20200702 Addendum 1.pdf
PDF 13 MB Posted
- Solicitation number
- 36C25020B0028
About this file
This pre-solicitation notice announces a requirement by the Department of Veterans Affairs to renovate approximately 17,000 square feet of intensive care and transitional care unit space at the Dayton VA Medical Center. The project involves upgrading outdated IT systems and will be conducted according to drawings and specifications. Interested service-disabled veteran-owned small businesses are advised to monitor the Federal Business Opportunities website for release of the solicitation around March 20, 2020, with proposals due approximately 30 days later. The North American Industry Classification System code assigned is 236220. The small business size standard is $39.5 million. The service-disabled veteran-owned small business must perform a minimum of 15% of construction work. Bid, payment and performance bonds will be required. A mandatory site visit will be scheduled. Questions should be emailed by the deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0028 0006.docx | DOCX document | |
| 36C25020B0028 0005.docx | DOCX document | |
| Site Visit sign-in.pdf | ||
| 20200701 TCUICU 2nd Floor Room Names.pdf | ||
| 20200701 TCUICU 2nd Floor RCP.pdf | ||
| PreBid RFIs Answers.pdf | ||
| 36C25020B0028 0004.docx | DOCX document | |
| Bid Opening Instructions.pdf | ||
| 36C25020B0028-0003000.docx | DOCX document | |
| 36C25020B0028-0002000.docx | DOCX document | |
| 36C25020B0028-0001000.docx | DOCX document | |
| 36C25020B0028-0001001.pdf | ||
| 36C25020B0028-004.pdf | ||
| 36C25020B0028-009.pdf | ||
| 36C25020B0028-007.pdf | ||
| 36C25020B0028-005.pdf | ||
| 36C25020B0028-008.pdf | ||
| 36C25020B0028-002.pdf | ||
| 36C25020B0028-006.pdf | ||
| 36C25020B0028-003.pdf | ||
| 36C25020B0028-001.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3131 Newmark Drive Suite 200 Miamisburg, OH
JOHN POE A R C H I T E C T S 45342
A D D E N D U M 937 461 3290 jpa@johnpoe.com
Addendum #1
Project: TCUICU
DVAMC, 4100 West Third Street
Dayton, Ohio 45428
Date: 07/1/2020
To: Jenessa Regan
3140 Governor’s Place Blvd.- Suite 210
Kettering, Ohio 45409
Please provide a proposal for changing contract documents as indicated below. Proposal is due within 10 calendar days of receipt of the Bulletin.
This Bulletin is not a change order. If work described in this Bulletin involves a change in time or contract sum, provide on Change of Work Proposal for each line item, itemizing labor and material, overhead and profit price breakdown in accordance with the Specifications. Also include any time extensions, if required.
Lump sum labor and material prices will not be accepted. If subcontractors’ or suppliers’ prices are included in the prime contractor’s proposal, provide a copy of their quotation. If no response to a Bulletin is received within the time specified above, then the non-responding Contractor will be determined to not be affected by the change, and any rights for increased compensation or time extensions shall be waived.
THE DRAWINGS ARE REVISED AS FOLLOWS:
General Information:
1. N/A
Drawing Sheets:
2. G001, AF101-F, AF101-P, and AF101-W see sheet A101-N for revised breakout graphic for ICU (Door type J).
3. G101- Phasing sheet reissued in their entirety.
4. A101-D1- Dimension strings updated at PPS cabinet and ICU door locations. ICU Door (Door type J) breakout graphic revised. General Plan Note F revised to add 100 sf of drywall construction as required for patching existing rated construction.
5. A101-D2- Dimension strings updated at PPS cabinet and ICU door locations. ICU Door (Door type J) breakout graphic revised. General Plan Note F revised to add 100 sf of drywall construction as required for existing rated construction.
6. A101-D3- General Plan Note F revised to add 100 sf of drywall construction as required for existing rated construction.
7. Sheet A101-N Note 9.58 added to Infection Control Bedrooms. ICU Door (Door type J) breakout graphic revised. General Plan Note F revised to add 100 sf of drywall construction as required for existing rated construction. Remove Detail 1 and associated key notes.
8. Sheet A402- Elevation 28 modified for electronic lock.
9. Sheet A403-PPS Storage Cabinet revised to elevations 40 and 43 with annotations.
10. Sheet A404- PPS Storage Cabinet revised to elevations 44 and 46 with annotations.
11. Sheet A511- Casework Section B5 modified for electronic lock.
12. Sheet A512-PPS Storage Cabinet details revised.
13. Sheet A513- Revise note 5.32 to include structural steel as an option for the patient lift delegated design supports.
14. Sheet A601- Detail H6 detail revised. Toilet patient door and frame heights revised see revised schedule
Door frame details revised. Deduct Alt #1 & Deduct Alt #2 door schedule removed.
15. Sheet AF601-Finish PL-3, PR-1 added, AR-1 removed. Revisions made to room schedule. Window sills to be SS-3.
16. Sheet AS101-Sign Type graphics added to sheet. Some changes to assigned sign types. ICU Door
(Door type J) breakout graphic revised.
17. Sheet F901 – Furniture shown for reference only. Furniture to be provided by installed by VA. ICU door breakout graphic revised.
18. Sheet F902 Markerboard to be CP/CI Contractor Provided, Contractor Installed. ICU Door (Door type J) breakout graphic revised.
19. Sheet S001- Patient lift structure delegated design notes.
20. Sheet S100- Patient lift structure delegated design notes.
21. Sheet MP103- Revised room pressure monitoring and indication requirements.
22. Sheet M702- Revised room pressure monitoring and indication requirements.
23. Sheet E502- Camera Schedule – Refer to revised Camera Schedule. Camera 1 represents the cameras in the Patient Rooms. Refer to the drawings for quantities. Camera 2 is a security camera that requires license for the Milestone system.
Specifications:
1. Section 00 01 10 Revised – 07 42 33 Phenolic Wall Panels added under Division 07. 01 31 00.01 Web
Base Project Management- Specification section added under Division 1.
2. Section 01 31 00.01 Web Base Project Management- Specification section added.
3. Section 06 06 60 Plastic Fabrications- Section removed with removal of AR-1 from project.
4. Section 06 41 16 Plastic Laminate Clad Architectural Cabinets- Added paragraph 2.3.G Battery Powered
Electronic Cabinet Lock. Basis of design: KitLock 1000.
5. Section 07 42 33 Phenolic Wall Panels added
6. Section 08 42 43 Intensive Care Unit/ Critical Care Unit Entrances- Specification reissued in its entirety.
7. Section 08 71 11 Door Hardware- Section header revised. Remove “SHOP DRAWINGS, PRODUCT
DATA AND SAMPLES” and replace with “DOOR HARDWARE”.
8. Section 09 06 00 Schedule for Finishes- PL-3 added to 2.1 Division 06, Table A. Added 2.2 Division 7.
Table B removed from 2.3 Division 10.
9. Section 09 30 13 Ceramic Porcelain Tile- Remove paragraph 3.14.
10. Section 10 15 00 Signage- 2.1/A Remove “at end of this section” from sentence.
11. Section 10 26 00 Basis of Design for handrail: Acrovyn HRB-10CN (6.25”H)
12. Section 10 26 00 Basis of Design for crash rail: Acrovyn SCR-48N (6”H)
13. Section 10 28 00 Toilet Accessories- Revise section 2.4 Grab Bar as indicated below:
a. 2.4/B: Remove nylon coated as material option.
b. D/1/b- Remove nylon coated as material option.
14. Section 10 51 61 Built-In Combination Locks- Omit specification
15. Section 11 73 00 Ceiling Mounted Patient Lifts- Specification replaced in its entirety.
Attachments: G101, A101-D1, A101-D2, A101-N, A402, A403, A404, A511, A512, A513,A501, A601, AF601, AS101, F901, F902, S001, S100, MP103, M702,E502, Section 01 31 00.01, Section 07 42 33, Section 08 42 43, Section 09 60
00, Section 11 73 00
Copy To: File
End of Bulletin
PHASING LEGEND
Temporary Construction Barrier and door.
Temporary door to have 45 min raiting.
Hardware to have closer and and panic hardware on owner occupied side. Reuse existing door and hardware where possible.
Ensure all accessibility requirements are met.
Extend wall from floor to deck. See A601 for wall types. Wall type T1.0, typical.
Area of renovation.
Owner-Occupied Area. No work to be performed by Contractor this phase.
Owner-Occupied Area. Minimal to no architectural work in current phase. PME work may be required. See PME drawings for additional phasing requirements. Work to be performed by Contractor during off-hours (9pm - 5am). Coordinate off-hour work with
COR.
Existing walls as construction barrier between phases.
1.06
1.06
1.07
1.07
1.081.091.09
1.10
1.11
1.10
1.13
1.13
1.07
1.07
1.031.04 1.05
1.12 1.12
1.07
1.041.03
1.13
1.14
1.071.07
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
PHASING PLANS
G101
DWTH
17005.00
552-18-102
Dayton Ohio
A. Temporary partitions are suggested locations. Coordinate final location in field with C.O.R. Temporary partition locations are approximate and may need to be adjusted to meet project requirements.
B. Verify all conditions in the field prior to fabrication, erection and construction.
C. Any work done on adjacent floors to be completed and cleaned by end of second shift.
D. Coordinate phase completion and start-up with requirements as set forth by the C.O.R. to maintain daily operations to near as normal as possible.
E. Coordinate location of job dumpster with the C.O.R. so as to disrupt daily operations as little as possible.
F. Coordinate access to all phases of construction, deliveries, and debris removal with the C.O.R.
G. Temporary door locations and sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with the C.O.R. Maintain all emergency egress paths.
H. Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction. See MEPDrawings.
J. Provide and maintain negative air pressure at all construction.
Coordinate with HVAC contractor. See HVAC plans for duct locations.
K. Extend all temporary partitions to structural deck above.
L. Existing power to occupied areas must be maintained throughout as required during each phase of construction.Coordinate phasing with Electrical Contractor. Coordinate power turnover with requirements as dictated by the C.O.R. See Electrical Drawings.
M. Coordinate construction sequence with C.O.R. so that only one side (not less than 48") of any corridor in use is obstructed at any one time in order to maintain required egress.
N. Coordinate all work involving the generation of excessive noise so as to occur during normal operating hours, 0700 to 1500 daily.
Activities to occur during this time include, but are not limited to saw cutting, jack hammering, hammer drilling and core drilling. If there is any question as to whether an operation should occur during this time the Contractor will contact the C.O.R.
P Relocate lights and sprinkler heads as required at temporary partitions.
Q. See phasing plan for location of construction barriers. Contractor to install firestop for up to 100 penetrations and 100 SF of existing, unfirestopped penetrations through existing construction barriers.
Contractor to also install up to 100 sf of drywall as required to provide adequate construction barrier.
GENERAL PHASING NOTES
N Scale: 3/32" = 1'-0"
PHASING PLAN - PHASE I
N Scale: 3/32" = 1'-0"
PHASING PLAN - PHASE II
1.03 Contractor access.
1.04 Staff/patient access.
1.05 Maintain access to waiting room.
1.06 See mechanical and structural drawings for detailed information regarding relocation of supply ductwork in this area.
1.07 Owner emergency egress. Keep path of egress clear at all times.
1.08 Relocate pneumatic tube station before work starts in Room 3B164. System shall be non-operational for no more than 10 days.
1.09 Construct corridor walls (Construction barrier) prior to removal of Storage room interior walls. (See keynote 1.10).
1.10 Remove interior walls after corridor walls have been
completed.(See keynote 1.09) Construction barrier moves to corridor walls.
1.11 Contractor to coordinate with COR and staff for interuptions in pneumatic station access.
1.12 No owner access this door.
1.13 Temporary door providing owner egress. Contractor to provide 3'-6 active door with 1'-6 inactive leaf.
1.14 Temporary door providing contractor egress. Contractor to provide 3'-6" door.
PLAN NOTES
Revision s
Date
7 100% For Bid 03.09.2020
F
1.2
EDCBA
1.5
2.2
3.2
3.1
2.1
E8
3.05
9 1/2"
10' - 9 5/8"
1' - 9 5/8"
/8
/4
/8
RESTROOM
3B123a
S2.0S2.0
RESTROOM
3B124a
ANTE
ROOM
3B123b
BED ROOM
3B125
CORRIDOR
C3-19
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
CORRIDOR
C3-17
CONTROL
CENTER
C3-15
MED ROOM
3B119
ELECTRICAL
CLOSET
3B144
BED ROOM,
INFECTION
CONTROL
3B124
STORAGE
3B164
STORAGE
3B145
RESTROOM
3B125a
RESTROOM
3B135a
BED ROOM,
BARIATRIC
3B135
BED ROOM,
INFECTION
CONTROL
3B137
RESTROOM
3B137a
RESTROOM
3B138a
A N
T E
R O
O M
B b
A N
T E
R O
O M
B b
BARIATRIC,
INFECTION
CONTROL
3B138
BED ROOM
3B140
UTILITY
ROOM,
CLEAN
3B130
CLEAN
LINEN
3B139
SOILED
UTILITY
3B152
NOURISHMENT
3B153
CORRIDOR
C3-20
RESTROOM
3B140a
RESTROOM
3B142a
ALCOVE
TRAY
STORAGE
3B141a
BED ROOM
3B142
CONTROL
CENTER
C3-25
BED ROOM
3B160
ALCOVE,
WHEELCHAIR
3B171
R E
S T
R O
O M
B a
RESTROOM
3B159a
BED ROOM
3B159
CORRIDOR
C3-26
MED ROOM
3B154
NURSE
WORKROOM
3B151
STORAGE
3B149
OFFICE
3B150
STORAGE
3B148
HAC
3B155
STORAGE
3B168
OFFICE
3B147
BREAK
ROOM
3B146
OFFICE
3B117
NURSE
WORKROOM
3B114
S .0
S1.1
S1.1
S .0
S1.1-N
S1.1-N
S1.1
S .1
S1.1
S1.1
S1.1
S2.0
S2.0S2.0
S2.0
S2.0
S2.0S2.0
S1.1
S2.0
S1.0-F
S1.1
S1.1
S2.0
S2.0
S1.1 S2.0
S2.0
S2.0
S1.0-F S1.0-F
S1.0-F
4' - 5 1/2"
4 1/4"
6' - 7 3/8" 4 7/8"
7 7/8"
4 1/4" 5' - 3 3/8"4
/4
/4
/8
/4
/4
S1.0-F
/8
/4
/4
/8
/8
/8
120°
13' - 6 7/8" 1' - 0 1/8" 2' - 0"
120°
3' - 0 1/8" 13' - 7 3/8"
4 1/2" 4' - 2" 3' - 11 1/8" 4' - 4 7/8"
4 7/8"
4' - 4 7/8" 3' - 11 1/2" 4' - 2 1/8" 4 1/2" 8' - 0 1/2" 9" 8' - 0 1/2"
5' - 4 1/8"
4 1/4"
11"
4 1/4"
120° 120° 120°
1' - 9 5/8" 4' - 5 3/4" 3' - 4 1/2" 4 7/8" 3' - 10"
ALIGN
/8
/8
/8
/4
/8
/4
0°
/2
/2
/2
/4
/2
/4
A L
IG
N
ALIGN
14' - 4 3/4"
4 7/8"
6' - 2"
4 7/8"
2' - 6 1/2" 4' - 5 1/8" 2' - 6 1/2"
4 7/8"
S1.0-F
ALIGN
ALIGN
ALIGN
ALIGN
ALIGN1
/2
/2
/8
/2
/8
/8
/8
/4
/8
/8
/2
/2
/4
/8
7' - 5 3/8" 3' - 11 3/4"
1' - 9 5/8"
4' - 8 3/8" 3' - 11 1/8" 3' - 8 5/8" 4 1/2"
8' - 0 1/2" 9" 8' - 0 1/2" 4 1/2" 4' - 0 7/8" 3' - 11 1/8"
4 7/8"
2' - 10 5/8"
4 7/8"
4' - 4 1/8"
4 7/8"
3' - 11 1/8" 3' - 5 3/8" 4 1/2" 8' - 0 1/2" 11 5/8"
/8
/8
/8
/8
/2
/2
2' - 2 1/2"
ALIGN S2.0
ALIG
N
S2.0S2.0
/2
S2.0
1' - 9 5/8" 12' - 1 1/8"
/8
/8
S2.0S2.0
2' - 6" 6 1/8" 13' - 5 3/8"
/2
/8
/4
/8
/4
/4
5' - 3 3/8"
1' - 7 1/2"
/4
13' - 5 3/4" 10 3/4" 2' - 2"
M
IN
/8
/8
/8
/4
/8
/2
5' - 5 1/4"
4 1/4"
11"
4 1/4"
1' - 7 1/2"
S2.0S2.0
4 7/8"
3' - 0 1/8" 13' - 1 1/2"
/2
/8
/4
/8
/8
/8
6'
9'
/8 " 1'
/8
4' - 7 7/8" +/-
/4
/8
8' - 0" MIN.
135°
/8
/4
/8
/8
/8
/8
ALIGN
/8
S2.0S2.0
S2.0
/2
/8
"4
/8
ALIGN
ALIGN
2' - 8 7/8"
/2
" 10' - 0 5/8"
13' - 4 3/4"
4'
/8
3'
0"
4"
6'
1/
4"
3'
0"
1/ 2"
2' - 0 5/8"
ALIGN
ALIGN
ALIGN ALIGN ALIGN
45°
6' - 4 7/8"
ALIGN
BEDROOM -
RESIDENT
ON-CALL
3B161
S2.0S2.0
9"
3' - 6"
CORRIDOR
3C-27
S1.0-F
S1.0-F
S1.0-F
S1.0-F
S1.0-F
S1.0-F
S1.0-F
E1.0
E1.0
E1.0
S1.0-N
4 1/2"4 1/2" 4 1/2"4 1/2"
AREA A
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
ENLARGED DIMENSION PLAN
A101-D1
DWTH
17005.00
552-18-102
Dayton Ohio
N Scale: 1/4" = 1'-0"
ENLARGED DIMENSION PLAN A GENERAL NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See enlarged plans for additional notes.
F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction.
Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated construction. Contractor to also install up to 100 sf of drywall construction for existing rated construction.
N.T.S.Scale:
Key Plan
Revision s
Date
8 Addendum #1 06.02.2020
FEDCBA B3 B6 C5 E1
3.2
4.1
4.7
5.3
4.2
3.1
D2C6
3.05
4.6
OFFICE
3B120
CORRIDOR
C3-18
BED ROOM
3B121
RESTROOM
3B121a
ALCOVE,
WHEELCHAIR
3B165
RESTROOM
3B122a
BED ROOM
3B122
ALCOVE
CRASH
CART
3B166
RESTROOM
3B110a
NOURISHMENT
3B115
BED ROOM,
INFECTION
CONTROL
3B123
CORRIDOR
C3-19
CONTROL
CENTER
C3-15
NURSE
WORKROOM
3B114
CLEAN
LINEN
3B116
COMM
CLOSET
3B111
OFFICE
3B117
BREAK
ROOM
3B146
OFFICE
3B147
CORRIDOR
C3-23
STORAGE
3B168
HAC
3B155
STORAGE
3B106
BED ROOM,
BARIATRIC
3B110
BED ROOM
3B108
RESTROOM
3B108a
ALCOVE
WHEELCHAIR
3B112
BED ROOM
3B105
RESTROOM
3B105a
CONSULTATION
ROOM
3B102
RESTROOM
3B158a
BED ROOM
3B158
CORRIDOR
C3-26
BED ROOM
3B159
UTILITY
ROOM,
CLEAN
3B109
SOILED
UTILITY
3B107
S2.0
S2.0
S2.0
S1.1
S1.1
S1.1
S2.0
S1.1
S1.1
S2.0
S1.1
S2.0
S2.0
S2.0
S2.0
S2.0
S2.0
S2.0
S1.1
S1.1
S2.0S2.0
S2.0
S2.0
S2.0S2.0
S1.0-F
/8
0°
/2
/2
/8
/8
/8
/4
/8
/4
/8 " 4
/8
/8
/8
/8
7' - 7 3/8" 3' - 11 3/4" 1' - 9 5/8"
/8
/4
/2
/2
/2
/2
/8
/8
/8
/2
/2
/2
A L
IG
N
120°
ALIGN
120°
/8
/8
120°
ALIGN
ALIGN
A L
IG
N
ALIGN
6' - 3 1/8"
6' - 7 7/8"
4 7/8"
5' - 4 1/2" 6' - 7"
ALIGN
CORRIDOR
C3-12
OFFICE
3B103
/8
/8
/8
/8
7' - 2 1/2"
/8
/4
/8
/2
S2.0
2' - 10 7/8" 5' - 10 1/2" 3' - 7 3/8" 3' - 11 1/8" 3' - 11 1/4" 4 1/2" 8' - 0 1/2" 9" 8' - 0 1/2" 4 1/2" 2' - 3 3/4" 3' - 11 1/8"
4 7/8"
5' - 4" 1' - 3" 8' - 0 1/2" 4 1/2" 5' - 8 7/8" 3' - 11 1/8" 2' - 7 1/8"
4' - 0 7/8"
4 1/4"
8 1/2"
4 1/4"
5' - 4 5/8"
4 7/8"
3' - 9" 13' - 3 3/4"
1' - 0 1/8"
/4
/4
11' - 9 7/8"
1' - 10 1/2"
2' - 10 1/2"
/8
/8
/8
S2.0
1' - 10" 3' - 6"
5' - 3 3/4"
4 1/4"
8 1/2"
13' - 11 7/8" 4' - 9" 4 7/8"
1' - 7 1/8"
5' - 3 3/8" 1' - 0 3/4"
/8
/8
ALIGN
/8
M
IN
/4
/4
/4
/4
/8
/2
/2
/4
/8
/2
5' - 5 5/8" 2' - 2 1/2"
2' - 0"
13' - 10 3/4"
/4
3 5/8"
17' - 11"
11' - 7 1/8"
1' - 9 5/8"
/4
7' - 0"
SCRUBS
3B106a
3'
6"
4'
1"
9"
S2.0S2.0S2.0
S2.0 S2.0
S2.0
AREA B
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
ENLARGED DIMENSION PLAN
A101-D2
DWTH
17005.00
552-18-102
Dayton Ohio
N Scale: 1/4" = 1'-0"
ENLARGED DIMENSION PLAN B
GENERAL NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See enlarged plans for additional notes.
F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction.
Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated construction. Contractor to also install up to 100 sf of drywall construction for existing rated construction.
N.T.S.Scale:
Key Plan
Revision s
Date
8 Addendum #1 06.02.2020
F
1.2
EDCBA B3 C5 E1
1.5
2.2
3.2
4.1
5.3
4.2
3.1
2.1
D2
4.65
C2 C6
5.2
E9E8
3.05
4.6
CONSULTATION
ROOM
3B102
OFFICE
3B103
OFFICE
3B120
BEDROOM -
RESIDENT
ON-CALL
3B161
CORRIDOR
C3-12
CORRIDOR
C3-14
CORRIDOR
C3-18
CORRIDOR
C3-19
CORRIDOR
C3-20
CORRIDOR
3C-27
CORRIDOR
3C-9
BED ROOM
3B121
RESTROOM
3B121a
RESTROOM
3B122a
BED ROOM
3B122
BED ROOM,
INFECTION
CONTROL
3B123
RESTROOM
3B123a
RESTROOM
3B124a
BED ROOM
3B125
RESTROOM
3B125a
BED ROOM
3B142
RESTROOM
3B142a
RESTROOM
3B140a
BED ROOM
3B140
BARIATRIC,
INFECTION
CONTROL
3B138
RESTROOM
3B138a
RESTROOM
3B137a
BED ROOM,
INFECTION
CONTROL
3B137
BED ROOM,
BARIATRIC
3B135
BED ROOM
3B160
BED ROOM
3B158
BED ROOM,
BARIATRIC
3B110
BED ROOM
3B105
RESTROOM
3B105a
RESTROOM
3B110a
NOURISHMENT
3B115
STORAGE
3B145
RESTROOM
3B158a
RESTROOM
3B135a
ANTE
ROOM
3B137b
ANTE
ROOM
3B138b
VESTIBULE
3B104
BED ROOM
3B108
RESTROOM
3B108a
ALCOVE,
WHEELCHAIR
3B165
ALCOVE
CRASH
CART
3B166
ALCOVE
TRAY
STORAGE
3B141a
ALCOVE
WHEELCHAIR
3B112
AREA OF DEDUCT ALTERNATE
AREA OF DEDUCT ALTERNATE
A405
A
A405
B
140a 142a
108a 105a110a
137a
A101-N
124a
A401
B
160a
CORRIDOR
C3-26
BED ROOM
3B159
RESTROOM
3B159a
RESTROOM
3B160a
122a
121a
125a
135a
110 108 105
142140138137135
159a
137c
137b 138b
138c
158a
NURSE
WORKROOM
3B114
CLEAN
LINEN
3B116
CONTROL
CENTER
C3-15
COMM
CLOSET
3B111
OFFICE
3B147
CORRIDOR
C3-17
BREAK
ROOM
3B146
CORRIDOR
C3-23
HAC
3B155
MED ROOM
3B154STORAGE
3B149
NURSE
WORKROOM
3B151
SOILED
UTILITY
3B152
CLEAN
LINEN
3B139
UTILITY
ROOM,
CLEAN
3B130
TOILET,
FEMALE
3B126
MED ROOM
3B119
STORAGE
3B168
NOURISHMENT
3B153
STORAGE
3B106
SOILED
UTILITY
3B107
UTILITY
ROOM,
CLEAN
3B109
OFFICE
3B117
TOILET,
MALE
3B128
ELECTRICAL
CLOSET
3B144
STORAGE
3B148
OFFICE
3B150CORRIDOR
C3-22
CONTROL
CENTER
C3-25
STORAGE
3B164
CORRIDOR
C3-27
139 152
109111
116 107
A401
C
BED ROOM,
INFECTION
CONTROL
3B124
ANTE
ROOM
3B124b
ALCOVE,
WHEELCHAIR
3B171
ANTE
ROOM
3B123b123b
124b
123c
124c
A
A
A
A
A
A A A A A
A
A
A
AAA
B
C
D
F
E
A401
D
G
F902
TYP.
F902
ALCOVE
CRASH
CART
3B141
130a
146a
106a
WAITING
ROOM
3B101
CONFERENCE
ROOM
3B100
SCRUBS
3B106a
G
G
14.04
8.14 8.14 8.14
8.14
8.14
8.14
8.14
8.14
8.14 8.14
8.14
8.14
8.14 8.14
8.15
3' - 10"
1.01
1.01
1.01
1.01
1.01 1.01
1.01
1.01
1.01
1.01
1.01
11.0211.03
11.02
11.02
11.02
11.02
11.02
11.02
11.02
11.03
11.02
11.02
11.02
11.02
11.02
123a
138a
8.14
8.14
11.03
8.14
9.52
9.52
F902
F902
SIM.
F902
SIM.
F902
SIM.
10.41
10.41
10.41
10.41
8.30 Typ.
8.30 Typ.
8.30
Typ.
8.30
Typ.
8.30
Typ.
8.30
8.30
Typ.
Typ.
8.30 8.30
Typ. Typ.
10.41
9.58
9.58
9.58 9.58
PLAN AREA
DCB
3.1
2.1
CORRIDOR
C3-14
NOURISHMENT
3B115
ALCOVE
WHEELCHAIR
3B112
BREAK
ROOM
3B179
OFFICE,
PHYSICIAN
3B117
OFFICE
3B174
COMM
CLOSET
3B111
UTILITY
ROOM,
CLEAN
3B109
STORAGE,
GENERAL
3B147
KITCHEN,
MISC
3B180
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
UTILITY
ROOM,
SOILED
3B106
UTILITY
ROOM,
SOILED
3B182
CORRIDOR
C3-23
UTILITY
ROOM,
CLEAN
3B155
HAC
3B148
MED PREP
3B154
TOILET
3B181OFFICE
3B149
OFFICE
3B150
LINEN
ROOM,
SOILED
3B152
NOURISHMENT
3B151
NOURISHMENT
3B175
MED PREP
3B176
UTILITY
ROOM,
SOILED
3B178
CORRIDOR
C3-17
CORRIDOR
C3-22
UTILITY
ROOM,
CLEAN
3B130
STORAGE
3B129A
OFFICE
3B177
TOILET,
MALE
3B128
TOILET,
FEMALE
3B126
ELECTRICAL
CLOSET
3B144
TOILET
3B139
CONTROL
CENTER
C3-15
CONTROL
CENTER
C3-25
A406
A
A406
B164
107 106109111
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18 8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.10
8.10
8.14
8.14
8.14
14.04
10.41 10.24
10.41
DCB
3.1
2.1
CORRIDOR
C3-14
NOURISHMENT
3B115
ALCOVE
WHEELCHAIR
3B112
UTILITY
ROOM,
SOILED
3B106
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
UTILITY
ROOM,
CLEAN
3B109
COMM
CLOSET
3B111
OFFICE
3B174
KITCHEN,
NOURISHMENT
3B175
MEDICATION
PREP.
3B176
OFFICE,
PHYSICIAN
3B117
OFFICE
3B177
UTILITY
ROOM,
SOILED
3B178
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B129A
TOILET,
CONGREGATE
3B139
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144
BREAK
ROOM
3B179
KITCHEN,
MISC
3B180
STORAGE,
GENERAL
3B147
HOUSEKEEPING
AID CLOSET
3B148
OFFICE
3B149
OFFICE
3B150
NOURISHMENT
3B151
LINEN
ROOM,
SOILED
3B152
TOILET
3B181
MEDICATION
PREP.
3B154
UTILITY
ROOM,
CLEAN
3B155
UTILITY
ROOM,
SOILED
3B182
CONTROL
CENTER
C3-15
CORRIDOR
C3-17
CORRIDOR
C3-22
CORRIDOR
C3-23
CONTROL
CENTER
C3-25
111 109 107
A406
A
A406
B
14.04
8.10
8.10
8.148.148.14
10.24
10.41
10.41
1/2"
/2
7.65
10.25
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
NOTE PLANS
A101-N
DWTH
17005.00
552-18-102
Dayton Ohio
GENERAL NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. See enlarged plans for additional notes.
F. See code plan for existing rated construction. Firestop all new penetrations to maintain integrity of existing rated construction.
Additionally, firestop up to a maximum of 100 penetrations and/or 100 SF of existing, unfirestopped penetrations through existing rated construction. Contractor to also install up to 100 sf of drywall construction for existing rated construction.
N Scale: 1/8" = 1'-0"a
NOTE PLAN - BASE BID
N N.T.S.Scale:
KEY PLAN
1.01 No architectural work this area.
7.65 Cont. sealant.
8.10 Refer to Base Bid Door Schedule for details about this door.
8.14 Electronic card reader.
8.15 Push button door operator.
8.18 New door leaf in existing frame. Reuse existing hardware. Field verification required.
8.30 Install solid surface window sill per detail 1/A101-N.
9.52 Coordinate final size of chase with plumbing contractor.
9.58 Construct room to limit the passage of air. Ensure that gypsum wall board is fitted tight and sealed to deck above and floor slab providing a continuous barrier. Seal drywall construction at perimeter and corners. Seal all penetrations created by Architectural and MEPFS items including, but not limited to, ducts, wall outlets, conduit, and pipes.
10.24 Remove and replace existing fire extinguisher cabinet.
10.25 Solid surface window sill.
10.41 Semi-recessed fire extinguisher cabinet.
11.02 Standard headwall. See Elevation 1/A513 for details.
11.03 Bariatric headwall. See Elevation 4/A513 for details.
14.04 Relocated pneumatic tube system. Refer to phasing plans for scheduling information.
PLAN NOTES
N Scale: 1/8" = 1'-0"2
NOTE PLAN - DEDUCT ALTERNATE #1
N Scale: 1/8" = 1'-0"3
NOTE PLAN - DEDUCT ALTERNATE #2
Revision s
Date
8 Addendum #1 06.02.2020
7 100% For Bid 03.09.2020
TYP. WINDOW SILL REPLACEMENT DETAIL
sodell Callout Remove Window Sill replacement covered by Detail S3
RB-1
CG-1
CG-2
FWP-1FWP-1
FWP-1
PL-1
SS-2
RB-1
NC
A
3' - 7 3/4"
B5
12.41
6.09
2'-0" 3'-0" 3'-0" 2"
2'-0" 3'-0" 3'-0" 2"
W1 W1 W1
B3B1B2
F
PL-1
SS-2
PL-1
RB-1
RB-1
P-1 E
RR
PL-1
3"2'-9"3'-0"1'-9"
3"2'-9"3'-0"1'-9"
PL-1
P-1
SS-2
PL-1
RB-1
W1 W1 W2
B1B3B4
F
E
RF
MV
PL-1
3' - 0"3 3/8"
W3
OC1
P-1
SD
PT
P-8
RB-1
PM
BP
P-8
RB-1
SB
11.02
22.08
MEMT
HS
CG-1
P-8
RB-1
MB
TR1
11.08
P-8
RB-1
WC
A
SD
PT
P-8
RB-1
GB
TR1
WC
PM
SB
P-8
RB-1
P-811.02
22.08BP
ME
MT
CG-1
RB-1
P-8
PL-1
P-1
W1 W1
UR
OC1
12.10
2" 3' - 6" 3' - 3"
2" 3' - 6" 3' - 3"
B1
PL-1
SS-2
RB-1 RB-1
PL-1
2" 3' - 0" 2' - 9" 1' - 6"
2" 3' - 0" 2' - 9" 1' - 6"
W1W1W1
B3 B1 B2
PL-1
P-1
SS-2
PL-1
RB-1
F
E
PL-1
12.15
12.15
UR
OC1
" PL-1
P-1
PL-1
SS-2
RB-1
3' - 0"2' - 6"2"
2" 2' - 3" 3' - 3" 12.10
W1W1
B1
PL-1
RB-1
RF
P-1
PL-1
SS-2
1'-9" 2'-9" 2"
W1
B1
W2
B1
MV
2" 3' - 0" 1' - 9" 2' - 9" 2"
PL-1PL-1
W3
EQ EQ
NCSS-2
P-1
RB-1
B5
C
W1W1
B2B3 B1
CMF
E
2" 3'-0" 3'-0" 1'-6" 2"
PL-1
SS-2
PL-1
RB-1
2" 3' - 0" 1' - 6" 3' - 0" 2"
W3
IM
PL-1
2 3/8" 2'-9" 1'-3" 2'-9" 2 3/8"
SS-2
P-1
IM
CM
2 3/8" 2' - 9" 1' - 3" 2' - 9" 2 3/8"
PL-1PL-1
PL-1
RB-1
F
E
W1 W1 W3
B2B3 B1
RF SS-2
P-1
MV
2 3/4" 3' - 3" 3' - 6" 2"
1' - 9" 1' - 9" 2"
?PL-1
PL-1
W3 W2
B1 B1
EQUIPMENT TAG
WINDOW OPENING
DOOR OPENING
FINISH DESIGNATION
X
XX
SIGNAGE TAG
TOILET ACCESSORY TAGX
X
TAG LEGEND
TR1
GB
SD
PT
P-8
RB-1
PM
SB
P-8
RB-1
22.08
11.03
BB
ME
MB
MT
HS
RB-1
P-8
CG-1
11.08
2" 2"
1' - 3"
10.06
10.09
10.08
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
INTERIOR ELEVATIONS
A402
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1/4" = 1'-0"28
TYP. NURSE STATION
Scale: 1/4" = 1'-0"20
3B119 MED ROOM
Scale: 1/4" = 1'-0"24
3B146 BREAK ROOM
Scale: 1/4" = 1'-0"26
3B154 MED ROOM
Scale: 1/4" = 1'-0"29
TYP. PATIENT ROOM
Scale: 1/4" = 1'-0"30
TYP. PATIENT ROOM
Scale: 1/4" = 1'-0"31
TYP. PATIENT ROOM
Scale: 1/4" = 1'-0"38
TYP. PATIENT SINK
Scale: 1/4" = 1'-0"32
TYP. INFECTION CONTROL ROOM
Scale: 1/4" = 1'-0"33
TYP. INFECTION CONTROL ROOM
Scale: 1/4" = 1'-0"34
TYP. INFECTION CONTROL ROOM
Scale: 1/4" = 1'-0"21
3B119 MED ROOM
Scale: 1/4" = 1'-0"27
3B154 MED ROOM
Scale: 1/4" = 1'-0"25
3B154 MED ROOM
Scale: 1/4" = 1'-0"23
3B153 NOURISHMENT
Scale: 1/4" = 1'-0"39
TYP. NURSE WORKROOM
GENERAL INT. ELEVATION NOTES
A. See Sheet AF101-F for Floor Finish Plan.
B. See Sheet A511 for Casework Details.
C. See Sheet AF601 for Room Finish Schedule.
D. See Sheet AF601 for Finish Materials Legend.
E. Provide tile substrate as follows: All Restrooms, HAC will receive Water-resistant gyp. board. Kitchen will receive Gyp. board.
F. Coordinate with owner and verify owner-provided equipment.
G. See Sheet A501 for Drop Down Grab Bar Details.
H. See Sheet F902 for Equipment Schedule.
I. See Sheet AS101 for Signage Schedule.
PLAN NOTES
6.09 Stile Plate.
10.06 Aluminum signage standoff post, 1" diameter and 2 1/2" long.
10.08 Back painted glass markerboard. Mount with standoffs.
10.09 Printed lines on markerboard surface.
11.02 Standard headwall. See Elevation 1/A513 for details.
11.03 Bariatric headwall. See Elevation 4/A513 for details.
11.08 Markerboard. See A/A402.
12.10 End panel. Plastic laminate over 3/4" plywood.
12.15 Filler panel. Plastic laminate over 3/4" plywood. Match finish to adjacent cabinet.
12.41 Battery powered electronic keypad cabinet lock, vertical throw.
22.08 Dialysis box. See Plumbing Drawings.
Scale: 1/4" = 1'-0"22
3B153 NOURISHMENT
Scale: 1/4" = 1'-0"18
3B115 NOURISHMENT
Scale: 1/4" = 1'-0"19
3B115 NOURISHMENT
Scale: 1/4" = 1'-0"35
TYP. BARIATRIC ROOM
Scale: 1/4" = 1'-0"36
TYP. BARIATRIC ROOM
Scale: 1/4" = 1'-0"37
TYP. BARIATRIC ROOM
Scale: 1" = 1'-0"A
MARKERBOARD
GFE: GOVERNMENT FURNISHED AND INSTALLED EQUIPMENT
GFE/CI: GOVERNMENT FURNISHED EQUIPMENT, CONTRACTOR INSTALLED
CP/CI: CONTRACTOR PROVIDED, CONTRACTOR INSTALLAED
SUPPLIER/INSTALLER LEGEND
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
OT Overbed Table GFE
PM Physiological Monitor GFE/CI
PR Printer - Desktop GFE 18" 18" 9"
PT Paper Towel Dispenser GFE/CI 42" A.F.F. TO BOTTOM
RF Refrigerator GFE
RR Rapid Response Cart GFE 18" 18" 36"
SB Sharps Box GFE/CI 19" 7" 15" 60" A.F.F. TO TOP
SD Soap Dispenser GFE/CI 42" A.F.F. TO BOTTOM
SE ScrubEx GFE 52" 16 1/2" 78"
SR Shredder Box GFE 22" 15" 35"
SW Open Shelf - Warmer GFE 28" 15" 36"
TM Telemetry Monitor GFE/CI 21" 3" 15"
TR1 Trash Can - Lidded GFE 18" 18" 30"
TR2 Trash Can - Small GFE 18" 18" 18"
TS Tray Storage Cart GFE 42" 72" 36"
UR Undercounter Refrigerator GFE 36" 24" 34"
WC Wall Clock GFE/CI
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
HS Hand Sanitizer GFE/CI 5" 3" 8" 50" A.F.F. TO TOP
IM Ice Machine GFE/CI
IV IV Pole GFE 18" 19" 54"
LB Patient Lift - Bariatric CP/CI 60" 2" 12"
LC Linen Cart GFE 24" 20" 35 3/4"
LP Patient Lift - Typical GFE 60" 2" 12"
LS Linen Storage GFE 60" 28" 36"
MB Marker Board, 15x24 CP/CI
MD Medicine Destruction Box GFE/CI 18" 10" 14"
ME Monitor - eICU GFE/CI
MT Monitor - TV GFE/CI VARIES - SEE ELEVATION
MV Microwave GFE
NC Nurse Charting Terminal GFE/CI
OC1 OmniCell GFE 86" 24 1/2" 77 5/8"
OC2 OmniCell GFE 76 1/4" 24 1/2" 77 5/8"
OC3 OmniCell GFE 51 1/2" 24 1/2" 77 5/8"
OS Open Shelf GFE 36" 18" 36"
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
GFE
Mobile Pedestal GFE 15" 18" 25 3/8"
AL Alex Automated Linen GFE 72" 30" 84"
BB Patient Bed - Bariatric GFE
BC Bed Camera Monitor GFE/CI 21" 3" 15"
BP Patient Bed - Typical GFE
BT Blue Tarp Storage Cart GFE 60" 26" 36"
BW Blanket Warmer GFE 22" 30" 36"
CB Cabinet - Staff CP/CI 24" 18" 36"
CC Crash Cart GFE 40" 24" 36"
CM Coffee Maker GFE
CP Copy/Print/Fax GFE 30" 38" 36"
CU Cabinet - Patient CP/CI 24" 12" 30"
FE Fire Extinguisher CP/CI
GB Glove Box GFE/CI 11 1/2" 4 1/4" 22 1/2" 80" A.F.F. TO TOP
HB Headwall - Bariatric CP/CI 136" 4" 96"
Revision s
Date
8 Addendum #1 06.02.2020
122 123 124 125
FWP-1FWP-1 FWP-1FWP-1FWP-1
FWP-1FWP-1FWP-1 FWP-1FWP-1 FWP-1FWP-1FWP-1
RB-1
CG-2CG-2
CG-1 CG-1
CG-2 CG-2
CG-2 CG-1
A402
Sim
P-1 P-1
P-1 P-1
A.1 A.1
123b 124b
A A A A
A
A512
NCNCNCNCNC
B5 B5 B5 B5 B5CG-1CG-1 A.1A.1
23.0423.0426.03 26.03
26.03
26.03
26.03 A A
A A A
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
CG-3 HR-1
CR-1
RB-2 SS-1 RB-1
HR-2
CR-2
RB-1
RWC-1
RWC-2
P-2 P-2
P-5
P-2
9.27F F C
OPEN OPEN OPEN
CG-1
EG-1
CG-3
CORRIDOR
C3-17
CORRIDOR
C3-14
ALCOVE
3B166
CORRIDOR
C3-20
M
120128
D C
RWC-2
CG-1CG-1
P-1
KI
116 111 109 107
HR-1
CR-1
HR-1 CR-1 RB-2SS-1 RB-1 RWC-1 RWC-1
P-5
P-2 P-2
9.27 C C C C
OPEN OPEN
CORRIDOR
C3-19
CORRIDOR
C3-26
RB-2
B
106a
CG-3
8.14 8.14 C
105 108 110
CG-1 CG-2CG-1 CG-1
CG-2 CG-2
CG-1 CG-1
FWP-1FWP-1FWP-1FWP-1FWP-1FWP-1FWP-1FWP-1FWP-1
RB-1 RB-1
A402
Sim
P-1
FWP-1 FWP-1
P-1
P-1 CA.1
OPEN
EG-1 EG-1
OPEN
NOURISHMENT
3B115
CORRIDOR
C3-187
A512
B5 B5 B5
NC NC NC
AAA
10.41
PR-1
PR-1
A
26.03
A
PR-1
PR-1
26.03
PR-1
PR-1
A
26.03
EQUIPMENT TAG
WINDOW OPENING
DOOR OPENING
FINISH DESIGNATION
X
XX
SIGNAGE TAG
TOILET ACCESSORY TAGX
X
TAG LEGEND
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
INTERIOR ELEVATIONS -
CORRIDORS
A403
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1/4" = 1'-0"40
CORRIDOR
Scale: 1/4" = 1'-0"41
CORRIDOR
Scale: 1/4" = 1'-0"42
CORRIDOR
Scale: 1/4" = 1'-0"43
CORRIDOR
GENERAL INT. ELEVATION NOTES
A. See Sheet AF101-F for Floor Finish Plan.
B. See Sheet A511 for Casework Details.
C. See Sheet AF601 for Room Finish Schedule.
D. See Sheet AF601 for Finish Materials Legend.
E. Provide tile substrate as follows: All Restrooms, HAC will receive Water-resistant gyp. board. Kitchen will receive Gyp. board.
F. Coordinate with owner and verify owner-provided equipment.
G. See Sheet A501 for Drop Down Grab Bar Details.
H. See Sheet F902 for Equipment Schedule.
I. See Sheet AS101 for Signage Schedule.
PLAN NOTES
8.14 Electronic card reader.
9.27 Gypsum board soffit.
10.41 Semi-recessed fire extinguisher cabinet.
23.04 Room pressure monitor.
26.03 Sconce light. Mount to HPL phenolic panel.
GFE: GOVERNMENT FURNISHED AND INSTALLED EQUIPMENT
GFE/CI: GOVERNMENT FURNISHED EQUIPMENT, CONTRACTOR INSTALLED
CP/CI: CONTRACTOR PROVIDED, CONTRACTOR INSTALLAED
SUPPLIER/INSTALLER LEGEND
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
OT Overbed Table GFE
PM Physiological Monitor GFE/CI
PR Printer - Desktop GFE 18" 18" 9"
PT Paper Towel Dispenser GFE/CI 42" A.F.F. TO BOTTOM
RF Refrigerator GFE
RR Rapid Response Cart GFE 18" 18" 36"
SB Sharps Box GFE/CI 19" 7" 15" 60" A.F.F. TO TOP
SD Soap Dispenser GFE/CI 42" A.F.F. TO BOTTOM
SE ScrubEx GFE 52" 16 1/2" 78"
SR Shredder Box GFE 22" 15" 35"
SW Open Shelf - Warmer GFE 28" 15" 36"
TM Telemetry Monitor GFE/CI 21" 3" 15"
TR1 Trash Can - Lidded GFE 18" 18" 30"
TR2 Trash Can - Small GFE 18" 18" 18"
TS Tray Storage Cart GFE 42" 72" 36"
UR Undercounter Refrigerator GFE 36" 24" 34"
WC Wall Clock GFE/CI
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
HS Hand Sanitizer GFE/CI 5" 3" 8" 50" A.F.F. TO TOP
IM Ice Machine GFE/CI
IV IV Pole GFE 18" 19" 54"
LB Patient Lift - Bariatric CP/CI 60" 2" 12"
LC Linen Cart GFE 24" 20" 35 3/4"
LP Patient Lift - Typical GFE 60" 2" 12"
LS Linen Storage GFE 60" 28" 36"
MB Marker Board, 15x24 CP/CI
MD Medicine Destruction Box GFE/CI 18" 10" 14"
ME Monitor - eICU GFE/CI
MT Monitor - TV GFE/CI VARIES - SEE ELEVATION
MV Microwave GFE
NC Nurse Charting Terminal GFE/CI
OC1 OmniCell GFE 86" 24 1/2" 77 5/8"
OC2 OmniCell GFE 76 1/4" 24 1/2" 77 5/8"
OC3 OmniCell GFE 51 1/2" 24 1/2" 77 5/8"
OS Open Shelf GFE 36" 18" 36"
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
GFE
Mobile Pedestal GFE 15" 18" 25 3/8"
AL Alex Automated Linen GFE 72" 30" 84"
BB Patient Bed - Bariatric GFE
BC Bed Camera Monitor GFE/CI 21" 3" 15"
BP Patient Bed - Typical GFE
BT Blue Tarp Storage Cart GFE 60" 26" 36"
BW Blanket Warmer GFE 22" 30" 36"
CB Cabinet - Staff CP/CI 24" 18" 36"
CC Crash Cart GFE 40" 24" 36"
CM Coffee Maker GFE
CP Copy/Print/Fax GFE 30" 38" 36"
CU Cabinet - Patient CP/CI 24" 12" 30"
FE Fire Extinguisher CP/CI
GB Glove Box GFE/CI 11 1/2" 4 1/4" 22 1/2" 80" A.F.F. TO TOP
HB Headwall - Bariatric CP/CI 136" 4" 96"
Revision s
Date
8 Addendum #1 06.02.2020
RWC-1
CR-1
RB-2 CG-3
HR-2
CR-2
RB-1
SS-1RB-1
RWC-2
RWC-1RB-1
P-2 P-2
P-5P-1 C C
OPEN OPEN
CORRIDOR
C3-20
CORRIDOR
C3-27
9.27
106 1551028
CG-1
EG-1BB
P-2 E
HR-1CG-3
I
135 137
137c 138c
138 140 142
FWP-1
CG-2CG-1 CG-2 CG-1 CG-1 CG-2
CG-2 CG-2
FWP-1 FWP-1FWP-1 FWP-1FWP-1FWP-1FWP-1FWP-1FWP-1 FWP-1FWP-1FWP-1
A402
Sim
RWC-2
P-1
P-1 P-1
P-1P-1
A.1A.1
P-1
RWC-2
EG-1EG-1EG-1
A A A A A
A512
B5 B5 B5 B5 B5
NC NC NC NC NC
RB-1
FWP-1
23.0523.0523.04 23.04
FWP-1
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1 PR-1
PR-1
PR-1
PR-1
A A A A A
26.03 26.03 26.03 26.03 26.03
CR-2
HR-2
164139152
RB-1
CG-1 CG-3
P-2
HR-1
CR-1
RB-2SS-1
RB-1
RWC-2
RWC-1RB-1
P-5
P-2
9.27 C C C C C
OPEN OPEN
OPEN
EG-1EG-1
CORRIDOR
C3-19
NOURISHMENT
3B153
CORRIDOR
C3-26
M
130a
F
8.148.14 8.14
K
8.14
3C-27 160 159 158
CG-1 CG-2
FWP-1FWP-1FWP-1 FWP-1FWP-1FWP-1 FWP-1FWP-1FWP-1
RB-1
A402
Sim
CG-1 CG-1
CG-2
CG-2
CG-1
P-1 P-1
P-1 P-1P-1
A.1
103 8
P-1
A A A
A512
C C
B5 B5
NC NC NC
B5
8.148.14
F K
PR-1
PR-1
PR-1
PR-1
PR-1
PR-1
AAA
26.03
26.03 26.03
8 8
EQUIPMENT TAG
WINDOW OPENING
DOOR OPENING
FINISH DESIGNATION
X
XX
SIGNAGE TAG
TOILET ACCESSORY TAGX
X
TAG LEGEND
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
INTERIOR ELEVATIONS -
CORRIDORS
A404
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1/4" = 1'-0"45
CORRIDOR
Scale: 1/4" = 1'-0"46
CORRIDOR
Scale: 1/4" = 1'-0"47
CORRIDOR
Scale: 1/4" = 1'-0"44
CORRIDOR
GENERAL INT. ELEVATION NOTES
A. See Sheet AF101-F for Floor Finish Plan.
B. See Sheet A511 for Casework Details.
C. See Sheet AF601 for Room Finish Schedule.
D. See Sheet AF601 for Finish Materials Legend.
E. Provide tile substrate as follows: All Restrooms, HAC will receive Water-resistant gyp. board. Kitchen will receive Gyp. board.
F. Coordinate with owner and verify owner-provided equipment.
G. See Sheet A501 for Drop Down Grab Bar Details.
H. See Sheet F902 for Equipment Schedule.
I. See Sheet AS101 for Signage Schedule.
PLAN NOTES
8.14 Electronic card reader.
9.27 Gypsum board soffit.
23.04 Room pressure monitor.
23.05 Room pressure sensor.
26.03 Sconce light. Mount to HPL phenolic panel.
GFE: GOVERNMENT FURNISHED AND INSTALLED EQUIPMENT
GFE/CI: GOVERNMENT FURNISHED EQUIPMENT, CONTRACTOR INSTALLED
CP/CI: CONTRACTOR PROVIDED, CONTRACTOR INSTALLAED
SUPPLIER/INSTALLER LEGEND
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
OT Overbed Table GFE
PM Physiological Monitor GFE/CI
PR Printer - Desktop GFE 18" 18" 9"
PT Paper Towel Dispenser GFE/CI 42" A.F.F. TO BOTTOM
RF Refrigerator GFE
RR Rapid Response Cart GFE 18" 18" 36"
SB Sharps Box GFE/CI 19" 7" 15" 60" A.F.F. TO TOP
SD Soap Dispenser GFE/CI 42" A.F.F. TO BOTTOM
SE ScrubEx GFE 52" 16 1/2" 78"
SR Shredder Box GFE 22" 15" 35"
SW Open Shelf - Warmer GFE 28" 15" 36"
TM Telemetry Monitor GFE/CI 21" 3" 15"
TR1 Trash Can - Lidded GFE 18" 18" 30"
TR2 Trash Can - Small GFE 18" 18" 18"
TS Tray Storage Cart GFE 42" 72" 36"
UR Undercounter Refrigerator GFE 36" 24" 34"
WC Wall Clock GFE/CI
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
HS Hand Sanitizer GFE/CI 5" 3" 8" 50" A.F.F. TO TOP
IM Ice Machine GFE/CI
IV IV Pole GFE 18" 19" 54"
LB Patient Lift - Bariatric CP/CI 60" 2" 12"
LC Linen Cart GFE 24" 20" 35 3/4"
LP Patient Lift - Typical GFE 60" 2" 12"
LS Linen Storage GFE 60" 28" 36"
MB Marker Board, 15x24 CP/CI
MD Medicine Destruction Box GFE/CI 18" 10" 14"
ME Monitor - eICU GFE/CI
MT Monitor - TV GFE/CI VARIES - SEE ELEVATION
MV Microwave GFE
NC Nurse Charting Terminal GFE/CI
OC1 OmniCell GFE 86" 24 1/2" 77 5/8"
OC2 OmniCell GFE 76 1/4" 24 1/2" 77 5/8"
OC3 OmniCell GFE 51 1/2" 24 1/2" 77 5/8"
OS Open Shelf GFE 36" 18" 36"
EQUIPMENT SCHEDULE
T a g
Description S u p p lie r
In s ta lle r
W id th
D e p th
H e ig h t
M o u n ti n g L o c a ti o n
GFE
Mobile Pedestal GFE 15" 18" 25 3/8"
AL Alex Automated Linen GFE 72" 30" 84"
BB Patient Bed - Bariatric GFE
BC Bed Camera Monitor GFE/CI 21" 3" 15"
BP Patient Bed - Typical GFE
BT Blue Tarp Storage Cart GFE 60" 26" 36"
BW Blanket Warmer GFE 22" 30" 36"
CB Cabinet - Staff CP/CI 24" 18" 36"
CC Crash Cart GFE 40" 24" 36"
CM Coffee Maker GFE
CP Copy/Print/Fax GFE 30" 38" 36"
CU Cabinet - Patient CP/CI 24" 12" 30"
FE Fire Extinguisher CP/CI
GB Glove Box GFE/CI 11 1/2" 4 1/4" 22 1/2" 80" A.F.F. TO TOP
HB Headwall - Bariatric CP/CI 136" 4" 96"
Revision s
Date
8 Addendum #1 06.02.2020
9.60
12.31
12.22
12.30
12.20
Drawer
B1
9.60
12.31
12.30
12.20
Sink
12.21
Drawer
Drawer
B2B3B4
W1
9.60
12.29
12.30
12.19
12.21
1'-0"
12.30
12.31
12.22
12.21
12.12
W2
Drawer
Drawer
12.27
Sink
12.20 8"
2'-1"
1'-8"
1"
/2
/2
12.12
12.21
12.29
12.30
12.31
11.32
12.21
/2
1"
2'-1" 2'-1" 2'-1"
1"
/2
3"3"
/4
3"
/2
2' - 1"
/2
B6
12.20
12.19
12.19
12.20
12.19
W3
12.30
12.31
12.21
12.12
1' - 0" 1' - 0"
1' - 8"
12.29
12.29
12.28
3"
12.32
22.06
22.09
12.29 12.29
3"
3"
" 12.05
12.31
12.21
9.60
12.20
12.22
1'-6"
A511
1"
3"
12.32
12.14
/4
/4
/4
/4
/4
A511
B5
12.17
12.1712.17
12.21
11 1/8"
12.41
6.09
2' - 9 3/8"
3' - 5 1/2"
1 1/2" 2"
/4
12.21
12.05
12.30
12.31
12.07
12.0612.13
12.14
1" 2' - 9 1/2" 1"
3' - 5 1/2"
/4
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
CASEWORK SECTIONS &
DETAILS
A511
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1" = 1'-0"1
CASEWORK SECTIONS
6.09 Stile Plate.
9.60 Resilient base. See Room Finish Schedule.
11.32 Owner provided and installed microwave. See
Electrical and Plumbing Drawings.
12.05 Recessed pull.
12.06 Fixed shelf. Plastic laminate over 3/4" plywood.
12.07 3/4" solid wood edge.
12.12 Soffit panel. Plastic laminate over 3/4" plywood.
Match finish to cabinet body finish.
12.13 Cabinet base panel. Plastic laminate over 3/4"
plywood.
12.14 Cutout gap in base panel for ventilation, 1" D.
12.17 Side splash. See Elevations for locations.
12.19 Applied solid surface backsplash.
12.20 Solid surface material over 3/4" plywood, with
1/4" eased edge.
12.21 Plastic laminate over 3/4" plywood.
12.22 Adjustable shelf. Plastic laminate over 3/4"
plywood.
12.27 Removable panel with concealed fasteners:
Plastic laminate over 3/4" plywood.
12.28 In-wall recessed countertop support bracket, 18"
x 20".
12.29 4" wire pull.
12.30 Self-latching, key-operated lock.
12.31 Concealed hinge.
12.32 2" Wire management grommet. Coordinate exact location with COR.
12.41 Battery powered electronic keypad cabinet lock, vertical throw.
22.06 Undermount solid surface sink bowl.
22.09 Drop-in stainless steel sink. See Plumbing
Drawings.
DETAIL NOTES
GENERAL CASEWORK NOTES
A. See Interior Elevations on sheet A401-A406 for further information.
B. Lift hangers and bracing to be attatched to structural steel only. No attatchment to deck permitted.
Scale: 1" = 1'-0"2
B5 NURSE STATION
Scale: 1" = 1'-0"3
B5 NURSE STATION
Revision s
Date
/2
/2 " 9"
2' - 9"
3"4 3/4"
12.20
12.2012.20
9.609.60
12.28
9.219.21
1 1/2"
12.32
2' - 6"
2' - 1 1/4"
12.20
2' - 9"
3"4 3/4"
12.20
12.28
9.609.60
9.219.21
12.20
1 1/2"
12.32
/2
12.2012.20
/2
2' - 1"
12.20
12.19
12.28
4 3/4" 3"
/4
/4
/4
12.2012.20
9.219.21
12.21
12.21
26.03
12.39
4 1/2" 9" 4 1/2"
V a ri e s
/4
/8
B a s e
1' - 6"
A512
GLOVES
GOWNS
BOOTIES
BOUFFANTS
1' - 6"
12.36
12.36
/4
/2
/2
/2
/2
/2
/4
GLOVES GLOVES
MASKS
MISCELLANEOUS
12.36
12.37
12.37
12.21
12.3812.38
CEILING PLANE
PR-1
PL-3
PL-3
PL-3
PL-3
PL-3
PL-3
PL-3
PL-3
12.39
PR-1
R u b b e r
B a s e
U p t o C e ili n g P la n e
26.03
12.36
12.37
9.21
6"
5/8"
3/8"
5 3/8"
5/8"
3/8"
/4
" 1
/2
/2
/2
/2
/2
/4
9.21
9.60
12.36
12.37
12.36
12.40
10.05
12.39
CEILING PLANE
PR-1
PR-1
CONTROL
CENTER
C3-15
4' - 11 1/2" 4' - 0 1/2"2' - 6"
/2
2' - 0"
12.32
TYP.
CONTROL
CENTER
C3-25
1' - 10 5/8" 4' - 3 3/8" 2' - 4"
/8
2' - 0"
12.32
TYP.
3' - 10" 5' - 0 1/8" 4' - 7 1/4" 1' - 11 1/2"
12.32
TYP.
/4
3' - 3 1/2" 5' - 2" 5' - 0" 5' - 0"
12.32
TYP.
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
CASEWORK SECTIONS &
DETAILS
A512
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1" = 1'-0"1
CONTROL CENTER SECTION
Scale: 1" = 1'-0"2
CONTROL CENTER SECTION
Scale: 1" = 1'-0"3
CONTROL CENTER SECTION
Scale: 1" = 1'-0"4
CONTROL CENTER DETAIL
Scale: 1" = 1'-0"5
PPE STORAGE CABINET
Scale: 1" = 1'-0"6
PPE STORAGE CABINET
9.21 5/8" Type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.
9.60 Resilient base. See Room Finish Schedule.
10.05 Sign Type A. Mount directly to high pressure
laminate phenolic door.
12.19 Applied solid surface backsplash.
12.20 Solid surface material over 3/4" plywood, with
1/4" eased edge.
12.21 Plastic laminate over 3/4" plywood.
12.28 In-wall recessed countertop support bracket, 18"
x 20".
12.32 2" Wire management grommet. Coordinate exact location with COR.
12.36 Adjustable shelf. Plastic laminate over 1/2"
plywood.
12.37 Fixed shelf. Plastic laminate over 1/2" plywood.
12.38 Plastic laminate over 1/2" plywood.
12.39 3/8" High pressure laminate phenolic panel.
12.40 3/8" High pressure laminate phenolic door with continuous hinge.
26.03 Sconce light. Mount to HPL phenolic panel.
DETAIL NOTES
GENERAL CASEWORK NOTES
A. See Interior Elevations on sheet A401-A406 for further information.
B. Lift hangers and bracing to be attatched to structural steel only. No attatchment to deck permitted.
Scale: 1/4" = 1'-0"7
C3-15 CONTROL CENTER GROMMETS
Scale: 1/4" = 1'-0"8
C3-25 CONTROL CENTER GROMMETS
Scale: 1/4" = 1'-0"9
C3-15 CONTROL CENTER GROMMETS - DEDUCT ALT
Scale: 1/4" = 1'-0"10
C3-25 CONTROL CENTER GROMMETS - DEDUCT ALT
Revision s
Date
REGULAR POWER
EMERGENCY POWER
DATA
OXYGEN
AIR
CODE BLUE
NURSE CALL
HEADWALL LEGEND
eICU
OVER BED LIGHT SWITCH
VACUUM WITH TRACKS
32 PIN CONNECTION
12.09
PL-1
SS-3
PL-1
P-8
RB-1
2' - 0" 2' - 0" 2' - 8" 2' - 8" 2' - 0"
P-8
SB
22.08
11.0611.06
3"
4 1/2" 4 1/2"
4 1/2"4 1/2" 4 1/2"
4 1/2"
3" 3"
4 1/2" 4 1/2"
1' - 8"
A513
Sim
A513
Sim
C O
R R
ID
O
R S
ID
E
W
IN
D O
W S
ID
E
4" 8" 4" 4" 4" 4" 8" 4"
PM
11.0711.07
9.41
RB-1
P-8 P-8
12.09
PL-1
PL-1
SS-3
9.46
2' - 0" 4' - 0" 2' - 0" 2' - 0"
SB
A513
A513
11.06
3"
4 1/2" 4 1/2"
4 1/2"
3"
4 1/2" 4 1/2"
4 1/2"
7 1/2"1' - 8"
4 1/2" 4 1/2"
1' - 7"
22.08
W
IN
D O
W S
ID
E
C O
R R
ID
O
R S
ID
E
4"4"8"4" 4" 4" 8" 4" 4"
PM
9.41
11.0711.07
11.05
11.18
5.32
2.282.28
2.27
11.1911.19
5.33
11.22
12.20
11.38
4.2
S1.1
9.60
9.41
11.06
11.07
1' - 10 3/4" 2' - 6 1/4"
5.32
2.27
S1.1
9.60
9.41
12.23
11.07
11.0711.07
12.21
12.22
12.31
12.29
12.30
12.21
12.29
12.30
12.20
1"
/2
EQUIPMENT TAG
WINDOW OPENING
DOOR OPENING
FINISH DESIGNATION
X
XX
SIGNAGE TAG
TOILET ACCESSORY TAGX
X
TAG LEGEND
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
HEADWALL DETAILS
A513
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 3/4" = 1'-0"4
TYP. BARIATRIC HEADWALL @ 3B110, 3B135, & 3B138
Scale: 3/4" = 1'-0"1
TYP. PATIENT HEADWALL
2.27 Existing roof deck. See structural.
2.28 Existing roof framing. See structural
5.01 Structural steel frame. See Structural Drawings.
5.32 New modular channel units or structural steel by
lift manufacturer. See structural drawings.
Coordinate final location of patient lift supports and hangers with lift manufacturer and all PMEFPT trades.
5.33 Patch spray-on fire proofing on existing steel
structure as required.
9.41 Suspended acoustic ceiling tile/grid. See Room
Finish Schedule.
9.46 Align ceiling grid with edge of headwall. See
Reflected Ceiling Plan for details.
9.60 Resilient base. See Room Finish Schedule.
11.01 Patient lifts and structural supports provided by
lift manufacturer.
11.05 Standard patient lift.
11.06 Headwall acrylic accent panel.
11.07 Headwall laminate panel.
11.10 Patient lift structure provided by lift manfuacturer.
See structural dwgs.
11.18 New/existing mechanical ductwork. see
Mechanical drawings for approximate locations.
Verify locations of existing ductwork to remain and adjust supports as necessary. Lift manufacturer to participate in preparation of PME coordination drawings by providing/coordinating lift support requirements.
11.19 Unistrut or other lift support by lift manufacturuer.
11.20 New recessed fixed lift rail with hangers, lateral
bracing, trapeze and supplemental structure as required. Coordinate location of lift supports with mechanical contractor and other trades.
11.21 Traveling rail.
11.22 Base cabinet by headwall manfuacturer.
11.38 Wall cabinet by headwall manufacturer.
12.09 Vacuum equipment track.
12.20 Solid surface material over 3/4" plywood, with
1/4" eased edge.
12.21 Plastic laminate over 3/4" plywood.
12.22 Adjustable shelf. Plastic laminate over 3/4"
plywood.
12.23 Sloped top.
This is the start of the file's text. The full file is on GovTribe.