corridor C*2*16

Corridor C*2*18

Corridor C*2*19

Corridor C*2*14

Corridor C*2*20

Corridor C*2*11

Corridor C*2*13

Corridor C*2*23

Corridor C*2*21

Mechanical C232A

Corridor C*2*1

Corridor C*2*5

7' - 10" 7' - 8"

7' - 5"

7' - 9"

7' - 9"

7' - 2"

7' - 11"

7' - 2"

7' - 4"

7' - 8"

8' - 0"

8' - 0"

8' - 3"

8' - 3"

8' - 0"

7' - 4"

7' - 8"

8' - 3"

7' - 11"

Lab B234B

Off.

B233

Off.

B233A

7' - 10" 8' - 2"

8' - 2" 7' - 11"

8' - 0"

8' - 0"

8' - 0"8' - 0"8' - 0"

8' - 0"

7' - 4"

1 1

11111

8' - 0"

8' - 2"

8' - 0"

7' - 5"

BID ITEM #3

BID ITEM #2

8' - 0"

7' - 8"

7' - 8"

7' - 8"

G E N E R A L C E I L I N G N O T E S

A. ALL CEILINGS SHALL BE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

B. ALL CEILING HEIGHTS SHOWN ON REFLECTED CEILING PLAN ARE PLUS-OR-MINUS (+/-).

CONTRACTOR SHALL DOCUMENT ALL EXISTING CEILING HEIGHTS PRIOR TO CONSTRUCTION

AND MATCH EXISTING HEIGHTS WITH NEW CEILINGS.

C. ANY ACOUSTICAL CEILING TILES THAT ARE DAMAGED DURING CONSTRUCTION SHALL BE

REPLACED.

D. ALL EXISTING LIGHTS SHALL REMAIN UNLESS NOTED OTHERWISE. SUPPORT DURING

REMOVAL OF CEILING AND REINSTALL IN THE SAME LOCATION.

E. SEE MECHANICAL DRAWINGS FOR MECHANICAL SCOPE.

F. CONTRACTOR SHALL TEMPORARILY SUPPORT ALL EXISTING CEILING ITEMS DURING CEILING

REPLACEMENT.

G. CONTRACTOR SHALL COORDINATE CEILING WORK WITH OTHER TRADES.

H. CONTRACTOR IS RESPONSIBLE FOR QUANTIFYING ALL CEILING DEVICES FOR REMOVAL AND

REINSTALLATION.

I. CONTRACTOR SHALL ASSUME THERMOSTATS ARE PLACED ON CLAY MASONRY TILE WALLS.

J. BUILDING 1 IS FULLY SPRINKLERED WITH AN AUTOMATIC WET PIPE FIRE PROTECTION

SYSTEM. CONTRACTOR SHALL PRESUME UP TO 15% OF THE SPRINKLER HEADS ON EACH

FLOOR IN THE SCOPE OF THIS PROJECT WITHIN THE AREA(S) OF WORK SHOWN WILL BE

REMOVED AND REPLACED TO AVOID CONFLICT WITH NEW CEILING GRID. NEW FIRE

SPRINKLER PIPING SHALL BE PROVIDED AS NECESSARY FOR SERVICE TO NEW SPRINKLER

HEADS. DESIGN, INSTALLATION, AND TESTING SHALL MEET THE REQUIREMENTS OF NFPA 13

LATEST EDITION, VA FIRE PROTECTION MANUAL, AND ALL STATE AND LOCAL CODES.

K. PLACEMENT OF EXISTING LIGHTING FIXTURES ARE INCLUDED ON THE ARCHITECTURAL RCP

SHEETS FOR GENERAL REFERENCE AND SHOULD NOT BE USED FOR REINSTALLATION

LOACATIONS OF THE FIXTURES. CONTRACTOR SHALL DOCUMENT LOCATION AND

ORIENTATION OF ALL CEILING-MOUNTED DEVICES /EQUIPMENT INCLUDING BUT NOT LIMITED

TO LIGHTING FIXTURES, CAMERAS, OCCUPANCY SENSORS, WAPS, SIGNAGE, ETC VIA DIGITAL

PHOTOGRAPHS PRIOR TO CEILING REMOVAL. PHOTOGRAPHS SHALL BE TAKEN TO INCLUDE

ADEQUATE BACKGROUND/CONTEXT INFORMATION FOR ACCURATE DEVICE/EQUIPMENT RE-

INSTALLATION, ORGANIZED ON A FLOOR-BY-FLOOR AND ROOM-BY-ROOM BASIS, AND BE

MADE AVAILABLE TO THE COR, ENGINEER, AND ALL TRADES UPON REQUEST.

D R A W I N G L E G E N D

T

THERMOSTAT. CONCEAL RACEWAY IN WALL TO THERMOSTAT LOCATION.

COORDINATE WITH MECHANICAL DRAWINGS. EXISTING CONCEALED

RACEWAYS ASSOCIATED WITH THERMOSTATS MAY BE RE-USED. REPAIR AND

PATCH WALL AS NECESSARY TO ACHIEVE FLUSH AND SMOOTH TRANSITION TO

ADJACENT WALL FACE. PAINT ENTIRE WALL TO MATCH ADJACENT WALL

FINISH.

2' X 2' ACCOUSTICAL TILE CEILING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Cincinnati VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FULLY SPRINKLERED

UPGRADE TERMINAL

UNITS

C U s e rs

\c a rt e \D o c u m e n ts

\0

L o c a l R e v it F ile s \2

\F F

E C in c in n a ti

U p g ra d e

A T

U s

B c a rt e r.

d a n ie l0

.r v t

/1 /2

:5

:1

P M

AC142

SECOND FLOOR REFLECTED

CEILING PLAN

08/31/2021 PQ CD

CINCINNATI, OH

539-21-111100% CONSTRUCTION

DOCUMENTS

1/16" = 1'-0"

SECOND FLOOR REFLECTED CEILING PLAN

1616637 EXPIRES 12/31/21

PATRICK R. QUINN

D R A W I N G N O T E S :

1 REMOVE AND REPLACE EXISTING ACOUSTICAL CEILING TILE AND GRID WITH NEW 24"X24" ACOUSTICAL CEILING

GRID AND TILES AT PREVIOUS CEILING HEIGHT.

2 TEMPORARY PARTITION (1/G002) SHALL BE ERECTED PRIOR TO WORK IN THIS AREA. SEAL ACCORDING TO ICRA

REQUIREMENTS.

3 SEAL DOOR ACCORDING TO ICRA REQUIREMENTS

4 REMOVE CROSS TEES AND ACOUSTICAL TILE AS NECESSARY FOR INSTALLATION OF MECHANICAL EQUIPMENT.

PROTECT MAIN BEAMS AND WALL ANGLES DURING NEW WORK. RE-INSTALL GRID AND ACOUSTIC TILE AT

CONCLUSION OF MECHANICAL WORK.

5 REMOVE EXISTING PLASTER CEILING. INSTALL 24"X24" ACOUSTICAL CEILING GRID AND TILES AT PREVIOUS

CEILING HEIGHT.

Revisions: Date:

AMENDMENT 2 10/20/2021

Sheets
AC142 - SECOND FLOOR REFLECTED CEILING PLAN

File details come from the government source that posted it. Updated .