This pre-solicitation notice announces a requirement by the Department of Veterans Affairs to renovate approximately 17,000 square feet of ICU/TCU space at the Dayton VA Medical Center. Key details include:
-
The project is set aside only for Service-Disabled Veteran-Owned Small Businesses and involves upgrading outdated IT systems associated with the renovation.
-
The solicitation and specifications will be posted on March 20, 2020 on FBO.gov with proposals due approximately 30 days later. Interested parties should register on FBO.gov to receive updates.
-
The project value is estimated between $5-10 million. The NAICS code is 236220 with a small business size standard of $39.5 million.
-
The SDVOSB prime or subcontractor must perform a minimum of 15% of construction work. Bid, payment and performance bonds will be required.
-
A one-time site visit will be scheduled. Amendments will be posted on FBO.gov and questions can be emailed to the point of contact by the deadline. The successful offeror must complete work within 365 calendar days of the notice to proceed.
36C25020B0028 S02. Attachment 3 - Project Drawings - Arch Structural (2 of 2).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25020B0028 0006.docx | DOCX document | |
| 36C25020B0028 0005.docx | DOCX document | |
| Site Visit sign-in.pdf | ||
| 20200702 Addendum 1.pdf | ||
| 20200701 TCUICU 2nd Floor Room Names.pdf | ||
| 20200701 TCUICU 2nd Floor RCP.pdf | ||
| PreBid RFIs Answers.pdf | ||
| 36C25020B0028 0004.docx | DOCX document | |
| Bid Opening Instructions.pdf | ||
| 36C25020B0028-0003000.docx | DOCX document | |
| 36C25020B0028-0002000.docx | DOCX document | |
| 36C25020B0028-0001000.docx | DOCX document | |
| 36C25020B0028-0001001.pdf | ||
| 36C25020B0028-009.pdf | ||
| 36C25020B0028-007.pdf | ||
| 36C25020B0028-005.pdf | ||
| 36C25020B0028-008.pdf | ||
| 36C25020B0028-002.pdf | ||
| 36C25020B0028-006.pdf | ||
| 36C25020B0028-003.pdf | ||
| 36C25020B0028-001.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-5
SS-1
RB-1
SS-1
RB-1
P-5
5' - 8 1/2" 5' - 0" 5' - 0" 5' - 8"
SR
PRBCBC
SS-1SS-1
P-2
RB-1
12.28
P-5
4' - 2 1/2"5' - 0"5' - 0"5' - 0"4' - 2"
RB-1
P-2
SS-1SS-1
P-5
12.28
SS-1
RB-1
P-5
9.27
SS-1
RB-1
P-5
9.27
TM
3' - 4 1/2" 5' - 0" 5' - 0" 5' - 0"
PR
P-5
SS-1SS-1
RB-1
P-2
12.28
CP
B1 B1 B1
3' - 0"3' - 6"3' - 0"
SS-1
PL-1
RB-1
P-1
BC BC
4' - 2" 5' - 0" 5' - 0" 4' - 2 1/2"
P-5
RB-1
P-2
SS-1SS-1
12.28
CP
3' - 0" 3' - 0" B1 B1
RB-1
PL-1
SS-1
A512
A512
A512
A512
A512
A512
19' - 6"
" 9"
2' - 9"
6' - 0"
2'
2"
12.32
TYP.
A512
A512
A512
A512
24' - 6"
9"
2' - 9"
9' - 6"
2'
2"
A512
A512
12.32
TYP.
EQUIPMENT TAG
WINDOW OPENING
DOOR OPENING
FINISH DESIGNATION
X
XX
SIGNAGE TAG
TOILET ACCESSORY TAGX
X
TAG LEGEND
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
ENLARGED PLANS & INTERIOR
ELEVATIONS - DEDUCT
ALTERNATE
A406
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1/4" = 1'-0"6
C3-25 CONTROL CENTER
Scale: 1/4" = 1'-0"7
C3-25 CONTROL CENTER
Scale: 1/4" = 1'-0"8
C3-25 CONTROL CENTER
Scale: 1/4" = 1'-0"9
C3-25 CONTROL CENTER
Scale: 1/4" = 1'-0"1
C3-15 CONTROL CENTER
Scale: 1/4" = 1'-0"2
C3-15 CONTROL CENTER
Scale: 1/4" = 1'-0"3
C3-15 CONTROL CENTER
Scale: 1/4" = 1'-0"10
C3-25 CONTROL CENTER
Scale: 1/4" = 1'-0"4
C3-15 CONTROL CENTER
Scale: 1/4" = 1'-0"5
C3-15 CONTROL CENTER
Scale: 1/4" = 1'-0"A
C3-15 CONTROL CENTER - DEDUCT ALT #1, 2
Scale: 1/4" = 1'-0"B
C3-25 CONTROL CENTER - DEDUCT ALT #1, 2
GENERAL INT. ELEVATION NOTES
A. See Sheet AF101-F for Floor Finish Plan.
B. See Sheet A511 for Casework Details.
C. See Sheet AF601 for Room Finish Schedule.
D. See Sheet AF601 for Finish Materials Legend.
E. Provide tile substrate as follows: All Restrooms, HAC will receive Water-resistant gyp. board. Kitchen will receive Gyp. board.
F. Coordinate with owner and verify owner-provided equipment.
G. See Sheet A501 for Drop Down Grab Bar Details.
H. See Sheet F902 for Equipment Schedule.
I. See Sheet AS101 for Signage Schedule.
PLAN NOTES
9.27 Gypsum board soffit.
12.28 In-wall recessed countertop support bracket, 18" x 20".
12.32 2" Wire management grommet. Coordinate exact location with COR.
Revision s
Date
7 100% For Bid 03.09.2020
1' - 6"
9.02 9.44 9.315.175.195.20 5.26
/2
/2
1 1/2" 4 1/2" 4 1/2" 1 1/2"
5.277.06 7.06
5.18
330-THIRD FLOOR
126' - 0"
5.20 9.31
9.02
5.31
/4
2' - 6 1/2"
M in
5"
7.06
7.06
5.30
S2.0
5.19
5.17
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
MISCELLANEOUS DETAILS
A501
DWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1 1/2" = 1'-0"1
DROP DOWN GRAB BAR PLAN
Scale: 1 1/2" = 1'-0"2
DROP DOWN GRAB BAR SECTION
PLAN NOTES
5.17 TS 6" x 3" x 1/4" welded to bottom plate w/ 3/16" weld.
5.18 Drop down grab bar.
5.19 3/8" diameter expansion anchor with 2 3/4" embed.
5.20 3/8" steel base plate.
5.26 Metal sleeve.
5.27 Mounting bracket.
5.30 Welded metal spacer to follow swing up grab bar mounting bracket profile.
5.31 Fasterners as required by grab bar manufacturer.
7.06 Sealant.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.31 Ceramic wall tile.
9.44 5/8" cement board.
TYPICAL AT EACH PATIENT TOILET
Revision s
9.60
12.31
12.22
12.30
12.20
Drawer
B1
9.60
12.31
12.30
12.20
Sink
12.21
Drawer
Drawer
B2B3B4
W1
9.60
12.29
12.30
12.19
12.21
1'-0"
12.30
12.31
12.22
12.21
12.12
W2
Drawer
Drawer
12.27
Sink
12.20 8"
2'-1"
1'-8"
1"
/2
/2
12.12
12.21
12.29
12.30
12.31
11.32
12.21
/2
1"
2'-1" 2'-1" 2'-1"
1"
/2
3"3"
/4
3"
/2
2' - 1"
/2
B6
12.20
12.19
12.19
12.20
12.19
W3
12.30
12.31
12.21
12.12
1' - 0" 1' - 0"
1' - 8"
12.29
12.29
12.28
3"
12.32
22.06
22.09
12.29 12.29
3"
3"
12.05
12.30
12.31
12.21
9.60
12.20
12.22
1'-6"
A511
1"
3"
12.32
12.14
/4
/4
/4
/4
/4
A511
B5
12.17
12.1712.17
12.21
11 1/8"
2' - 9 3/8"
3' - 5 1/2"
1 1/2" 2"
/4
12.21
12.05
12.30
12.31
12.07
12.0612.13
12.14
1" 2' - 9 1/2" 1"
3' - 5 1/2"
/4
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
CASEWORK SECTIONS &
DETAILS
A511
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1" = 1'-0"1
CASEWORK SECTIONS
9.60 Resilient base. See Room Finish Schedule.
11.32 Owner provided and installed microwave. See
Electrical and Plumbing Drawings.
12.05 Recessed pull.
12.06 Fixed shelf. Plastic laminate over 3/4" particle
board.
12.07 3/4" solid wood edge.
12.12 Soffit panel. Plastic laminate over 3/4" plywood.
Match finish to cabinet body finish.
12.13 Cabinet base panel. Plastic laminate over 3/4"
particle board.
12.14 Cutout gap in base panel for ventilation, 1" D.
12.17 Side splash. See Elevations for locations.
12.19 Applied solid surface backsplash.
12.20 Solid surface material over 3/4" plywood, with
1/4" eased edge.
12.21 Plastic laminate over 3/4" particle board.
12.22 Adjustable shelf. Plastic laminate over 3/4"
particle board.
12.27 Removable panel with concealed fasteners:
Plastic laminate over 3/4" plywood.
12.28 In-wall recessed countertop support bracket, 18"
x 20".
12.29 4" wire pull.
12.30 Self-latching, key-operated lock.
12.31 Concealed hinge.
12.32 2" Wire management grommet. Coordinate exact location with COR.
22.06 Undermount solid surface sink bowl.
22.09 Drop-in stainless steel sink. See Plumbing
Drawings.
DETAIL NOTES
GENERAL CASEWORK NOTES
A. See Interior Elevations on sheet A401-A406 for further information.
B. Lift hangers and bracing to be attatched to structural steel only. No attatchment to deck permitted.
Scale: 1" = 1'-0"2
B5 NURSE STATION
Scale: 1" = 1'-0"3
B5 NURSE STATION
Revision s
/2
/2 " 9"
2' - 9"
3"4 3/4"
12.20
12.2012.20
9.609.60
12.28
9.219.21
1 1/2"
12.32
2' - 6"
2' - 1 1/4"
12.20
2' - 9"
3"4 3/4"
12.20
12.28
9.609.60
9.219.21
12.20
1 1/2"
12.32
/2
12.2012.20
/2
2' - 1"
12.20
12.19
12.28
4 3/4" 3"
/4
/4
/4
12.2012.20
9.219.21
12.21
10.05
26.01
10.07
3" 9" 3"
/4
/4
/2
/2
1' - 3"
A512
GLOVES
THERMOMETERS
STETHOSCOPES
GOWNS
MASKS
1' - 3"
12.22
10.06
4"
8"
26.01
12.22
12.21
10.05
10.07
9.219.21
10.06
10.06
CONTROL
CENTER
C3-15
4' - 11 1/2" 4' - 0 1/2"2' - 6"
/2
2' - 0"
12.32
TYP.
CONTROL
CENTER
C3-25
1' - 10 5/8" 4' - 3 3/8" 2' - 4"
/8
2' - 0"
12.32
TYP.
3' - 10" 5' - 0 1/8" 4' - 7 1/4" 1' - 11 1/2"
12.32
TYP.
/4
3' - 3 1/2" 5' - 2" 5' - 0" 5' - 0"
12.32
TYP.
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
CASEWORK SECTIONS &
DETAILS
A512
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 1" = 1'-0"1
CONTROL CENTER SECTION
Scale: 1" = 1'-0"2
CONTROL CENTER SECTION
Scale: 1" = 1'-0"3
CONTROL CENTER SECTION
Scale: 1" = 1'-0"4
CONTROL CENTER DETAIL
Scale: 1" = 1'-0"5
PPS STORAGE CABINET
Scale: 1" = 1'-0"6
PPS STORAGE CABINET
9.21 5/8" Type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.
9.60 Resilient base. See Room Finish Schedule.
10.05 Sign Type A. Mount directly to acrylic panel.
10.06 Aluminum signage standoff post, 1" diameter
and 2 1/2" long.
10.07 AR-1, Acrylic resin panel.
12.19 Applied solid surface backsplash.
12.20 Solid surface material over 3/4" plywood, with
1/4" eased edge.
12.21 Plastic laminate over 3/4" particle board.
12.22 Adjustable shelf. Plastic laminate over 3/4"
particle board.
12.28 In-wall recessed countertop support bracket, 18"
x 20".
12.32 2" Wire management grommet. Coordinate exact location with COR.
26.01 Light fixture. See Electrical Drawings.
DETAIL NOTES
GENERAL CASEWORK NOTES
A. See Interior Elevations on sheet A401-A406 for further information.
B. Lift hangers and bracing to be attatched to structural steel only. No attatchment to deck permitted.
Scale: 1/4" = 1'-0"7
C3-15 CONTROL CENTER GROMMETS
Scale: 1/4" = 1'-0"8
C3-25 CONTROL CENTER GROMMETS
Scale: 1/4" = 1'-0"9
C3-15 CONTROL CENTER GROMMETS - DEDUCT ALT
Scale: 1/4" = 1'-0"10
C3-25 CONTROL CENTER GROMMETS - DEDUCT ALT
Revision s
REGULAR POWER
EMERGENCY POWER
DATA
OXYGEN
AIR
CODE BLUE
NURSE CALL
HEADWALL LEGEND
eICU
OVER BED LIGHT SWITCH
VACUUM WITH TRACKS
32 PIN CONNECTION
12.09
PL-1
SS-3
PL-1
P-8
RB-1
2' - 0" 2' - 0" 2' - 8" 2' - 8" 2' - 0"
P-8
SB
22.08
11.0611.06
3"
4 1/2" 4 1/2"
4 1/2"
7 1/2"7 1/2"
4 1/2" 4 1/2"
4 1/2"
3" 3"
4 1/2" 4 1/2"
1' - 8"
A513
Sim
A513
Sim
C O
R R
ID
O
R S
ID
E
W
IN
D O
W S
ID
E
4" 4" 8" 4" 4" 4" 4" 8" 4" 4"
PM
11.0711.07
9.41
RB-1
P-8 P-8
12.09
PL-1
PL-1
SS-3
9.46
2' - 0" 4' - 0" 2' - 0" 2' - 0"
SB
A513
A513
11.06
3"
4 1/2" 4 1/2"
4 1/2"
7 1/2" 3"
4 1/2" 4 1/2"
4 1/2"
7 1/2"1' - 8"
4 1/2" 4 1/2"
1' - 7"
22.08
W
IN
D O
W S
ID
E
C O
R R
ID
O
R S
ID
E
4"4"8"4"4" 4" 4" 8" 4" 4"
PM
9.41
11.0711.07
11.05
11.18
11.18
5.32
2.28
11.10
11.01
2.28
2.27
11.1911.19
11.20
5.33
11.21
11.22
12.20
11.38
4.2
S1.1
9.60
9.41
11.06
11.07
1' - 10 3/4" 2' - 6 1/4"
5.01
5.325.32
11.20
11.21
2.27
2.282.28
11.1811.18
11.19
4"
S1.1
9.60
9.41
12.23
11.07
11.0711.07
12.21
12.22
12.31
12.29
12.30
12.21
12.29
12.30
12.20
1' - 6"
1"
1' - 0"
/2
EQUIPMENT TAG
WINDOW OPENING
DOOR OPENING
FINISH DESIGNATION
X
XX
SIGNAGE TAG
TOILET ACCESSORY TAGX
X
TAG LEGEND
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
HEADWALL DETAILS
A513
MWTH
17005.00
552-18-102
Dayton Ohio
Scale: 3/4" = 1'-0"4
TYP. BARIATRIC HEADWALL @ 3B110, 3B135, & 3B138
Scale: 3/4" = 1'-0"1
TYP. PATIENT HEADWALL
2.27 Existing roof deck. See structural.
2.28 Existing roof framing. See structural
5.01 Structural steel frame. See Structural Drawings.
5.32 New modular channel units by lift manufacturer.
See structural drawings. Coordinate final location of modular channel units supports and hangers with lift manufacturer and all PMEFPT trades.
5.33 Patch spray-on fire proofing on existing steel
structure as required.
9.41 Suspended acoustic ceiling tile/grid. See Room
Finish Schedule.
9.46 Align ceiling grid with edge of headwall. See
Reflected Ceiling Plan for details.
9.60 Resilient base. See Room Finish Schedule.
11.01 Patient lifts and structural supports provided by
lift manufacturer.
11.05 Standard patient lift.
11.06 Headwall acrylic accent panel.
11.07 Headwall laminate panel.
11.10 Patient lift structure provided by lift manfuacturer.
See structural dwgs.
11.18 New/existing mechanical ductwork. see
Mechanical drawings for approximate locations.
Verify locations of existing ductwork to remain and adjust supports as necessary. Lift manufacturer to participate in preparation of PME coordination drawings by providing/coordinating lift support requirements.
11.19 Unistrut or other lift support by lift manufacturuer.
11.20 New recessed fixed lift rail with hangers, lateral
bracing, trapeze and supplemental structure as required. Coordinate location of lift supports with mechanical contractor and other trades.
11.21 Traveling rail.
11.22 Base cabinet by headwall manfuacturer.
11.38 Wall cabinet by headwall manufacturer.
12.09 Vacuum equipment track.
12.20 Solid surface material over 3/4" plywood, with
1/4" eased edge.
12.21 Plastic laminate over 3/4" particle board.
12.22 Adjustable shelf. Plastic laminate over 3/4"
particle board.
12.23 Sloped top. Plastic laminate over 3/4" particle
board
12.29 4" wire pull.
12.30 Self-latching, key-operated lock.
12.31 Concealed hinge.
22.08 Dialysis box. See Plumbing Drawings.
23.01 Mechanical Equipment. See Mechanical
Drawings.
DETAIL NOTES
GENERAL CASEWORK NOTES
A. See Interior Elevations on sheet A401-A406 for further information.
B. Lift hangers and bracing to be attatched to structural steel only. No attatchment to deck permitted.
Scale: 3/4" = 1'-0"2
HEADWALL SECTION
Scale: 3/4" = 1'-0"3
HEADWALL SECTION
Revision s
SEE SCHED.
S E
E S
C H
E D
U L E
FJ
2"
SEE
SCHED. 2"
S E
E S
C H
E D
U L E
3 1/4" SEE SCHEDULE 3 1/4"
/4
S E
E S
C H
E D
U L E
2"
SEE
SCHED. 2"
P A
T
IE
N T
L
IF
T M
A N
U F
A C
T U
R E
R
(C O
O R
D
IN
A T
E W
IT
H
SEE PLAN
1/2" 1/2"
H1J1
8.02
9.21
9.80
8.02
9.09
9.21
9.80
8.04
S1
9.08
7.82
7.82 1/2" 1/2"
J2 H2 S e e P la n
1 3/4"
ROUGH OPENING
PACKAGE WIDTH
See Plan
9.17
9.19 7
O P
E N
IN
G
/8
C L E
A R
P
A C
K A
G E
H E
IG
H
T
R O
U G
H O
P E
N
IN
G
9.20
SEE PLAN
S2
9.02
9.80
6.01
5.10
7.83
9.39
8.09
8.09
7.83
9.39
5.10
6.01 9.21
5.09
9.02
9.80
H4
J4
9.02
9.80
9.21 7.83
8.09
6.036.03
9.13
9.169.14
SEE PLAN
1/2" 1/2"
H6J5
9.21
9.80
9.09
9.21
9.80
9.08
7.82
7.82 1/2" 1/2"
SEE PLAN
8.02
8.03Applicable to all HM Frames
7.83
7.83
7.83
6.01
9.21
5.09
9.02 9.80
9.57
3/4"3/4"
9.66
S2.0
9.21
9.02
7.82
7.82
4 1/4"
9.80
S1.0-F
4 7/8"
9.219.21
9.02
9.80
7.82
7.82
S1.0
4 7/8"
9.219.21
9.02
9.80
7.82
7.82
FLOOR SLAB
FIN. CEILING
STRUCTURE ABOVE
T1.0
4 7/8"
1-HR RATED
FIRE BARRIER
U.L. #U465
S1.0-N
4 7/8"
9.219.21
9.02
9.80
7.82
7.82
NON-RATED
SMOKE PARTITION
S1.1
7 1/4"
9.03
9.80
9.219.21
9.819.81
9.819.81
9.219.21
9.02
9.80
7.82
7.82
1-HR RATED
FIRE BARRIER
U.L. #U465
E1.0
1' - 0"
9.03
9.21
7.82
7.82
9.21
7.14
7.14
4.01
4.23
7.18
4.16
7.18
6.19
A
1' - 4"
S4
A601
H5
A601
8.20
S
IL
L H
E
IG
H T
B
J4
A601
S2
A601
H4
A601
7.83
S
IL
L H
E
IG
H T
2' - 6 7/8" 2' - 6 7/8" 2' - 6 7/8" 2' - 6 7/8"
10' - 3 1/4"
8.16
C
6' - 9 1/2"
2' - 2 7/8" 2' - 2 5/8" 2' - 3 7/8"
J4
A601
S2
A601
H4
A601
7.83
S
IL
L H
E
IG
H T
8.16
D
4' - 7 5/8"
2' - 3 7/8" 2' - 3 7/8"
J4
A601
S2
A601
H4
A601
7.83
S
IL
L H
E
IG
H T
8.16
E
5' - 8 1/4"
2' - 10 1/8" 2' - 10 1/8"
J4
A601
S2
A601
H4
A601
7.83
S
IL
L H
E
IG
H T
8.16
F
J4
A601
S2
A601
H4
A601
7.83
S
IL
L H
E
IG
H T
2' - 4" 2' - 3 3/4" 2' - 4"
6' - 11 3/4"
8.16 7
8' - 0"
DOOR OPENING
4' - 5 3/4" CLEAR
8.25
G
(M
A T
C H
E X
IS
T
3' - 6"
S3
A601
H3
A601
S
IL
L H
E
IG
H T
(M A
T C
H E
X
IS
T
8.25
G-1
J3
A601
8.41
6.19
9.21
7.14
4.16
H3
6.05
7.18
8.19
7.65
S3
7.14
9.21
4.01
4.23
4.26
8.19
J3
3/4" 7.35
/2
7.65
10.25
8.24
6.01 9.21
5.09
9.02
9.80
H5
7.06
9.02
9.80
6.01
S4
8.24
7.83
3/4" 3/4"
9.66
9.21
7.14
6.05
8.19
7.18
6.19
4.16
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
WALL TYPES, DOOR SCHEDULE &
DETAILS
A601
DWTH
17005.00
552-18-102
Dayton Ohio
DOOR SCHEDULE - BASE BID
DOOR
BETWEEN DOOR DESCRIPTION FRAME DESCRIPTION
FIRE
RATING
HDWE
SET REMARKSRM RM TYPE MAT'L
SIZE
TYPE
MAT'L HEAD JAMB# W H T
100 C3-12 3B100 F WD 1 3' - 6" 7' - 0" 1 3/4" EXIST - - - 10 New WD door and HDWE, existing frame.
101 C3-12 3B101 F WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 15 New WD door and HDWE, existing frame.
102 C3-12 3B102 F HM 1 3' - 8" 7' - 0" 1 3/4" EXIST - - - 09 New WD door and HDWE, existing frame.
103 C3-12 3B103 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 07
104 C3-26 3B104 F WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 25A New WD door and HDWE, existing frame.
105 3B105 C3-14 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
105a 3B105 3B105a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
106 C3-26 3B106 F HM 1 3' - 8" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 18 New WD door and HDWE, existing frame.
106a C3-14 3B106a F WD 1 3' - 8" 7' - 0" 1 3/4" 1 HM H1 J1 20 MIN. 22
107 C3-14 3B107 F WD 1 3' - 8" 7' - 0" 1 3/4" 1 HM H1 J1 20 MIN. 31
108 3B108 C3-14 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
108a 3B108 3B108a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
109 C3-14 3B109 F WD 1 3' - 8" 7' - 0" 1 3/4" 1 HM H1 J1 20 MIN. 30
110 C3-14 3B110 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
110a 3B110a 3B110 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
111 3B111 C3-14 F WD 2 2' - 6" 7' - 0" 1 3/4" 1 HM H1 J1 34
112 C3-14 3B112 F WD 1 4' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 20
114 C3-17 3B114 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 12
116 C3-14 3B116 F WD 1 4' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 25
117 C3-17 3B117 F WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 07 New WD door and HDWE, existing frame.
119 C3-17 3B119 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 27
120 C3-18 3B120 F HM 1 3' - 8" 7' - 0" 1 3/4" EXIST - - - 08 New WD door and HDWE, existing frame.
121 3B121 C3-18 J AL/GL 1 8' - 0" 8' - 0" 1 3/4" 3 HM H2 J2 38
121a 3B121a 3B121 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
122 3B122 C3-19 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
122a 3B122 3B122a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
123 3B123 C3-19 J AL/GL 1 8' - 0" 7' - 6" 1 3/4"
Alum H2 J2 38 Provide smoke gasketing for Isolation (Infection Control) Room
123a 3B123a 3B123 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
123b C3-19 3B123b F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 03
123c 3B123 3B123b F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 04
124 3B124 C3-19 J AL/GL 1 8' - 0" 7' - 6" 1 3/4"
Alum H2 J2 38 Provide smoke gasketing for Isolation (Infection Control) Room
124a 3B124 3B124a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
124b 3B124b C3-19 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 03
124c 3B124b 3B124 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 04
125 3B125 C3-20 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
125a 3B125a 3B125 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
126 3B126 C3-19 F HM 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 06
128 3B128 C3-19 F HM 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 06
130 C3-22 3B130 F HM 1 3' - 8" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 33 New WD door and HDWE, existing frame.
130a C3-20 3B130 F HM 1 3' - 8" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 28 New WD door and HDWE, existing frame.
135 3B135 C3-20 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
135a 3B135 3B135a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
137 3B137 C3-20 J AL/GL 1 8' - 0" 7' - 6" 1 3/4"
Alum H2 J2 38 Provide smoke gasketing for Isolation (Infection Control) Room
137a 3B137a 3B137 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
137b 3B137 3B137b F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 04
137c 3B137b C3-20 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 03
138 3B138 C3-20 J AL/GL 1 8' - 0" 7' - 6" 1 3/4"
Alum H2 J2 38 Provide smoke gasketing for Isolation (Infection Control) Room
138a 3B138 3B138a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
138b 3B138b 3B138 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 04
138c C3-20 3B138b F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 03
139 3B139 C3-20 F WD 1 4' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 25
140 3B140 C3-20 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
140a 3B140a 3B140 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
142 3B142 C3-20 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
142a 3B142 3B142a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
144 3B144 C3-22 F WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 29 New WD door and HDWE, existing frame.
145 C3-20 3B145 F WD 1 3' - 6" 7' - 0" 1 3/4" 1 HM H1 J1 45 MIN. 17
146 C3-23 3B146 F WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 01 New WD door and HDWE, existing frame.
146a C3-22 3B146 F WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 02 New WD door and HDWE, existing frame.
147 C3-23 3B147 F WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 11 New WD door and HDWE, existing frame.
148 3B148 C3-23 G WD 1 3' - 0" 7' - 0" 1 3/4" EXIST - - - 19 New WD door and HDWE, existing frame.
149 C3-23 3B149 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 24
150 C3-23 3B150 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 07
151 C3-27 3B151 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 13
152 C3-20 3B152 F WD 1 3' - 8" 7' - 0" 1 3/4" 1 HM H1 J1 45 MIN. 31
154 C3-27 3B154 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 27
155 C3-26 3B155 F HM 1 3' - 8" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 23 New WD door and HDWE, existing frame.
158 3B158 C3-26 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
158a 3B158 3B158a F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
159 C3-26 3B159 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
159a 3B159a 3B159 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
160 3B160 C3-26 J AL/GL 1 8' - 0" 7' - 6" 1 3/4" 3 Alum H2 J2 38
160a 3B160a 3B160 F WD 1 3' - 6" 7' - 0" 2" 2 HM H6 J5 05
164 3B164 C3-20 F HM 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 45 MIN. 30
165 3B165 C3-18 F WD 2 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 21
168 3B168 C3-23 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 14
171 C3-26 3B171 F WD 2 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 21
314 C3-26 C3-14 F WD 2 3' - 3" 7' - 0" 1 3/4" 3 HM H1 J1 20 MIN. 35
317 C3-22 C3-17 F HM 1 3' - 8" 7' - 0" 1 3/4" EXIST - - - 20 MIN. 32 New WD door and HDWE, existing frame.
319 C3-19 C3-20 F WD 2 3' - 6" 7' - 0" 1 3/4" 3 HM H1 J1 20 MIN. 35
326 C3-26 C3-12 F WD 2 3' - 6" 7' - 0" 1 3/4" 1 HM H1 J1 36
327 C3-23 C3-27 F WD 1 3' - 0" 7' - 0" 1 3/4" 1 HM H1 J1 26
Scale: 1/4" = 1'-0"
DOOR TYPES
Scale: 1/4" = 1'-0"
FRAME TYPES
DETAIL NOTES
N.T.S.Scale:
FRAME DETAILS
4.01 Brick veneer.
4.16 Limestone panel.
4.23 Masonry veneer anchor.
4.26 Thru wall flashing.
5.09 Cold formed framing box header.
5.10 Fastener
6.01 2" x 4" wood blocking.
6.03 2x wood blocking.
6.05 2" x 6" presure treated wood blocking.
6.19 5/8" exterior glass matt gypsum board sheathing. Seal all joints.
7.06 Sealant.
7.14 Batt thermal wall insulation. R-19 min.
7.18 Air and moisture barrier.
7.35 Sill Flashing.
7.65 Cont. sealant.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
7.83 Cont. sealant each side.
8.02 Hollow metal frame.
8.03 Hollow metal window frame.
8.04 Hospital stops @ all interior hollow metal frames.
8.09 1/2" monolithic glass
8.16 All glass window system.
8.19 Window type G.
8.20 Switchable privacy glass.
8.24 Window type A.
8.25 Integral blinds.
8.41 Aluminum window.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.03 6" non-structural metal framing @ 16" o.c.
9.08 Metal framing box header.
9.09 Double metal framing at jambs, typ.
9.13 Floor mounted pivot
9.14 Header above
9.16 Recessed slide pulls
9.17 1/4" shim space
9.19 Access cover
9.20 Finished floor
9.21 5/8" Type X gypsum board. Provide cement backer board where tile is indicated on the finish plans.
9.39 U-channel
9.57 5/8" Type X gypsum board.
9.66 3/4" solid surface sill.
9.80 Acoustic insulation
9.81 Acoustic sealant / fire-rated sealant each side
10.25 Solid surface window sill.
N.T.S.Scale:
WALL TYPES
N.T.S.Scale:
WINDOW ELEVATIONS
DOOR SCHEDULE - DEDUCT ALTERNATE #1, #2
DOOR
BETWEEN DOOR DESCRIPTION FRAME DESCRIPTION
FIRE
RATING
HDWE
SET REMARKSRM RM TYPE MAT'L
SIZE
TYPE
MAT'L HEAD JAMB# W H T
106 3B106 C3-14 F WD 1 3' - 8" 7' - 0" 1 3/4" 1 HM H1 J1 45 MIN. 31
107 C3-14 3B107 F WD 1 3' - 8" 7' - 0" 1 3/4" 1 HM H1 J1 45 MIN. 17
109 C3-14 3B109 F WD 1 3' - 8" 7' - 0" 1 3/4" 1 HM H1 J1 45 MIN. 30
111 3B111 C3-14 F WD 2 2' - 6" 7' - 0" 1 3/4" 1 HM H1 J1 34
Revision s
CORRIDOR
C3-29
CONFERENCE
ROOM
3B100
WAITING
ROOM
3B101
CONSULTATION
ROOM
3B102
OFFICE
3B103
LOCKER
ROOM
3B104A
TOILET,
MALE
3B104B
TOILET,
FEMALE
3B104C
LOCKER
ROOM
3B104D
OFFICE
3B120
BEDROOM -
RESIDENT
ON-CALL
3B161
OFFICE,
PHYSICIAN
3B162
BEDROOM -
RESIDENT
ON-CALL
3B163BATH/SHOWER
ROOM
3B161A
CORRIDOR
C3-12
CORRIDOR
C3-14
CORRIDOR
C3-18
CORRIDOR
C3-19
CORRIDOR
C3-20
LOBBY
C3-30
CORRIDOR
C3-11
CORRIDOR
C3-28
STAIR
S-2-3
CORRIDOR
3C-27
CORRIDOR
3C-9
BED ROOM
3B121
RESTROOM
3B121a
RESTROOM
3B122a
BED ROOM
3B122
BED ROOM,
INFECTION
CONTROL
3B123
RESTROOM
3B123a
RESTROOM
3B124a
BED ROOM
3B125
RESTROOM
3B125a
BED ROOM
3B142
RESTROOM
3B142a
RESTROOM
3B140a
BED ROOM
3B140
BARIATRIC,
INFECTION
CONTROL
3B138
RESTROOM
3B138a
RESTROOM
3B137a
BED ROOM,
INFECTION
CONTROL
3B137
BED ROOM,
BARIATRIC
3B135
RESTROOM
3B160a
BED ROOM
3B160
BED ROOM
3B158
BED ROOM,
BARIATRIC
3B110
BED ROOM
3B105
RESTROOM
3B105a
RESTROOM
3B110a
NOURISHMENT
3B115
STORAGE
3B145
RESTROOM
3B158a
RESTROOM
3B135a
ANTE
ROOM
3B137b
ANTE
ROOM
3B138b
VESTIBULE
3B104
BED ROOM
3B108
RESTROOM
3B108a
ALCOVE,
WHEELCHAIR
3B165
ALCOVE
CRASH
CART
3B166
ANTE
ROOM
3B123b
ALCOVE
TRAY
STORAGE
3B141a
ALCOVE
WHEELCHAIR
3B112
CORRIDOR
C3-50
LVT-2
WSF-1
WSF-1
PT-1PT-1PT-1
WSF-1
WSF-1
CPT-1
WSF-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
WSF-1
WSF-1
WSF-1 WSF-1
WSF-1
PT-1PT-1
WSF-1 WSF-1
PT-1PT-1
WSF-1
WSF-1
LVT-2
LVT-2
WSF-1
CPT-1
CPT-1
LVT-3
PT-1
WSF-1
PT-1
LVT-2
WSF-1
CPT-1
LVT-2
SC-1
LVT-2
LVT-2
LVT-3
CPT-1
CPT-1
WSF-1
LVT-3
LVT-2
LVT-2
WSF-1
LVT-2
LVT-2
LVT-2
PT-1
WSF-1
LVT-2
PT-1
PT-1
LVT-2
LVT-2
CORRIDOR
C3-26
BED ROOM
3B159
RESTROOM
3B159a
PT-1
STORAGE
3B106
UTILITY
ROOM,
CLEAN
3B109
NURSE
WORKROOM
3B114
OFFICE
3B117
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B148
SOILED
UTILITY
3B152
MED ROOM
3B154
CONTROL
CENTER
C3-15
CORRIDOR
C3-22
CONTROL
CENTER
C3-25
NOURISHMENT
3B153
CORRIDOR
C3-27
BREAK
ROOM
3B146
STORAGE
3B168
HAC
3B155
CORRIDOR
C3-23
STORAGE
3B149
NURSE
WORKROOM
3B151
OFFICE
3B150
CLEAN
LINEN
3B139
CLEAN
LINEN
3B116
COMM
CLOSET
3B111
SOILED
UTILITY
3B107
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144MED ROOM
3B119
STORAGE
3B164
CORRIDOR
C3-17
OFFICE
3B147
CPT-1
ANTE
ROOM
3B124b
BED ROOM,
INFECTION
CONTROL
3B124
ALCOVE,
WHEELCHAIR
3B171
WSF-1
WSF-1
WSF-1
WSF-1
LVT-2
WSF-1
WSF-1
3' - 0"
ALCOVE
CRASH
CART
3B141
3' - 0"
CPT-1
SCRUBS
3B106a
WSF-1
WSF-1
LVT-2
LVT-2
PLAN AREA
CORRIDOR
C3-14
CORRIDOR
C3-19
CORRIDOR
C3-20
CORRIDOR
C3-26
UTILITY
ROOM,
SOILED
3B106
UTILITY
ROOM,
CLEAN
3B109
OFFICE
3B174
MED PREP
3B176
OFFICE,
PHYSICIAN
3B117
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B129A
TOILET
3B139
STORAGE,
GENERAL
3B147
HAC
3B148
OFFICE
3B149
NOURISHMENT
3B151
MED PREP
3B154
CONTROL
CENTER
C3-15
CORRIDOR
C3-17
CORRIDOR
C3-23
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
COMM
CLOSET
3B111
OFFICE
3B174
NOURISHMENT
3B175
OFFICE,
PHYSICIAN
3B117
OFFICE
3B177
UTILITY
ROOM,
SOILED
3B178
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144
BREAK
ROOM
3B179
KITCHEN,
MISC
3B180
OFFICE
3B150
LINEN
ROOM,
SOILED
3B152
TOILET
3B181
UTILITY
ROOM,
CLEAN
3B155
UTILITY
ROOM,
SOILED
3B182
CORRIDOR
C3-22
LVT-3
CPT-1
SC-1
WSF-1
LVT-2
WSF-1
LVT-3
LVT-2
LVT-2
LVT-2
LVT-2
LVT-2
LVT-3
LVT-2
WSF-1
WSF-1
PT-1
LVT-2
PT-1
LVT-2
CPT-1
CPT-1
WSF-1 LVT-3
WSF-1
PT-1
LVT-2
CPT-1
PT-1
PT-1
WSF-1
CPT-1
CONTROL
CENTER
C3-25
CORRIDOR
C3-14
CORRIDOR
C3-19
CORRIDOR
C3-20
NOURISHMENT
3B115
CORRIDOR
C3-26
UTILITY
ROOM,
SOILED
3B106
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
UTILITY
ROOM,
CLEAN
3B109COMM
CLOSET
3B111
OFFICE
3B174
KITCHEN,
NOURISHMENT
3B175
MEDICATION
PREP.
3B176
OFFICE,
PHYSICIAN
3B117
OFFICE
3B177
UTILITY
ROOM,
SOILED
3B178
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B129A
TOILET,
CONGREGATE
3B139
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144
BREAK
ROOM
3B179
KITCHEN,
MISC
3B180
STORAGE,
GENERAL
3B147
HOUSEKEEPING
AID CLOSET
3B148
OFFICE
3B149
OFFICE
3B150
NOURISHMENT
3B151
LINEN
ROOM,
SOILED
3B152
TOILET
3B181
MEDICATION
PREP.
3B154
UTILITY
ROOM,
CLEAN
3B155
UTILITY
ROOM,
SOILED
3B182
CONTROL
CENTER
C3-15
CORRIDOR
C3-17
CORRIDOR
C3-22
CORRIDOR
C3-23
CONTROL
CENTER
C3-25
LVT-3
LVT-3
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
FLOOR FINISH PLAN
AF101-F
MWTH
17005.00
552-18-102
Dayton Ohio
N Scale: 1/8" = 1'-0"1
FLOOR FINISH PLAN - BASE BID
N N.T.S.Scale:
KEY PLAN
GENERAL FINISH PLAN NOTES
A. See Sheet AF601-602 for Finish Materials Legend.
B. See Sheet AF601-602 for Room Finish Schedule.
C. See Interior Elevations on Sheet A401-A406 for further information.
D. All walls to be painted P-1, unless otherwise noted. See Finish Legend and Finish Schedule.
E. All metal door frames to be painted to match adjacent wall color, in Gloss Level 5, unless otherwise noted. See Finish Legend.
F. Provide appropriate flooring transition pieces at all unlike flooring material intersections. Color for all transition accessories to match
RB-1.
N Scale: 1/8" = 1'-0"2
FLOOR FINISH PLAN - DEDUCT ALTERNATE #1
N Scale: 1/8" = 1'-0"3
FLOOR FINISH PLAN - DEDUCT ALTERNATE #2
Revision s
CONFERENCE
ROOM
3B100
WAITING
ROOM
3B101
CONSULTATION
ROOM
3B102
OFFICE
3B103
LOCKER
ROOM
3B104A
TOILET,
MALE
3B104B
TOILET,
FEMALE
3B104C
LOCKER
ROOM
3B104D
OFFICE
3B120
BEDROOM -
RESIDENT
ON-CALL
3B161
OFFICE,
PHYSICIAN
3B162
BEDROOM -
RESIDENT
ON-CALL
3B163
BATH/SHOWER
ROOM
3B161A
CORRIDOR
C3-12
CORRIDOR
C3-14
CORRIDOR
C3-18
CORRIDOR
C3-19
CORRIDOR
C3-20
LOBBY
C3-30
CORRIDOR
C3-11
CORRIDOR
C3-28
STAIR
S-2-3
CORRIDOR
3C-27
CORRIDOR
3C-9
BED ROOM
3B121
RESTROOM
3B121a
RESTROOM
3B122a
BED ROOM
3B122
BED ROOM,
INFECTION
CONTROL
3B123
RESTROOM
3B123a
RESTROOM
3B124a
BED ROOM
3B125
RESTROOM
3B125a
BED ROOM
3B142
RESTROOM
3B142a
RESTROOM
3B140a
BED ROOM
3B140
BARIATRIC,
INFECTION
CONTROL
3B138
RESTROOM
3B138a
RESTROOM
3B137aBED ROOM, INFECTION
CONTROL
3B137
BED ROOM,
BARIATRIC
3B135
RESTROOM
3B160a
BED ROOM
3B160
BED ROOM
3B158
BED ROOM,
BARIATRIC
3B110
BED ROOM
3B105
RESTROOM
3B105a
RESTROOM
3B110a
NOURISHMENT
3B115
STORAGE
3B145
RESTROOM
3B158a
RESTROOM
3B135a
ANTE
ROOM
3B137b
ANTE
ROOM
3B138b
VESTIBULE
3B104
BED ROOM
3B108
RESTROOM
3B108a
ALCOVE,
WHEELCHAIR
3B165
ALCOVE
CRASH
CART
3B166
ANTE
ROOM
3B123b
ALCOVE
TRAY
STORAGE
3B141a
ALCOVE
WHEELCHAIR
3B112
CORRIDOR
C3-50
CG-1
CG-1
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2 CG-2
CG-1
CG-1
CG-1
CG-2
CG-2
CG-2
CG-2
CG-2
CG-2CG-2
CG-2CG-2CG-2
CG-1
CG-1
CG-1
CG-2CG-2
CG-2
CG-2
CG-2
CG-2
CG-2
CG-1
CG-1
HR-2
HR-2
HR-2
HR-2
STORAGE
3B106
STORAGE
3B168
SOILED
UTILITY
3B107
UTILITY
ROOM,
CLEAN
3B109
COMM
CLOSET
3B111
NURSE
WORKROOM
3B114
BREAK
ROOM
3B146
CORRIDOR
C3-23
CORRIDOR
C3-27
CONTROL
CENTER
C3-15
CONTROL
CENTER
C3-25
SOILED
UTILITY
3B152
OFFICE
3B150
STORAGE
3B149
MED ROOM
3B119
TOILET,
MALE
3B128
NOURISHMENT
3B153
BED ROOM
3B159
RESTROOM
3B159a
CG-1
CG-1
EG-1
CG-1CG-1
ELECTRICAL
CLOSET
3B144
CORRIDOR
C3-26
CLEAN
LINEN
3B116
OFFICE
3B117
TOILET,
FEMALE
3B126
CLEAN
LINEN
3B139
UTILITY
ROOM,
CLEAN
3B130
OFFICE
3B147
STORAGE
3B148
NURSE
WORKROOM
3B151
MED ROOM
3B154
HAC
3B155
CORRIDOR
C3-17
CORRIDOR
C3-22
STORAGE
3B164
CG-1
CG-1
CG-3
CG-1
CG-1
CG-1
CG-3
HR-1
HR-1
HR-1HR-1HR-1HR-1
HR-1
HR-1
HR-1 HR-1 HR-1 HR-1
CG-1
CG-1
EG-1
CR-1
CR-1
EG-1
CR-1
CR-1CR-1CR-1CR-1
CR-1
CR-1
CR-1 CR-1 CR-1CR-1
CR-2
HR-2
CG-1
CR-2
CG-1
CR-2
CR-2
CR-2
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1 CG-1 CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1 CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1CG-1
RWC-2
RWC-2
RWC-2
RWC-2
RWC-2
CG-2
RWC-2
RWC-1
RWC-1
RWC-1
RWC-2
RWC-1
RWC-2
ANTE
ROOM
3B124b
BED ROOM,
INFECTION
CONTROL
3B124
ALCOVE,
WHEELCHAIR
3B171
CG-1
EG-1EG-1
EG-1
EG-1
RWC-2
CG-1
CG-1
CG-3
ALCOVE
CRASH
CART
3B141
RWC-2
CR-2
HR-2
CG-3
SCRUBS
3B106a
RWC-2
RWC-2
RWC-2
RWC-2
RWC-2
RWC-2
CG-1 CG-1
CG-1
CG-1
CG-1
CG-1
CR-2
RWC-2
CG-1 HR-2
PLAN AREA
CORRIDOR
C3-14
CORRIDOR
C3-19
CORRIDOR
C3-20
CORRIDOR
C3-26
UTILITY
ROOM,
SOILED
3B106
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
UTILITY
ROOM,
CLEAN
3B109COMM
CLOSET
3B111
OFFICE
3B174
KITCHEN,
NOURISHMENT
3B175
MEDICATION
PREP.
3B176
OFFICE,
PHYSICIAN
3B117
OFFICE
3B177
UTILITY
ROOM,
SOILED
3B178
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B129A
TOILET,
CONGREGATE
3B139
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144
BREAK
ROOM
3B179
KITCHEN,
MISC
3B180
STORAGE,
GENERAL
3B147
HOUSEKEEPING
AID CLOSET
3B148
OFFICE
3B149
OFFICE
3B150
NOURISHMENT
3B151
LINEN
ROOM,
SOILED
3B152
TOILET
3B181
MEDICATION
PREP.
3B154
UTILITY
ROOM,
CLEAN
3B155
UTILITY
ROOM,
SOILED
3B182
CONTROL
CENTER
C3-15
CORRIDOR
C3-17
CORRIDOR
C3-22
CORRIDOR
C3-23
CONTROL
CENTER
C3-25
CR-1
CR-1
CR-1 CR-1CR-1
RWC-1
RWC-1
RWC-1
HR-1
HR-1
HR-1HR-1HR-1
CR-1
HR-1
CR-1CR-1CR-1
CR-1
CR-1
HR-1HR-1 HR-1
CR-1
HR-1
CR-1
HR-1
HR-1
HR-1
RWC-1
RWC-1
CG-3
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-3
CG-4
CG-2
CG-2
CG-2
CG-1
CG-1
CG-2
CG-3
CG-2 CG-2CG-2
CG-1
CG-1
CG-1
CG-1CG-1
EG-1CG-1
CORRIDOR
C3-14
CORRIDOR
C3-19
CORRIDOR
C3-20
CORRIDOR
C3-26
UTILITY
ROOM,
SOILED
3B106
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
UTILITY
ROOM,
CLEAN
3B109
COMM
CLOSET
3B111
OFFICE
3B174
NOURISHMENT
3B175
MED PREP
3B176
OFFICE,
PHYSICIAN
3B117
OFFICE
3B177
UTILITY
ROOM,
SOILED
3B178
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B129A
TOILET
3B139
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144
BREAK
ROOM
3B179
KITCHEN,
MISC
3B180
STORAGE,
GENERAL
3B147
HAC
3B148
OFFICE
3B149
OFFICE
3B150
NOURISHMENT
3B151
LINEN
ROOM,
SOILED
3B152
TOILET
3B181
MED PREP
3B154
UTILITY
ROOM,
CLEAN
3B155
UTILITY
ROOM,
SOILED
3B182
CONTROL
CENTER
C3-15
CORRIDOR
C3-17
CORRIDOR
C3-22
CORRIDOR
C3-23
CONTROL
CENTER
C3-25
CR-1
CR-1
CR-1 CR-1CR-1
RWC-1
RWC-1
RWC-1
HR-1
HR-1
HR-1HR-1HR-1
CR-1
HR-1
CR-1CR-1CR-1
CR-1
CR-1
HR-1HR-1 HR-1
CR-1
HR-1
CR-1
HR-1
HR-1
HR-1
RWC-1
RWC-1
CG-1
CG-1
CG-1CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-1
CG-2
CG-2
CG-2
CG-1
CG-1
CG-2
CG-1
CG-1
CG-1
CG-2
CG-1
CG-2
CG-2
EG-1
CG-2
CG-2
CG-2
CG-2
CG-1
CG-2
CG-2 CG-2CG-2
CG-1
CG-1
CG-1
CG-1CG-1
EG-1CG-1
RWC-2
RWC-2
RWC-2
RWC-2
RWC-2
RWC-2
RWC-2
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
WALL PROTECTION PLAN
AF101-P
MWTH
17005.00
552-18-102
Dayton Ohio
N Scale: 1/8" = 1'-0"1
WALL PROTECTION PLAN - BASE BID
N.T.S.Scale:
KEY PLAN
GENERAL FINISH PLAN NOTES
A. See Sheet AF601-602 for Finish Materials Legend.
B. See Sheet AF601-602 for Room Finish Schedule.
C. See Interior Elevations on Sheet A401-A406 for further information.
D. All walls to be painted P-1, unless otherwise noted. See Finish Legend and Finish Schedule.
E. All metal door frames to be painted to match adjacent wall color, in Gloss Level 5, unless otherwise noted. See Finish Legend.
F. Provide appropriate flooring transition pieces at all unlike flooring material intersections. Color for all transition accessories to match
RB-1.
N Scale: 1/8" = 1'-0"3
WALL PROTECTION PLAN - DEDUCT ALTERNATE #2
N Scale: 1/8" = 1'-0"2
WALL PROTECTION PLAN - DEDUCT ALTERNATE #1
Revision s
CONFERENCE
ROOM
3B100
WAITING
ROOM
3B101
CONSULTATION
ROOM
3B102
OFFICE
3B103
LOCKER
ROOM
3B104A
TOILET,
MALE
3B104B
TOILET,
FEMALE
3B104C
LOCKER
ROOM
3B104D
OFFICE
3B120
BEDROOM -
RESIDENT
ON-CALL
3B161
OFFICE,
PHYSICIAN
3B162
BEDROOM -
RESIDENT
ON-CALL
3B163
BATH/SHOWER
ROOM
3B161A
CORRIDOR
C3-12
CORRIDOR
C3-14
CORRIDOR
C3-18
CORRIDOR
C3-19
CORRIDOR
C3-20
LOBBY
C3-30
CORRIDOR
C3-11
CORRIDOR
C3-28
STAIR
S-2-3
CORRIDOR
3C-27
CORRIDOR
3C-9
BED ROOM
3B121
RESTROOM
3B121a
RESTROOM
3B122a
BED ROOM
3B122
BED ROOM,
INFECTION
CONTROL
3B123
RESTROOM
3B123a
RESTROOM
3B124a
BED ROOM
3B125
RESTROOM
3B125a
BED ROOM
3B142
RESTROOM
3B142a
RESTROOM
3B140aBED ROOM
3B140
BARIATRIC,
INFECTION
CONTROL
3B138
RESTROOM
3B138a
RESTROOM
3B137a
BED ROOM,
INFECTION
CONTROL
3B137
BED ROOM,
BARIATRIC
3B135
RESTROOM
3B160a
BED ROOM
3B160
BED ROOM
3B158
BED ROOM,
BARIATRIC
3B110
BED ROOM
3B105
RESTROOM
3B105a
RESTROOM
3B110a
NOURISHMENT
3B115
STORAGE
3B145
RESTROOM
3B158a
RESTROOM
3B135a
ANTE
ROOM
3B137b
ANTE
ROOM
3B138b
VESTIBULE
3B104
BED ROOM
3B108
RESTROOM
3B108a
ALCOVE,
WHEELCHAIR
3B165
ALCOVE
CRASH
CART
3B166
ANTE
ROOM
3B123b
ALCOVE
TRAY
STORAGE
3B141a
ALCOVE
WHEELCHAIR
3B112
CORRIDOR
C3-50
STORAGE
3B106
HAC
3B155
SOILED
UTILITY
3B107
UTILITY
ROOM,
CLEAN
3B109
OFFICE
3B147
COMM
CLOSET
3B111
CLEAN
LINEN
3B116
BREAK
ROOM
3B146
OFFICE
3B117
NURSE
WORKROOM
3B114
CORRIDOR
C3-23
STORAGE
3B148
MED ROOM
3B154
CONTROL
CENTER
C3-25
NURSE
WORKROOM
3B151
SOILED
UTILITY
3B152
CLEAN
LINEN
3B139
UTILITY
ROOM,
CLEAN
3B130
STORAGE
3B164
TOILET,
MALE
3B128
TOILET,
FEMALE
3B126
MED ROOM
3B119
ELECTRICAL
CLOSET
3B144
CORRIDOR
C3-17
STORAGE
3B149
CONTROL
CENTER
C3-15
BED ROOM
3B159
RESTROOM
3B159a
CORRIDOR
C3-26
NOURISHMENT
3B153
OFFICE
3B150CORRIDOR
C3-22
CORRIDOR
C3-27
STORAGE
3B168
FWP-1
FWP-1
FWP-1
FWP-1
FWP-1
FWP-1
FWP-1 FWP-1 FWP-1 FWP-1 FWP-1
FWP-1
FWP-1
FWP-1
FWP-1
FWP-1
P-5
P-5
P-5
P-5
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-3
P-2
P-2
P-2
P-3
P-3
P-3
P-2
ANTE
ROOM
3B124b
BED ROOM,
INFECTION
CONTROL
3B124
ALCOVE,
WHEELCHAIR
3B171
P-2
P-2
ALCOVE
CRASH
CART
3B141
P-2
SCRUBS
3B106a
P-2
P-2
PLAN AREA
CORRIDOR
C3-14
CORRIDOR
C3-19
CORRIDOR
C3-20
CORRIDOR
C3-26
UTILITY
ROOM,
SOILED
3B106
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
UTILITY
ROOM,
CLEAN
3B109
COMM
CLOSET
3B111
OFFICE
3B174
KITCHEN,
NOURISHMENT
3B175
MEDICATION
PREP.
3B176
OFFICE,
PHYSICIAN
3B117
OFFICE
3B177
UTILITY
ROOM,
SOILED
3B178
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B129A
TOILET,
CONGREGATE
3B139
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144
BREAK
ROOM
3B179
KITCHEN,
MISC
3B180
STORAGE,
GENERAL
3B147
HOUSEKEEPING
AID CLOSET
3B148
OFFICE
3B149
OFFICE
3B150
NOURISHMENT
3B151
LINEN
ROOM,
SOILED
3B152
TOILET
3B181
MEDICATION
PREP.
3B154
UTILITY
ROOM,
CLEAN
3B155
UTILITY
ROOM,
SOILED
3B182
CONTROL
CENTER
C3-15
CORRIDOR
C3-17
CORRIDOR
C3-22
CORRIDOR
C3-23
CONTROL
CENTER
C3-25
P-5
P-5
P-5
P-5
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-2
CORRIDOR
C3-14
CORRIDOR
C3-19
CORRIDOR
C3-20
CORRIDOR
C3-26
UTILITY
ROOM,
SOILED
3B106
STORAGE,
STRETCHER/
WHEELCHAIR
3B107
UTILITY
ROOM,
CLEAN
3B109
COMM
CLOSET
3B111
OFFICE
3B174
NOURISHMENT
3B175
MED PREP
3B176
OFFICE,
PHYSICIAN
3B117
OFFICE
3B177
UTILITY
ROOM,
SOILED
3B178
TOILET,
FEMALE
3B126
TOILET,
MALE
3B128
STORAGE
3B129A
TOILET
3B139
UTILITY
ROOM,
CLEAN
3B130
ELECTRICAL
CLOSET
3B144
BREAK
ROOM
3B179
KITCHEN,
MISC
3B180
STORAGE,
GENERAL
3B147
HAC
3B148
OFFICE
3B149
OFFICE
3B150
NOURISHMENT
3B151
LINEN
ROOM,
SOILED
3B152
TOILET
3B181
MED PREP
3B154
UTILITY
ROOM,
CLEAN
3B155
UTILITY
ROOM,
SOILED
3B182
CONTROL
CENTER
C3-15
CORRIDOR
C3-17
CORRIDOR
C3-22
CORRIDOR
C3-23
CONTROL
CENTER
C3-25
P-5
P-5
P-5
P-5
P-2
P-2
P-2
P-2
P-2
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-2
P-2
P-2 P-2
P-2
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
WALL FINISH PLAN
AF101-W
MWTH
17005.00
552-18-102
Dayton Ohio
N Scale: 1/8" = 1'-0"1
WALL FINISH PLAN - BASE BID
N.T.S.Scale:
KEY PLAN
GENERAL FINISH PLAN NOTES
A. See Sheet AF601-602 for Finish Materials Legend.
B. See Sheet AF601-602 for Room Finish Schedule.
C. See Interior Elevations on Sheet A401-A406 for further information.
D. All walls to be painted P-1, unless otherwise noted. See Finish Legend and Finish Schedule.
E. All metal door frames to be painted to match adjacent wall color, in Gloss Level 5, unless otherwise noted. See Finish Legend.
F. Provide appropriate flooring transition pieces at all unlike flooring material intersections. Color for all transition accessories to match
RB-1.
N Scale: 1/8" = 1'-0"3
WALL FINISH PLAN - DEDUCT ALTERNATE #2
N Scale: 1/8" = 1'-0"2
WALL FINISH PLAN - DEDUCT ALTERNATE #1
Revision s
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
FINISH SCHEDULE
AF601
MWTH
17005.00
552-18-102
Dayton Ohio
FINISH LEGEND
CODE FINISH TYPE MANUFACTURER PRODUCT / COLOR COMMENTS
CASEWORK FINISHES
PL-1 PLASTIC LAMINATE (TYPICAL CABINETRY) FORMICA 8826-58 NEUTRAL TWILL
PL-2 PLASTIC LAMINATE (TOILET ROOM) FORMICA 8826-58 NEUTRAL TWILL
SS-1 SOLID SURFACE (CONTROL STATION) DUPONT CORIAN DUNE PRIMA
SS-2 SOLID SURFACE (TYPICAL CABINETRY) DUPONT CORIAN HAZELNUT
SS-3 SOLID SURFACE (TOILET) FORMICA LUNA SAND, 757
CEILING FINISHES
ACT-1 ACOUSTIC CEILING TILE 2x2 (OFFICE, WORK) ARMSTRONG "OPTIMA HEALTH ZONE" 3114, 24x24 GRID: "PRELUDE XL" 15/16" EXPOSED TEE
ACT-2 ACOUSTIC CEILING TILE 4x4 (VECTOR EDGE) ARMSTRONG "OPTIMA VECTOR" 3909, 48x48 GRID: "PRELUDE" 15/16" CONCEALED
ACT-3 ACOUSTIC CEILING TILE 2X2 (CLEAN LAY IN) ARMSTRONG "CLEAN ROOM VL" 868, 24x24 GRID: "CLEAN ROOM" 15/16" CO-EXTRUDED
P-6 PAINT SHERWIN WILLIAMS SW 7004 SNOWBOUND GLOSS LEVEL 1
FLOOR FINISHES
CPT-1 CARPET TILE (OFFICE, CONSULT) MILLIKEN "WHALE SONG BELUGA" BEL 108-204 BRINY, 50CMx50CM
LVT-2 LUXURY VINYL TILE (CORRIDOR, UTILITY, STORAGE) MANNINGTON "CITY BLOCK" ANT200 CORE, 18x18
LVT-3 LUXURY VINYL TILE (CONTROL, BREAK, MED, KITCHEN) MANNINGTON "HERITAGE CHERRY" 12105 NATURAL, 3x36
PT-1 PORCELAIN TILE ATLAS CONCORDE "FRAY" SAND 30CMx60CM
SC-1 SEALED CONCRETE - -
WSF-1 WELDED SHEET FLOORING MANNINGTON "REALITIES II BOARDWALK" 5667R COCONUT
MISCELLANEOUS FINISHES
CG-1 CORNER GUARD CS ACROVYN #929 OYSTER GRAY TO CEILING
CG-2 CORNER GUARD, ANGLED CS ACROVYN #929 OYSTER GRAY TO CEILING
CG-3 CORNER GUARD CS ACROVYN #373 AMBER CHERRY TO 2'-9" A.F.F. UNLESS NOTED OTHERWISE
CR-1 CRASH RAIL CS ACROVYN #373 AMBER CHERRY
CR-2 CRASH RAIL CS ACROVYN #929 OYSTER GRAY
EG-1 END GUARD CS ACROVYN #929 OYSTER GRAY TO CEILING
GR-1 GROUT MAPEI 39 IVORY
HR-1 HAND RAIL CS ACROVYN #373 AMBER CHERRY
HR-2 HAND RAIL CS ACROVYN #929 OYSTER GRAY
WALL FINISHES
AR-1 ACRYLIC RESIN SHEET 3FORM VARIA ECORESIN, MIRAGE TWILIGHT STRAIGHT FRONT FINISH: SANDSTONE
FWP-1 FLEXIBLE WALL PROTECTION DL COUCH "P3TEC" UPLIFT, BONE WHITE P3T-60112
P-1 PAINT (FIELD) SHERWIN WILLIAMS SW 6098 PACER WHITE
P-2 PAINT (DARK NEUTRAL) SHERWIN WILLIAMS SW 7038 TONY TAUPE
P-3 PAINT (LIGHT ACCENT) SHERWIN WILLIAMS SW 7603 POOLHOUSE
P-5 PAINT (DARK ACCENT) SHERWIN WILLIAMS SW 7604 SMOKY BLUE
P-7 HIGH BUILD EPOXY (TOILET ROOM) SHERWIN WILLIAMS SW 6098 PACER WHITE
P-8 PAINT (PATIENT ROOM) SHERWIN WILLIAMS SW 6106 KILIM BEIGE
P-9 PAINT (MATCH EXISTING) SHERWIN WILLIAMS MATCH EXISTING
PT-2 PORCELAIN TILE ATLAS CONCORDE "FRAY" SAND, 30CMx60CM
PT-3 PORCELAIN TILE - ACCENT ATLAS CONCORDE "FRAY" TATAMI WARM, 1" x 6" SHEET MOUNTED MOSAIC
PT-4 PORCELAIN TILE - BULLNOSE ATLAS CONCORDE "FRAY" SAND, 7.2CMx60CM
RB-1 RUBBER BASE JOHNSONITE COVE BASE, 80 FAWN CB
RB-2 RUBBER BASE (WOOD PROFILE) JOHNSONITE MILLWORK REVEAL BASE, ACH AMBER CHERRY
RB-3 RUBBER BASE (MATCH EXISTING) JOHNSONITE MATCH EXISTING
RWC-1 RIGID WALL COVERING CS ACROVYN #373 AMBER CHERRY TO 2'-9" A.F.F. UNLESS NOTED OTHERWISE
RWC-2 RIGID WALL COVERING CS ACROVYN #929 OYSTER GRAY TO 4'-0" A.F.F. UNLESS NOTED OTHERWISE
GENERAL FINISH PLAN NOTES
A. See Sheet AF601-602 for Finish Materials Legend.
B. See Sheet AF601-602 for Room Finish Schedule.
C. See Interior Elevations on Sheet A401-A406 for further information.
D. All walls to be painted P-1, unless otherwise noted. See Finish Legend and Finish Schedule.
E. All metal door frames to be painted to match adjacent wall color, in Gloss Level 5, unless otherwise noted. See Finish Legend.
F. Provide appropriate flooring transition pieces at all unlike flooring material intersections. Color for all transition accessories to match
RB-1.
ROOM FINISH SCHEDULE
ROOM # ROOM NAME FLOOR BASE
WALLS CASEWORK
CEILINGNORTH SOUTH EAST WEST CABINET COUNTERTOP
3B102 CONSULTATION ROOM CPT-1 RB-1 P-1 P-1 P-1 P-3 - - ACT-1
3B103 OFFICE CPT-1 RB-1 P-1 P-1 P-1,2 P-1 - - ACT-1
3B104 VESTIBULE LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
3B105 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B105a RESTROOM PT-1 - P-7/PT-2,3,4 P-7/PT-2,4 PT-3 P-7/PT-2,4 PL-2 SS-3 P-6
3B106 STORAGE LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
3B106a SCRUBS WSF-1 WSF-1 P-1 P-1 P-1 P-1 - - ACT-3
3B107 SOILED UTILITY WSF-1 WSF-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-3
3B108 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B108a RESTROOM PT-1 - P-7/PT-2,3,4 P-7/PT-2,4 PT-3 P-7/PT-2,4 PL-2 SS-3 P-6
3B109 UTILITY ROOM, CLEAN WSF-1 WSF-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-3
3B110 BED ROOM, BARIATRIC WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B110a RESTROOM PT-1 - P-7/PT-2,3,4 P-7/PT-2,4 P-7/PT-2,4 PT-3 PL-2 SS-3 P-6
3B111 COMM CLOSET - - P-1 P-1 P-1 P-1 - - -
3B112 ALCOVE WHEELCHAIR LVT-2 RB-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-1
3B114 NURSE WORKROOM CPT-1 RB-1 P-1 P-1 P-1,3 P-1 - SS-3 ACT-1
3B115 NOURISHMENT LVT-2 RB-1 P-1 P-1 P-1 P-1 PL-1 SS-3 ACT-1
3B116 CLEAN LINEN WSF-1 WSF-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-3
3B117 OFFICE CPT-1 RB-1 P-1 P-1 P-2 P-1 - - ACT-1
3B119 MED ROOM LVT-2 RB-1 P-1 P-1 P-1 P-1 PL-1 SS-3 ACT-1
3B120 OFFICE CPT-1 RB-1 P-1 P-1 P-2 P-1 - - ACT-1
3B121 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B121a RESTROOM PT-1 - PT-3 P-7/PT-2,4 P-7/PT-2,3,4 P-7/PT-2,4 PL-2 SS-3 P-6
3B122 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B122a RESTROOM PT-1 - P-7/PT-2,4 PT-3 P-7/PT-2,3,4 P-7/PT-2,4 PL-2 SS-3 P-6
3B123 BED ROOM, INFECTION CONTROL WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-3
3B123a RESTROOM PT-1 - PT-3 P-7/PT-2,4 P-7/PT-2,3,4 P-7/PT-2,4 PL-2 SS-3 P-6
3B123b ANTE ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 - - ACT-1
3B124 BED ROOM, INFECTION CONTROL WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-3
3B124a RESTROOM PT-1 - P-7/PT-2,4 PT-3 P-7/PT-2,3,4 P-7/PT-2,4 PL-2 SS-3 P-6
3B124b ANTE ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 - - ACT-1
3B125 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B125a RESTROOM PT-1 - PT-3 P-7/PT-2,4 P-7/PT-2,4 P-7/PT-2,4 PL-2 SS-3 P-6
3B126 TOILET, FEMALE PT-1 - PT-3 P-7/PT-2,4 P-7/PT-2,4 P-7/PT-2,4 PL-2 SS-3 ACT-1
3B128 TOILET, MALE PT-1 - P-7/PT-2,4 PT-3 P-7/PT-2,4 P-7/PT-2,4 - - ACT-1
3B130 UTILITY ROOM, CLEAN WSF-1 WSF-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-3
3B135 BED ROOM, BARIATRIC WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B135a RESTROOM PT-1 - P-7/PT-2,4 P-7/PT-2,3,4 P-7/PT-2,4 PT-3 PL-2 SS-3 P-6
3B137 BED ROOM, INFECTION CONTROL WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-3
3B137a RESTROOM PT-1 - P-7/PT-2,4 P-7/PT-2,3,4 PT-3 P-7/PT-2,4 PL-2 SS-3 P-6
3B137b ANTE ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 - - ACT-1
3B138 BARIATRIC, INFECTION CONTROL WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-3
3B138a RESTROOM PT-1 - P-7/PT-2,4 P-7/PT-2,3,4 P-7/PT-2,4 PT-3 PL-2 SS-3 P-6
3B138b ANTE ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 - - ACT-1
3B139 CLEAN LINEN WSF-1 WSF-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-3
3B140 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B140a RESTROOM PT-1 - P-7/PT-2,4 P-7/PT-2,3,4 PT-3 P-7/PT-2,4 PL-2 SS-3 P-6
3B141 ALCOVE CRASH CART LVT-2 RB-1 P-1/RWC-2 - P-1/RWC-2 P-1/RWC-2 - - ACT-1
3B141a ALCOVE TRAY STORAGE LVT-2 RB-1 P-1/RWC-2 - P-1/RWC-2 P-1/RWC-2 - - ACT-1
3B142 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B142a RESTROOM PT-1 - P-7/PT-2,4 P-7/PT-2,3,4 P-7/PT-2,4 PT-3 PL-2 SS-3 P-6
3B144 ELECTRICAL CLOSET - - P-1 P-1 P-1 P-1 - - -
3B145 STORAGE LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
3B146 BREAK ROOM LVT-3 RB-1 P-1 P-3 P-1,3 P-1,3 PL-1 SS-3 ACT-1
3B147 OFFICE CPT-1 RB-1 P-2 P-1 P-1 P-1 - - ACT-1
3B148 STORAGE LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
3B149 STORAGE LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
3B150 OFFICE CPT-1 RB-1 P-1 P-1 P-2 P-1 - - ACT-1
3B151 NURSE WORKROOM CPT-1 RB-1 P-1 P-1 P-1 P-3 - SS-3 ACT-1
3B152 SOILED UTILITY WSF-1 WSF-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-3
3B153 NOURISHMENT LVT-2 RB-1 P-1 P-1 P-1 P-1 PL-1 SS-3 ACT-1
3B154 MED ROOM LVT-2 RB-1 P-1 P-1 P-1 P-1 PL-1 SS-3 ACT-1
3B155 HAC PT-1 - PT-2 PT-2 PT-2 PT-2 - - ACT-3
3B158 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B158a RESTROOM PT-1 - P-7/PT-2,4 PT-3 P-7/PT-2,4 P-7/PT-2,3,4 PL-2 SS-3 P-6
3B159 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B159a RESTROOM PT-1 - PT-3 P-7/PT-2,4 P-7/PT-2,4 P-7/PT-2,3,4 PL-2 SS-3 P-6
3B160 BED ROOM WSF-1 WSF-1 P-8 P-8 P-8 P-8 PL-1 SS-3 ACT-1
3B160a RESTROOM PT-1 - P-7/PT-2,4 PT-3 P-7/PT-2,4 P-7/PT-2,3,4 PL-2 SS-3 P-6
3B161 BEDROOM - RESIDENT ON-CALL WSF-1 WSF-1 P-1 P-1 P-1 P-1 - - -
3B164 STORAGE LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
3B165 ALCOVE, WHEELCHAIR LVT-2 RB-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-1
3B166 ALCOVE CRASH CART LVT-2 RB-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - - ACT-1
3B168 STORAGE LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
3B171 ALCOVE, WHEELCHAIR LVT-2 RB-1 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 P-1/RWC-2 - - ACT-1
3C-27 CORRIDOR LVT-2 RB-1 P-1 P-2/RWC-2 P-1 P-1 - - ACT-1
C3-12 CORRIDOR LVT-2 RB-1 P-1 P-1 P-1 P-2/RWC-2 - - ACT-1
C3-14 CORRIDOR LVT-2,3 RB-1,2 P-2,5/RWC-1 P-1/FWP-1 P-1/FWP-1 P-1,5/FWP-1 PL-1 SS-1,2 ACT-1,2/P-1,5
C3-15 CONTROL CENTER LVT-3 RB-1 P-2,5 P-2,5 P-2,5 P-2,5 PL-1 SS-1 ACT-1/P-5,6
C3-17 CORRIDOR LVT-2,3 RB-1,2 P-2/RWC-1 P-2 P-2 P-2,5 - - ACT-1/P-5
C3-18 CORRIDOR LVT-2 RB-1 FWP-1 P-1/FWP-1 P-2/RWC-2 P-1/FWP-1 PL-1 SS-1,2 ACT-1/P-1
C3-19 CORRIDOR LVT-2,3 RB-1,2 P-1,5/FWP-1 P-5/FWP-1 P-2,5/RWC-1,2 P-1/FWP-1 PL-1 SS-1,2 ACT-1,2/P-1,5
C3-20 CORRIDOR LVT-2,3 RB-1,2 P-1/FWP-1 P-2,5/RWC-1,2 P-1,5/FWP-1/RWC-1 P-1/FWP-1 PL-1 SS-1,2 ACT-1,2/P-1,5
C3-22 CORRIDOR LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
C3-23 CORRIDOR LVT-2 RB-1 P-1 P-1 P-1 P-1 - - ACT-1
C3-25 CONTROL CENTER LVT-3 RB-1 P-2,5 P-2,5 P-2,5 P-2,5 PL-1 SS-1 ACT-1/P-5,6
C3-26 CORRIDOR LVT-2,3 RB-1,2 P-2,5/FWP-1 P-1/FWP-1 P-1/FWP-1 P-2,5/RWC-1,2 PL-1 SS-1,2 ACT-1,2/P-1,5
C3-27 CORRIDOR LVT-2,3 RB-1,2 P-2 P-2/RWC-1 P-2,5 P-2 - - ACT-1/P-5
Revision s
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o t th re e in c h e s o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
FULLY SPRINKLERED
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
Renovate TCU-ICU Space Bldg. 330
03/09/2020
FINISH SCHEDULE -…