This document is a pre-solicitation notice for a construction project to renovate TCU/ICU space at the Dayton VA Medical Center. The contractor shall provide labor, materials, and equipment to renovate approximately 17,000 square feet of space over 25 years old at a cost between $5-10 million. Work must be completed within 365 days of notice to proceed. The solicitation releasing on March 20, 2020 will be set aside exclusively for verified service-disabled veteran-owned small businesses. Interested parties should register at FBO.gov. The project is assigned NAICS 236220 with a $39.5 million small business size standard. The awarded contractor must perform a minimum of 15% of construction work. Bid, payment and performance bonds will be required, and an on-site visit scheduled. Questions may be emailed by the deadline.
36C25020B0028 S02. Attachment 5 - Project Drawings - Division 23 (1 of 2).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0028 0006.docx | DOCX document | |
| 36C25020B0028 0005.docx | DOCX document | |
| Site Visit sign-in.pdf | ||
| 20200702 Addendum 1.pdf | ||
| 20200701 TCUICU 2nd Floor Room Names.pdf | ||
| 20200701 TCUICU 2nd Floor RCP.pdf | ||
| PreBid RFIs Answers.pdf | ||
| 36C25020B0028 0004.docx | DOCX document | |
| Bid Opening Instructions.pdf | ||
| 36C25020B0028-0003000.docx | DOCX document | |
| 36C25020B0028-0002000.docx | DOCX document | |
| 36C25020B0028-0001000.docx | DOCX document | |
| 36C25020B0028-0001001.pdf | ||
| 36C25020B0028-004.pdf | ||
| 36C25020B0028-009.pdf | ||
| 36C25020B0028-007.pdf | ||
| 36C25020B0028-005.pdf | ||
| 36C25020B0028-008.pdf | ||
| 36C25020B0028-002.pdf | ||
| 36C25020B0028-003.pdf | ||
| 36C25020B0028-001.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.
3. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK IN THIS PROJECT.
4. PROVIDE ALL ROOFING PENETRATION, REPAIR & REINFORCEMENT IN THE EXISTING BUILDING FOR WORK INDICATED. ENGAGE A ROOFING SUBCONTRACTOR TO PERFORM THE
ROOFING WORK. WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON
THE ROOF.
5. THE CONTRACTOR SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES. THE CONTRACTOR
SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES
INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE COR THRU THE CONTRACTING OFFICER
FOR CLARIFICATION BEFORE PROCEEDING.
6. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE
JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON RESPONSIBILITIES.
7. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.
8. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHERS. HE SHALL KEEP HIMSELF INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING HIS WORK WITH OTHERS SO THAT THE PROGRESS OF THE TOTAL WORK SHALL BE KEPT
ON SCHEDULE.
9. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.
10. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR
SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING
CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
11. EACH CONTRACTOR AND/OR TRADE, FITTING OR PLACING HIS WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE INSTALLATION OF HIS
WORK CONSTITUTES HIS ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, HE SHALL NOTIFY THE COR AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE
NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.
12. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION
HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.
13. CONTRACTORS SHALL TAKE SPECIAL CARE WHILE WORKING ADJACENT TO ASBESTOS MATERIALS AND MUST BE PROPERLY PROTECTED WITH CLOTHING, BREATHING APPARATUS, ETC. VERIFY REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT TEAM (ICRA).
14. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH
FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE CAULKED AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE WITH ALL TRADES TO ENSURE
FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.
15. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH
0-HOUR RATED WALLS & FLOORS SHALL BE FIRE CAULKED TO RETARD PASSAGE OF SMOKE.
16. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
17. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
18. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL ON SHEET M0.3. COORDINATE SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.
19. ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC.
COORDINATE SIZES AND LOCATIONS WITH OTHER TRADES.
20. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
21. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.
22. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
23. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
24. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM OF REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.
25. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
26. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT
RE-USED.
27. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
28. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH
EXISTING.
29. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
30. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY
THE CONTRACTOR.
31. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE
WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
32. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING WORK.
33. HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS. COORDINATE WITH GENERAL CONTRACTOR
AND THE COR.
34. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
35. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.
36. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK
TO SOURCE.
37. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL
INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS ASSOCIATED WITH THE REMOVAL WORK.
38. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE
NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.
39. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED 3 WEEKS (15 WORKING DAYS) IN ADVANCE WITH
THE COR.
40. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN END OF THE DUCT.
41. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERWISE NOTED.
42 . APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS AND EQUIPMENT, AND TO THE CENTER OF PIPES.
43. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR VARIABLE SPEED MOTOR CONTROLLERS ASSOCIATED WITH MECHANICAL EQUIPMENT.
44. REFER TO SPECIFICATIONS SECTION 01 00 00 GENERAL REQUIREMENTS FOR DESCRIPTIONS OF THE BID ITEMS INCLUDING DEDUCT ALTERNATES, ADDITIONAL INFORMATION
NOTED THROUGHOUT THE DRAWINGS.
45. SYSTEMS SERVING AREAS OUTSIDE THE CONSTRUCTION ZONE SHALL REMAIN OPERATIONAL DURING CONSTRUCTION. ANY OUTAGES SHALL BE PERFORMED ON WEEKENDS
OR WEEK NIGHTS. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED 4 WEEKS (30 CALENDAR DAYS) IN ADVANCE WITH THE COR.
46. ALL ITEMS REMOVED TO BE REUSED IN THE PROJECT SHALL BE CLEANED AND SAFELY STORED BY THE CONTRACTOR.
47. REFER TO NEW WORK FLOOR PLANS FOR WORK THAT MAY BE REQUIRED PRIOR TO ANY REMOVAL WORK.
48. READ ALL NOTES THOROUGHLY PRIOR TO STARTING CONSTRUCTION.
GENERAL NOTES:
PHASE 1
- DISCONNECT DUCTWORK THAT SERVES PHASE 1 AS INDICATED. CAP DUCTS SO PHASE 2 AREAS REMAIN ACTIVE. THIS WORK SHALL TAKE PLACE DURING OFF HOURS
(9PM-5AM).
- PREPARE NEW CHASE FOR RETURN AIR MAIN. INSTALL AS MUCH NEW DUCTWORK AS POSSIBLE AHEAD OF RETURN MAIN DEMOLITION TO MINIMIZE DOWNTIME. DOWNTIME OF
RETURN FAN SHALL BE LIMITED TO ONE (1) WEEKEND (9PM FRIDAY TO 5AM MONDAY).
- SUPPLY AND RETURN FAN MOTORS SHALL BE REPLACED DURING THIS OUTAGE.
- STEAM HUMIDIFIER MAY BE REPLACED DURING THIS OUTAGE OR PHASE 2 OUTAGE.
- INSTALL NEW DUCT MAINS AS INDICATED IN PHASE1 TEMPORARY PARTIAL PLANS. ALL COOLING AIR SUPPLIED FROM EXISTING COLD DECK UNTIL HOT DECK REMOVED DURING
PHASE 2
- INSTALL BALL VALVES ON THE SUPPLY AND RETURN HW MAINS AS THEY CROSS THE PHASING LINE TO BE CONNECTED IN PHASE 2.
PHASE 2
- REMOVAL AND REPLACEMENT OF THE HOT DECK COIL WITH NEW COOLING COIL 330-CC12b MUST TAKE PLACE AFTER PHASE 2 DEMOLITION BEGINS.
- STEAM HUMIDIFIER MAY BE REPLACED DURING THIS OUTAGE OR PHASE 1 OUTAGE. THIS WORK SHALL BE LIMITED TO ONE (1) WEEKEND (9PM FRIDAY TO 5AM MONDAY).
- REPLACEMENT OF COOLING COIL 330-CC12a MUST TAKE PLACE AFTER THE INSTALLATION OF 330-CC12a AND SHALL BE LIMITED TO ONE (1) WEEKEND (9PM FRIDAY TO 5AM
MONDAY).
- REMOVE TEMPORARY DUCT MAIN CONNECTIONS INSTALLED AS INDICATED ON PHASE 1 TEMPORARY PARTIAL PLANS AND INSTALL MAINS IN THESE AREAS AS INDICATED ON
BASE BID PLAN.
NOTES
- COORDINATE OUTAGES CLOSELY WITH ALL TRADES AND COR WELL IN ADVANCE.
- COORDINATE ALL WORK OUTSIDE OF WORK AREA OF GENERAL TRADES CONTRACTOR WITH COR. IN AREAS WITH NO CEILING WORK BY THE GENERAL TRADES CONTRACTOR, REMOVE ALL CEILING PADS REQUIRED AND WORK THRU THE GRID OR REMOVE CEILING GRID AND TILES AS REQUIRED. ALL DAMAGED TILES AND GRID SHALL BE REPAIRED OR
REPLACED.
- SEE SHEET MH102 FOR ADDITIONAL REQUIREMENTS.
SEQUENCE OF CONSTRUCTION
DEDUCT ALTERNATE #1 (BID ITEM 2)
CONTRACTOR SHALL PERFORM ALL WORK AS DESCRIBED IN BID ITEM 1 (BASE BID) EXCEPT:
- DEDUCT WORK ASSOCIATED WITH CORE AREA IN TCU/ICU SUITE INCLUDING BUT NOT LIMITED TO THE OFFICES, STORAGE ROOMS, UTILITY ROOMS, MEDICATION PREP ROOMS, CLEAN LINEN, NOURISHMENT, BREAK ROOM, HAC AND ASSOCIATED INTERIOR CORRIDORS, AS INDICATED IN DEDUCT ALTERNATE #1 PARTIAL PLANS.
- ALL WORK OUTSIDE OF DEDUCT ALTERNATE #1 PARTIAL PLANS SHALL TAKE PLACE IN ALL BIDDING SCENARIOS.
DEDUCT ALTERNATE #2 (BID ITEM 3)
CONTRACTOR SHALL PERFORM ALL WORK AS DESCRIBED IN BID ITEM 1 (BASE BID) EXCEPT DEDUCT ALL WORK ASSOCIATED WITH BID ITEM 2 AND:
- DEDUCT WORK AND FINISHES ASSOCIATED WITH CORE AREA IN TCU/ICU SUITE INCLUDING BUT NOT LIMITED TO THE OFFICES, STORAGE ROOMS, UTILITY ROOMS, MEDICATION
PREP ROOMS, CLEAN LINEN, NOURISHMENT, BREAK ROOM, LIGHTING IN ELECTRICAL CLOSET (ELECTRICAL DISTRIBUTION WORK SHALL BE PROVIDED), HAC AND ASSOCIATED
INTERIOR CORRIDORS, AS INDICATED IN DEDUCT ALTERNATE #2 PARTIAL PLANS.
- THE CEILINGS IN THE CORE AREA ARE EXISTING TO REMAIN UNDER THIS ALTERNATE.
- ALL WORK OUTSIDE OF DEDUCT ALTERNATE #2 PARTIAL PLANS SHALL TAKE PLACE IN ALL BIDDING SCENARIOS.
DEDUCT ALTERNATES
NOTE: ALL SYMBOLS AND ABBREVIATIONS
ARE SUBJECT TO MODIFICATIONS
ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS
MIGHT NOT NECESSARILY BE USED ON
THIS PROJECT.
ABBREVIATIONS
AC - AIR COM PRESSOR OR AIR CONDITIONER
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
AFM S - AIR FLOW M EASURING STATION
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIM ATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEM BLY
ATC - AUTOM ATIC TEM PERATURE CONTROL
ATU - AIR TERMINAL UNIT
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BTU - BRITISH THERM AL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
CBD - COUNTER BALANCED BACKDRAFT DAM PER
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED W ATER SUPPLY
CHR - CHILLED W ATER RETURN
CHGR - CHILLED W ATER GLYCOL SOLUTION RETURN
CHGS - CHILLED W ATER GLYCOL SOLUTION SUPPLY
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICERS REPRESENTATIVE
CTR - CENTER
CU - COPPER
CVR - CONSTANT VOLUME REHEAT (AIR TERM INAL
UNIT)
CW - COLD W ATER
CW R - CONDENSER W ATER RETURN
CW S - CONDENSER W ATER SUPPLY
D - DRAIN LINE
DB - DRY BULB
DCP - DISTRIBUTED CONTROL PANEL
DDC - DIRECT DIGITAL CONTROLS
DI - DEIONIZED W ATER
DIA - DIAMETER
DIM - DIM ENSION
DN - DOW N
DW G - DRAW ING
EA - EACH OR EXHAUST AIR
EAT - ENTERING AIR TEMPERATURE
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
ECC - ENGINEERING CONTROL CENTER
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQUIP - EQUIPM ENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EW T - ENTERING W ATER TEMPERATURE
EXH - EXHAUST
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
FD - FLOOR DRAIN
FF - FINISHED FLOOR ELEVATION
FLR - FLOOR
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER M INUTE
FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION
21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GPM - GALLONS PER M INUTE
HB - HOSE BIBB
HC - HVAC CONTRACTOR (DIVISION 23)
HD - HUB DRAIN
HG - REFRIGERANT HOT GAS
HP - HORSEPOW ER
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HR - HOUR
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT W ATER
HW R - HEATING HOT W ATER RETURN
HW S - HEATING HOT W ATER SUPPLY
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LAV - LAVATORY
LBS - POUNDS
LPC - LOW PRESSURE CONDENSATE
RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LW T - LEAVING W ATER TEM PERATURE
M AX - M AXIMUM
M DD - M OTORIZED DAMPER
M EZZ - M EZZANINE
M FR - M ANUFACTURER
M H - M ANHOLE
M IN - M INIMUM OR M INUTE
M ISC - M ISCELLANEOUS
M TD - M OUNTED
M TG - M OUNTING
M PC - M EDIUM PRESSURE CONDENSATE
RETURN
M PS - M EDIUM PRESSURE STEAM SUPPLY
M U - W ATER M AKE-UP
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOM INAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OBD - OPPOSED BLADE DAMPER
OD - OUTSIDE DIAM ETER
OFCI - OW NER FURNISHED CONTRACTOR
INSTALLED
OFOI - OW NER FURNISHED OW NER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PLBG - PLUMBING
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIG - POUNDS PER SQUARE INCH GAUGE
RA - RETURN AIR
RAD - RADIUS
RCP - REFLECTED CEILING PLAN
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS W ATER SUPPLY
ROR - REVERSE OSMOSIS W ATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
S - SPRINKLER (W ET)
SA - SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD W ATER
SHT - SHEET
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SRV - SAFETY RELIEF VALVE
SS - STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEM P - TEM PERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPM ENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TYP - TYPICAL
UNO - UNLESS NOTED OTHERW ISE
V - VENT
VAC - VACUUM
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUM E
VTR - VENT THROUGH ROOF
VR - VENT RISER
VVR - VARIABLE VOLUM E REHEAT (AIR
TERMINAL UNIT)
W / - W ITH
W /0 - W ITHOUT
W B - W ET BULB
W CO - W ALL CLEANOUT
GENERAL FLOOR PLAN NOTES
PLAN NOTE. APPLIES ONLY TO THE SHEET W HICH IT IS SHOW N UNLESS
NOTED OTHERW ISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
A1
EQUIPM ENT, DEVICE, OR PLUM BING FIXTURE M ARK. LETTER
DESIGNATIONS REFER TO SCHEDULES.
H1 H1OR
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
H2
B
H2
RISER OR STACK NUM BER
DETAIL: B = DETAIL DESIGNATION
H2 = SHEET W HERE DETAIL IS LOCATED
SECTION: 1 = SECTION DESIGNATION
H2 = SHEET W HERE DETAIL IS LOCATED
A1 "UP TO" SYM BOL (ITEM ON FLOOR ABOVE)
APPROXIMATE DIM ENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM
OF EQUIPM ENT, UNLESS NOTED OTHERW ISE
10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOD: 8' - 10"
BOD: 7' - 2"
20x20
20x20
APPROXIM ATE DIM ENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM
OF DUCTW ORK, UNLESS NOTED OTHERW ISE
APPROXIM ATE DIM ENSION ABOVE FINISHED FLOOR TO CENTERLINE OF
PIPE, UNLESS NOTED OTHERW ISE
DL-1
UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH
UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE W ITH GC.
DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.
CONNECT TO EXISTING
HVAC PIPING DESIGNATIONS
CHILLED W ATER SUPPLY PIPECHS
CONDENSER W ATER SUPPLY PIPECW S
CONDENSER W ATER RETURN PIPECW R
DRAIN LINE. PITCH IN DIRECTION INDICATEDD
HEATING HOT W ATER SUPPLY PIPEHW S
HEATING HOT W ATER RETURN PIPEHW R
W ATER MAKE-UP PIPEM U
VENT PIPEV
REFRIGERANT LIQUID LINERL
REFRIGERANT SUCTION LINERS
EXPANSION TANK PIPEET
REFRIGERANT HOT GAS LINEHG
LOW PRESSURE CONDENSATE RETURN PIPELPC
LOW PRESSURE STEAM SUPPLY PIPELPS
M EDIUM PRESSURE CONDENSATE RETURN PIPEMPC
M EDIUM PRESSURE STEAM SUPPLY PIPEMPS
PUM PED CONDENSATE RETURN PIPEPC
HIGH PRESSURE CONDENSATE RETURN PIPEHPC
HIGH PRESSURE STEAM SUPPLY PIPEHPS
STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10
MISC SYMBOLS
DUCTWORK SYMBOLS
ROUND BRANCH DUCTW ORKCONICAL
FITTING
ACOUSTIC
FITTING
ADAD
D
R R
D
RECTANGULAR BRANCH DUCTW ORK
SQUARE TEE W ITH TURNING VANES
NOTE: ALL SQUARE ELBOW S IN
RECTANGULAR AND ROUND / OVAL
DUCTW ORK SHALL BE PROVIDED W ITH
TURNING VANES. REFER TO THE
SPECIFICATIONS FOR ADDITIONAL
DETAILS.
EXISTING DUCTW ORK TO REMOVED
RETURN AIR, RELIEF AIR, OR TRANSFER
AIR DUCTW ORK. (UP AND DOW N)
RADIUSED OR SQUARE W ITH TURNING
VANES.SUPPLY AIR OR OUTDOOR AIR
DUCTW ORK.
(UP AND DOW N) RADIUSED OR SQUARE
W ITH TURNING VANES.EXHAUST AIR DUCTW ORK. (UP AND
DOW N) RADIUSED OR SQUARE W ITH
TURNING VANES.
RECTANGULAR AND ROUND / OVAL
DUCTW ORK RISE / DROP W ITH 90° RADIUSED
OR SQUARE ELBOW S AND TURNING VANES.
RADIUS ELBOW
90° SQUARE ELBOW (W ITH TURNING
VANES)
NOTE: ALL SQUARE ELBOW S IN
RECTANGULAR AND ROUND DUCTW ORK
SHALL BE PROVIDED W ITH TURNING
VANES.
ACCESS DOOR OR PANEL
DUCTW ORK RISE IN DIRECTION OF AIR
FLOW
DUCTW ORK DROP IN DIRECTION OF AIR
FLOW
DUCTW ORK W ITH ACOUSTICAL LINER.
LISTED DUCT SIZES ARE INSIDE CLEAR
DIM ENSIONS.
RECTANGULAR ROUND / OVAL
FLEXIBLE DUCTW ORK
FLEXIBLE CONNECTION
DUCTW ORK CONSTRUCTED OF SPECIAL
M ATERIAL AS NOTED
DIRECTION OF PITCH
RECTANGULAR DUCTW ORK DIM ENSIONS
(W x H)26x20
ROUND DUCTW ORK DIMENSIONS (DIA)26ø
OVAL DUCTW ORK DIM ENSIONS (W x H)26x20 OV
DUCTWORK DEVICE SYMBOLS
W ALL OR DUCTW ORK M OUNTED AIR DEVICE. SG1 = DESIGNATION
(REFER TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN
INCHES).
300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO
BOTTOM OF GRILLE.
A3 10ø
M ANUAL BALANCING VALVE DAMPER W ITH LOCKING DEVICE
BDD = BACK DRAFT DAM PER
CBD = COUNTER-BALANCED BACK DRAFT DAM PER
SD = SM OKE DAM PER
FS = COMBINATION FIRE - SM OKE DAM PER
M DD = M OTORIZED DAM PER
AFM S = AIR FLOW M EASURING STATION
DUCT MOUNTED SM OKE DETECTOR. COORDINATE LOCATION.
HUM IDITY SENSOR - DUCT M OUNTED
SG1
20x12
BOG: 9'-0"
XXX
A-D
XX
H
SD
SP
AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR
DEVICE SCHEDULE FOR VARIOUS DESIGNATIONS).
10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM . ALL AIR DEVICE
DISCHARGE 4-W AY UNLESS NOTED W ITH FLOW ARROW S. AIR DEVICE
SHOW N IS 2-W AY SIDE THROW . M ETHOD OF IDENTIFICATION ALSO
APPLIES TO OTHER CEILING MOUNTED AIR DEVICES.
FIRE DAMPER
A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)
D OR S = DYNAM IC OR STATIC
STATIC PRESSURE SENSOR - DUCT M OUNTED
C
CARBON DIOXIDE SENSOR - DUCT M OUNTED
S
TEM PERATURE SENSOR - DUCT M OUNTED
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEM PERATURE GAUGE OR THERM OMETER
UNION
CLEANOUT
STRAINER
STRAINER W ITH A BLOW DOW N VALVE AND
HOSE CONNECTION
DRAIN VALVE W ITH HOSE END CONNECTION
AUTOM ATIC FLOW CONTROLLER W ITH P/T PLUG
IN AND OUT
EXPANSION JOINT
M ANUAL AIR VENT
AUTOM ATIC AIR VENT
PRESSURE REDUCING VALVE
2 PORT AUTOMATIC CONTROL VALVE
3 PORT AUTOMATIC CONTROL VALVE
QUICK OPENING MANUAL VALVE
VACUUM BREAKER
NEEDLE VALVE
PRESSURE AND TEM PERATURE TEST PLUG
VACUUM GAUGE W ITH STOP
END CAP
GLOBE VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
A
M
M
N
V
VB
COM BINATION SHUTOFF AND BALANCING
VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
VALVES AND FITTINGS
DOUBLE LINE SINGLE LINE
SOLENOID VALVE
S
SAFETY RELIEF VALVE. FOR HYDRONIC
SYSTEM S PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERW ISE. FOR
STEAM SYSTEM S PIPE DISCHARGE TO
OUTDOORS.
W ATER METERM
PRESSURE GAUGE W ITH COCK AND SIPHON LOOP
BI-METALIC STEAM TRAP AND DRIP ASSEMBLY
THERM ODYNAM IC STEAM TRAP AND DRIP
ASSEM BLY
INVERTED BUCKET STEAM TRAP AND DRIP
ASSEM BLY
FLOAT AND THERM OSTATIC STEAM TRAP AND
DRIP ASSEMBLY
THERM OSTATIC STEAM TRAP AND DRIP ASSEMBLY
BM
TD
IB
FT
TS
10"
TOE: 3' - 0"
BOE: 0' - 6"
CHILLED W ATER GLYCOL SOLUTION RETURN PIPECHGR
CHILLED W ATER GLYCOL SOLUTION SUPPLY PIPECHGS
CHILLED W ATER RETURN PIPECHR
SQUARE THROAT / RADIUS HEEL
FITTINGS NOT ACCEPTABLE
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOW N
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REM AIN
FLOW DIRECTION DESIGNATION
PUM P
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
PIPE RISER
RADIUS'D BRANCH
RADIUS'D TEE
EXISTING DUCTW ORK TO REMAIN
UNLESS NOTED OTHERW ISE ON
DRAW INGS, 15° MAX FOR DIVERGING, 30°
M AX FOR CONVERGING TRANSITION
EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED
OTHERW ISE.
SPACE TEM PERATURE SENSOR / THERMOSTAT. W HEN W ALL MOUNTED, M OUNTING
HEIGHT 46" TO MEET ADA REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH
COORDINATE W ITH ARCHITECT.
T
DP
DIFFERENTIAL PRESSURE SENSOR. W HEN W ALL MOUNTED, M OUNTING HEIGHT 46"
TO M EET ADA REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH
COORDINATE W ITH ARCHITECT.
H
HUM IDITY SENSOR. W HEN W ALL M OUNTED, MOUNTING HEIGHT 46" TO M EET ADA
REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH
ARCHITECT.
CARBON DIOXIDE SENSOR. W HEN W ALL M OUNTED, M OUNTING HEIGHT 46" TO MEET
ADA REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH
ARCHITECT.
C
CO
CARBON MONOXIDE SENSOR. W HEN W ALL MOUNTED, M OUNTING HEIGHT 46" TO
M EET ADA REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE
W ITH ARCHITECT.
TEM PERATURE SENSOR. W HEN W ALL M OUNTED, M OUNTING HEIGHT 46" TO MEET
ADA REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH
ARCHITECT.
S
S P
TEM PERATURE SENSOR M OUNTED IN CEILING PLENUM.
STATIC PRESSURE SENSOR.SP
FLOW M ETER
F
M AUTOM ATIC PRESSURE INDEPENDENT CONTROL
VALVE
ACOUSTIC
FITTING
ROOM PRESSURE SENSOR
ROOM PRESSURE MONITOR
CURRENT SENSING RELAY
RS
RM
C
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528
/9
/2
:3
:1
A
M
Renovate TCU-ICU Space Bldg. 330
03/09/2020
LEGEND & GENERAL NOTES
M001
PCWW JS
17005.00
552-18-102
Dayton, Ohio
INDEX OF DRAWINGS
Sheet Number Sheet Name
M001 LEGEND & GENERAL NOTES
MD102 PARTIAL SECOND FLOOR PLAN - REMOVALS
MD103 PARTIAL THIRD FLOOR PLAN - REMOVALS
MH102 PARTIAL SECOND FLOOR PLAN - NEW WORK
MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK
MH104 ROOF PLAN
MP103 PARTIAL THIRD FLOOR PLAN - PIPING
M300 SECTIONS
M501 DETAILS
M502 DETAILS
M503 DETAILS
M601 SCHEDULES & DIAGRAMS
M602 SCHEDULES & DIAGRAMS
M701 CONTROLS & AUTOMATION
M702 CONTROLS & AUTOMATION
Revisions Date
1 For Bid 03.09.2020
A B C D E F
5.3
4.2
3.1
2.1
AH-15
AH-14
AH-13
330-AH12
AH-11
AH-10
330-RF12
CC-12
HC-12
48x24
60x22
49/18 OV
80x22
64/20 OV
27/18 OV
34/18 O V
40/18 OV
31/18 OV
48/20 OV
60x2460x2460x24
48x24
46x42 x2
46/22 OV
x6 x5 x2
7/
O
V
46x18
EF-7 2
4x
24/18 OV26/18 OV
4x
16x10
4x
7 21/18 OV
0x
46x18
20ø
40/18 OV
18x16 x1
50x24 x5 x1
26/18 OV
x2
30x18
24x14
24x14
6x
50x24
4x x1 x1 ø 16 x1
8ø
14x14
9/
O
V
12x14
4x
24x18
2/
O
V x1
64/20 OV
16x14
4x ø
28x18
UP TO
3RD
FLOOR
UP TO
3RD
FLOOR
DN FROM
3RD FLOOR
COLD
HOT
COLD
HOT
330-SF12
3TYP.
TYP.
2 TYP.
2 TYP.
2 TYP.
RELIEF PLENUM
DN FROM
3RD FLOOR
TYP.
M
P C 2
H W
S
H W
R
C H
S
C H
R
M
P C
H
W S
H
W R
C
H S
C
H R 2
M P
S
M
P C
H
W S 4
H W
R
C H
S
C H
R
M P
S
14 15
AREA OF W ORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528
/9
/2
:3
:0
A
M
Renovate TCU-ICU Space Bldg. 330
03/09/2020
PARTIAL SECOND FLOOR PLAN -
REMOVALS
MD102
PCWW JS
17005.00
552-18-102
Dayton, Ohio
N Scale: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN - REMOVALS
GENERAL NOTES
A REFER TO SHEET MH103 FOR W ORK THAT IS REQUIRED TO TAKE PLACE
PRIOR TO ANY REMOVAL W ORK.
B REFER TO SHEET M 001 FOR LEGEND, INDEX AND ADDITIONAL GENERAL
NOTES.
PLAN NOTES
1 EXISTING DUCTW ORK TO REM AIN.
2 EXISTING AIR DEVICE TO REMAIN.
3 EXISTING AIR CONTROL TERM INAL UNIT TO REM AIN.
4 EXISTING AIR HANDLING UNIT TO REMAIN.
5 EXISTING FAN TO REMAIN. REM OVE INLET GUIDE VANES.
6 REM OVE STEAM HUMIDIFIER AND ASSOCIATED SUPPORTS, BRANCH PIPING,
CONTROLS, ETC.
7 REM OVE FAN MOTOR FOR REPLACEMENT IN NEW W ORK.
8 REM OVE EXISTING HEATING AND COOLING COILS AND ASSOCIATED
SUPPORTS, BRANCH PIPING, CONTROLS, ETC.
9 EXISTING FAN TO REMAIN.
10 REM OVE PIPING BACK TO THIS POINT FOR RE-CONNECTION IN NEW W ORK.
11 HOT DECK HEATING COIL SHALL BE REPLACED AND CONVERTED TO A COLD
DECK DURING PHASE 2.
12 REM OVE EXISTING DUCTW ORK AND ASSOCIATED DAMPERS, SUPPORTS, ETC.
13 TAKE FAN PROFILE READINGS PRIOR TO ANY CONSTRUCTION TAKING PLACE.
READINGS SHALL INCLUDE BUT NOT BE LIM ITED TO CFM , SP, RPM , AM PS,
VOLTS, AND BELT SIZES.
14 TRAVERSE DUCT FOR AIR FLOW READING PRIOR TO ANY CONSTRUCTION
TAKING PLACE.
15 MAINTAIN AIR FLOW THROUGHOUT CONSTRUCTION.
16 REM OVE EXISTING M INIM UM AND M AXIM UM OUTSIDE AIR DAMPERS FOR
REPLACEMENT IN NEW W ORK.
SEE SHEET MH102 FOR 2ND
FLOOR PHASING SEQUENCE
N N.T.S.Scale:
KEY PLAN
T T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T TT
T
T
TT
T
T
T
TT
T
T
T
T
T
T T
T
T
T
T
T
S
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
A B C D E F
5.3
4.2
3.1
2.1
DN TO
AH-12
40/1 8 O
V
34/18 O V
28/14 OV 23/14 OV
22/1 4 O
V
22/14 OV17/14 OV
23/14 OV
20/14 OV 17/14 OV
20/14 OV
ø ø ø
12x8 ø ø
14x6
2x x1 x1 ø x1
8ø
12x10 8ø x1
20x12
4x
4x
24x14
8x
0x
28x14
4x
34x14
4x
4x x1 x1
24x6
18x8 x1
4x x1
24x6
24x6
24x6
10x1
16x1
26x1
2x x1
12x6
26x14
26x14 x1 ø ø ø ø
17/14 OV
17/14 OV
22/1 4 O
V x1
DN TO
RF-12
DN TO
EF-7
DN TO
AH-12
HO
T
CO
LD
C O
L D
H O
T
HEPA-2
10ø ø
24x6
14ø ø ø ø ø20 x1 ø
18ø
18ø ø 10 ø
18x12 x1 x1 ø
24x10 x1
16ø
16ø
14ø
14ø x1
36x14
8x68x101 2x
26x1626x1
12x8
2x
8ø
26x18
10ø
14x6
8ø
4x
12ø
10ø
14x10
6x8 x1
2x ø
24x1232x14 x1
2x
14x6 x1
2x
2x
8x1212x16
32x14
34x20 24x8
4x
4x
4x
4x x1
4x
42x20
46x24 44x22
10x108ø x6
12x6 12x8
2x
8ø ø
2x
4x
11-2
12-12 12-10
11-1
12-1112-9
12-8
12-7
12-5
12-4
12-6
12-38
12-2
12-15
12-40 12-3
12-14
12-13
12-23
12-17
12-24
12-22
12-21
12-20
12-18
12-19
12-25 12-26 12-28
12-27
12-29
12-30
12-32 12-33
12-31
12-34
12-36
12-35
12-37
12-39
12-E4 12-E3
12-E2
12-E1
1 6
8 TYP
8 TYP
8 TYP
TYP
7 6
TYP
TYP
1 1
TYP
TYP 1
TYP
7 6
8TYP
TYP
6 7
8 TYP
7 1
PHASE 1
PHASE 2
10ø ø
P H
A S
E
P H
A S
E
12-16
12-1
B C D
3.1
2.1
DN TO
AH-12
DN TO
EF-7
DN TO
AH-12
HO
T
CO
LD
C O
L D
H O
T
HEPA-2
1 1
DN TO
AH-12
48/1 8 O
V
34/18 O V
22/1 4 O
V ø ø
14x10
0x
10x1
16x1
26x1
2x x1
12x6
26x14
22/1 4 O
V
DN TO
EF-7
DN TO
AH-12
HO
T
CO
LD
C O
L D
H O
T
HEPA-2
14ø ø ø ø ø 18ø 16ø 14ø
36x14
8x6
8x10
2x
26x1626x1
12x8
2x
8ø
26x18
10ø
14x6
8ø
4x
12ø
10ø
14x10
32x14
2x
8x1212x16
32x14
12-8
12-6
12-38
12-40 12-3
12-14
12-17
12-24 12-27
12-35
12-37
12-39
B C D
3.1
2.1
DN TO
AH-12
DN TO
EF-7
DN TO
AH-12
HO
T
CO
LD
C O
L D
H O
T
HEPA-2
1 1
DN TO
AH-12
DN TO
EF-7
DN TO
AH-12
HO
T
CO
LD
C O
L D
H O
T
HEPA-2
DN TO
AH-12
DN TO
EF-7
DN TO
AH-12
HO
T
CO
LD
C O
L D
H O
T
HEPA-2
DN TO
AH-12
48/1 8 O
V
34/18 O V
22/1 4 O
V ø
14x10
10x1
16x1
26x1
2x x1 x412x6
26x14
DN TO
EF-7
DN TO
AH-12
HO
T
CO
LD
C O
L D
H O
T
HEPA-2
14ø ø ø
36x14
8x6
8x10
2x
26x1626x1
12x8
2x
8ø
26x18
10ø
14x6
8ø
4x
12ø
10ø
14x10
32x14
2x
8x1212x16
32x14
12-8
12-6
12-38
12-40 12-3
12-14
12-17
12-24 12-27
12-35
12-37
12-39
AREA OF W ORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528
/9
/2
:3
:2
A
M
Renovate TCU-ICU Space Bldg. 330
03/09/2020
PARTIAL THIRD FLOOR PLAN -
REMOVALS
MD103
PCWW JS
17005.00
552-18-102
Dayton, Ohio
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - REMOVALS-BASE BID
GENERAL NOTES
A REFER TO SHEET M001 FOR LEGEND, INDEX AND GENERAL NOTES.
B PHASING LINE AND PHASING DETAILS SHOW INTENT. PROVIDE ALL ISOLATION
VALVES, DAM PERS, DUCT CAPS, TEM PORARY DUCTW ORK, ETC. TO
ACCOM MODATE PHASING.
C CAP DUCTW ORK AS REQUIRED FOR PHASING.
D PROVIDE BALANCING DAM PERS AS REQUIRED FOR PHASING.
E DEDUCT ALTERNATE PLANS ONLY SHOW AREAS OF W ORK THAT CHANGE FROM
BASE BID. ALL W ORK NOT SHOW N ON DEDUCT ALTERNATE PLANS SHALL REM AIN
AS SHOW N ON BASE BID PLAN UNDER ALL BIDDING SCENARIOS.
F REFER TO SHEET MH102 FOR W ORK THAT IS REQUIRED TO TAKE PLACE PRIOR TO
ANY REM OVAL W ORK.
G TAKE AIRFLOW READINGS AND ADJUST EF-7 AS REQUIRED TO M AINTAIN EXHAUST
IN PHASE 2, AND ALL OTHER EXISTING SPACES, DURING PHASE 1 CONSTRUCTION.
AND, PHASE 1 AND ALL OTHER EXISTING SPACES, DURING PHASE 2.
PLAN NOTES
1. EXISTING DUCTW ORK TO REM AIN.
2. EXISTING AIR DEVICE TO REMAIN.
3. EXISTING AIR CONTROL TERM INAL UNIT TO REM AIN.
4. REM OVE EXISTING HEPA FILTER AND ASSOCIATED SUPPORTS, ETC.
5. REM OVE EXISTING EXHAUST AIR CONTROL DEVICE ALONG W ITH ALL
ASSOCIATED HANGERS, W IRING, CONTROLS, ETC.
6. REM OVE EXISTING DUAL DUCT VAV BOX AND ALL ASSOCIATED BRANCH
DUCTW ORK, CONTROLS, HANGERS, TUBING, ETC. CAP AND SEAL REM AINING
DUCTW ORK AIR TIGHT.
7. REM OVE EXISTING AIR DEVICE AND ASSOCIATED BRANCH DUCTW ORK ETC.
CAP AND SEAL REMAINING DUCTW ORK AIR TIGHT.
8. REM OVE EXISTING THERM OSTAT AND ASSOCIATED W IRING/TUBING, ETC.
9. REM OVE EXISTING DUCTW ORK AND ASSOCIATED DAMPERS, SUPPORTS, ETC.
CAP AND SEAL REMAINING DUCTW ORK AIR TIGHT.
10. REM OVE AIR DEVICE FOR REPLACEMENT IN NEW W ORK.
11. W ORK IN THIS AREA SHALL TAKE PLACE IN PHASE 1 DURING OFF HOURS
(9PM -5AM ). COORDINATE CLOSELY W ITH COR.
12. DUCT TO BE REPLACED DURING PHASE 1.
13. EXISTING THERMOSTAT TO REMAIN.
14. REM OVE AIR DEVICE FOR REPLACEMENT IN NEW W ORK. CAP DUCTW ORK AS
REQUIRED. SEAL AIR TIGHT.
15. REM OVE EXISTING DUAL DUCT VAV BOX AND ASSOCIATED DUCTW ORK,
CONTROLS, ETC. REMOVE DUCTW ORK AS REQUIRED FOR BOX
REPLACEMENT. REM OVE UNUSED HOT/COLD DUCT BACK TO MAIN, CAP AND
SEAL AIR TIGHT.
16. REFER TO SHEET MH103 FOR PHASE 1 TEM PORARY W ORK IN THIS AREA.
17. DUCT SHALL BE ACTIVE DURING PHASE 2 CONSTRUCTION. SCHEDULE ALL
DOW N TIM E MINIM UM 3 W EEKS IN ADVANCE W ITH COR. DUCT SHALL ONLY BE
TAKEN OUT OF SERVICE BETW EEN 9PM AND 5AM .
18. DUCT SHALL BE REPLACED OVER ONE W EEKEND (9PM FRIDAY TO 5AM
MONDAY).
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - REMOVALS -
DEDUCT ALTERNATE #2
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - REMOVALS -
DEDUCT ALTERNATE #1
CEILINGS ARE EXISTING TO REM AIN UNDER THIS ALTERNATE. REM OVE AND REINSTALL AS
REQUIRED. TAKE PHOTOGRAPHS OF EXISTING PRIOR TO PERFORMING W ORK.
REPAIR/REPLACE ANY CEILINGS THAT ARE DAMAGED AS PART OF THIS W ORK TO PRE-W ORK
CONDITION.
N N.T.S.Scale:
KEY PLAN
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
(ALL BASE BID PHASING NOTES APPLY)
(ALL BASE BID PHASING NOTES APPLY)
A B C D E F
4.2
3.1
2.1
M
P C
H
W S 4
H W
R
C H
S
C H
R
M P
S
M
P C
H
W S
H
W R
C
H S
C
H R 2
M P
S
C H
R
C H
S
H W
R
H W
S
M P
C
1 .25" - MPS
.5
H W
S
.5
H
W R x2
60x24
27/18 OV
80x22
64/20 OV
x5
48/20 OV
46/22 OV
44x4046x42
48x24 x2
6/
O
V
7/
O V
60x22
49/18 OV
48x24
48x24 x2 x3 x2
80x22 x1
20x12
40x46
40x46 UP TO 3RD FLOOR
330-SH12
330-CC12b
330-CC12a
4" - CHR
4" - CHS3" - CHS
3" - CHR
3" - CHR
3" - CHS
330-RF12
330-SF12
2 4 PH.1 - 9,500 CFM
PH.2 - 7,000 CFM
RELIEF PLENUM
EF-7 10
2 DN FROM
3RD
FLOOR
UP TO 3RD
FLOOR
330-AHU12
31/18 OV
UP TO 3RD
FLOOR
4 PH.1 - 11,435 CFM
PH.2 - 11,100 CFM
6 8
5 7
34/18 OV
40/18 OV
46x18
AREA OF W ORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528
/9
/2
:3
:4
A
M
Renovate TCU-ICU Space Bldg. 330
03/09/2020
PARTIAL SECOND FLOOR PLAN -
NEW W ORK
MH102
PCWW JS
17005.00
552-18-102
Dayton, Ohio
N Scale: 1/8" = 1'-0"
PARTIAL SECOND FLOOR PLAN - NEW WORK
GENERAL NOTES
A REFER TO SHEET M 001 FOR LEGEND, INDEX AND GENERAL NOTES.
B REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORM ATION.
C PROVIDE ACCESS TO ALL EQUIPM ENT, COMPONENTS, ETC. REQUIRED FOR
BALANCING, ADJUSTMENT, MAINTENANCE, ETC. COORDINATE ACCESS
PANEL LOCATIONS CLOSELY W ITH G.C.
D AFTER EACH PHASE, THE HVAC SYSTEM S SHALL BE REBALANCED AND
COMM ISSIONED TO ENSURE CORRECT OPERATION OF TCU/ICU SUITE. FULL
RE-BALANCING OF PHASE 1 SYSTEMS W ILL BE REQUIRED AT PROJECT
COMPLETION.
PLAN NOTES
1. EXTEND NEW 2.5" HOT W ATER SUPPLY AND RETURN UP TO THIRD FLOOR.
2. EXISTING DUCTW ORK TO REM AIN.
3. EXISTING AIR HANDLING UNIT TO REMAIN.
4. BALANCE EXISTING FAN TO INDICATED CFM DURING LISTED OF
CONSTRUCTION (NUMBER IS 10% HIGHER THAN ADDITIVE AIR TERM INAL
UNITS). BALANCE FAN TO SCHEDULED CFM (M601) FOR FINAL TAB. REPLACE
SHEAVES AS REQUIRED.
5. REPLACE SUPPLY FAN M OTOR. CLEAN AND INSPECT FAN PRIOR TO PUTTING
BACK INTO OPERATION.
6. REPLACE RETURN FAN M OTOR. CLEAN AND INSPECT FAN PRIOR TO PUTTING
BACK INTO OPERATION.
7. PROVIDE NEW VFD FOR SUPPLY FAN.
8. PROVIDE NEW VFD FOR RETUN FAN.
9. PROVIDE 18" TEMPORARY BYPASS DUCT FOR SUPPLY FAN MINIMUM FLOW .
DUCT SHALL BE INSTALLED PRIOR TO ANY REM OVAL W ORK AND SHALL BE
REM OVED AFTER ATU'S IN PHASE 2 ARE OPERATIONAL. SEAL DUCT M AINS
AIR TIGHT AFTER REMOVAL.
10. REPLACE SHEAVES AND BALANCE FAN AS REQUIRED THROUGHOUT
CONSTRUCTION TO MAINTAIN AIR FLOW S FOR SPACES OUTSIDE
CONSTRUCTION ZONE.
11. TRAVERSE DUCT AND M AINTAIN AIR FLOW THROUGHOUT CONSTRUCTION.
12. BALANCE M INIMUM OUTSIDE AIR TO SCHEDULED VALUE ON SHEET M 601.
13. PROVIDE NEW MINIM UM AND M AXIM UM OUTSIDE AIR DAMPERS W ITH
INTEGRAL AIR FLOW M EASURING STATIONS.
14. APPROXIM ATE LOCATION OF EXISTING AIR FLOW M EASURING STATION TO
REM AIN.
PHASE 1
• ALL W ORK ASSOCIATED W ITH RETURN AIR
• HW S & HW R UP TO 3RD FLOOR FOR ATU'S
PROVIDE CONNECTION TO HOT DECK HEATING COIL PIPING. PROVIDE
ISOLATION VALVES FOR ATU PIPING AND ISOLATION VALVES FOR HOT DECK
PIPING TO KEEP PHASE 2 DOW N TIM E TO AN ABSOLUTE MINIM UM .
• BALANCE FANS AS INDICATED.
PHASING SEQUENCE FOR 2ND FLOOR
PHASE 2
• REM AINDER OF W ORK.
• REM OVE TEMPORARY PHASE 1 PIPING CONNECTIONS AND PROVIDE
PERMANENT CONNECTIONS AS SHOW N. W ORK SHALL BE PERFORM ED TO
KEEP DOW NTIME TO AN ABSOLUTE MINIM UM AND SHALL TAKE PLACE
BETW EEN OFF HOURS (9PM-5AM). COORDINATE CLOSELY W ITH COR.
N N.T.S.Scale:
KEY PLAN
REFER TO SHEET M001 FOR ADDITIONAL REQUIREM ENTS.
C
CTCT
TT
TTTT
T
T
T
T
T
T
T
T
T
T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
A B C D E F
5.3
4.2
3.1
2.1
3B145
STORAGE
3B135a
RESTROOM
3B135
BED
ROOM,
BARIATRIC
3B137
BED
ROOM ,
INFECTION
CONTROL
3B138
BARIATRIC,
INFECTION
CONTROL
3B140
BED
ROOM
3B142
BED
ROOM
3B161
BEDROOM
RESIDENT
ON-CALL
3B163
BEDROOM
RESIDENT
ON-CALL
3B161A
BATH/SHOWER
ROOM
3B142a
RESTROOM
3B140a
RESTROOM
3B138a
RESTROOM
3B137a
RESTROOM
3B138b
ANTE
ROOM3B137b
ANTE
ROOM
3B125a
RESTROOM
3B125
BED
ROOM
3B124
BED
ROOM ,
INFECTION
CONTROL
3B124a
RESTROOM
3B123a
RESTROOM
3B123
BED
ROOM ,
INFECTION
CONTROL
3B122
BED
ROOM
3B122a
RESTROOM
3B121a
RESTROOM
3B121
BED
ROOM
3B120
OFFICE
3B110a
RESTROOM
3B115
NOURISHM ENT
3B110
BED
ROOM,
BARIATRIC
3B108
BED
ROOM
3B108a
RESTROOM
3B105
BED
ROOM
3B105a
RESTROOM
3B102
CONSULTATION
ROOM
3B100
CONFERENCE
ROOM
C3-30
LOBBY
3B101
WAITING
ROOM
3B103
OFFICE
3B104D
LOCKER
ROOM
3B104C
TOILET,
FEM ALE
3B104B
TOILET,
M ALE
3B104A
LOCKER
ROOM
3B104
VESTIBULE
3B158a
RESTROOM
3B158
BED
ROOM
3B160a
RESTROOM
3B171
ALCOVE,
WHEELCHAIR
3B160
BED
ROOM
3C-27
CORRIDOR
3B162
OFFICE,
PHYSICIAN
C3-20
CORRIDOR
C3-19
CORRIDOR
C3-18
CORRIDOR
C3-14
CORRIDOR
C3-15
CONTROL
CENTER
C3-17
CORRIDOR
3B126
TOILET,
FEM ALE
3B128
TOILET,
M ALE
3B130
UTILITY
ROOM ,
CLEAN
3B139
CLEAN
LINEN
3B144
ELECTRICAL
CLOSET
3B119
M ED
ROOM
C3-22
CORRIDOR
3B144
NOURISHM ENT
C3-25
CONTROL
CENTER
3B151
NURSE
WORKROOM
3B152
SOILED
UTILITY
C3-27
CORRIDOR
3B154
M EDICATION
PREP.
3B155
HAC
3B156
STORAGE
C3-23
CORRIDOR
3B148
STORAGE
3B149
STORAGE
3B150
OFFICE
3B145
BREAK
ROOM
3B117
OFFICE
3B114
NURSE
WORKROOM
3B116
CLEAN
LINEN
3B109
UTILITY
ROOM ,
CLEAN
3B107
SOILED
UTILITY
3B147
OFFICE
C3-12
CORRIDOR
C3-26
CORRIDOR
M 300
DN TO
AH-12
DN TO
AH-12
SA
SA
34x14 28x14 24x14 ø12 ø 12 ø
12x8
14x10
12ø
10ø
8x
28/14 OV
23/14 OV
22/1 4 O
V 34/18 O
V40/1 8 O
V
22/1 4 O
V
26x16
26x1 x1
16x1
26x1 426x14 x1 x1 x1
42x20
46x24 34x20 x1
16ø18ø
18ø 16ø
14ø 10ø
24x8 x1
10x10
11-1
12x8
11-2 8ø
2x
4x x1 x1
4x
12x8
32x14
32x14 x1
12-912-1012-11
12-23
12-12
12-13
12-35
12-16
12-15
12-14
12-1 12-2
12-3
12-4
12-5
12-6
3B159
BED
ROOM
12-7
12-8
12-17
12-18
12-19
12-20
12-2112-22
12-27 12-253B164
STORAGE
12-26
12-30
12-28
12-29
12-31 12-32
12-34
12-33
12-39
12-36
12-42
12-38
8ø
CD1
180 CFM
6ø
CD1
75 CFM
6ø
CD1
150 CFM
6ø
CD1
75 CFM
8ø
CD1
230 CFM
12x10
8ø
CD1
230 CFM
8ø
CD1
185 CFM
14x12
8ø
CD1
180 CFM
6ø
CD1
75 CFM
6ø
CD1
75 CFM
8ø
CD1
180 CFM
8ø
CD1
180 CFM
6ø
CD1
75 CFM
6ø
CD1
75 CFM
8ø
CD1
180 CFM
12x10
6ø
(2)CD1
150 CFM
10x10
10x10 10x10
8ø
CD1
250 CFM
6ø
CD1
90 CFM
6ø
CD1
90 CFM
8ø
CD1
180 CFM
8ø
CD1
220 CFM
3B124b
ANTE
ROOM
3B123b
ANTE
ROOM
3B159a
RESTROOM
3B112
ALCOVE
WHEELCHAIR
3B166
ALCOVE
CRASH
CART
3B165
ALCOVE,
WHEELCHAIR
3B141a
ALCOVE
TRAY
STORAGE
x1
12x10
12x10
8ø
CD1
165 CFM
10x10
UC
U C
UC
UC
UC
UC
UC
U C
U C
UC
8ø
CD1
195 CFM
6ø
CD2
110 CFM
8ø
CD1
250 CFM10ø
CD1
375 CFM
24x12
435 CFM
CG1
24x12
75 CFM
CR2
8ø
CD1
150 CFM
12ø
CD1
505 CFM
24x12
430 CFM
CG1
8ø
CD2
185 CFM
8ø
CD1
180 CFM
x1 x1
UC
x1
8ø
CD2
185 CFM
U C
U C
8ø
CD1
230 CFM
14x10
8ø
CD1
185 CFM
8ø
CD1
150 CFM
8ø
CD1
150 CFM
8ø
CD1
230 CFM
14x12 x1
10ø
CD1
290 CFM
x1
10ø
CD1
295 CFM
24x12
585 CFM
CG1
x1
10ø
CD1
265 CFM
6x1 x1
6ø
CD1
135 CFM
6ø
CD1
70 CFM
10ø
CD1
315 CFM
8x10
6ø
CD1
80 CFM24x12
150 CFM
CR1
6ø
CD1
125 CFM
8ø
(2)CD1
210 CFM
6x8
10x1
42x20
40x20
42x20
30x8
515 CFM
TR1
x1
8ø
CD1
250 CFM
6x1
8ø
CD1
160 CFM
6x10
6ø
CD1
110 CFM
8ø
CD3
185 CFM
14x12
UC
UC
6ø
CD1
90 CFM
8ø
CD3
130 CFM
8ø
CD3
130 CFM
8ø
CD1
255 CFM
10ø
CD1
360 CFM
6ø
CD1
120 CFM
8ø
CD1
150 CFM
x1 x1
8x8
8ø
CD1
130 CFM
6ø
CD1
75 CFM
6ø
CD1
75 CFM
6ø
CD1
75 CFM
26x18
6ø
CD1
105 CFM
10ø
CD1
375 CFM
6ø
CD1
110 CFM
8ø
CD1
265 CFM
8ø
CD1
140 CFM
x1 x1
14x1
8x8
8x8
6ø
CD1
75 CFM
8x1
8ø
6ø
CD1
75 CFM
x1
6x8
12x8 12x6
2x
5 75
5 75
12x10 8ø
10ø
CD1
350 CFM
8ø
CD1
250 CFM
8ø
CD1
250 CFM
14x12
8ø
CD1
230 CFM
24x12
430 CFM
CG1
24x12
580 CFM
CR1
24x12
150 CFM
CG1
24x12
230 CFM
CG1
24x12
380 CFM
CR1
24x12
375 CFM
CR1
24x12
225 CFM
CG1
24x12
225 CFM
CG1
24x12
435 CFM
CG1
24x12
175 CFM
CG1
24x12
250 CFM
CG1
24x12
325 CFM
CG1
24x12
125 CFM
CG1
24x12
215 CFM
CG1
24x12
160 CFM
CG1
12x14
24x12
150 CFM
CR2
24x12
150 CFM
CR2
24x12
150 CFM
CR2
24x12
150 CFM
CR2
24x12
150 CFM
CR2
U C
U C
U C
24x12
260 CFM
CR2
24x12
260 CFM
CR2
24x12
225 CFM
CR1
24x12
225 CFM
CR1
24x12
580 CFM
CR1
24x12
260 CFM
(2)CR2
24x12
150 CFM
CG1
24x12
640 CFM
CG1
24x12
355 CFM
CG1
24x12
185 CFM
CR2
24x12
290 CFM
CG1
24x12
75 CFM
CR2
24x12
230 CFM
CG1
20x12 10x14 x1
24x12
350 CFM
CG1
5 105
24x12
120 CFM
CR1
24x12
100 CFM
CR1 8
x8
24x12
75 CFM
CR2
x8 x1
0x
0x
24x12
165 CFM
CR2
24x12
165 CFM
CR2
24x12 x1 x1
12x10
14x6
24x12
225 CFM
CR1
24x12
210 CFM
CR1
24x12
210 CFM
CG1
12x12
24x12
75 CFM
CR1
24x12
75 CFM
CR1
12x8
16x8
12x8
12x6
12x6
24x12
90 CFM
CG1
24x12
210 CFM
CR1
24x12
265 CFM
CG1
14x6
24x12
265 CFM
CG1
24x12
210 CFM
CG1
24x12
140 CFM
CG1
14x8
12x6
24x24
525 CFM
CG1
8x6
24x12
105 CFM
CG1
24x12
100 CFM
CG1
24x12
150 CFM
CG1
24x12
305 CFM
CG1
10x8
24x12
75 CFM
CG1
24x12
75 CFM
CG1
24x12
125 CFM
CG1
24x24
430 CFM
CG1
6x
24x12
50 CFM
CG1
24x12
435 CFM
CG1
16x12
860 CFM
TR1
24x12
105 CFM
CG1
24x24
360 CFM
CG1
8ø
CD6
155 CFM
10ø
CD5
310 CFM
8ø
CD5
155 CFM
6ø
CD6
80 CFM
6ø
CD6
65 CFM
8ø
CD5
135 CFM
6ø
CD5
120 CFM
6ø
CD6
60 CFM
6ø
CD5
105 CFM
6ø
CD6
50 CFM
6ø
CD5
80 CFM
6ø
CD6
40 CFM
6ø
CD5
80 CFM
6ø
CD6
40 CFM
6ø
CD6
45 CFM
6ø
CD5
80 CFM
6ø
CD5
90 CFM
6ø
CD6
45 CFM
8ø
CD5
185 CFM
6ø
CD6
95 CFM
6ø
CD6
90 CFM
8ø
CD5
185 CFM
6ø
CD6
90 CFM
8ø
CD5
185 CFM
6ø
CD6
90 CFM
8ø
CD5
185 CFM
8ø
CD3
190 CFM
8ø
CD3
200 CFM
8ø
CD3
200 CFM
8ø
CD3
180 CFM
8ø
CD3
180 CFM
8ø
CD3
135 CFM
12-24
18x16 14x12
12x12
0x
10x814x12
18x10
24x12
185 CFM
CR1
14x12 14x10
24x12
50 CFM
CG1
14x8
10x8
40x46
DN TO
RF-12
330-FC1
x1 x1
26x14 x1 ø
12ø
10ø
16x14
22x14
10x1
8ø
6x6 x1 x1 x1
12x12
8x6
8ø
CD1
260 CFM
ø
12ø
6ø
CD5
80 CFM
6ø
CD6
40 CFM
8x8 18x16
12x128 ø
10x10
8ø
CD3
135 CFM
6x8
4x x1 ø
1/
O
V18 ø
14ø ø
6x8
6x8
12-41
8x6
8x6
0x
6x6
6x6
24x12
100 CFM
CR1
24x12
70 CFM
CG1
x1
12-40
10ø x1
12-37
8ø
12ø ø
16x14
22x14 x1
12ø ø ø ø
8x10
4x
20x14 x1
24x12
500 CFM
CG1
5 190
5 375
5 185
24x12
225 CFM
CR1
24x12
150 CFM
CR2
6ø
(2)CD1
150 CFM
x1
12E2
12E1
12E3
M 300
P H
A S
E
P H
A S
E
PHASE 1
PHASE 2 24x12
250 CFM
CG1
6ø
CD1
105 CFM
5 540
10ø
6ø
3B111
COMM
CLOSET
8x10
5 250
DN TO
EF-7
24x12
140 CFM
CG1
22x8
515 CFM
TR2
14x1
22x12
860 CFM
TR2
14x8 x1
RA
S A
S A
E A
R A
R A
R A
RA
EA
R A
SA
14ø RA
EA
RA
EA
SA
RA
SA
SA
SA
E A
B D
3.1
2.1
C3-20
CORRIDOR
C3-15
CONTROL
CENTER
C3-17
CORRIDOR
3B126
TOILET,
FEM ALE
3B128
TOILET,
M ALE
3B130
UTILITY
ROOM ,
CLEAN
3B144
ELECTRICAL
CLOSET
C3-22
CORRIDOR
C3-25
CONTROL
CENTER
3B154
M EDICATION
PREP.
C3-23
CORRIDOR
3B150
OFFICE
3B109
UTILITY
ROOM ,
CLEAN
DN TO
AH-12
DN TO
AH-12
UC
UC
5 150
3B129A
STORAGE
3B177
OFFICE
3B178
UTILITY
ROOM ,
SOILED
3B176
M EDICATION
PREP
3B175
KITCHEN
NOURISHM ENT
3B174
OFFICE
3B117
OFFICE
PHYSICIAN
3B179
BREAK
ROOM
3B180
KITCHEN
MISC.
3B147
STORAGE
GEN.
3B107
STORAGE,
STRETCHER/WHEELCHAIR
3B106
UTILITY
ROOM ,
SOILED
3B182
UTILITY
ROOM ,
SOILED
3B155
UTILITY
ROOM ,
CLEAN
3B148
HOUSEKEEPING
AND
CLOSET
3B149
OFFICE
3B181
TOILET
3B151
NOURISHM ENT
3B152
LINEN
ROOM,
SOILED
3B139
TOILET
CONGREGATE
26x14
26x1
16x1
24x24
810 CFM
CG1
10ø
CD1
340 CFM
150 125 5 140
5 250
5 250
5 150
12-27
12-25 12-42
12-26
12-30
12-31
12-34
12-33
12-38
12-37
12-40
10ø
CD1
365 CFM
10ø
CD1
360 CFM
10ø
CD1
365 CFM
24x12
140 CFM
CG1
6ø
CD2
140 CFM
6ø
CD1
80 CFM
10ø
CD1
340 CFM
8ø
CD1
180 CFM
24x12
160 CFM
J2
330-FC1
22/1 4 O
V 34/18 O
V
0/
O
V
0x ø
4x
12ø
10ø x1
48/1 8 O
V
22/1 4 O
V
10x1
8x1
14x6
2x
12x10
12x6
2x
8x10
14x10
26x18
32x14
36x14
8x10 8x6
2x x1 x1
18x1
26x1
16x8
12x8 x1
2x ø ø ø ø 14x6
10x10
12x16
8x1
12x6
CORRIDOR
C3-14
CORRIDOR
C3-14
CORRIDOR
C3-22
CORRIDOR
C3-26 12-41
8ø
10ø
B D
3.1
2.1
C3-20
CORRIDOR
C3-15
CONTROL
CENTER
C3-17
CORRIDOR
3B126
TOILET,
FEM ALE
3B128
TOILET,
M ALE
3B130
UTILITY
ROOM ,
CLEAN
3B144
ELECTRICAL
CLOSET
C3-22
CORRIDOR
C3-25
CONTROL
CENTER
3B154
M EDICATION
PREP.
C3-23
CORRIDOR
3B150
OFFICE
3B109
UTILITY
ROOM ,
CLEAN
C3-26
CORRIDOR
DN TO
AH-12
DN TO
AH-12
HO
T
CO
LD
UC
UC
5 150
1 1
3B129A
STORAGE
3B177
OFFICE
3B178
UTILITY
ROOM ,
SOILED
3B176
M EDICATION
PREP
3B175
KITCHEN
NOURISHM ENT
3B174
OFFICE
3B117
OFFICE
PHYSICIAN
3B179
BREAK
ROOM
3B180
KITCHEN
MISC.
3B147
STORAGE
GEN.
3B107
STORAGE,
STRETCHER/WHEELCHAIR
3B106
UTILITY
ROOM ,
SOILED
3B182
UTILITY
ROOM ,
SOILED
3B155
UTILITY
ROOM ,
CLEAN
3B148
HOUSEKEEPING
AND
CLOSET
3B149
OFFICE
3B181
TOILET
3B151
NOURISHM ENT
3B152
LINEN
ROOM,
SOILED
3B139
TOILET
CONGREGATE
10ø
CD1
365 CFM
10ø
CD1
360 CFM
10ø
CD1
410 CFM
24x12
50 CFM
J2
8ø
CD1
180 CFM
6ø
CD1
60 CFM
8ø
CD1
180 CFM
24x12
180 CFM
J2
6ø
CD1
150 CFM 6ø
CD1
120 CFM
24x12
100 CFM
CR1
6ø
CD1
150 CFM
24x12
150 CFM
J2
24x12
120 CFM
J2 8ø
CD1
290 CFM
24x12
290 CFM
J2
8ø
CD1
200 CFM
6ø
CD1
80 CFM
24x12
200 CFM
J2
24x12
180 CFM
J2
6ø
CD1
150 CFM
8ø
CD1
180 CFM
8ø
CD1
250 CFM
24x12
250 CFM
J2
8ø
CD1
250 CFM
6ø
CD1
120 CFM
24x12
135 CFM
CR1
6ø
CD1
140 CFM
6ø
CD1
140 CFM
24x12
125 CFM
J2
24x12
155 CFM
CR1
24x12
85 CFM
J2
6ø
CD1
100 CFM
8ø
CD1
180 CFM
24x12
180 CFM
J2
10ø
CD1
340 CFM
24x24
810 CFM
CR1
6ø
CD1
40 CFM
24x12
40 CFM
J2
8ø
CD1
160 CFM
24x12
160 CFM
J2
6ø
CG1
100 CFM
6ø
CG1
100 CFM
6ø
CD2
140 CFM
10ø
CD1
320 CFM
24x12
320 CFM
CG1 24x12
100 CFM
CR1
24x12
180 CFM
J2
24x12
150 CFM
CR2
24x12
160 CFM
J2
24x12
150 CFM
J2
8ø
CD1
180 CFM
30x8
490 CFM
TR1
12-27
12-25
12-42 12-40
12-38
12-34
12-33
12-31
12-30
12-26
12-37
10ø
CD1
340 CFM
10ø
CD1
365 CFM
24x12
140 CFM
CG1
36x14
12x16 8x12
12x10
12x6
26x18
14x10
26x1 x1 x1
16x1
2x
26x1 x1 ø ø
14x6 x1 ø ø
2x
16x1
16x1 5 10x10
8x1
48/1 8 O
V x1
12x8
16x8
14x6
12x8
22/1 4 O
V
0/
O
V
34/18 O V
0x ø
4x
10ø
12ø
10ø
8ø 8ø
2x
2x
6 8x10
330-FC1
24x12
210 CFM
CR1
32x14
CORRIDOR
C3-26
CORRIDOR
C3-14
CORRIDOR
C3-14
CORRIDOR
C3-22
6ø
CD1
150 CFM
12-41
DN TO
AH-12
18ø
3B164
STORAGE
14x12
1/
O
V
CAP
4.2
17/14 OV
ø ø
20/14 OV
ø x1
24x12
CAP
x1
AREA OF W ORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528
/9
/2
:4
:5
A
M
Renovate TCU-ICU Space Bldg. 330
03/09/2020
PARTIAL THIRD FLOOR PLAN -
DUCTW ORK
MH103
PCWW JS
17005.00
552-18-102
Dayton, Ohio
N Scale: 1/8" = 1'-0"1
PARTIAL THIRD FLOOR PLAN - DUCTW ORK - BASE BID
GENERAL NOTES
A REFER TO SHEET M001 FOR LEGEND, INDEX AND GENERAL NOTES.
B REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORM ATION.
C PROVIDE ACCESS TO ALL EQUIPM ENT, COM PONENTS, ETC. REQUIRED FOR
BALANCING, ADJUSTMENT, MAINTENANCE, ETC. COORDINATE ACCESS PANEL
LOCATIONS CLOSELY W ITH G.C.
D AFTER EACH PHASE, THE HVAC SYSTEMS SHALL BE REBALANCED AND
COMM ISSIONED TO ENSURE CORRECT OPERATION OF TCU/ICU SUITE. RE-
BALANCING OF PHASE 1 SYSTEM S W ILL BE REQUIRED AT PROJECT COMPLETION.
E PHASING LINE AND PHASING DETAILS SHOW INTENT. PROVIDE ALL ISOLATION
VALVES, DAM PERS, DUCT CAPS, TEM PORARY DUCTW ORK, ETC. TO
ACCOM MODATE PHASING.
F DEDUCT ALTERNATE PLANS ONLY SHOW AREAS OF W ORK THAT CHANGE FROM
BASE BID. ALL W ORK NOT SHOW N ON DEDUCT ALTERNATE PLANS SHALL REM AIN
AS SHOW N ON BASE BID PLAN UNDER ALL BIDDING SCENARIOS.
PLAN NOTES
1. EXISTING DUCTW ORK TO REM AIN.
2. EXISTING AIR DEVICE TO REMAIN.
3. EXISTING AIR CONTROL TERM INAL UNIT TO REM AIN.
4. ROOM PRESSURE RELATIONSHIPS TAKE PRECEDENCE OVER LISTED AIR
FLOW QUANTITIES. ROOM S SHALL BE M INIMUM 0.01" W .C. NEGATIVE TO
CORRIDOR. PROVIDE DIGITAL PRESSURE MONITOR W ITH LOCAL DISPLAY FOR
ISOLATION ROOM AND ANTE ROOM . REFER TO SHEET MP103 FOR
ADDITIONAL REQUIREM ENTS.
5. EXISTING AIR DEVICE TO REMAIN. BALANCE TO CFM INDICATED.
6. DUCTW ORK TO BE PROVIDED IN PHASE 1 DURING OFF HOURS (9PM -5AM ).
COORDINATE CLOSELY W ITH COR.
7. BALANCE ATU ACCORDINGLY UNDER PHASE 1 AND AGAIN UNDER PHASE 2.
8. W ORK IN THIS AREA SHALL TAKE PLACE IN PHASE 1 DURING OFF HOURS
(9PM -5AM ). COORDINATE CLOSELY W ITH COR.
9. DUCT SHALL BE ACTIVE DURING PHASE 2 CONSTRUCTION.
10. PROVIDE TEM PORARY DUCT DURING PHASE 2 CONSTRUCTION IF REQUIRED
FOR PHASE 1 ATU'S TO BE OPERATIONAL.
11. PROVIDE ALL REQUIRED M ANUAL DAM PERS TO ACCOM MODATE PHASING.
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - DUCTWORK -
DEDUCT ALTERNATE #2
N Scale: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - DUCTWORK -
DEDUCT ALTERNATE #1
PHASE 1 TEMPORARY
PHASE 1 TEMPORARY
N N.T.S.Scale:
KEY PLAN
PHASE 1
PHASE 2
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
P H
A S
E
CEILINGS ARE EXISTING TO REM AIN UNDER THIS ALTERNATE. REM OVE AND REINSTALL AS
REQUIRED. TAKE PHOTOGRAPHS OF EXISTING PRIOR TO PERFORMING W ORK.
REPAIR/REPLACE ANY CEILINGS THAT ARE DAMAGED AS PART OF THIS W ORK TO PRE-W ORK
CONDITION.
(ALL BASE BID PHASING NOTES APPLY)
(ALL BASE BID PHASING NOTES APPLY)
B C D F
4.2
2.1
330-EF1
330-EF2
330-CU1
2 R
4 1
AREA OF W ORK
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528
/9
/2
:4
:0
A
M
Renovate TCU-ICU Space Bldg. 330
03/09/2020
ROOF PLAN
MH104
PCWW JS
17005.00
552-1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .