20200701 TCUICU 2nd Floor Room Names.pdf

PDF 663 KB Posted

Attached to
Y1DB--552-18-102: Renovate TCU/ICU Space (VA-20-00027634)
Solicitation number
36C25020B0028
Issued by

About this file

This document provides details for a federal contract opportunity to renovate TCU/ICU space at the Dayton VA Medical Center. The Department of Veterans Affairs seeks to professionally renovate and modernize approximately 17,000 square feet of ICU/TCU space, over 25 years old, including upgrading associated IT systems. The renovation work must be completed within 365 calendar days of the Notice to Proceed. The solicitation documents will be posted on March 20, 2020 on FBO.gov, with proposals due approximately 30 days later. This opportunity is set aside only for verified Service-Disabled Veteran-Owned Small Businesses, with a minimum of 15% of construction work to be performed by the contractor or subcontractor. The estimated value is between $5-10 million. The NAICS code assigned is 236220 with a small business size standard of $39.5 million. Bid, payment and performance bonds will be required.

View the file

Other files

File Type Posted
36C25020B0028 0006.docx DOCX document
36C25020B0028 0005.docx DOCX document
Site Visit sign-in.pdf PDF
20200702 Addendum 1.pdf PDF
20200701 TCUICU 2nd Floor RCP.pdf PDF
PreBid RFIs Answers.pdf PDF
36C25020B0028 0004.docx DOCX document
Bid Opening Instructions.pdf PDF
36C25020B0028-0003000.docx DOCX document
36C25020B0028-0002000.docx DOCX document
36C25020B0028-0001000.docx DOCX document
36C25020B0028-0001001.pdf PDF
36C25020B0028-004.pdf PDF
36C25020B0028-009.pdf PDF
36C25020B0028-007.pdf PDF
36C25020B0028-005.pdf PDF
36C25020B0028-008.pdf PDF
36C25020B0028-002.pdf PDF
36C25020B0028-006.pdf PDF
36C25020B0028-003.pdf PDF
36C25020B0028-001.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

1.2

EDC

B

F6

A

E1

E6 G6

H9 J8

1.5

2.2

3.2

4.1

4.7

5.3

4.2

3.1

2.1

5.8

A1 A7

5.6

6.6

7.4

D2C2

E4

3.05

G9

AACC

5.4

5.5

2.7

DD

155 SF

OFFICE

236 SF

OFFICE

124 SF

LOUNGE

118 SF

OFFICE

175 SF

STORAGE,

GENERAL

251 SF

EXAM/TREATMENT

ROOM

51 SF

HOUSEKEEPING

AND

CLOSET

47 SF

HOUSEKEEPING

AND

CLOSET

118 SF

BEDROOM -

RESIDENT

ON-CALL

20 SF

COMM

CLOSET

91 SF

ELECTRICAL

CLOSET

44 SF

TOILET,

CONGREGATE

49 SF

TOILET,

MALE

49 SF

TOILET,

FEMALE

216 SF

Corridor

949 SF

Corridor

265 SF

Corridor

386 SF

Passenger Elevator Lobby451 SF

Service Elevator Lobby

301 SF

Corridor

2469 SF

Corridor

111 SF

OFFICE

101 SF

EXAM/TREATMENT

ROOM

101 SF

EXAM/TREATMENT

ROOM

93 SF

OFFICE

308 SF

WAITING

ROOM

141 SF

OFFICE

129 SF

OFFICE

142 SF

OFFICE

672 SF

LAB

80 SF

LAB

54 SF

STORAGE,

EQUIPMENT

75 SF

LAB

61 SF

TOILET,

CONGREGATE

132 SF

BREAK

ROOM

67 SF

LINEN

ROOM,

CLEAN

164 SF

EXAM/TREATMENT

ROOM

98 SF

OFFICE

155 SF

EXAM/TREATMENT

ROOM

127 SF

RECOVERY

13 SF

CLOSET

27 SF

STORAGE,

GENERAL

128 SF

EXAM/TREATMENT

ROOM

130 SF

EXAM/TREATMENT

ROOM

127 SF

EXAM/TREATMENT

ROOM

130 SF

EXAM/TREATMENT

ROOM

93 SF

BIOHAZ

SUPPLY RM

75 SF

X-RAY

ROOM

67 SF

X-RAY

ROOM

303 SF

Corridor

219 SF

Corridor

82 SF

X-Ray

27 SF

Computers

730 SF

Corridor

122 SF

EXAM/TREATMENT

ROOM

114 SF

EXAM/TREATMENT

ROOM

131 SF

EXAM/TREATMENT

ROOM

124 SF

PREP

125 SF

EXAM/TREATMENT

ROOM

130 SF

EXAM/TREATMENT

ROOM

133 SF

EXAM/TREATMENT

ROOM

127 SF

EXAM/TREATMENT

ROOM

130 SF

EXAM/TREATMENT

ROOM

130 SF

EXAM/TREATMENT

ROOM

130 SF

EXAM/TREATMENT

ROOM

132 SF

STORAGE,

WARD

SUPPLIES

43 SF

TOILET,

MALE

43 SF

TOILET,

FEMALE

101 SF

Corridor

937 SF

Corridor

195 SF

Stair

40 SF

HOUSEKEEPING

AND

CLOSET

347 SF

Corridor

95 SF

OFFICE

209 SF

CLASS

ROOM

129 SF

Sec'y Clerk

120 SF

WAITING

ROOM

184 SF

OFFICE

131 SF

OTHER

SPACE

183 SF

OFFICE

121 SF

EXAM/TREATMENT

ROOM

69 SF

TOILET,

CONGREGATE

146 SF

EMG

121 SF

OFFICE,

ASST.

CHIEF

130 SF

EEG TEST

124 SF

OFFICE,

PHYSICIAN

177 SF

Corridor

926 SF

Corridor

474 SF

Corridor

237 SF

Corridor

162 SF

Corridor

79 SF

Corridor

102 SF

Corridor

279 SF

Corridor

130 SF

Corridor

224 SF

Corridor

42 SF

COMM

CLOSET

66 SF

ELECTRICAL

CLOSET

32 SF

LINEN

ROOM,

CLEAN

40 SF

TRASH

CHUTE

204 SF

STORAGE,

GENERAL

193 SF

OFFICE

35 SF

TOILET,

FEMALE

81 SF

TOILET,

MALE

161 SF

CONFERENCE

ROOM230 SF

STORAGE,

GENERAL

869 SF

Corridor

117 SF

OFFICE

147 SF

OFFICE

126 SF

OFFICE

126 SF

OFFICE

219 SF

WAITING

ROOM

95 SF

TOILET,

CONGREGATE

165 SF

OFFICE

115 SF

OFFICE

100 SF

OFFICE

382 SF

Corridor

256 SF

EXAM/TREATMENT

ROOM

70 SF

LINEN

ROOM,

CLEAN

64 SF

LINEN

ROOM,

SOILED

397 SF

EXAM/TREATMENT

ROOM

99 SF

OFFICE

103 SF

EXAM/TREATMENT

ROOM

103 SF

EXAM/TREATMENT

ROOM

71 SF

DIRTY

SCOPE LAB

209 SF

OFFICE

203 SF

Stair

13015 SF

MECHANICAL

ROOM

244 SF

Chiropractor

88 SF

EXAM/TREATMENT

ROOM

88 SF

EXAM/TREATMENT

ROOM

88 SF

EXAM/TREATMENT

ROOM

1879 SF

TREATMENT

FLOOR

50 SF

TOILET,

CONGREGATE

144 SF

STORAGE,

GENERAL

48 SF

LINEN

CLOSET

297 SF

RECEPTION

AREA

396 SF

OFFICE,

CLERK

108 SF

LOCKER RM

MALE

214 SF

Storage

Floor Plans
330-SECOND FLOOR(1)

File details come from the government source that posted it. Updated .