This document is a pre-solicitation notice for a construction project to renovate TCU/ICU space at the Dayton VA Medical Center. The contractor shall provide labor, materials, and equipment to renovate approximately 17,000 square feet of space over 25 years old at a cost between $5-10 million. Work must be completed within 365 days of notice to proceed. The solicitation releasing on March 20, 2020 will be set aside exclusively for verified service-disabled veteran-owned small businesses. Interested parties should register at FBO.gov. The project is assigned NAICS 236220 with a $39.5 million small business size standard. The awarded contractor must perform a minimum of 15% of construction work. Bid, payment and performance bonds will be required, and an on-site visit scheduled. Questions may be emailed by the deadline.

36C25020B0028 S02. Attachment 5 - Project Drawings - Division 23 (1 of 2).pdf

View the file

Other files

File Type Posted
36C25020B0028 0006.docx DOCX document
36C25020B0028 0005.docx DOCX document
Site Visit sign-in.pdf PDF
20200702 Addendum 1.pdf PDF
20200701 TCUICU 2nd Floor Room Names.pdf PDF
20200701 TCUICU 2nd Floor RCP.pdf PDF
PreBid RFIs Answers.pdf PDF
36C25020B0028 0004.docx DOCX document
Bid Opening Instructions.pdf PDF
36C25020B0028-0003000.docx DOCX document
36C25020B0028-0002000.docx DOCX document
36C25020B0028-0001000.docx DOCX document
36C25020B0028-0001001.pdf PDF
36C25020B0028-004.pdf PDF
36C25020B0028-009.pdf PDF
36C25020B0028-007.pdf PDF
36C25020B0028-005.pdf PDF
36C25020B0028-008.pdf PDF
36C25020B0028-002.pdf PDF
36C25020B0028-003.pdf PDF
36C25020B0028-001.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.

2. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.

3. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK IN THIS PROJECT.

4. PROVIDE ALL ROOFING PENETRATION, REPAIR & REINFORCEMENT IN THE EXISTING BUILDING FOR WORK INDICATED. ENGAGE A ROOFING SUBCONTRACTOR TO PERFORM THE

ROOFING WORK. WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON

THE ROOF.

5. THE CONTRACTOR SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES. THE CONTRACTOR

SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES

INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE COR THRU THE CONTRACTING OFFICER

FOR CLARIFICATION BEFORE PROCEEDING.

6. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE

JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL

WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON RESPONSIBILITIES.

7. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.

8. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHERS. HE SHALL KEEP HIMSELF INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING HIS WORK WITH OTHERS SO THAT THE PROGRESS OF THE TOTAL WORK SHALL BE KEPT

ON SCHEDULE.

9. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.

10. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR

SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING

CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE

CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.

11. EACH CONTRACTOR AND/OR TRADE, FITTING OR PLACING HIS WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE INSTALLATION OF HIS

WORK CONSTITUTES HIS ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, HE SHALL NOTIFY THE COR AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE

NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.

12. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION

HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.

13. CONTRACTORS SHALL TAKE SPECIAL CARE WHILE WORKING ADJACENT TO ASBESTOS MATERIALS AND MUST BE PROPERLY PROTECTED WITH CLOTHING, BREATHING APPARATUS, ETC. VERIFY REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT TEAM (ICRA).

14. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH

FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE CAULKED AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE WITH ALL TRADES TO ENSURE

FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.

15. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH

0-HOUR RATED WALLS & FLOORS SHALL BE FIRE CAULKED TO RETARD PASSAGE OF SMOKE.

16. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

17. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

18. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL ON SHEET M0.3. COORDINATE SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.

19. ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC.

COORDINATE SIZES AND LOCATIONS WITH OTHER TRADES.

20. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.

21. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.

22. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

23. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

24. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM OF REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.

25. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

26. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT

RE-USED.

27. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

28. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH

EXISTING.

29. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.

30. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY

THE CONTRACTOR.

31. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE

WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.

32. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING WORK.

33. HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS. COORDINATE WITH GENERAL CONTRACTOR

AND THE COR.

34. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

35. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.

36. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK

TO SOURCE.

37. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL

INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS ASSOCIATED WITH THE REMOVAL WORK.

38. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE

NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.

39. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED 3 WEEKS (15 WORKING DAYS) IN ADVANCE WITH

THE COR.

40. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN END OF THE DUCT.

41. RUNOUT PIPING TO TERMINAL UNITS SHALL BE 0.75” SIZE UNLESS OTHERWISE NOTED.

42 . APPROXIMATE ELEVATIONS NOTED ON FLOOR PLANS ARE TO THE BOTTOM OF DUCTS AND EQUIPMENT, AND TO THE CENTER OF PIPES.

43. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR VARIABLE SPEED MOTOR CONTROLLERS ASSOCIATED WITH MECHANICAL EQUIPMENT.

44. REFER TO SPECIFICATIONS SECTION 01 00 00 GENERAL REQUIREMENTS FOR DESCRIPTIONS OF THE BID ITEMS INCLUDING DEDUCT ALTERNATES, ADDITIONAL INFORMATION

NOTED THROUGHOUT THE DRAWINGS.

45. SYSTEMS SERVING AREAS OUTSIDE THE CONSTRUCTION ZONE SHALL REMAIN OPERATIONAL DURING CONSTRUCTION. ANY OUTAGES SHALL BE PERFORMED ON WEEKENDS

OR WEEK NIGHTS. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED 4 WEEKS (30 CALENDAR DAYS) IN ADVANCE WITH THE COR.

46. ALL ITEMS REMOVED TO BE REUSED IN THE PROJECT SHALL BE CLEANED AND SAFELY STORED BY THE CONTRACTOR.

47. REFER TO NEW WORK FLOOR PLANS FOR WORK THAT MAY BE REQUIRED PRIOR TO ANY REMOVAL WORK.

48. READ ALL NOTES THOROUGHLY PRIOR TO STARTING CONSTRUCTION.

GENERAL NOTES:

PHASE 1

- DISCONNECT DUCTWORK THAT SERVES PHASE 1 AS INDICATED. CAP DUCTS SO PHASE 2 AREAS REMAIN ACTIVE. THIS WORK SHALL TAKE PLACE DURING OFF HOURS

(9PM-5AM).

- PREPARE NEW CHASE FOR RETURN AIR MAIN. INSTALL AS MUCH NEW DUCTWORK AS POSSIBLE AHEAD OF RETURN MAIN DEMOLITION TO MINIMIZE DOWNTIME. DOWNTIME OF

RETURN FAN SHALL BE LIMITED TO ONE (1) WEEKEND (9PM FRIDAY TO 5AM MONDAY).

- SUPPLY AND RETURN FAN MOTORS SHALL BE REPLACED DURING THIS OUTAGE.

- STEAM HUMIDIFIER MAY BE REPLACED DURING THIS OUTAGE OR PHASE 2 OUTAGE.

- INSTALL NEW DUCT MAINS AS INDICATED IN PHASE1 TEMPORARY PARTIAL PLANS. ALL COOLING AIR SUPPLIED FROM EXISTING COLD DECK UNTIL HOT DECK REMOVED DURING

PHASE 2

- INSTALL BALL VALVES ON THE SUPPLY AND RETURN HW MAINS AS THEY CROSS THE PHASING LINE TO BE CONNECTED IN PHASE 2.

PHASE 2

- REMOVAL AND REPLACEMENT OF THE HOT DECK COIL WITH NEW COOLING COIL 330-CC12b MUST TAKE PLACE AFTER PHASE 2 DEMOLITION BEGINS.

- STEAM HUMIDIFIER MAY BE REPLACED DURING THIS OUTAGE OR PHASE 1 OUTAGE. THIS WORK SHALL BE LIMITED TO ONE (1) WEEKEND (9PM FRIDAY TO 5AM MONDAY).

- REPLACEMENT OF COOLING COIL 330-CC12a MUST TAKE PLACE AFTER THE INSTALLATION OF 330-CC12a AND SHALL BE LIMITED TO ONE (1) WEEKEND (9PM FRIDAY TO 5AM

MONDAY).

- REMOVE TEMPORARY DUCT MAIN CONNECTIONS INSTALLED AS INDICATED ON PHASE 1 TEMPORARY PARTIAL PLANS AND INSTALL MAINS IN THESE AREAS AS INDICATED ON

BASE BID PLAN.

NOTES

- COORDINATE OUTAGES CLOSELY WITH ALL TRADES AND COR WELL IN ADVANCE.

- COORDINATE ALL WORK OUTSIDE OF WORK AREA OF GENERAL TRADES CONTRACTOR WITH COR. IN AREAS WITH NO CEILING WORK BY THE GENERAL TRADES CONTRACTOR, REMOVE ALL CEILING PADS REQUIRED AND WORK THRU THE GRID OR REMOVE CEILING GRID AND TILES AS REQUIRED. ALL DAMAGED TILES AND GRID SHALL BE REPAIRED OR

REPLACED.

- SEE SHEET MH102 FOR ADDITIONAL REQUIREMENTS.

SEQUENCE OF CONSTRUCTION

DEDUCT ALTERNATE #1 (BID ITEM 2)

CONTRACTOR SHALL PERFORM ALL WORK AS DESCRIBED IN BID ITEM 1 (BASE BID) EXCEPT:

- DEDUCT WORK ASSOCIATED WITH CORE AREA IN TCU/ICU SUITE INCLUDING BUT NOT LIMITED TO THE OFFICES, STORAGE ROOMS, UTILITY ROOMS, MEDICATION PREP ROOMS, CLEAN LINEN, NOURISHMENT, BREAK ROOM, HAC AND ASSOCIATED INTERIOR CORRIDORS, AS INDICATED IN DEDUCT ALTERNATE #1 PARTIAL PLANS.

- ALL WORK OUTSIDE OF DEDUCT ALTERNATE #1 PARTIAL PLANS SHALL TAKE PLACE IN ALL BIDDING SCENARIOS.

DEDUCT ALTERNATE #2 (BID ITEM 3)

CONTRACTOR SHALL PERFORM ALL WORK AS DESCRIBED IN BID ITEM 1 (BASE BID) EXCEPT DEDUCT ALL WORK ASSOCIATED WITH BID ITEM 2 AND:

- DEDUCT WORK AND FINISHES ASSOCIATED WITH CORE AREA IN TCU/ICU SUITE INCLUDING BUT NOT LIMITED TO THE OFFICES, STORAGE ROOMS, UTILITY ROOMS, MEDICATION

PREP ROOMS, CLEAN LINEN, NOURISHMENT, BREAK ROOM, LIGHTING IN ELECTRICAL CLOSET (ELECTRICAL DISTRIBUTION WORK SHALL BE PROVIDED), HAC AND ASSOCIATED

INTERIOR CORRIDORS, AS INDICATED IN DEDUCT ALTERNATE #2 PARTIAL PLANS.

- THE CEILINGS IN THE CORE AREA ARE EXISTING TO REMAIN UNDER THIS ALTERNATE.

- ALL WORK OUTSIDE OF DEDUCT ALTERNATE #2 PARTIAL PLANS SHALL TAKE PLACE IN ALL BIDDING SCENARIOS.

DEDUCT ALTERNATES

NOTE: ALL SYMBOLS AND ABBREVIATIONS

ARE SUBJECT TO MODIFICATIONS

ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS

MIGHT NOT NECESSARILY BE USED ON

THIS PROJECT.

ABBREVIATIONS

AC - AIR COM PRESSOR OR AIR CONDITIONER

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

AFM S - AIR FLOW M EASURING STATION

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIM ATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEM BLY

ATC - AUTOM ATIC TEM PERATURE CONTROL

ATU - AIR TERMINAL UNIT

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BTU - BRITISH THERM AL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

CBD - COUNTER BALANCED BACKDRAFT DAM PER

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFM - CUBIC FEET PER MINUTE

CHS - CHILLED W ATER SUPPLY

CHR - CHILLED W ATER RETURN

CHGR - CHILLED W ATER GLYCOL SOLUTION RETURN

CHGS - CHILLED W ATER GLYCOL SOLUTION SUPPLY

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

CO2 - CARBON DIOXIDE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

COR - CONTRACTING OFFICERS REPRESENTATIVE

CTR - CENTER

CU - COPPER

CVR - CONSTANT VOLUME REHEAT (AIR TERM INAL

UNIT)

CW - COLD W ATER

CW R - CONDENSER W ATER RETURN

CW S - CONDENSER W ATER SUPPLY

D - DRAIN LINE

DB - DRY BULB

DCP - DISTRIBUTED CONTROL PANEL

DDC - DIRECT DIGITAL CONTROLS

DI - DEIONIZED W ATER

DIA - DIAMETER

DIM - DIM ENSION

DN - DOW N

DW G - DRAW ING

EA - EACH OR EXHAUST AIR

EAT - ENTERING AIR TEMPERATURE

EC - ELECTRICAL CONTRACTOR (DIVISION 26)

ECC - ENGINEERING CONTROL CENTER

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQUIP - EQUIPM ENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

EQS - EQUIPMENT SUPPLIER

EW T - ENTERING W ATER TEMPERATURE

EXH - EXHAUST

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

FD - FLOOR DRAIN

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER M INUTE

FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION

21)

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES CONTRACTOR

GPM - GALLONS PER M INUTE

HB - HOSE BIBB

HC - HVAC CONTRACTOR (DIVISION 23)

HD - HUB DRAIN

HG - REFRIGERANT HOT GAS

HP - HORSEPOW ER

HPC - HIGH PRESSURE CONDENSATE RETURN

HPS - HIGH PRESSURE STEAM SUPPLY

HR - HOUR

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

HW - HOT W ATER

HW R - HEATING HOT W ATER RETURN

HW S - HEATING HOT W ATER SUPPLY

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

L - LENGTH

LAT - LEAVING AIR TEMPERATURE

LAV - LAVATORY

LBS - POUNDS

LPC - LOW PRESSURE CONDENSATE

RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LW T - LEAVING W ATER TEM PERATURE

M AX - M AXIMUM

M DD - M OTORIZED DAMPER

M EZZ - M EZZANINE

M FR - M ANUFACTURER

M H - M ANHOLE

M IN - M INIMUM OR M INUTE

M ISC - M ISCELLANEOUS

M TD - M OUNTED

M TG - M OUNTING

M PC - M EDIUM PRESSURE CONDENSATE

RETURN

M PS - M EDIUM PRESSURE STEAM SUPPLY

M U - W ATER M AKE-UP

N/C - NORMALLY CLOSED

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NOM - NOM INAL

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

OA - OUTDOOR AIR

OBD - OPPOSED BLADE DAMPER

OD - OUTSIDE DIAM ETER

OFCI - OW NER FURNISHED CONTRACTOR

INSTALLED

OFOI - OW NER FURNISHED OW NER INSTALLED

P - PROPANE GAS

PC - PLUMBING CONTRACTOR (DIVISION 22)

OR PUMPED CONDENSATE RETURN

PLBG - PLUMBING

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSIG - POUNDS PER SQUARE INCH GAUGE

RA - RETURN AIR

RAD - RADIUS

RCP - REFLECTED CEILING PLAN

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS W ATER SUPPLY

ROR - REVERSE OSMOSIS W ATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTION

S - SPRINKLER (W ET)

SA - SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD W ATER

SHT - SHEET

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SRV - SAFETY RELIEF VALVE

SS - STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TEM P - TEM PERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPM ENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TYP - TYPICAL

UNO - UNLESS NOTED OTHERW ISE

V - VENT

VAC - VACUUM

VEL - VELOCITY

VIB - VALVE IN BOX

VOL - VOLUM E

VTR - VENT THROUGH ROOF

VR - VENT RISER

VVR - VARIABLE VOLUM E REHEAT (AIR

TERMINAL UNIT)

W / - W ITH

W /0 - W ITHOUT

W B - W ET BULB

W CO - W ALL CLEANOUT

GENERAL FLOOR PLAN NOTES

PLAN NOTE. APPLIES ONLY TO THE SHEET W HICH IT IS SHOW N UNLESS

NOTED OTHERW ISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

A1

EQUIPM ENT, DEVICE, OR PLUM BING FIXTURE M ARK. LETTER

DESIGNATIONS REFER TO SCHEDULES.

H1 H1OR

EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO

SCHEDULES.

H2

B

H2

RISER OR STACK NUM BER

DETAIL: B = DETAIL DESIGNATION

H2 = SHEET W HERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

H2 = SHEET W HERE DETAIL IS LOCATED

A1 "UP TO" SYM BOL (ITEM ON FLOOR ABOVE)

APPROXIMATE DIM ENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM

OF EQUIPM ENT, UNLESS NOTED OTHERW ISE

10"

ELEV: 8' - 0"ELEV: 8' - 0"

TOD: 8' - 10"

BOD: 7' - 2"

20x20

20x20

APPROXIM ATE DIM ENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM

OF DUCTW ORK, UNLESS NOTED OTHERW ISE

APPROXIM ATE DIM ENSION ABOVE FINISHED FLOOR TO CENTERLINE OF

PIPE, UNLESS NOTED OTHERW ISE

DL-1

UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH

UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE W ITH GC.

DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.

CONNECT TO EXISTING

HVAC PIPING DESIGNATIONS

CHILLED W ATER SUPPLY PIPECHS

CONDENSER W ATER SUPPLY PIPECW S

CONDENSER W ATER RETURN PIPECW R

DRAIN LINE. PITCH IN DIRECTION INDICATEDD

HEATING HOT W ATER SUPPLY PIPEHW S

HEATING HOT W ATER RETURN PIPEHW R

W ATER MAKE-UP PIPEM U

VENT PIPEV

REFRIGERANT LIQUID LINERL

REFRIGERANT SUCTION LINERS

EXPANSION TANK PIPEET

REFRIGERANT HOT GAS LINEHG

LOW PRESSURE CONDENSATE RETURN PIPELPC

LOW PRESSURE STEAM SUPPLY PIPELPS

M EDIUM PRESSURE CONDENSATE RETURN PIPEMPC

M EDIUM PRESSURE STEAM SUPPLY PIPEMPS

PUM PED CONDENSATE RETURN PIPEPC

HIGH PRESSURE CONDENSATE RETURN PIPEHPC

HIGH PRESSURE STEAM SUPPLY PIPEHPS

STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10

MISC SYMBOLS

DUCTWORK SYMBOLS

ROUND BRANCH DUCTW ORKCONICAL

FITTING

ACOUSTIC

FITTING

ADAD

D

R R

D

RECTANGULAR BRANCH DUCTW ORK

SQUARE TEE W ITH TURNING VANES

NOTE: ALL SQUARE ELBOW S IN

RECTANGULAR AND ROUND / OVAL

DUCTW ORK SHALL BE PROVIDED W ITH

TURNING VANES. REFER TO THE

SPECIFICATIONS FOR ADDITIONAL

DETAILS.

EXISTING DUCTW ORK TO REMOVED

RETURN AIR, RELIEF AIR, OR TRANSFER

AIR DUCTW ORK. (UP AND DOW N)

RADIUSED OR SQUARE W ITH TURNING

VANES.SUPPLY AIR OR OUTDOOR AIR

DUCTW ORK.

(UP AND DOW N) RADIUSED OR SQUARE

W ITH TURNING VANES.EXHAUST AIR DUCTW ORK. (UP AND

DOW N) RADIUSED OR SQUARE W ITH

TURNING VANES.

RECTANGULAR AND ROUND / OVAL

DUCTW ORK RISE / DROP W ITH 90° RADIUSED

OR SQUARE ELBOW S AND TURNING VANES.

RADIUS ELBOW

90° SQUARE ELBOW (W ITH TURNING

VANES)

NOTE: ALL SQUARE ELBOW S IN

RECTANGULAR AND ROUND DUCTW ORK

SHALL BE PROVIDED W ITH TURNING

VANES.

ACCESS DOOR OR PANEL

DUCTW ORK RISE IN DIRECTION OF AIR

FLOW

DUCTW ORK DROP IN DIRECTION OF AIR

FLOW

DUCTW ORK W ITH ACOUSTICAL LINER.

LISTED DUCT SIZES ARE INSIDE CLEAR

DIM ENSIONS.

RECTANGULAR ROUND / OVAL

FLEXIBLE DUCTW ORK

FLEXIBLE CONNECTION

DUCTW ORK CONSTRUCTED OF SPECIAL

M ATERIAL AS NOTED

DIRECTION OF PITCH

RECTANGULAR DUCTW ORK DIM ENSIONS

(W x H)26x20

ROUND DUCTW ORK DIMENSIONS (DIA)26ø

OVAL DUCTW ORK DIM ENSIONS (W x H)26x20 OV

DUCTWORK DEVICE SYMBOLS

W ALL OR DUCTW ORK M OUNTED AIR DEVICE. SG1 = DESIGNATION

(REFER TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN

INCHES).

300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO

BOTTOM OF GRILLE.

A3 10ø

M ANUAL BALANCING VALVE DAMPER W ITH LOCKING DEVICE

BDD = BACK DRAFT DAM PER

CBD = COUNTER-BALANCED BACK DRAFT DAM PER

SD = SM OKE DAM PER

FS = COMBINATION FIRE - SM OKE DAM PER

M DD = M OTORIZED DAM PER

AFM S = AIR FLOW M EASURING STATION

DUCT MOUNTED SM OKE DETECTOR. COORDINATE LOCATION.

HUM IDITY SENSOR - DUCT M OUNTED

SG1

20x12

BOG: 9'-0"

XXX

A-D

XX

H

SD

SP

AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR

DEVICE SCHEDULE FOR VARIOUS DESIGNATIONS).

10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM . ALL AIR DEVICE

DISCHARGE 4-W AY UNLESS NOTED W ITH FLOW ARROW S. AIR DEVICE

SHOW N IS 2-W AY SIDE THROW . M ETHOD OF IDENTIFICATION ALSO

APPLIES TO OTHER CEILING MOUNTED AIR DEVICES.

FIRE DAMPER

A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)

D OR S = DYNAM IC OR STATIC

STATIC PRESSURE SENSOR - DUCT M OUNTED

C

CARBON DIOXIDE SENSOR - DUCT M OUNTED

S

TEM PERATURE SENSOR - DUCT M OUNTED

CHECK VALVE

T

P

FOB

FOT

SHUTOFF VALVE

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PRESSURE GAUGE

TEM PERATURE GAUGE OR THERM OMETER

UNION

CLEANOUT

STRAINER

STRAINER W ITH A BLOW DOW N VALVE AND

HOSE CONNECTION

DRAIN VALVE W ITH HOSE END CONNECTION

AUTOM ATIC FLOW CONTROLLER W ITH P/T PLUG

IN AND OUT

EXPANSION JOINT

M ANUAL AIR VENT

AUTOM ATIC AIR VENT

PRESSURE REDUCING VALVE

2 PORT AUTOMATIC CONTROL VALVE

3 PORT AUTOMATIC CONTROL VALVE

QUICK OPENING MANUAL VALVE

VACUUM BREAKER

NEEDLE VALVE

PRESSURE AND TEM PERATURE TEST PLUG

VACUUM GAUGE W ITH STOP

END CAP

GLOBE VALVE

SHUTOFF VALVE AND BOX

SHUTOFF VALVE ON RISER

A

M

M

N

V

VB

COM BINATION SHUTOFF AND BALANCING

VALVE (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

BALL VALVE

BUTTERFLY VALVE

GATE VALVE

VALVES AND FITTINGS

DOUBLE LINE SINGLE LINE

SOLENOID VALVE

S

SAFETY RELIEF VALVE. FOR HYDRONIC

SYSTEM S PIPE DISCHARGE AIR GAPPED TO

FLOOR DRAIN UNLESS NOTED OTHERW ISE. FOR

STEAM SYSTEM S PIPE DISCHARGE TO

OUTDOORS.

W ATER METERM

PRESSURE GAUGE W ITH COCK AND SIPHON LOOP

BI-METALIC STEAM TRAP AND DRIP ASSEMBLY

THERM ODYNAM IC STEAM TRAP AND DRIP

ASSEM BLY

INVERTED BUCKET STEAM TRAP AND DRIP

ASSEM BLY

FLOAT AND THERM OSTATIC STEAM TRAP AND

DRIP ASSEMBLY

THERM OSTATIC STEAM TRAP AND DRIP ASSEMBLY

BM

TD

IB

FT

TS

10"

TOE: 3' - 0"

BOE: 0' - 6"

CHILLED W ATER GLYCOL SOLUTION RETURN PIPECHGR

CHILLED W ATER GLYCOL SOLUTION SUPPLY PIPECHGS

CHILLED W ATER RETURN PIPECHR

SQUARE THROAT / RADIUS HEEL

FITTINGS NOT ACCEPTABLE

PIPING SYMBOLS

DOUBLE LINE SINGLE LINE

BOTTOM CONNECTION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOW N

ELBOW UP

EXISTING PIPE TO BE REMOVED

EXISTING PIPE TO REM AIN

FLOW DIRECTION DESIGNATION

PUM P

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

DD

RR

PIPE RISER

RADIUS'D BRANCH

RADIUS'D TEE

EXISTING DUCTW ORK TO REMAIN

UNLESS NOTED OTHERW ISE ON

DRAW INGS, 15° MAX FOR DIVERGING, 30°

M AX FOR CONVERGING TRANSITION

EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED

OTHERW ISE.

SPACE TEM PERATURE SENSOR / THERMOSTAT. W HEN W ALL MOUNTED, M OUNTING

HEIGHT 46" TO MEET ADA REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH

COORDINATE W ITH ARCHITECT.

T

DP

DIFFERENTIAL PRESSURE SENSOR. W HEN W ALL MOUNTED, M OUNTING HEIGHT 46"

TO M EET ADA REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH

COORDINATE W ITH ARCHITECT.

H

HUM IDITY SENSOR. W HEN W ALL M OUNTED, MOUNTING HEIGHT 46" TO M EET ADA

REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH

ARCHITECT.

CARBON DIOXIDE SENSOR. W HEN W ALL M OUNTED, M OUNTING HEIGHT 46" TO MEET

ADA REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH

ARCHITECT.

C

CO

CARBON MONOXIDE SENSOR. W HEN W ALL MOUNTED, M OUNTING HEIGHT 46" TO

M EET ADA REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE

W ITH ARCHITECT.

TEM PERATURE SENSOR. W HEN W ALL M OUNTED, M OUNTING HEIGHT 46" TO MEET

ADA REQUIREM ENTS. W HEN M OUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH

ARCHITECT.

S

S P

TEM PERATURE SENSOR M OUNTED IN CEILING PLENUM.

STATIC PRESSURE SENSOR.SP

FLOW M ETER

F

M AUTOM ATIC PRESSURE INDEPENDENT CONTROL

VALVE

ACOUSTIC

FITTING

ROOM PRESSURE SENSOR

ROOM PRESSURE MONITOR

CURRENT SENSING RELAY

RS

RM

C

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

JPA Project No.

Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528

/9

/2

:3

:1

A

M

Renovate TCU-ICU Space Bldg. 330

03/09/2020

LEGEND & GENERAL NOTES

M001

PCWW JS

17005.00

552-18-102

Dayton, Ohio

INDEX OF DRAWINGS

Sheet Number Sheet Name

M001 LEGEND & GENERAL NOTES

MD102 PARTIAL SECOND FLOOR PLAN - REMOVALS

MD103 PARTIAL THIRD FLOOR PLAN - REMOVALS

MH102 PARTIAL SECOND FLOOR PLAN - NEW WORK

MH103 PARTIAL THIRD FLOOR PLAN - DUCTWORK

MH104 ROOF PLAN

MP103 PARTIAL THIRD FLOOR PLAN - PIPING

M300 SECTIONS

M501 DETAILS

M502 DETAILS

M503 DETAILS

M601 SCHEDULES & DIAGRAMS

M602 SCHEDULES & DIAGRAMS

M701 CONTROLS & AUTOMATION

M702 CONTROLS & AUTOMATION

Revisions Date

1 For Bid 03.09.2020

A B C D E F

5.3

4.2

3.1

2.1

AH-15

AH-14

AH-13

330-AH12

AH-11

AH-10

330-RF12

CC-12

HC-12

48x24

60x22

49/18 OV

80x22

64/20 OV

27/18 OV

34/18 O V

40/18 OV

31/18 OV

48/20 OV

60x2460x2460x24

48x24

46x42 x2

46/22 OV

x6 x5 x2

7/

O

V

46x18

EF-7 2

4x

24/18 OV26/18 OV

4x

16x10

4x

7 21/18 OV

0x

46x18

20ø

40/18 OV

18x16 x1

50x24 x5 x1

26/18 OV

x2

30x18

24x14

24x14

6x

50x24

4x x1 x1 ø 16 x1

8ø

14x14

9/

O

V

12x14

4x

24x18

2/

O

V x1

64/20 OV

16x14

4x ø

28x18

UP TO

3RD

FLOOR

UP TO

3RD

FLOOR

DN FROM

3RD FLOOR

COLD

HOT

COLD

HOT

330-SF12

3TYP.

TYP.

2 TYP.

2 TYP.

2 TYP.

RELIEF PLENUM

DN FROM

3RD FLOOR

TYP.

M

P C 2

H W

S

H W

R

C H

S

C H

R

M

P C

H

W S

H

W R

C

H S

C

H R 2

M P

S

M

P C

H

W S 4

H W

R

C H

S

C H

R

M P

S

14 15

AREA OF W ORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

JPA Project No.

Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528

/9

/2

:3

:0

A

M

Renovate TCU-ICU Space Bldg. 330

03/09/2020

PARTIAL SECOND FLOOR PLAN -

REMOVALS

MD102

PCWW JS

17005.00

552-18-102

Dayton, Ohio

N Scale: 1/8" = 1'-0"

PARTIAL SECOND FLOOR PLAN - REMOVALS

GENERAL NOTES

A REFER TO SHEET MH103 FOR W ORK THAT IS REQUIRED TO TAKE PLACE

PRIOR TO ANY REMOVAL W ORK.

B REFER TO SHEET M 001 FOR LEGEND, INDEX AND ADDITIONAL GENERAL

NOTES.

PLAN NOTES

1 EXISTING DUCTW ORK TO REM AIN.

2 EXISTING AIR DEVICE TO REMAIN.

3 EXISTING AIR CONTROL TERM INAL UNIT TO REM AIN.

4 EXISTING AIR HANDLING UNIT TO REMAIN.

5 EXISTING FAN TO REMAIN. REM OVE INLET GUIDE VANES.

6 REM OVE STEAM HUMIDIFIER AND ASSOCIATED SUPPORTS, BRANCH PIPING,

CONTROLS, ETC.

7 REM OVE FAN MOTOR FOR REPLACEMENT IN NEW W ORK.

8 REM OVE EXISTING HEATING AND COOLING COILS AND ASSOCIATED

SUPPORTS, BRANCH PIPING, CONTROLS, ETC.

9 EXISTING FAN TO REMAIN.

10 REM OVE PIPING BACK TO THIS POINT FOR RE-CONNECTION IN NEW W ORK.

11 HOT DECK HEATING COIL SHALL BE REPLACED AND CONVERTED TO A COLD

DECK DURING PHASE 2.

12 REM OVE EXISTING DUCTW ORK AND ASSOCIATED DAMPERS, SUPPORTS, ETC.

13 TAKE FAN PROFILE READINGS PRIOR TO ANY CONSTRUCTION TAKING PLACE.

READINGS SHALL INCLUDE BUT NOT BE LIM ITED TO CFM , SP, RPM , AM PS,

VOLTS, AND BELT SIZES.

14 TRAVERSE DUCT FOR AIR FLOW READING PRIOR TO ANY CONSTRUCTION

TAKING PLACE.

15 MAINTAIN AIR FLOW THROUGHOUT CONSTRUCTION.

16 REM OVE EXISTING M INIM UM AND M AXIM UM OUTSIDE AIR DAMPERS FOR

REPLACEMENT IN NEW W ORK.

SEE SHEET MH102 FOR 2ND

FLOOR PHASING SEQUENCE

N N.T.S.Scale:

KEY PLAN

T T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T TT

T

T

TT

T

T

T

TT

T

T

T

T

T

T T

T

T

T

T

T

S

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

A B C D E F

5.3

4.2

3.1

2.1

DN TO

AH-12

40/1 8 O

V

34/18 O V

28/14 OV 23/14 OV

22/1 4 O

V

22/14 OV17/14 OV

23/14 OV

20/14 OV 17/14 OV

20/14 OV

ø ø ø

12x8 ø ø

14x6

2x x1 x1 ø x1

8ø

12x10 8ø x1

20x12

4x

4x

24x14

8x

0x

28x14

4x

34x14

4x

4x x1 x1

24x6

18x8 x1

4x x1

24x6

24x6

24x6

10x1

16x1

26x1

2x x1

12x6

26x14

26x14 x1 ø ø ø ø

17/14 OV

17/14 OV

22/1 4 O

V x1

DN TO

RF-12

DN TO

EF-7

DN TO

AH-12

HO

T

CO

LD

C O

L D

H O

T

HEPA-2

10ø ø

24x6

14ø ø ø ø ø20 x1 ø

18ø

18ø ø 10 ø

18x12 x1 x1 ø

24x10 x1

16ø

16ø

14ø

14ø x1

36x14

8x68x101 2x

26x1626x1

12x8

2x

8ø

26x18

10ø

14x6

8ø

4x

12ø

10ø

14x10

6x8 x1

2x ø

24x1232x14 x1

2x

14x6 x1

2x

2x

8x1212x16

32x14

34x20 24x8

4x

4x

4x

4x x1

4x

42x20

46x24 44x22

10x108ø x6

12x6 12x8

2x

8ø ø

2x

4x

11-2

12-12 12-10

11-1

12-1112-9

12-8

12-7

12-5

12-4

12-6

12-38

12-2

12-15

12-40 12-3

12-14

12-13

12-23

12-17

12-24

12-22

12-21

12-20

12-18

12-19

12-25 12-26 12-28

12-27

12-29

12-30

12-32 12-33

12-31

12-34

12-36

12-35

12-37

12-39

12-E4 12-E3

12-E2

12-E1

1 6

8 TYP

8 TYP

8 TYP

TYP

7 6

TYP

TYP

1 1

TYP

TYP 1

TYP

7 6

8TYP

TYP

6 7

8 TYP

7 1

PHASE 1

PHASE 2

10ø ø

P H

A S

E

P H

A S

E

12-16

12-1

B C D

3.1

2.1

DN TO

AH-12

DN TO

EF-7

DN TO

AH-12

HO

T

CO

LD

C O

L D

H O

T

HEPA-2

1 1

DN TO

AH-12

48/1 8 O

V

34/18 O V

22/1 4 O

V ø ø

14x10

0x

10x1

16x1

26x1

2x x1

12x6

26x14

22/1 4 O

V

DN TO

EF-7

DN TO

AH-12

HO

T

CO

LD

C O

L D

H O

T

HEPA-2

14ø ø ø ø ø 18ø 16ø 14ø

36x14

8x6

8x10

2x

26x1626x1

12x8

2x

8ø

26x18

10ø

14x6

8ø

4x

12ø

10ø

14x10

32x14

2x

8x1212x16

32x14

12-8

12-6

12-38

12-40 12-3

12-14

12-17

12-24 12-27

12-35

12-37

12-39

B C D

3.1

2.1

DN TO

AH-12

DN TO

EF-7

DN TO

AH-12

HO

T

CO

LD

C O

L D

H O

T

HEPA-2

1 1

DN TO

AH-12

DN TO

EF-7

DN TO

AH-12

HO

T

CO

LD

C O

L D

H O

T

HEPA-2

DN TO

AH-12

DN TO

EF-7

DN TO

AH-12

HO

T

CO

LD

C O

L D

H O

T

HEPA-2

DN TO

AH-12

48/1 8 O

V

34/18 O V

22/1 4 O

V ø

14x10

10x1

16x1

26x1

2x x1 x412x6

26x14

DN TO

EF-7

DN TO

AH-12

HO

T

CO

LD

C O

L D

H O

T

HEPA-2

14ø ø ø

36x14

8x6

8x10

2x

26x1626x1

12x8

2x

8ø

26x18

10ø

14x6

8ø

4x

12ø

10ø

14x10

32x14

2x

8x1212x16

32x14

12-8

12-6

12-38

12-40 12-3

12-14

12-17

12-24 12-27

12-35

12-37

12-39

AREA OF W ORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

JPA Project No.

Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528

/9

/2

:3

:2

A

M

Renovate TCU-ICU Space Bldg. 330

03/09/2020

PARTIAL THIRD FLOOR PLAN -

REMOVALS

MD103

PCWW JS

17005.00

552-18-102

Dayton, Ohio

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - REMOVALS-BASE BID

GENERAL NOTES

A REFER TO SHEET M001 FOR LEGEND, INDEX AND GENERAL NOTES.

B PHASING LINE AND PHASING DETAILS SHOW INTENT. PROVIDE ALL ISOLATION

VALVES, DAM PERS, DUCT CAPS, TEM PORARY DUCTW ORK, ETC. TO

ACCOM MODATE PHASING.

C CAP DUCTW ORK AS REQUIRED FOR PHASING.

D PROVIDE BALANCING DAM PERS AS REQUIRED FOR PHASING.

E DEDUCT ALTERNATE PLANS ONLY SHOW AREAS OF W ORK THAT CHANGE FROM

BASE BID. ALL W ORK NOT SHOW N ON DEDUCT ALTERNATE PLANS SHALL REM AIN

AS SHOW N ON BASE BID PLAN UNDER ALL BIDDING SCENARIOS.

F REFER TO SHEET MH102 FOR W ORK THAT IS REQUIRED TO TAKE PLACE PRIOR TO

ANY REM OVAL W ORK.

G TAKE AIRFLOW READINGS AND ADJUST EF-7 AS REQUIRED TO M AINTAIN EXHAUST

IN PHASE 2, AND ALL OTHER EXISTING SPACES, DURING PHASE 1 CONSTRUCTION.

AND, PHASE 1 AND ALL OTHER EXISTING SPACES, DURING PHASE 2.

PLAN NOTES

1. EXISTING DUCTW ORK TO REM AIN.

2. EXISTING AIR DEVICE TO REMAIN.

3. EXISTING AIR CONTROL TERM INAL UNIT TO REM AIN.

4. REM OVE EXISTING HEPA FILTER AND ASSOCIATED SUPPORTS, ETC.

5. REM OVE EXISTING EXHAUST AIR CONTROL DEVICE ALONG W ITH ALL

ASSOCIATED HANGERS, W IRING, CONTROLS, ETC.

6. REM OVE EXISTING DUAL DUCT VAV BOX AND ALL ASSOCIATED BRANCH

DUCTW ORK, CONTROLS, HANGERS, TUBING, ETC. CAP AND SEAL REM AINING

DUCTW ORK AIR TIGHT.

7. REM OVE EXISTING AIR DEVICE AND ASSOCIATED BRANCH DUCTW ORK ETC.

CAP AND SEAL REMAINING DUCTW ORK AIR TIGHT.

8. REM OVE EXISTING THERM OSTAT AND ASSOCIATED W IRING/TUBING, ETC.

9. REM OVE EXISTING DUCTW ORK AND ASSOCIATED DAMPERS, SUPPORTS, ETC.

CAP AND SEAL REMAINING DUCTW ORK AIR TIGHT.

10. REM OVE AIR DEVICE FOR REPLACEMENT IN NEW W ORK.

11. W ORK IN THIS AREA SHALL TAKE PLACE IN PHASE 1 DURING OFF HOURS

(9PM -5AM ). COORDINATE CLOSELY W ITH COR.

12. DUCT TO BE REPLACED DURING PHASE 1.

13. EXISTING THERMOSTAT TO REMAIN.

14. REM OVE AIR DEVICE FOR REPLACEMENT IN NEW W ORK. CAP DUCTW ORK AS

REQUIRED. SEAL AIR TIGHT.

15. REM OVE EXISTING DUAL DUCT VAV BOX AND ASSOCIATED DUCTW ORK,

CONTROLS, ETC. REMOVE DUCTW ORK AS REQUIRED FOR BOX

REPLACEMENT. REM OVE UNUSED HOT/COLD DUCT BACK TO MAIN, CAP AND

SEAL AIR TIGHT.

16. REFER TO SHEET MH103 FOR PHASE 1 TEM PORARY W ORK IN THIS AREA.

17. DUCT SHALL BE ACTIVE DURING PHASE 2 CONSTRUCTION. SCHEDULE ALL

DOW N TIM E MINIM UM 3 W EEKS IN ADVANCE W ITH COR. DUCT SHALL ONLY BE

TAKEN OUT OF SERVICE BETW EEN 9PM AND 5AM .

18. DUCT SHALL BE REPLACED OVER ONE W EEKEND (9PM FRIDAY TO 5AM

MONDAY).

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - REMOVALS -

DEDUCT ALTERNATE #2

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - REMOVALS -

DEDUCT ALTERNATE #1

CEILINGS ARE EXISTING TO REM AIN UNDER THIS ALTERNATE. REM OVE AND REINSTALL AS

REQUIRED. TAKE PHOTOGRAPHS OF EXISTING PRIOR TO PERFORMING W ORK.

REPAIR/REPLACE ANY CEILINGS THAT ARE DAMAGED AS PART OF THIS W ORK TO PRE-W ORK

CONDITION.

N N.T.S.Scale:

KEY PLAN

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

(ALL BASE BID PHASING NOTES APPLY)

(ALL BASE BID PHASING NOTES APPLY)

A B C D E F

4.2

3.1

2.1

M

P C

H

W S 4

H W

R

C H

S

C H

R

M P

S

M

P C

H

W S

H

W R

C

H S

C

H R 2

M P

S

C H

R

C H

S

H W

R

H W

S

M P

C

1 .25" - MPS

.5

H W

S

.5

H

W R x2

60x24

27/18 OV

80x22

64/20 OV

x5

48/20 OV

46/22 OV

44x4046x42

48x24 x2

6/

O

V

7/

O V

60x22

49/18 OV

48x24

48x24 x2 x3 x2

80x22 x1

20x12

40x46

40x46 UP TO 3RD FLOOR

330-SH12

330-CC12b

330-CC12a

4" - CHR

4" - CHS3" - CHS

3" - CHR

3" - CHR

3" - CHS

330-RF12

330-SF12

2 4 PH.1 - 9,500 CFM

PH.2 - 7,000 CFM

RELIEF PLENUM

EF-7 10

2 DN FROM

3RD

FLOOR

UP TO 3RD

FLOOR

330-AHU12

31/18 OV

UP TO 3RD

FLOOR

4 PH.1 - 11,435 CFM

PH.2 - 11,100 CFM

6 8

5 7

34/18 OV

40/18 OV

46x18

AREA OF W ORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

JPA Project No.

Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528

/9

/2

:3

:4

A

M

Renovate TCU-ICU Space Bldg. 330

03/09/2020

PARTIAL SECOND FLOOR PLAN -

NEW W ORK

MH102

PCWW JS

17005.00

552-18-102

Dayton, Ohio

N Scale: 1/8" = 1'-0"

PARTIAL SECOND FLOOR PLAN - NEW WORK

GENERAL NOTES

A REFER TO SHEET M 001 FOR LEGEND, INDEX AND GENERAL NOTES.

B REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORM ATION.

C PROVIDE ACCESS TO ALL EQUIPM ENT, COMPONENTS, ETC. REQUIRED FOR

BALANCING, ADJUSTMENT, MAINTENANCE, ETC. COORDINATE ACCESS

PANEL LOCATIONS CLOSELY W ITH G.C.

D AFTER EACH PHASE, THE HVAC SYSTEM S SHALL BE REBALANCED AND

COMM ISSIONED TO ENSURE CORRECT OPERATION OF TCU/ICU SUITE. FULL

RE-BALANCING OF PHASE 1 SYSTEMS W ILL BE REQUIRED AT PROJECT

COMPLETION.

PLAN NOTES

1. EXTEND NEW 2.5" HOT W ATER SUPPLY AND RETURN UP TO THIRD FLOOR.

2. EXISTING DUCTW ORK TO REM AIN.

3. EXISTING AIR HANDLING UNIT TO REMAIN.

4. BALANCE EXISTING FAN TO INDICATED CFM DURING LISTED OF

CONSTRUCTION (NUMBER IS 10% HIGHER THAN ADDITIVE AIR TERM INAL

UNITS). BALANCE FAN TO SCHEDULED CFM (M601) FOR FINAL TAB. REPLACE

SHEAVES AS REQUIRED.

5. REPLACE SUPPLY FAN M OTOR. CLEAN AND INSPECT FAN PRIOR TO PUTTING

BACK INTO OPERATION.

6. REPLACE RETURN FAN M OTOR. CLEAN AND INSPECT FAN PRIOR TO PUTTING

BACK INTO OPERATION.

7. PROVIDE NEW VFD FOR SUPPLY FAN.

8. PROVIDE NEW VFD FOR RETUN FAN.

9. PROVIDE 18" TEMPORARY BYPASS DUCT FOR SUPPLY FAN MINIMUM FLOW .

DUCT SHALL BE INSTALLED PRIOR TO ANY REM OVAL W ORK AND SHALL BE

REM OVED AFTER ATU'S IN PHASE 2 ARE OPERATIONAL. SEAL DUCT M AINS

AIR TIGHT AFTER REMOVAL.

10. REPLACE SHEAVES AND BALANCE FAN AS REQUIRED THROUGHOUT

CONSTRUCTION TO MAINTAIN AIR FLOW S FOR SPACES OUTSIDE

CONSTRUCTION ZONE.

11. TRAVERSE DUCT AND M AINTAIN AIR FLOW THROUGHOUT CONSTRUCTION.

12. BALANCE M INIMUM OUTSIDE AIR TO SCHEDULED VALUE ON SHEET M 601.

13. PROVIDE NEW MINIM UM AND M AXIM UM OUTSIDE AIR DAMPERS W ITH

INTEGRAL AIR FLOW M EASURING STATIONS.

14. APPROXIM ATE LOCATION OF EXISTING AIR FLOW M EASURING STATION TO

REM AIN.

PHASE 1

• ALL W ORK ASSOCIATED W ITH RETURN AIR

• HW S & HW R UP TO 3RD FLOOR FOR ATU'S

PROVIDE CONNECTION TO HOT DECK HEATING COIL PIPING. PROVIDE

ISOLATION VALVES FOR ATU PIPING AND ISOLATION VALVES FOR HOT DECK

PIPING TO KEEP PHASE 2 DOW N TIM E TO AN ABSOLUTE MINIM UM .

• BALANCE FANS AS INDICATED.

PHASING SEQUENCE FOR 2ND FLOOR

PHASE 2

• REM AINDER OF W ORK.

• REM OVE TEMPORARY PHASE 1 PIPING CONNECTIONS AND PROVIDE

PERMANENT CONNECTIONS AS SHOW N. W ORK SHALL BE PERFORM ED TO

KEEP DOW NTIME TO AN ABSOLUTE MINIM UM AND SHALL TAKE PLACE

BETW EEN OFF HOURS (9PM-5AM). COORDINATE CLOSELY W ITH COR.

N N.T.S.Scale:

KEY PLAN

REFER TO SHEET M001 FOR ADDITIONAL REQUIREM ENTS.

C

CTCT

TT

TTTT

T

T

T

T

T

T

T

T

T

T T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T T T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

A B C D E F

5.3

4.2

3.1

2.1

3B145

STORAGE

3B135a

RESTROOM

3B135

BED

ROOM,

BARIATRIC

3B137

BED

ROOM ,

INFECTION

CONTROL

3B138

BARIATRIC,

INFECTION

CONTROL

3B140

BED

ROOM

3B142

BED

ROOM

3B161

BEDROOM

RESIDENT

ON-CALL

3B163

BEDROOM

RESIDENT

ON-CALL

3B161A

BATH/SHOWER

ROOM

3B142a

RESTROOM

3B140a

RESTROOM

3B138a

RESTROOM

3B137a

RESTROOM

3B138b

ANTE

ROOM3B137b

ANTE

ROOM

3B125a

RESTROOM

3B125

BED

ROOM

3B124

BED

ROOM ,

INFECTION

CONTROL

3B124a

RESTROOM

3B123a

RESTROOM

3B123

BED

ROOM ,

INFECTION

CONTROL

3B122

BED

ROOM

3B122a

RESTROOM

3B121a

RESTROOM

3B121

BED

ROOM

3B120

OFFICE

3B110a

RESTROOM

3B115

NOURISHM ENT

3B110

BED

ROOM,

BARIATRIC

3B108

BED

ROOM

3B108a

RESTROOM

3B105

BED

ROOM

3B105a

RESTROOM

3B102

CONSULTATION

ROOM

3B100

CONFERENCE

ROOM

C3-30

LOBBY

3B101

WAITING

ROOM

3B103

OFFICE

3B104D

LOCKER

ROOM

3B104C

TOILET,

FEM ALE

3B104B

TOILET,

M ALE

3B104A

LOCKER

ROOM

3B104

VESTIBULE

3B158a

RESTROOM

3B158

BED

ROOM

3B160a

RESTROOM

3B171

ALCOVE,

WHEELCHAIR

3B160

BED

ROOM

3C-27

CORRIDOR

3B162

OFFICE,

PHYSICIAN

C3-20

CORRIDOR

C3-19

CORRIDOR

C3-18

CORRIDOR

C3-14

CORRIDOR

C3-15

CONTROL

CENTER

C3-17

CORRIDOR

3B126

TOILET,

FEM ALE

3B128

TOILET,

M ALE

3B130

UTILITY

ROOM ,

CLEAN

3B139

CLEAN

LINEN

3B144

ELECTRICAL

CLOSET

3B119

M ED

ROOM

C3-22

CORRIDOR

3B144

NOURISHM ENT

C3-25

CONTROL

CENTER

3B151

NURSE

WORKROOM

3B152

SOILED

UTILITY

C3-27

CORRIDOR

3B154

M EDICATION

PREP.

3B155

HAC

3B156

STORAGE

C3-23

CORRIDOR

3B148

STORAGE

3B149

STORAGE

3B150

OFFICE

3B145

BREAK

ROOM

3B117

OFFICE

3B114

NURSE

WORKROOM

3B116

CLEAN

LINEN

3B109

UTILITY

ROOM ,

CLEAN

3B107

SOILED

UTILITY

3B147

OFFICE

C3-12

CORRIDOR

C3-26

CORRIDOR

M 300

DN TO

AH-12

DN TO

AH-12

SA

SA

34x14 28x14 24x14 ø12 ø 12 ø

12x8

14x10

12ø

10ø

8x

28/14 OV

23/14 OV

22/1 4 O

V 34/18 O

V40/1 8 O

V

22/1 4 O

V

26x16

26x1 x1

16x1

26x1 426x14 x1 x1 x1

42x20

46x24 34x20 x1

16ø18ø

18ø 16ø

14ø 10ø

24x8 x1

10x10

11-1

12x8

11-2 8ø

2x

4x x1 x1

4x

12x8

32x14

32x14 x1

12-912-1012-11

12-23

12-12

12-13

12-35

12-16

12-15

12-14

12-1 12-2

12-3

12-4

12-5

12-6

3B159

BED

ROOM

12-7

12-8

12-17

12-18

12-19

12-20

12-2112-22

12-27 12-253B164

STORAGE

12-26

12-30

12-28

12-29

12-31 12-32

12-34

12-33

12-39

12-36

12-42

12-38

8ø

CD1

180 CFM

6ø

CD1

75 CFM

6ø

CD1

150 CFM

6ø

CD1

75 CFM

8ø

CD1

230 CFM

12x10

8ø

CD1

230 CFM

8ø

CD1

185 CFM

14x12

8ø

CD1

180 CFM

6ø

CD1

75 CFM

6ø

CD1

75 CFM

8ø

CD1

180 CFM

8ø

CD1

180 CFM

6ø

CD1

75 CFM

6ø

CD1

75 CFM

8ø

CD1

180 CFM

12x10

6ø

(2)CD1

150 CFM

10x10

10x10 10x10

8ø

CD1

250 CFM

6ø

CD1

90 CFM

6ø

CD1

90 CFM

8ø

CD1

180 CFM

8ø

CD1

220 CFM

3B124b

ANTE

ROOM

3B123b

ANTE

ROOM

3B159a

RESTROOM

3B112

ALCOVE

WHEELCHAIR

3B166

ALCOVE

CRASH

CART

3B165

ALCOVE,

WHEELCHAIR

3B141a

ALCOVE

TRAY

STORAGE

x1

12x10

12x10

8ø

CD1

165 CFM

10x10

UC

U C

UC

UC

UC

UC

UC

U C

U C

UC

8ø

CD1

195 CFM

6ø

CD2

110 CFM

8ø

CD1

250 CFM10ø

CD1

375 CFM

24x12

435 CFM

CG1

24x12

75 CFM

CR2

8ø

CD1

150 CFM

12ø

CD1

505 CFM

24x12

430 CFM

CG1

8ø

CD2

185 CFM

8ø

CD1

180 CFM

x1 x1

UC

x1

8ø

CD2

185 CFM

U C

U C

8ø

CD1

230 CFM

14x10

8ø

CD1

185 CFM

8ø

CD1

150 CFM

8ø

CD1

150 CFM

8ø

CD1

230 CFM

14x12 x1

10ø

CD1

290 CFM

x1

10ø

CD1

295 CFM

24x12

585 CFM

CG1

x1

10ø

CD1

265 CFM

6x1 x1

6ø

CD1

135 CFM

6ø

CD1

70 CFM

10ø

CD1

315 CFM

8x10

6ø

CD1

80 CFM24x12

150 CFM

CR1

6ø

CD1

125 CFM

8ø

(2)CD1

210 CFM

6x8

10x1

42x20

40x20

42x20

30x8

515 CFM

TR1

x1

8ø

CD1

250 CFM

6x1

8ø

CD1

160 CFM

6x10

6ø

CD1

110 CFM

8ø

CD3

185 CFM

14x12

UC

UC

6ø

CD1

90 CFM

8ø

CD3

130 CFM

8ø

CD3

130 CFM

8ø

CD1

255 CFM

10ø

CD1

360 CFM

6ø

CD1

120 CFM

8ø

CD1

150 CFM

x1 x1

8x8

8ø

CD1

130 CFM

6ø

CD1

75 CFM

6ø

CD1

75 CFM

6ø

CD1

75 CFM

26x18

6ø

CD1

105 CFM

10ø

CD1

375 CFM

6ø

CD1

110 CFM

8ø

CD1

265 CFM

8ø

CD1

140 CFM

x1 x1

14x1

8x8

8x8

6ø

CD1

75 CFM

8x1

8ø

6ø

CD1

75 CFM

x1

6x8

12x8 12x6

2x

5 75

5 75

12x10 8ø

10ø

CD1

350 CFM

8ø

CD1

250 CFM

8ø

CD1

250 CFM

14x12

8ø

CD1

230 CFM

24x12

430 CFM

CG1

24x12

580 CFM

CR1

24x12

150 CFM

CG1

24x12

230 CFM

CG1

24x12

380 CFM

CR1

24x12

375 CFM

CR1

24x12

225 CFM

CG1

24x12

225 CFM

CG1

24x12

435 CFM

CG1

24x12

175 CFM

CG1

24x12

250 CFM

CG1

24x12

325 CFM

CG1

24x12

125 CFM

CG1

24x12

215 CFM

CG1

24x12

160 CFM

CG1

12x14

24x12

150 CFM

CR2

24x12

150 CFM

CR2

24x12

150 CFM

CR2

24x12

150 CFM

CR2

24x12

150 CFM

CR2

U C

U C

U C

24x12

260 CFM

CR2

24x12

260 CFM

CR2

24x12

225 CFM

CR1

24x12

225 CFM

CR1

24x12

580 CFM

CR1

24x12

260 CFM

(2)CR2

24x12

150 CFM

CG1

24x12

640 CFM

CG1

24x12

355 CFM

CG1

24x12

185 CFM

CR2

24x12

290 CFM

CG1

24x12

75 CFM

CR2

24x12

230 CFM

CG1

20x12 10x14 x1

24x12

350 CFM

CG1

5 105

24x12

120 CFM

CR1

24x12

100 CFM

CR1 8

x8

24x12

75 CFM

CR2

x8 x1

0x

0x

24x12

165 CFM

CR2

24x12

165 CFM

CR2

24x12 x1 x1

12x10

14x6

24x12

225 CFM

CR1

24x12

210 CFM

CR1

24x12

210 CFM

CG1

12x12

24x12

75 CFM

CR1

24x12

75 CFM

CR1

12x8

16x8

12x8

12x6

12x6

24x12

90 CFM

CG1

24x12

210 CFM

CR1

24x12

265 CFM

CG1

14x6

24x12

265 CFM

CG1

24x12

210 CFM

CG1

24x12

140 CFM

CG1

14x8

12x6

24x24

525 CFM

CG1

8x6

24x12

105 CFM

CG1

24x12

100 CFM

CG1

24x12

150 CFM

CG1

24x12

305 CFM

CG1

10x8

24x12

75 CFM

CG1

24x12

75 CFM

CG1

24x12

125 CFM

CG1

24x24

430 CFM

CG1

6x

24x12

50 CFM

CG1

24x12

435 CFM

CG1

16x12

860 CFM

TR1

24x12

105 CFM

CG1

24x24

360 CFM

CG1

8ø

CD6

155 CFM

10ø

CD5

310 CFM

8ø

CD5

155 CFM

6ø

CD6

80 CFM

6ø

CD6

65 CFM

8ø

CD5

135 CFM

6ø

CD5

120 CFM

6ø

CD6

60 CFM

6ø

CD5

105 CFM

6ø

CD6

50 CFM

6ø

CD5

80 CFM

6ø

CD6

40 CFM

6ø

CD5

80 CFM

6ø

CD6

40 CFM

6ø

CD6

45 CFM

6ø

CD5

80 CFM

6ø

CD5

90 CFM

6ø

CD6

45 CFM

8ø

CD5

185 CFM

6ø

CD6

95 CFM

6ø

CD6

90 CFM

8ø

CD5

185 CFM

6ø

CD6

90 CFM

8ø

CD5

185 CFM

6ø

CD6

90 CFM

8ø

CD5

185 CFM

8ø

CD3

190 CFM

8ø

CD3

200 CFM

8ø

CD3

200 CFM

8ø

CD3

180 CFM

8ø

CD3

180 CFM

8ø

CD3

135 CFM

12-24

18x16 14x12

12x12

0x

10x814x12

18x10

24x12

185 CFM

CR1

14x12 14x10

24x12

50 CFM

CG1

14x8

10x8

40x46

DN TO

RF-12

330-FC1

x1 x1

26x14 x1 ø

12ø

10ø

16x14

22x14

10x1

8ø

6x6 x1 x1 x1

12x12

8x6

8ø

CD1

260 CFM

ø

12ø

6ø

CD5

80 CFM

6ø

CD6

40 CFM

8x8 18x16

12x128 ø

10x10

8ø

CD3

135 CFM

6x8

4x x1 ø

1/

O

V18 ø

14ø ø

6x8

6x8

12-41

8x6

8x6

0x

6x6

6x6

24x12

100 CFM

CR1

24x12

70 CFM

CG1

x1

12-40

10ø x1

12-37

8ø

12ø ø

16x14

22x14 x1

12ø ø ø ø

8x10

4x

20x14 x1

24x12

500 CFM

CG1

5 190

5 375

5 185

24x12

225 CFM

CR1

24x12

150 CFM

CR2

6ø

(2)CD1

150 CFM

x1

12E2

12E1

12E3

M 300

P H

A S

E

P H

A S

E

PHASE 1

PHASE 2 24x12

250 CFM

CG1

6ø

CD1

105 CFM

5 540

10ø

6ø

3B111

COMM

CLOSET

8x10

5 250

DN TO

EF-7

24x12

140 CFM

CG1

22x8

515 CFM

TR2

14x1

22x12

860 CFM

TR2

14x8 x1

RA

S A

S A

E A

R A

R A

R A

RA

EA

R A

SA

14ø RA

EA

RA

EA

SA

RA

SA

SA

SA

E A

B D

3.1

2.1

C3-20

CORRIDOR

C3-15

CONTROL

CENTER

C3-17

CORRIDOR

3B126

TOILET,

FEM ALE

3B128

TOILET,

M ALE

3B130

UTILITY

ROOM ,

CLEAN

3B144

ELECTRICAL

CLOSET

C3-22

CORRIDOR

C3-25

CONTROL

CENTER

3B154

M EDICATION

PREP.

C3-23

CORRIDOR

3B150

OFFICE

3B109

UTILITY

ROOM ,

CLEAN

DN TO

AH-12

DN TO

AH-12

UC

UC

5 150

3B129A

STORAGE

3B177

OFFICE

3B178

UTILITY

ROOM ,

SOILED

3B176

M EDICATION

PREP

3B175

KITCHEN

NOURISHM ENT

3B174

OFFICE

3B117

OFFICE

PHYSICIAN

3B179

BREAK

ROOM

3B180

KITCHEN

MISC.

3B147

STORAGE

GEN.

3B107

STORAGE,

STRETCHER/WHEELCHAIR

3B106

UTILITY

ROOM ,

SOILED

3B182

UTILITY

ROOM ,

SOILED

3B155

UTILITY

ROOM ,

CLEAN

3B148

HOUSEKEEPING

AND

CLOSET

3B149

OFFICE

3B181

TOILET

3B151

NOURISHM ENT

3B152

LINEN

ROOM,

SOILED

3B139

TOILET

CONGREGATE

26x14

26x1

16x1

24x24

810 CFM

CG1

10ø

CD1

340 CFM

150 125 5 140

5 250

5 250

5 150

12-27

12-25 12-42

12-26

12-30

12-31

12-34

12-33

12-38

12-37

12-40

10ø

CD1

365 CFM

10ø

CD1

360 CFM

10ø

CD1

365 CFM

24x12

140 CFM

CG1

6ø

CD2

140 CFM

6ø

CD1

80 CFM

10ø

CD1

340 CFM

8ø

CD1

180 CFM

24x12

160 CFM

J2

330-FC1

22/1 4 O

V 34/18 O

V

0/

O

V

0x ø

4x

12ø

10ø x1

48/1 8 O

V

22/1 4 O

V

10x1

8x1

14x6

2x

12x10

12x6

2x

8x10

14x10

26x18

32x14

36x14

8x10 8x6

2x x1 x1

18x1

26x1

16x8

12x8 x1

2x ø ø ø ø 14x6

10x10

12x16

8x1

12x6

CORRIDOR

C3-14

CORRIDOR

C3-14

CORRIDOR

C3-22

CORRIDOR

C3-26 12-41

8ø

10ø

B D

3.1

2.1

C3-20

CORRIDOR

C3-15

CONTROL

CENTER

C3-17

CORRIDOR

3B126

TOILET,

FEM ALE

3B128

TOILET,

M ALE

3B130

UTILITY

ROOM ,

CLEAN

3B144

ELECTRICAL

CLOSET

C3-22

CORRIDOR

C3-25

CONTROL

CENTER

3B154

M EDICATION

PREP.

C3-23

CORRIDOR

3B150

OFFICE

3B109

UTILITY

ROOM ,

CLEAN

C3-26

CORRIDOR

DN TO

AH-12

DN TO

AH-12

HO

T

CO

LD

UC

UC

5 150

1 1

3B129A

STORAGE

3B177

OFFICE

3B178

UTILITY

ROOM ,

SOILED

3B176

M EDICATION

PREP

3B175

KITCHEN

NOURISHM ENT

3B174

OFFICE

3B117

OFFICE

PHYSICIAN

3B179

BREAK

ROOM

3B180

KITCHEN

MISC.

3B147

STORAGE

GEN.

3B107

STORAGE,

STRETCHER/WHEELCHAIR

3B106

UTILITY

ROOM ,

SOILED

3B182

UTILITY

ROOM ,

SOILED

3B155

UTILITY

ROOM ,

CLEAN

3B148

HOUSEKEEPING

AND

CLOSET

3B149

OFFICE

3B181

TOILET

3B151

NOURISHM ENT

3B152

LINEN

ROOM,

SOILED

3B139

TOILET

CONGREGATE

10ø

CD1

365 CFM

10ø

CD1

360 CFM

10ø

CD1

410 CFM

24x12

50 CFM

J2

8ø

CD1

180 CFM

6ø

CD1

60 CFM

8ø

CD1

180 CFM

24x12

180 CFM

J2

6ø

CD1

150 CFM 6ø

CD1

120 CFM

24x12

100 CFM

CR1

6ø

CD1

150 CFM

24x12

150 CFM

J2

24x12

120 CFM

J2 8ø

CD1

290 CFM

24x12

290 CFM

J2

8ø

CD1

200 CFM

6ø

CD1

80 CFM

24x12

200 CFM

J2

24x12

180 CFM

J2

6ø

CD1

150 CFM

8ø

CD1

180 CFM

8ø

CD1

250 CFM

24x12

250 CFM

J2

8ø

CD1

250 CFM

6ø

CD1

120 CFM

24x12

135 CFM

CR1

6ø

CD1

140 CFM

6ø

CD1

140 CFM

24x12

125 CFM

J2

24x12

155 CFM

CR1

24x12

85 CFM

J2

6ø

CD1

100 CFM

8ø

CD1

180 CFM

24x12

180 CFM

J2

10ø

CD1

340 CFM

24x24

810 CFM

CR1

6ø

CD1

40 CFM

24x12

40 CFM

J2

8ø

CD1

160 CFM

24x12

160 CFM

J2

6ø

CG1

100 CFM

6ø

CG1

100 CFM

6ø

CD2

140 CFM

10ø

CD1

320 CFM

24x12

320 CFM

CG1 24x12

100 CFM

CR1

24x12

180 CFM

J2

24x12

150 CFM

CR2

24x12

160 CFM

J2

24x12

150 CFM

J2

8ø

CD1

180 CFM

30x8

490 CFM

TR1

12-27

12-25

12-42 12-40

12-38

12-34

12-33

12-31

12-30

12-26

12-37

10ø

CD1

340 CFM

10ø

CD1

365 CFM

24x12

140 CFM

CG1

36x14

12x16 8x12

12x10

12x6

26x18

14x10

26x1 x1 x1

16x1

2x

26x1 x1 ø ø

14x6 x1 ø ø

2x

16x1

16x1 5 10x10

8x1

48/1 8 O

V x1

12x8

16x8

14x6

12x8

22/1 4 O

V

0/

O

V

34/18 O V

0x ø

4x

10ø

12ø

10ø

8ø 8ø

2x

2x

6 8x10

330-FC1

24x12

210 CFM

CR1

32x14

CORRIDOR

C3-26

CORRIDOR

C3-14

CORRIDOR

C3-14

CORRIDOR

C3-22

6ø

CD1

150 CFM

12-41

DN TO

AH-12

18ø

3B164

STORAGE

14x12

1/

O

V

CAP

4.2

17/14 OV

ø ø

20/14 OV

ø x1

24x12

CAP

x1

AREA OF W ORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

JPA Project No.

Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528

/9

/2

:4

:5

A

M

Renovate TCU-ICU Space Bldg. 330

03/09/2020

PARTIAL THIRD FLOOR PLAN -

DUCTW ORK

MH103

PCWW JS

17005.00

552-18-102

Dayton, Ohio

N Scale: 1/8" = 1'-0"1

PARTIAL THIRD FLOOR PLAN - DUCTW ORK - BASE BID

GENERAL NOTES

A REFER TO SHEET M001 FOR LEGEND, INDEX AND GENERAL NOTES.

B REFER TO ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORM ATION.

C PROVIDE ACCESS TO ALL EQUIPM ENT, COM PONENTS, ETC. REQUIRED FOR

BALANCING, ADJUSTMENT, MAINTENANCE, ETC. COORDINATE ACCESS PANEL

LOCATIONS CLOSELY W ITH G.C.

D AFTER EACH PHASE, THE HVAC SYSTEMS SHALL BE REBALANCED AND

COMM ISSIONED TO ENSURE CORRECT OPERATION OF TCU/ICU SUITE. RE-

BALANCING OF PHASE 1 SYSTEM S W ILL BE REQUIRED AT PROJECT COMPLETION.

E PHASING LINE AND PHASING DETAILS SHOW INTENT. PROVIDE ALL ISOLATION

VALVES, DAM PERS, DUCT CAPS, TEM PORARY DUCTW ORK, ETC. TO

ACCOM MODATE PHASING.

F DEDUCT ALTERNATE PLANS ONLY SHOW AREAS OF W ORK THAT CHANGE FROM

BASE BID. ALL W ORK NOT SHOW N ON DEDUCT ALTERNATE PLANS SHALL REM AIN

AS SHOW N ON BASE BID PLAN UNDER ALL BIDDING SCENARIOS.

PLAN NOTES

1. EXISTING DUCTW ORK TO REM AIN.

2. EXISTING AIR DEVICE TO REMAIN.

3. EXISTING AIR CONTROL TERM INAL UNIT TO REM AIN.

4. ROOM PRESSURE RELATIONSHIPS TAKE PRECEDENCE OVER LISTED AIR

FLOW QUANTITIES. ROOM S SHALL BE M INIMUM 0.01" W .C. NEGATIVE TO

CORRIDOR. PROVIDE DIGITAL PRESSURE MONITOR W ITH LOCAL DISPLAY FOR

ISOLATION ROOM AND ANTE ROOM . REFER TO SHEET MP103 FOR

ADDITIONAL REQUIREM ENTS.

5. EXISTING AIR DEVICE TO REMAIN. BALANCE TO CFM INDICATED.

6. DUCTW ORK TO BE PROVIDED IN PHASE 1 DURING OFF HOURS (9PM -5AM ).

COORDINATE CLOSELY W ITH COR.

7. BALANCE ATU ACCORDINGLY UNDER PHASE 1 AND AGAIN UNDER PHASE 2.

8. W ORK IN THIS AREA SHALL TAKE PLACE IN PHASE 1 DURING OFF HOURS

(9PM -5AM ). COORDINATE CLOSELY W ITH COR.

9. DUCT SHALL BE ACTIVE DURING PHASE 2 CONSTRUCTION.

10. PROVIDE TEM PORARY DUCT DURING PHASE 2 CONSTRUCTION IF REQUIRED

FOR PHASE 1 ATU'S TO BE OPERATIONAL.

11. PROVIDE ALL REQUIRED M ANUAL DAM PERS TO ACCOM MODATE PHASING.

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - DUCTWORK -

DEDUCT ALTERNATE #2

N Scale: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - DUCTWORK -

DEDUCT ALTERNATE #1

PHASE 1 TEMPORARY

PHASE 1 TEMPORARY

N N.T.S.Scale:

KEY PLAN

PHASE 1

PHASE 2

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

P H

A S

E

CEILINGS ARE EXISTING TO REM AIN UNDER THIS ALTERNATE. REM OVE AND REINSTALL AS

REQUIRED. TAKE PHOTOGRAPHS OF EXISTING PRIOR TO PERFORMING W ORK.

REPAIR/REPLACE ANY CEILINGS THAT ARE DAMAGED AS PART OF THIS W ORK TO PRE-W ORK

CONDITION.

(ALL BASE BID PHASING NOTES APPLY)

(ALL BASE BID PHASING NOTES APPLY)

B C D F

4.2

2.1

330-EF1

330-EF2

330-CU1

2 R

4 1

AREA OF W ORK

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt er s in ch o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

FULLY SPRINKLERED

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

JPA Project No.

Dwg. ofHEAPY PROJECT No.: 2017-05154 FIRM LICENSE No.: 01528

/9

/2

:4

:0

A

M

Renovate TCU-ICU Space Bldg. 330

03/09/2020

ROOF PLAN

MH104

PCWW JS

17005.00

552-1…