610-311 FW Primary Care Drawings MEP.pdf

PDF 26 MB Posted

Attached to
Y1DA--Expand First Floor B-1 for PACT - 610-311
Solicitation number
36C25020B0004
Issued by

About this file

This solicitation package outlines requirements for an expansion project at the VA Northern Indiana Health Care System campus in Fort Wayne, Indiana. The project involves expanding the first floor of Building 1 to add additional primary care capacity.

Key details include expanding an existing primary care suite by approximately 8,000 square feet. Construction work includes mechanical, electrical, and plumbing infrastructure upgrades. The solicitation package provides architectural drawings, mechanical drawings, and plumbing drawings detailing the existing conditions and work to be performed. The solicitation number is 36C25020B0004, with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 listed as the contracting agency. The estimated award date is not specified.

The document focuses on defining the technical scope of work required through construction drawings and notes. It does not include standard solicitation elements such as response dates, pricing terms, or small business set-aside designations.

View the file

Other files

File Type Posted
2020.8.6. Add 3 088000 - Glazing.docx DOCX document
16.1045 - 2020.8.6. Add 3 Civil Sheets.pdf PDF
2020.8.6. Add 3 061000 - Rough Carpentry.docx DOCX document
36C25020B0004 0008.docx DOCX document
16.1045 - 2020.8.6 Addendum 3 Responses.pdf PDF
2020.8.6. Add 3 090600 - SCHEDULE OF FINISHES.docx DOCX document
16.1045 - 2020.8.6. Add 3 Arch Sheets.pdf PDF
2020.8.6. Add 3 083616.13 - BARN DOOR.doc DOC document
16.1045 - 2020.8.6 Revised Sheet MI102.pdf PDF
36C25020B0004 0007.docx DOCX document
36C25020B0004 0006.docx DOCX document
36C25020B0004 0005.pdf PDF
RFI - 7-30-2020.pdf PDF
Masking due to COVID.pdf PDF
RFI - 7-31-2020.pdf PDF
RFI - 7-29-2020.pdf PDF
08 44 13 - Glazed Aluminum Curtain Walls.pdf PDF
16.1045 - 2020.7.28 - Addendum 2.pdf PDF
16965 - PD101 - BASEMENT PLUMBING REMOVAL PLAN.pdf PDF
36C25020B0004 0004.pdf PDF
16965 - PL101 - BASEMENT PLUMBING PLAN.pdf PDF
RFI Form AHS 1 Plumbing.pdf PDF
RFI Form AHS 4 Plumbing.pdf PDF
RFI Form AHS 3 Plumbing.pdf PDF
RFI Form AHS 2 Plumbing.pdf PDF
16.1045 - 2020.7.16 - Addendum 1 Revised Sheets.pdf PDF
16.1045 - 2020.7.16 - Addendum 1 Description.pdf PDF
36C25020B0004 0003.pdf PDF
36C25020B0004 0002.docx DOCX document
Sign-in Sheet Sub-Contractors.pdf PDF
Sign-in Sheet Prime Contractors 7-7-2020.pdf PDF
36C25020B0004 0001.docx DOCX document
36C25020B0004.docx DOCX document
610-311 FW Primary Care Drawings STRUCTURAL.pdf PDF
610-311 FW Primary Care Drawings ARCHITECTURAL.pdf PDF
610-311_6.24.2020_FW Primary Care Drawings GENERAL.pdf PDF
610-311 FW Primary Care Drawings CIVIL.pdf PDF
36C25020B0004_2.docx DOCX document
Wage Determination - Highway 6-12-20.pdf PDF
36C25020B0004_3.docx DOCX document
Spec Volume 1 - 610-311.pdf PDF
Wage Determination - Building 6-12-20.pdf PDF
Spec Volume 2 - 610-311.pdf PDF
Contractor Certification Regarding Safety and Environmental.pdf PDF
RFI Form.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PROTECTION NOTES:

PROVIDE TAMPER SWITCHES ON ALL CONTROL VALVES.

PROVIDE MONITORED CONTROL VALVES AT THE BASE OF EACH RISER.

PROVIDE RECORD FLOW TEST PRIOR TO PREPARING SHOP DRAWINGS AND HYDRAULIC

CALCULATIONS. CONTRACTOR SHALL PROVIDE THE FIRE SUPPRESSION DESIGN CRITERIA

FORM AS PART OF THEIR STATE SUBMITTAL.

THE MAIN DRAINS FOR RISERS & FLOW TEST STATIONS SHALL TERMINATE TO AN

ACCEPTABLE FLOOR DRAIN THAT CAN ACCOMMODATE THE FLOW IN A MECHANICAL ROOM OR

TO FINISHED GRADE. PROIVDE SIGHT GLASS.

COORDINATE INSTALLATION OF ALL SYSTEMS WITH MECHANICAL (HVAC), PLUMBING, AND

ELECTRICAL SYSTEMS. CEILING CAVITY SPACE IS RESTRICTED AND INSTALLTION OF

DUCTWORK SHALL TAKE PRIORITY OVER ALL OTHER TRADES. NO EXTRA COMPENSATION

WILL BE ALLOWED TO COVER THE COST OF RELOCATING SYSTEMS FOUND ENCROACHING

ON SPACE REQUIRED BY MECHANICAL, PLUMBING, OR ELECTRICAL SYSTEMS.

PROVIDE SPRINKLERS ABOVE AND BELOW WIDE DUCTS (48" AND WIDER INCLUDING

INSULATION) PER NFPA 13 REQUIREMENTS. REFER TO HVAC DRAWINGS FOR ADDITIONAL

INFORMATION.

PIPING ARRANGEMENT AND SPRINKLER LOCATIONS ARE DIAGRAMMATIC AND ARE PROVIDED

FOR THE CONTRACTOR'S INFORMATION. EXACT ROUTING OF PIPING AND FINAL SIZING AND

LOCATION OF SPRINKLERS SHALL BE SELECTED BY THE CONTRACTOR TO ACCOUNT FOR

ACUTAL FIELD CONDITIONS. ALL AREAS SHALL BE PROTECTED UNLESS SPECIFICALLY NOTED

OTHERWISE. COORDINATE INSTALLATION WITH CEILING HEIGHTS AND SOFFITS. REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

EXTENDED COVERAGE SPRINKLERS MAY BE UTILIZED. THE USE OF EXTENDED COVERAGE

SHALL BE CONFIRMED BY HYDRAULIC CALCULATIONS.

PIPING SHALL BE CONCEALED IN ALL FINISHED AREAS.

THIS BUILDING SHALL BE CONSIDERED LIGHT/ORDINARY HAZARD OCCUPANCY WITH

EXCEPTIONS PER NFPA 13, STATE, AND LOCAL CODES. DESIGN DENSITIES SHALL BE IN

ACCORDANCE WITH GOVERNMENT/VA REQUIREMENTS.

INSTALL SPRINKLER MAINS AS HIGH AS POSSIBLE IN CEILING CAVITIES. SOME BRANCH LINES

WILL REQUIRE ARM OVERS TO SUPPLY SPRINKLERS BELOW DUCTWORK. REFER TO

MECHANICAL DRAWINGS AND COORDINATE WITH THE MECHANICAL CONTRACTOR.

SPRINKLER PIPING SHALL BE SCHEDULE 10 STEEL FOR PIPING THAT IS 2-1/2" AND LARGER.

PROVIDE SCHEDULE 40 STEEL PIPING FOR 2" AND SMALLER UNLESS OTHERWISE NOTED.

THINWALL, LIGHTWALL, PRO-PRESS TYPE PIPING/FITTINGS WILL NOT BE ALLOWED.

PROVIDE PIPE LABELS FOR ALL SPRINKLER PIPING & DEVICES. LABELS SHALL READ "FIRE

PROTECTION PIPING".

PAINT ALL SPRINKLER PIPING THAT IS EXPOSED IN PUBLIC SPACES. COORDINATE WITH ALL

TRADES. COLOR SHALL BE RED.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

E Q

E Q

36" 12"

NOTE:

INDICATES CENTERLINE OF

SPRINKLER HEAD

CL

CL

CL

CL

CL

CL

CL

24" X 48"

CEILING TILE

12" X 48"

CEILING TILE

36" 12"

EQ EQ

E Q

E Q

12" X 12"/24" X 24"

CEILING TILE

EQ EQ

E

Q E

Q

E Q

E Q

EQ EQ

24" X 48"

CEILING TILE

12" X 48"

CEILING TILE

SPRINKLER HEAD

(TYPICAL)

P

PRESSURE GAUGE

CAP FOR FUTURE

EXTENSION

4" STANDPIPE

PIPE SUPPORTINTERMDIATE LANDING

48"

2 1/2" HOSE VALVE

CAP & CHAIN

8"

1 1/2" MANUAL AIR VENT

RECESSED SPRINKLER

HEAD 165 DEGREES FAHRENHEIT TEMP(TYP)

1"X1/2"

REDUCING

COUPLING

ONE (1) INCH

DROP- LENGTH

AS REQUIRED

ONE (1) INCE ARM-

LENGTH AS REQUIRED

ONE (1)

INCH RISER-

LENGTH AS

REQUIRED

1/2" MAX

ROUTE TO OUTDOORS

CHECK VALVE

FEED MAIN

WATERFLOW SWITCH PRESSURE RELIEF

VALVE

PRESSURE GAUGE

INDICATING TYPE FLOOR

CONTROL VALVE WITH

SUPERVISORY SWITCH

RISER

FROM END OF

REMOTE

BRANCH LINE

TEST VALVE IN READILY

ACCESSIBLE LOCATION

45 DEGREE ELL

SMOOTH BORE CORROSION

RESISTANT OUTLET GIVING

FLOW EQUIVALENT TO ONE

SPRINKLER. DISCHARGE

TO SPLASH BLOCK.

P

ROOF

1ST FLOOR

BASEMENT

WEST EAST

EXST 6"

EXST 2 1/2"

EXST SPRINKLER

IN BASEMENT

EXST 2 1/2" HOSE

CONNECTION

2 1/2" HOSE

CONNECTION

6"

FLOW SWITCH

MONITORED

CONTROL VALVE

TO SPRINKLERS

ON FIRST FLOOR

6" CAPPED

FOR FUTURE

6" CAPPED

FOR FUTURE

6"

2 1/2" HOSE

CONNECTION

2 1/2" HOSE

CONNECTION

EXST 6"

MONITORED

CONTROL VALVE

1/2" MANUAL

AIR VENT

2" MAIN DRAIN

ROUTE TO EXTERIOR

1/2" MANUAL

AIR VENT

2" MAIN DRAIN

ROUTE TO EXTERIOR

1/2" MANUAL

AIR VENT

P

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

FP100

MABCJM

FIRE PROTECTION NOTES, DETAILS, &

DIAGRAM

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: NONE

SPRINKLER HEAD LOCATION

SCALE: NONE

STANDPIPE VALVE DIAGRAM

SCALE: NONE

RECESSED SPRINKLER HEAD

SCALE: NONE

FLOOR CONTROL VALVE

SCALE: NONE

INSPECTOR TEST

SCALE: NONE

FIRE RISER DIAGRAM

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

19447

2019/4/16

EXST 2 1/2"

HOSE CONNECTION

EXST 6"

6"FP-UP

6"FP-UP

EXST 6"

TO IN BASEMENT

SPRINKLER SYSTEM

EXST 6"

XX

WW

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

YY

A.4

2 1/2" HOSE

CONNECTION

REMOVE EXST

6" MAIN & 2 1/2"

HOSE CONNECTION

PHARMACY

STORAGE

53A

OIT

BIOMETRICS

MAIL

ROOM

49B

B-1

STAIR

45B

60A

59A

59B

59C

B-C-109A

MENS

LOCKER

ROOM

B-C-109

LOUNGE,

STAFF

B-C-109B

WOMENS

LOCKER

ROOM

B-C-113

STERILE/

NON-STERILE

STORAGE

B-C-116

OFFICE

B-C-114

HAC

B-C-106G

HAC

B-C-113A

STORAGE

(FUTURE

EQUIP.

ROOM)B-C-106F

STORAGE

(FUTURE

DUMBWAITER)

B-C-102

DECONTAMINATION

B-C-102D

AUTOMATIC

CART

WASH

B-C-106E

SCOPE

STERILIZATION

B-C-102C

SCOPE

DECONTAMINATIONB-C-102B

STORAGE

(FUTURE

DUMBWAITER)

B-C-101

STORAGE

(FUTURE

EQUIP

ROOM)

B-C-103D

SPS

ASSISTANT

OFFICE

B-C-103B

MENS

LOCKER

ROOM

B-C-103A

WOMENS

LOCKER

ROOM

ROOM

49C

WATER

TREATMENT

B-C-106A

PPE

AREA

B-C-106B

CART

PREP

2"FP-DN

2" MAIN DRAIN TO

2'X2'X4" SPLASH

BLOCK ON GRADE

28.2 28.324.1 35343332313029282623.8 2524

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

INDICATES REMOVAL

FIRE PROTECTION WATER

CONNECTION POINT NEW

TO EXISITING

FIRE PROTECTION

FPW

FP

LEGEND

KEY NOTES:

SEE DRAWING FP102 FOR NOTES.1

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

FP101

MABCJM

BASEMENT FIRE PROTECTION PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

BASEMENT FIRE PROTECTION PLAN

12" 0 5'

SCALE: 1/8"=1'-0"

10' 15'

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

DASHED LINE INDICATES AREA TO BE

PROVIDED WITH AN AUTOMATIC SPRINKLER

SYSTEM PER NFPA 13, STATE, AND LOCAL CODES.

SPRINKLER MAIN FOR FIRST

FLOOR SPRINKLER SYSTEM

6"FP-UP&DN

CAP 6"FP-UP FOR

FUTURE FLOORS

MODIFY EXISTING

SPRINKLER SYSTEM

2 1/2" HOSE

CONNECTION

6"FP-UP&DN

CAP 6"FP-UP

FOR FUTURE FLOORS

2 1/2" HOSE

CONNECTION

XX

WW

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

YY

A.4

MODIFY EXISTING

SPRINKLER SYSTEM

FUTURE ELEVATOR

FUTURE

DUMBWAITER

FUTURE DUMBWAITER

FUTURE DUMBWAITER

1-C-115

MULTIPURPOSE

1-C-116

STAFF

LOUNGE

1-C-114

EXAM 101-C-113

EXAM 9

1-C-112

EXAM 8

1-C-111

HYBRID

1-C-110

P.

TOILET

1-C-109

EXAM 61-C-108

EXAM 5

1-C-107

HYBRID

1-C-106

EXAM 3

1-C-105

EXAM 2

1-C-C1

PATIENT

CORR. 1

1-C-C1

PATIENT

CORR. 1

1-C-117

OPEN

OFFICE

1-C-117

OPEN

OFFICE

1-C-104

NEG.

PRESSURE

HYBRID

1-C-C5

CORRIDOR

UTILITY

SHAFT

1-C-ST1

STAIRS

1-C-102

RECEPTION

WAITING

MECHANICAL

FAMILY

TOILET

148A

FUTURE

HAC

NURSE

MANAGER

1-B-ST3

STAIR

P.

TOILET

INTAKE

CONSULT

MEN'S

PUBLIC

TOILET

PATIENT

EDUCATION

WOMEN'S

PUBLIC

TOILET

SMALL

CONFERENCE

? 175A

SHARED

GROUP

ROOM 2

176A

SHARED

MED

APP

STORAGE 171

TELEHEALTH

TELERETINAL 169A

TELEDERM 169

PROCEDURE

167A

PR.

TOILET

MED

ROOM 3

PROCEDURE

CONSULT

CLEAN

UTILITY

HYBRID

1E-3

PATIENT

CORR. 3

1E-1

CORRIDOR

HYBRID

28 154A

EXAM 29

CONSULT

HYBRID

CONSULT

HYBRID

158A

EXAM 34

1E-4

CORRIDOR

TEAM

ROOM

1E-3

PATIENT

CORR. 3

TRAINING

ROOM

EXAM 37

162A

SOILED

UTILITY163

EQUIP

STORAGE

1E-1E

STAIR

1-C-130

INTAKE

1-C-C2

PATIENT

CORR. 2

1-C-134

STORAGE

1-C-133

DW

1-C-132

P.

TOILET

1-C-EL1-2

TEAM

ROOM

(FUTURE

ELEV.)

1-C-135

HYBRID

1-C-136

EXAM 21

1-C-137

EXAM 22

1-C-138

HYBRID

1-C-141

MED

ROOM 2

1-C-140

ELECTRICAL

1-C-142

EXAM 24

1-C-154

SPECIALTY

1-C-139

OIT

1-C-143

EXAM 25

1-C-144

CONSULT

26 1-C-145

CLEAN

UTILITY

1-C-C3

STAFF

CORR.

1-C-147

W.

STAFF

TOILET

1-C-146

M.

STAFF

TOILET

1-C-ST2

STAIRS

1-C-148

OPEN

OFFICE

1-C-148

OPEN

OFFICE

1-C-124

MED

ROOM 1

1-C-123

DW

1-C-125

EXAM 15

1-C-126

EXAM 14

1-C-127

HYBRID

1-C-128

EXAM 12

1-C-129

CONSULT

11 1-C-122

CONSULT

16 1-C-121

CONSULT

1-C-120

CONSULT

1-C-119

CONSULT

1-C-118

EQUIP.

STOR.

RELIEF

AIR

CHASE

2" MAIN DRAIN-DN

TO EXTERIOR

PROVIDE 2'X2'X4" CONCRETE

SPLASH BLOCK

COORDINATE EXACT LOCATION

W/ ARCHITECT

28.2 28.324.1

C1

C3 C4 C5 C6 35343332313029282623.8 2524

C2 C7

1-C-100

VESTIBULE

KEY NOTES:

NO SPRINKLER MAINS OR MAIN BRANCH LINES

SHALL BE ROUTED IN THE FUTURE DUMBWAITER

OR ELEVATOR AREAS. PROVIDE SPRINKLERS TO

CONFORM TO NFPA 13.

ORDINARY HAZARD OCCUPANCY

RELOCATE EXISTING PIPING & PROVIDE NEW HEADS IN

ROOM TO PROVIDE FIRE PROTECTION FOR NEW ROOM

CONFIGURARTION.

DESIGN REQUIREMENTS SHALL MEET THE MINIMUM NFPA

13 DESIGN FOR:

DESIGN BUILDING FOR LIGHT HAZARD OCCUAPANCY

UNLESS OTHERWISE NOTES.

ORDINARY HAZARD, GROUP 1 AND AREAS WITH EXPOSED

COMBUSTIBLE CONSTRUCTION, THE DESIGN

REQUIREMENT SHALL BE A MINIMUM OF 0.15GPM/SQ.FT.

FOR THE HYDRAULIC REMOTE AREA OF 1500 SQ.FT.

ORDINARY HAZARD, GROUP 2 AND AREAS WITH EXPOSED

COMBUSTIBLE CONSTRUCTIO, THE DESIGN REQUIREMENT

SHALL BE A MINIMUM OF 0.2 GPM/SQ.FT. FOR THE

HYDRAULIC REMOTE AREA OF 1500 SQ.FT.

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

FP102

MABCJM

FIRST FLOOR FIRE PROTECTION PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

FIRST FLOOR FIRE PROTECTION PLAN 12" 0 5'

SCALE: 1/8"=1'-0"

10' 15'

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

XX

WW

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

2"V-UP

4"W-UP&DN

FD WC

LV

2"W

LV

4"W

3"V-UP&DN

LV

LV

LV

CW

HW

HR

YY

4"W-DN

3"W-UP

A.4

RELOCATE PIT

& DUPLEX PUMP,

CONTROLS, ETC.

STM

S T

M

S T

M S T

M

S T

M

STM

STM

6"

6"4"

6"

6"

8"

6"

2"

4" 8"

6"

6"

6"

6"

6"

4" 6"

OD RD

OD RD

OD

RD

OD

RD

OD

RD

3"V-4"VTR

4"W-DN

RD

6"

3"V-4"VTR

3"V-4"VTR

8"

2" 2"

4"W-DN

OD

RD

6"W-DN

6"W-DN

8"STM-DN 6"STM-DN

6"STM-DN

4"W-DN

OD

8" DISCHARGE

ABOVE GRADE

6"W-DN

8"STM-DN

8" DISCHARGE

ABOVE GRADE

6"STM-DN

6" DISCHARGE

ABOVE GRADE

WCO

4" 3"

1 1/2"

2"

3"

2"

3"

2"

2"

4"

2"

2"

4"

4"

PHARMACY

STORAGE

B-2

STAIR

53A

OIT

BIOMETRICS

MAIL

ROOM

B-1

STAIR

5859C

59B59A

60A

60B

46 47

45 45B

ROOM

49C

WATER

TREATMENT

B-C-101

STORAGE

(FUTURE

EQUIP

ROOM) B-C-102B

STORAGE

(FUTURE

DUMBWAITER)

B-C-102C

SCOPE

DECONTAMINATION

B-C-106E

SCOPE

STERILIZATION

B-C-102

DECONTAMINATION

B-C-103A

WOMENS

LOCKER

ROOM

B-C-103B

MENS

LOCKER

ROOM

B-C-106C

PREP/ASSEMBLY

B-C-106G

HAC

B-C-106F

STORAGE

(FUTURE

DUMBWAITER)

B-C-113A

STORAGE

(FUTURE

EQUIP.

ROOM)

B-C-113

STERILE/

NON-STERILE

STORAGE

B-C-112

LOGISTICS

CLERICAL

B-C-114

HAC

B-C-116

OFFICE

B-C-109B

WOMENS

LOCKER

ROOM

B-C-109A

MENS

LOCKER

ROOM

B-C-109

LOUNGE,

STAFF

B-C-106F

STORAGE

(FUTURE

DUMBWAITER)

B-C-106A

PPE

AREA

B-C-106B

CART

PREP

1 1/2"CW

1"HW

3/4"HR-UP

B-C-EL3

OFFICE

(FUTURE

ELEVATOR)

B-C-103C

PPE

AREA

B-C-103D

SPS

ASSISTANT

OFFICE

RELIEF

AIR

CHASE

STM

C W

H W

H R

HW

HW

H

R

CW

HW

C W

H W

H R

HR

CW

HW

HR

HW

CW

2 1/2" 2"

3/4"

3/4"

2 1/2"

2" 3/4"

1"

1"

3/4" 2"

1 1/2" 2"

1/2"

1 1/4" 3/4"

28.2 28.324.1 C3 35343332313029282623.8 2524

KEY NOTES:

SEE DWG PL100 FOR REMOVAL NOTES1

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PD101

MABCJM

BASEMENT PLUMBING REMOVAL PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

BASEMENT PLUMBING REMOVAL PLAN

12" 0 5'

SCALE: 1/8"=1'-0"

10' 15'

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

1 1/2"CW

1"HW

3/4"HR-UP&DN

3/4"

2"V-UP

2"V

4"W-DN

3"V

4"W-UP&DN

WC

LV

FD

LV

LV

LV

H R

CW

HW

HR

CW

H W

CAP

CAP

CAP

3"V 4"W

3"CW

2"HW-UP&DN

CW

HW

HR

CW

HW

HR

4"W

3"V-UP&DN

CAP

CAP

CAP

YY

3"W-UP

RD

OFD

RD OFD

RD OFD RD

OFD

RD

OFD

RD

OFD

RD

OFD

A.4

LV

EXST MEDICAL GAS

ZONE VALVE FOR

PROCEDURE ROOM

O

MA

MV

REMOVE MEDICAL

GAS OUTLETS

O

MA

MV

MECHANICAL

WAITING

FAMILY

TOILET

NURSE

MANAGER

1-B-ST3

STAIR

INTAKE

HYBRID

154A

EXAM 29

CONSULT

HYBRID

CONSULT

158A

EXAM 34 1E-4

CORRIDOR

TEAM

ROOM

TRAINING

ROOM

1E-3

PATIENT

CORR. 3

1E-1

CORRIDOR

SMALL

CONFERENCE

WOMEN'S

PUBLIC

TOILET

SHARED

MED

APP

STORAGE

TELEHEALTH

TELERETINAL

169A

TELEDERM 169

PROCEDURE

1 167A

PR.

TOILET

MED

ROOM 3

PROCEDURE

2 166

CONSULT

35 165

CLEAN

UTILITY

HYBRID

1E-1E

STAIR

EQUIP

STORAGE

3 162A

SOILED

UTILITY

EXAM 37

4"VTR

4"VTR

4"VTR

1 1/2" 1"

3/4"

1"

1" 1"

3/4"

2"2"

1 1/2"1"

3"

3/4"

1 1/4"

2"

3/4" 1"2"

1"

2"

1"

1"

2"

3/4"

1 1/2"

1"

3/4"

1/2" 1/2"

3/4"

28.2 28.324.1 35343332313029282623.8 2524

KEY NOTES:

SEE DWG PL100 FOR REMOVAL NOTES1

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PD102

MABCJM

FIRST FLOOR PLUMBING REMOVAL PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLUMBING REMOVAL PLAN

12" 0 5'

SCALE: 1/8"=1'-0"

10' 15'

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

*ZURN MODELS ARE FOR MINIMUM QUALITY.

WATER HAMMER ARRESTER SCHEDULE

155-330

F

114-154

E

61-113

D

33-60

C

12-32

B

1-11

A

IDENTIFICATION

SERIES Z-1700

*ZURN MODEL

FIXTURE UNITS

ARRESTER

WATER HAMMER

ABBREVIATION

BMS BUILDING MANAGEMENT SYSTEM

CC COLD WATER CONNECTION

CO CLEANOUT

CW DOMESTIC COLD WATER

EC ELECTRIC WATER COOLER

EXST EXISTING

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

HR DOMESTIC HOT WATER RETURN

HW DOMESTIC HOT WATER

LV LAVATORY

MB MOP BASIN

OFD OVERFLOW DRAIN

RD ROOF DRAIN

SK COMMERCIAL SINK

STM STORM DRAINAGE

UR URINAL

V SANITARY VENT

VTR VENT THRU ROOF

W SANITARY WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

SANITARY WASTE

SANITARY VENT

STORM DRAINAGE

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SHUT-OFF VALVE

PRESSURE REDUCING VALVE

BALL VALVE

CHECK VALVE

CIRCUIT SETTER

STRAINER

BALANCING STATION

REDUCED PRESSURE BACKFLOW

PREVENTER

WATER HAMMER ARRESTOR

TRAP PRIMER

UNION

FLOW-IN DIRECTION OF ARROW

VALVE IN VERTICAL

RISER OR DROP

BRANCH CONNECTION

RISER DOWN

RISER UP

HOSE BIBB

WALL HYDRANT

RECIRCULATING PUMP

END CAP

CONNECTION POINT- NEW TO

EXISTING

INDICATES REMOVAL

OXYGEN

MEDICAL VACUUM

MEDICAL AIR

PRESSURE GAUGE

TEMPERATURE GAUGE

PIPING REMOVAL

PLUMBING FIXTURE REMOVAL

O2 (OXYGEN OUTLET)

MA (MEDICAL AIR OUTLET)

MV (MEDICAL VACUUM OUTLET)

STM

CW

HW

HR

A

2D

WATER CLOSET-

WALL HUNG

URINAL

LAVATORY-

WALL HUNG

LAVATORY-

VANITY

SINK-

SINGLE COMPARTMENT

ELECTRIC WATER

COOLER

MOP BASIN

FLOOR DRAIN

3D

SYMBOLS

PLUMBING LEGEND

O

MV

MA

P

T

LV

NOTES:

PROVIDE VALVE TAGS & PLASTIC LAMINATE IDENTIFICATION ON

CEILING FOR ALL NEW AND EXISTING VALVES AND EQUIPMENT

LOCATED WITHIN THE CONSTRUCTION LIMITS AS INDICATED IN

THE SPECIFICATIONS.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE

AREA TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS.

VERIFY SIZE, LOCATION, AND USAGE OF EXISTING UTILITIES

PRIOR TO CONSTRUCTION. ROUTE PIPING AND CONNECT AS

REQUIRED.

CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS,

CEILING, ECT. WHERE REQUIRED FOR NEW CONSTRUCTION.

PATCHING SHALL MATCH EXISTING CONSTRUCTION & FINISHES.

COORDINATE ALL PATCHING AND FINISHES WITH ARCHITECT.

CONTRACTOR SHALL VERIFY REQUIREMENTS TO OWNER

PROVIDED EQUIPMENT WITH EQUIPMENT MANUFACTURE.

PROVIDE ALL UTILITIES & ACCESSORIES REQUIRED FOR THIS

EQUIPMENT FOR A COMPLETE OPERABLE SYSTEM.

PLUMBING FIXTURES & EQUIPMENT TO REMAIN OR RELOCATED

SHALL BE PROTECTED DURING CONSTRUCTION, AFTER

CONSTRUCTION CLEAN & CAULK ALL FIXTURES & EQUIPMENT TO

THE SATISFACTION OF THE OWNER.

SEAL ALL OPENINGS NEW & EXISTING AROUND PLUMBING &

UTILITY LINES PENETRATING FIRE WALLS. REFER TO

ARCHITECTURAL DRAWINGS FOR LOCATION OF FIRE WALLS &

ARCHITECTURAL SPECS FOR MATERIAL & INSTALLATION.

REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.

1.

2.

3.

4.

5.

6.

7.

REMOVAL NOTES:

THE REMOVAL DRAWINGS SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF

DEMOLITION, BUT SHALL NOT BE HELD TO ALL INCLUSIVE.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING

THE AREA TO BECOME FAMILIAR WITH THE EXISTING

CONDITIONS. VERIFY SIZE, LOCATION, AND USAGE OF

EXISTING UTILITIES PRIOR TO REMOVAL.

FOR FURTHER INFORMATION WITH REGARD TO THE

EXTENT OF DEMOLITION & REMOVALS, SEE THE NEW

CONSTRUCTION DRAWINGS AND THE ARCHITECTURAL

DRAWINGS WHICH SHOW WORK TO BE PERFORMED.

OWNER SHALL BE GIVEN FIRST CHOICE ON ALL

EQUIPMENT BEING REMOVED THAT WILL NOT BE

RELOCATED. CONTRACTOR SHALL REVIEW THE EXISTING

EQUIPMENT WITH OWNER. EQUIPMENT BEING REMOVED

OR RELOCATED SHALL BE REMOVED IN A MANNER THAT

REUSE IS POSSIBLE AND STORED AS DIRECTED BY

OWNER. ALL OTHER EQUIPMENT SHALL BECOME THE

PROPERTY OF THE CONTRACTOR AND SHALL BE

REMOVED & DISPOSED OF FROM THE SITE BY THE

CONTRACTOR.

CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS,

CEILING, ETC.. WHERE REQUIRED BY THE REMOVAL OF

EQUIPMENT AND ACCESSORIES. PATCHING SHALL MATCH

EXISTING CONSTRUCTION & FINISHES. COORDINATE ALL

PATCHING AND FINISHES WITH ARCHITECT.

IF PLUMBING LINES SERVING PLUMBING EQUIPMENT TO

REMAIN MUST BE REMOVED DUE TO DEMOLITION OR NEW

CONSTRUCTION, THE UTILITIES SHALL BE RELOCATED IN A

MANNER THAT IS ACCEPTABLE BY THE

ARCHITECT/ENGINEER. PROPER SLOPE, MATERIALS, AND

SIZES OF PIPING SHALL BE MAINTAINED TO INSURE

EQUIPMENT IS MADE FULLY OPERATIONAL.

REMOVAL OF EXISTING UTILITIES SHALL BE MADE SO THAT

SERVICE TO OTHER AREAS UTILIZED BY THE OWNER ARE

NOT INTERRUPTED WITHOUT CONSENT FROM OWNER.

PROVIDE TEMPORARY VALVES AND TEMPORARY

SERVICES REQUIRED DURING DEMOLITION AND NEW

CONSTRUCTION.

REMOVE COMPLETE ALL EXISTING PLUMBING EQUIPMENT

AND ALL ASSOCIATED PIPING BEING MADE OBSOLETE BY

THIS CONSTRUCTION. REMOVAL OF PIPING SHALL BE

MADE BACK TO MAINS & CAPPED.

1.

2.

3.

4.

5.

6.

7.

8.

3/8" O.D.x12" LONG

FLEXIBLE SUPPLY

RISER

INSULATION

INSULATION SHALL BE MITERED

AND TAPED AT ALL CHANGES

IN DIRECTION

1/2" COPPER

TEE HANDLE

HANDLES SHALL BE

GIVEN TO OWNER UPON

COMPLETION OF PROJECT

1" MAX

INSULATION SHALL

BE MITERED AND

TAPED AT END JOINT

SERVICE STOP

LOOSE KEY

BUTTON

CHROME PLATED

ESCUTCHEON

1/2" COPPER

1/2" COPPER SOLDER X

1/2" COPPER SOLDER

PIPE POSITIONING UNIT

TYPICAL PIPING

LENGTH AS REQUIRED BY

QUANTITY AND SIZE OF PIPES

NOTES:

1. HANGER ROD, STRUT, NUTS, WASHER

AND PIPE STRAPS SHALL BE OF

ZINC COATED GALVANIZED MATERIALS

GALVANIZED DOUBLE

NUT WITH SINGLE WASHER

TYPICAL ON BOTH SIDES

OF STRUT

UNISTRUT CHANNEL

TYPICAL 10 GAUGE

GALVANIZED SHEET

METAL SADDLE

PIPING INSULATION

DO NOT CRUSH

GALVANIZED ALL-THREAD

CONTINUOUS ONE PIECE

HANGER ROD. COUPLING

OF RODS IS NOT PERMITTED

PIPE

WALL

PIPE

INSULATION

1/2" MIN.

PIPE

WALL

PIPE

INSULATION

1/2" MIN.

SLEEVE

INSULATION

FIRE STOPPING

INSULATION

SLEEVE

FINISHED APPEARANCE

PIPE

INSULATION

PIPE

FIRE STOPPING

FLOOR

INSULATION

1" MIN.

PIPE

INSULATION

PIPE

FIRE STOPPING

FLOOR

INSULATION

1" MIN.

PIPE RING

SILICON

SECURE PIPE RING

TO FLOOR

FIRE STOPPING

SLEEVE

SLEEVE

CORE DRILL

NOTES:

1. INSTALL FIRE STOP PER MANUFACTURERS RECOMMENDATION.

SEE PLAN FOR GPM

T

STRAINER

CHECK VALVE

BRASS

DOWNSPOUT

NOZZLE

ANCHOR TO WALL

WITH BRASS BOLTS

OVERFLOW

DRAIN

SEAL AIR &

WATER TIGHTMAX 6" AFF

CW

CW

3/8"

PIPING CONCEALED

IN WALL

FILTER & PIPING EXPOSED

TO ICEMAKER SECURE

TO WALL

5 MICRON WATER

FILTER W/ AIR

RELEASE FOR ICE MAKER

BACKFLOW

PREVENTER

DRAIN TO FD

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PL100

MABCJM

PLUMBING LEGEND, DETAILS & NOTES

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: NONE

TYPICAL SERVICE STOP INSTALLATION

SCALE: NONE

TRAPEZE PIPE HANGER DETAIL

SCALE: NONE

INTERIOR AND FLOOR PIPE SLEEVE DETAIL

SCALE: NONE

TYPICAL BALANCING STATION

SCALE: NONE

DOWNSPOUT NOZZLE DETAIL

SCALE: NONE

ICE MAKER DETAIL

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

YY

A.4

CD

3628.2 28.324.1

C1

C3 C4 C5 C6 35343332313029282623.8 2524

C2

VV

WB

2"

EXST 6"

EXST 6"

EXST 6"

FD

FD

EXST FCO

4"

4"

EXST 6"

EXST 8"

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PL101

MABCJM

FOUNDATION PLUMBING PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CAREW

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

19447

2019/4/16

SCALE: 1/8" = 1'-0"

FOUNDATION PLUMBING PLAN

CW

HW

HR

XX

WW

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

FD

FD

LV WC

EXST 4"

EXST 2"

EXST LVEXST LV

WC LV

WC2"W

YY

UR

CO

EXST 4"W-DN

EXST 3"W-UP

EXST 4"W-UP&DN

A.4

FD

CAP EXST

1 1/2"CW

1"HW

3/4"HR

2"CW

1 1/4"HW

3/4"HR-UP

3"CW

2 1/2"HW

1 1/2"HR-UP

C W

H W

H R

3"

2 1/2" 1 1/2"

EXST 4"W-DN

CO

COEC

2"W 2"

4"

2" 4"

3"

2"

3" 3"

FD FD

2"W

1 1/2"V-UP

4"W

SK

4"W

2"

3"

4"

EXST 6"W-DN

5"STM-UP

3"V-UP

4"W-UP

EXST 6"

EXST 6"W-DN

EXST 6"

EXST 6"

S T

M

EXST 6"

EXST 8"

EXST 6"

EXST 2"

2" 4"

2"

4"

SKSK

1 1/2" 1 1/2"

4"

CO

CO

5"STM-UP

4"W-UP

3"V-UP

DRAIN PAN W/

WATER SENSOR

MONITOR/BMS

FUTURE

ELEVATOR

SK

CO

4"W-UP 3"V-UP

4"STM-UP

4"

4"

CO

4"W

SKSK SK4"

DOUBLE

WALL PIPE

4"STM-UP

4"W-UP 3"V-UP

FUTURE

ELEVATOR

CO

EXST 6"W-DN

4"

4"

4"W-UP

5"STM-UP

3"V-UP

EXST 3"

EXST 3"

1 1/2"2"3"

4"

SKSKSKSK

DOUBLE

WALL PIPE

SKSK

2"

1 1/2"

VISUAL

STATION/BMSVISUAL

STATION/BMS

4"

RELOCATED

SUMP PUMP & PIT

5"STM-UP

3"V-UP

4"W-UP

1 1/2"

4"

4"W

SK SK SK SK

1 1/2"

CO 2" 2" 1 1/2"

SK

1 1/2"1 1/2"

EXST 4"W-DN

2"

2"

2"

SKSKSK

2"

4"

SK

CO

DOUBLE WALL PIPE

DOUBLE WALL PIPE

4"V-UP

EXST 6"W-DN

5"STM-UP

3"

SK

CO

4"

4"

2"

4"

EXST 4" EXST 3"

EXST 1 1/2"

EXST 2"

2"

4"

4"

EXST 6"STM-DN

EXST 6"STM-DNEXST 8"STM-DN

4"W-UP

EXST 3"

49C

WATER

TREATMENT

MAIL

ROOM 82

BIOMETRICS

53A

OIT

PHARMACY

STORAGE

B-2

STAIR

59C59B 59A

60A

60B

ROOM

B-C-102

DECONTAMINATION

B-C-103D

SPS

ASSISTANT

OFFICE

B-C-106C

PREP/ASSEMBLY

B-C-103A

WOMENS

LOCKER

ROOM

B-C-103B

MENS

LOCKER

ROOM

B-C-113

STERILE/

NON-STERILE

STORAGEB-C-106G

HAC

B-C-114

HAC

B-C-116

OFFICE

B-C-112

LOGISTICS

CLERICAL

B-C-C3

CORRIDOR

B-C-EL3

OFFICE

(FUTURE

ELEVATOR)

B-C-109B

WOMENS

LOCKER

ROOM

B-C-109A

MENS

LOCKER

ROOM

B-C-109

LOUNGE,

STAFF

B-C-106A

PPE

AREA

B-C-106E

SCOPE

STERILIZATION

B-C-102C

SCOPE

DECONTAMINATION

B-C-101

STORAGE

(FUTURE

EQUIP

ROOM) B-C-102B

STORAGE

(FUTURE

DUMBWAITER)

4"

3"

4"

3"

3"

4"

4"

3"

4"

4" 4"

2"

EXST 4"W-DN

EXST WCO

B-C-106F

STORAGE

(FUTURE

DUMBWAITER)

B-C-106B

CART

PREP

B-C-102D

AUTOMATIC

CART

WASH

3"

1 1/2"

CO

4"

3"

VISUAL STATION/BMS

DRAIN PAN W/

WATER SENSOR

MONITOR/BMS

1 1/2"

4"

6"

CO

CO

VISUAL

STATION/BMS

C W

H W

H R

HW

HW

CW

HW

H R

H W

C W

HR

CW

HW

HR

HW

CW

EXST 2"

EXST 1 1/4"

EXST 1/2"

EXST 3/4"

EXST 3/4"

EXST 2"

EXST 2 1/2"

3/4" HOSE

BIBB

EXST 3/4" EXST 2"

EXST 1 1/2"

EXST 1"

EXST 1"

28.2 35343332313029282623.8 2524

3/4"

3/4"CW MAKE-UP

FOR HVAC SYSTEM

1 1/2"

EXST 2"

1/2"

1/2"

FDE

FDE

EXST FCO

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

KEY NOTES:

LOCATE VISUAL SITE STATION 6" BELOW CEILING EXPOSED ON

WALL. PROVIDE MOISTURE SENSOR AND CONNECT MOISTURE

SENSOR TO HOSPITAL BUILDING MANAGEMENT SYSTEM.

DRAIN PAN SHALL BE MINIMUM OF 4" HIGH. LOCATE DRAIN PAN

UNDER NEW PIPING. DRAIN PAN SHALL BE MINIMUM OF TWO

TIMES THE PIPE SIZE. PROVIDE MOISTURE SENSOR AND

CONNECT MOISTURE SENSOR TO HOSPITAL BUILDING

MANAGMENT SYSTEM.

SEE DRAWING PL100 FOR ADDITIONAL NOTES.

DRAIN BOX FOR 1" CONDENSATE LINE. DRAIN BOX, GUY GRAY,

MODEL# DBSS2DLV. CONNECT 2" WASTE LINE TO EXISTING

WASTE LINE UNDER SLAB.

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PL102

MABCJM

BASEMENT PLUMBING PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

BASEMENT PLUMBING PLAN

12" 0 5'

SCALE: 1/8"=1'-0"

10' 15'

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

GENERATOR BUILDING

Sim Sim

WORK SHOWN IN

THIS AREA SHALL

BE BY VA - NIC

3"CW

2 1/2"HW

1 1/2"HR-UP&DN

RISERS

4"W-UP&DN

3"V-UP&DN

5"STM-UP&DN

4"W-UP&DN 3"V-UP&DN

5"RD

4"W-UP&DN

3"V-UP&DN

5"STM-UP&DN

CAP 3"CW, 2 1/2"HW, &

1 1/2"HR AT CEILING

LINE FOR FUTURE FLOORS

XX

WW

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

P528 P528P528

P104

P528

P418

P528P528P528P528P528P528

P418

P104

P528

P528

P528 P528 P528

P528

P528

P528

P528

P418 P104

P.

TOILET

167A

PR.

TOILET

PROCEDURE

169A

TELEDERM170

TELERETINAL

PROCEDURE

CONSULT

CLEAN

UTILITY

HYBRID

1E-3

PATIENT

CORR. 3

1E-1E

STAIR

EQUIP

STORAGE

162A

SOILED

UTILITY

EXAM 37

TRAINING

ROOM

1E-1

CORRIDOR

1E-1

CORRIDOR

175A

SHARED

GROUP

ROOM 2

SHARED

MED

APP

STORAGE 171

TELEHEALTH

WOMEN'S

PUBLIC

TOILET

SMALL

CONFERENCE

MEN'S

PUBLIC

TOILET

1-B-ST3

STAIR

INTAKE

CONSULT

HYBRID

154A

EXAM 29

CONSULT

HYBRID

CONSULT

HYBRID

158A

EXAM 34

1E-4

CORRIDOR

TEAM

ROOM

1-C-148

OPEN

OFFICE

1-C-148

OPEN

OFFICE

1-C-ST2

STAIRS

1-C-147

W.

STAFF

TOILET

1-C-146

M.

STAFF

TOILET

1-C-116

STAFF

LOUNGE

1-C-115

MULTIPURPOSE

1-C-117

OPEN

OFFICE

1-C-117

OPEN

OFFICE

1-C-102

RECEPTION

1-C-C1

PATIENT

CORR. 1

1-C-104

NEG.

PRESSURE

HYBRID

1 1-C-105

EXAM 2

1-C-106

EXAM 3

1-C-107

HYBRID

1-C-108

EXAM 5

1-C-109

EXAM 6

1-C-111

HYBRID

1-C-110

P.

TOILET

1-C-112

EXAM 8 1-C-113

EXAM 9

1-C-114

EXAM 10

1-C-ST1

STAIRS

MECHANICAL

WAITING

EXST 2"

EXST 1" EXST 1"

EXST 3/4"

CW

HW

HR

EXST 1 1/2"

3/8"HW

1 1/2"V

3/8"CW-DN

(TYP SK)

EXST 2"

EXST

4"W

3"V-UP&DN

CW

HW

HR

NURSE

MANAGER

1-C-132

P.

TOILET

1-C-EL1-2

TEAM

ROOM

(FUTURE

ELEV.)

1-C-141

MED

ROOM 2

1-C-135

HYBRID

20 1-C-136

EXAM 21

1-C-137

EXAM 22

1-C-138

HYBRID

1-C-142

EXAM 24

1-C-143

EXAM 25

1-C-144

CONSULT

1-C-145

CLEAN

UTILITY

1-C-118

EQUIP.

STOR.

1-C-119

CONSULT

1-C-120

CONSULT

1-C-121

CONSULT

1-C-122

CONSULT

1-C-124

MED

ROOM 1

1-C-123

DW

1-C-125

EXAM 15

1-C-126

EXAM 141-C-127

HYBRID

1-C-128

EXAM 12

1-C-129

CONSULT

1-C-130

INTAKE

CW

HW

C W

H W

CW

H R

EXST 2"

1-C-C5

CORRIDOR

1-C-100

VESTIBULE

1-C-117

OPEN

OFFICE

1-C-C1

PATIENT

CORR. 1

148A

FUTURE

HAC

FAMILY

TOILET

1-C-139

OIT

5"STM-UP&DN

5"OFD

5"OFD

5"RD

5"OFD

5"RD

5"STM-DN

YY

3/8"HW

1 1/2"V

3/8"CW-DN

1"CW

2"V-DN P528P528P528

3/8"CW-

VALVE & CAP

1/2"HW

1 1/2"V

1/2"CW-DN

(TYP SK)

3/8"CW-VALVE &

CAP

P528

3/8"HW

1 1/2"V

3/8"CW-DN

(TYP SK)

HWHR

3/8"HW

1 1/2"V

3/8"CW-DN

(TYP SK)

3/8"HW

1 1/2"V

3/8"CW-DN

(TYP SK)

1"CW

2"V-DN

3/8"HW

1 1/2"V

3/8"CW-DN

A.4

CD

4"RD 4"OFD

5"RD

5"OFD

4"W-UP&DN

3"V-UP&DN

4"STM-UP&DN

4"RD

4"OFD

4"W-UP&DN

3"V-UP&DN

4"STM-UP&DN

THRU ROOF

4"STM-UP&DN

4"RD

4"OFD

1-C-154

SPECIALTY

1-C-140

ELECTRICAL

4"W-UP&DN

3"V-UP&DN

5"OFD

5"RD

5"STM-UP&DN

4"W-UP&DN

3"V-UP&DN

5"STM-UP&DN

THRU ROOF

S T

M

3 3

BALANCE

HR FOR

3 GPM

2"

1/2"O

1/2"MA

3/4"MV-DN

O

MA

MV

O

MA

MV

AA

A

A

AAA

A

A

1 1/2"

3/4"

2"

1 1/2"1 1/2"

2"

1/2" 1/2"

1 1/2"

1/2"

1/2"

2" 1 1/4"

1/2" 1/2" 1 1/2"

1 1/2" 2" 3"

1 1/2" 1"

1 1/4"

1" 2"2"2" 1 1/4"3/4"

1 1/2"

A A A A

A

6"

5"

6"STM-DN

S S

T M

6"STM-DN

6"

S S

T M

1 1/2" 1 1/2"2"

A

A

3/8"

A A

88 8

A

3/4" 1"

A

1" 8

A A

A AA

8 8 5"

STM

CO

CO

5"STM-DN

CO

4"

S T

M

EXST 3/4"

EXST 1"

EXST 1 1/2"

EXST 1"

EXST 1 1/2"

EXST 3/4"

H R

HW

CW

4"STM-THRU ROOF

5"STM-THRU ROOF

5"STM-THRU ROOF

5"STM-THRU ROOF

5"STM-THRU ROOF

SEE DOWNSPOUT

NOZZEL DETAIL 4

DWG PL100

SEE DOWNSPOUT

NOZZEL DETAIL 4

DWG PL100

SEE DOWNSPOUT

NOZZEL DETAIL 4

DWG PL100

1"1/2" 3/4"1"

1/2" 1/2"

3/4"

1 1/4"

H R

H W

C W

2"

4"

4"

4"

EXST 1 1/2"

EXST 1"

EXST 3/4"

EXST 1/2" EXST 1/2"

EXST 3/4"

3"RD

A

1-C-C3

STAFF

CORR.

1 1/2"

3"

3"2"

1 1/4"CW

3/4"HW-DN

1 1/2"

3/8"CW-DN

1/2" 1/2"

PL105

PL105

PL105

CW

HW

EXST 1"

EXST 1"

PL105

HW

CW

C W

H W

H R

1"

FUTURE ELEVATOR

SEE DOWNSPOUT

NOZZEL DETAIL 4

DWG PL100

6"STM-DN

S S

T M

6"

5"

CW

HW

CO

SHARED

GROUP

ROOM

PATIENT

EDUCATION

UTILITY

SHAFT

3"

28.2 28.324.1

C1

C3 C4 C5 C6 35343332313029282623.8 2524

C2 C7

VV

KEY NOTES:

CENTRAL STERILE AREA IS LOCATED IN BASEMENT UNDER THE

NEW ADDITION. CONTRACTOR SHALL COORDINATE ALL CORE

DRILLING OF SLAB WITH OWNER PRIOR TO WORK. ALL

COORDINATION AND ROUTING OF PIPING IN BASEMENT SHALL BE

DONE WITH THE OWNERS APPROVAL.

PROVIDE MEDICAL GAS OUTLETS. COORDINATE LOCATION OF

MEDICAL GAS OUTLET WITH ARCHITECTURAL DRAWINGS.

SEE DETAIL 8 ON DRAWING PL104 FOR WASTE & VENT RISER

DIAGRAM

SEE DETAIL 9 ON DRAWING PL100 FOR CW, HW & HR RISER

DIAGRAM.

FUTURE DUMB WAITER. NO PIPING SHALL BE ROUTED IN THIS

AREA.

FUTURE ELEVATOR. NO PIPING SHALL BE ROUTED IN THIS AREA.

SEE DWG PL100 FOR GENERAL NOTES.

PROVIDE SHUT-OFF VALVES HOT & COLD WATER.

SEE DETAIL 9 ON DRAWING PL105 FOR WASTE & VENT PIPING

DIAGRAM.

SEE DRAWING PL100 FOR ADDITIONAL NOTES.

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PL103

MABCJM

FIRST FLOOR PLUMBING PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLUMBING PLAN

12" 0 5'

SCALE: 1/8"=1'-0"

10' 15'

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

YY

A.4

CD

4"W-THRU ROOF 3"VTR

5"STM-THRU ROOF

5"STM-THRU

ROOF

4"W-THRU ROOF

3"VTR

5"STM-THRU ROOF

5"STM-THRU

ROOF

4"W-THRU ROOF

3"VTR

4"STM-THRU ROOF

4"STM-THRU ROOF

4"W-THRU ROOF 3"VTR

5"STM-THRU ROOF

5"STM-THRU ROOF

4"W-THRU ROOF

3"VTR

4"STM-THRU ROOF

4"STM-THRU ROOF

4"W-THRU ROOF

3"VTR

5"STM-THRU ROOF

5"STM-THRU ROOF

4"W-THRU ROOF

3"VTR

5"STM-THRU ROOF

5"STM-THRU ROOF

4"RD

4"OFD

5"RD 5"OFD

5"RD 5"OFD 4"RD 4"OFD 4"RD 4"OFD

5"RD 5"OFD

5"RD

5"OFD5"RD 5"OFD

4193 SF 2740 SF 2673 SF

2189 SF1743 SF2492 SF

3084 SF

331 SF

3"RD

35 SF

28.2 28.324.1 35343332313029282623.8 2524

VV

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

KEY NOTES:

SEE DRAWING PL100 FOR ADDITIONAL NOTES.1

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PL104

MABCJM

ROOF PLUMBING PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"

ROOF PLUMBING PLAN

12" 0 5'

SCALE: 1/8"=1'-0"

10' 15'

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

B

B.5

P418

P104

EXST 2"

1"CW

2"V-DN

3/4"CW

1 1/2"V-DNP202

3/8"HW

1 1/2"V

3/8"CW-DN

A

A

EXST 2" 149

FAMILY

TOILET

28.2 28.328

30.5

P418P104

EXST 2"

2"

2"V

1"CW-DN

3/8"CW

1 1/2"V

3/8"HW-DN

EXST 1"

EXST 1"EXST 3/4"

CW

HW

HR

P.

TOILET

ZZ

A

YY

A.4

P104P103

FDC

P420P420

P420 P202

P104

FDC

P528

1-C-147

W.

STAFF

TOILET

1-C-146

M.

STAFF

TOILET

1-C-116

STAFF

LOUNGE

2"CW

1/2"HW-DN

3/8"CW-DN

FDC

ICE MAKER

B

AA

3"V-DN

C

23.9

WOMEN'S

PUBLIC

TOILET 143

MEN'S

PUBLIC

TOILET

P104

FDC

P202

P202

P103

P104

FDC

P103

P103

P103

P420

P420

P420

P420

P420

P420

EXST 4"W-UP&DN

3"V-UP&DN

1/2"CW

1/2"HW-DN

1 1/2"V-DN

WCO

3"V-DN

1 1/2"

3"

EXST 3"V-UP&DN

2"CW-DN

HW

CW

1 1/2"

P609

3"

1 1/2"

2"CW

1 1/4"HW

3/4"HR-DN

EXST

1 1/2"CW

1"HW

3/4"HR-UP

EXST 4"W-UP&DN

3/8"CW

1 1/2"V-DN

1 1/2"V-DN

1/2"CW

1/2"HW-DN

1/2"

24.1 2623.8 2524

HW

CW

LV

3/8"

WC

A

1"

1"

1 1/4"

1"

1 1/4"

HW

CW

WC

B

2"1 1/4" 1 1/2"

CW

HW

2" 1 1/2"

LV LV LV

3/8" 1/2"

WCWC

UR

3/4"

2"

1 1/2" 1"

2"

HW

CW

LV

3/8"

ROOF

1ST FLOOR

4"W

3"V

3"VTR

ROUTE 4" WASTE LINE 1'-0"

ABOVE ROOF FOR FUTURE EXTENSION

3"V-3"VTR ROUTE 4" VENT LINE

1'-0" ABOVE ROOF FOR FUTURE EXTENSION

SANITARY VENT PIPING

FROM 1ST FLOOR

EXST 4"W

3"

1ST FLOOR

ROOF

CAP 3"CW, 2 1/2"HW & 1 1/2" HR

ABOVE CEILING TO EXTEND

TO UPPER FLOOR IN THE FUTURE

3/4"

2"

1 1/4"44 HWFU

100 CW FU

3"

2 1/2"

1 1/2"

H W

C W

H R

3"CW, 2 1/2"HW &

1 1/2"HR IN BASEMENT

T

HR HW CW

EXST 4"CW, 3"HW

1 1/2"HR IN BASEMENT

3 GPM

EXST 1 1/2"

EXST 3"

EXST 4"

3/4" DRAIN VALVE

W/ THREADED CAP (TYP)

A

CW

HW

1/2"

LV LV LV

3/8" 1/2"

3/8"

EWC

WCWCWC

URUR

3/4"

WC

B

1""

2" 2"

1/2"

141 2"

C W

CW

HW2"

CW

HW

1/2"

LV LV LV

3/8" A

3/4"EXST 1"

EXST 1 1/2"

CW

HW

HR

HW

CW

EXST 3/4"

EXST 1 1/2"

EXST 1"

3/4"

1"

1 1/2"

2"

C W

H W

H R

HR

HW

CW

HR

HW

CW

BASEMENT

2"

1 1/4"

3/4"

EXST 4"

EXST 1 1/2"

EXST 3"

C W

H W

H R

EXST 1 1/2" EXST 1"

EXST 3/4"

1 GPM

KEY NOTES:

PROVIDE SHUT-OFF VALVES HOT & COLD WATER.

SEE DRAWING PL100 FOR ADDITIONAL NOTES.

SEE DRAWING PL100 FOR GENERAL NOTES.

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PL105

MABCJM

DIAGRAMS & ENLARGED PLUMBING

PLANS

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING PLAN - FAMILY ROOM 149

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING PLAN - P. TOILET 151

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING PLAN - W. STAFF TOILET 147, M. STAFF TOILET 148, STAFF LOUNGE 116

SCALE: 1/4" = 1'-0"

ENLARGED PLUMBING PLAN - W. (141) & M. (143) PUBLIC TOILET

SCALE: NONE

WATER PIPING DIAGRAM

SCALE: NONE

WATER PIPING DIAGRAM

SCALE: NONE

TYPICAL WATER PIPING DIAGRAM FOR INDIVIDUAL LAVATORY OR SINK

SCALE: NONE

TYPICAL WASTE & VENT RISER DIAGRAM

NOTE: ALL RISERS SIMILAR

SCALE: NONE

MAIN CW, HW & HR RISER DIAGRAM

SCALE: NONE

WATER PIPING DIAGRAM

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

3"

4"

EXST 2"

EXST 2"

EXST 4"

EXST 2"

EXST 3"

EXST 2"

EXST 2"

EXST 2"

EXST 2"

2"

1 1/2" 1 1/2"

2"

2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

2"

4"

4"

3"

1 1/2"

1 1/2"

2"

3" 1 1/2"

3"

3"

2"

1 1/2" 1 1/2"

1 1/2"

1 1/2"1 1/2"

1 1/2"

2"

2"

4"

3"

1 1/2"

2"

1 1/2"

2"

1 1/2"

EXST 4"

2"

4"

2"

EXST 2"

EXST 2"

2"

1 1/2"

4" 4"

2"

3"

4"

1 1/2"

2"

1 1/2"

3"

4"

3"

4"

EXST 6"

EXST 6"

EXST 3"

EXST 6"

EXST 6"

CO

CO

CO

CO

CO

CO

1 1/2"

1 1/2" 1 1/2"

1 1/2"

2"

4"

1 1/2"

1 1/2"

2" 1 1/2"

3"

4"

2"

3" 2"

2"

1 1/2"

4" 2"

2"

4"

2"

2"

2" 4"

4"

3"

4"

3"

2"

3"

3"

4" 2"

4"

4"

EXST 6"

EXST 2"

1 1/2"

1 1/2"

4" 4"

CO

CO

3"

3" 2"

CO

WCO

EXST 4"

EXST 3"

2"

4"

2"

CO

EXST 3"

2"

4"

4"

2"

2"

CO

1 1/2"

2"

4"

4" 4"

2"

EXST 3"

3"

1 1/2"

3"

1 1/2"

1 1/2"

1 1/2"

3"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

2"

3"

EXST 3"

EXST 3"

2"

2" 2"

EXST 6"

4"

3"

3"

3"

3"

EXST 6"

4"

4"

3"V-3"VTR

3"V-3"VTR

3"V-3"VTR

3"V-3"VTR

3"V-3"VTR

3"V-3"VTR

4"

4"

2"

1 1/2"

1 1/2"

2"

3"2"

1 1/2"

1 1/2"

3"

3" 4"

2"

3"

3"

2"

3"V-3"VTR

4"

EXST 4"

EXST WCO

1 1/2"

2"

EXST 2"

EXST 4"

EXST 3"

112 113

116 146

CO

4"

4"

3"

1 1/2"

2"

1 1/2"

CO

1 1/2"

EXST 8"

EXST 6"

2"

EXST 6"

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\B a rt s c h \D o c u m e n ts

\1 V

A F t W a y n e R b a rt s c h .r v t

CONSTRUCTION DOCUMENTS

PL106

MABCJM

WASTE & VENT PIPING DIAGRAM

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: NONE

WASTE & VENT PIPING DIAGRAM

W

IL

L IAM J HOSMO

N

P R O F

ESS IONAL ENG

IN

E E R

R

EG

I STERED

I N D I A NA

No.

STATE OF

ZZ

A

B

B.5

C

23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37

12"ø

"ø

12"ø

40"x24" 20"x14"

"x1

6"

34"x16"

36"x24"

"x

36"x24"

YY

A.4

EX. VAV

1-1

12"x10"

12"x12"

36"x24"

36"x24"

EX. EAB

1-2

12"x8"

"x

28"x16"

EX. VAV

1-14

16"x15" 16"x12"

12"x6"

12"x12"

"x

EX. VAV

1-15

14"x12"

"x

EX. VAV

1-11

"x

EX. VAV

1-10

EX. VAV

1-12

EX. VAV

1-13

"x

36"x14"

"x

24"x14"

"x

EX. VAV

1-16

"x

"x

"x

12"x10"

"x

"x

12"x10"

EX. VAV

1-7

EX. VAV

1-8

"x

34"x12" 18"x10"

"x

EX. VAV

1-3

"x

EX. VAV

1-9

12"x8"

EX. EAB

1-4

"x

"ø

"ø

12"ø 14"x8"

EX. VAV

1-4

EX. VAV

1-5

12"x10"

14"x12"

EX. VAV

1-2

12"x10"

EX. CUH

EX. CUH

EX. CUH

EX. CUH

EX. CUH EX. CUH

EX. CUH EX. CUH EX. CUH EX. CUH

E X

P

A C

-1

EX. CUH EX. CUH EX. CUH EX. CUH

S-E

E-E

E-E

E-E

E-E

10"x6"10"x6"

12"x10"

E-E

E-E

E-E

E-E

S-E

12"x6" S-E

12"x6" 12"x6" S-E

S-E

S-E

12"x6"

E-E

"x

E-E 100 6"ø

E-E

6"ø

E-E 50 7

"ø

S-E

"ø

10"x8"

EX. VAV

1-17

S-E

S-E

E-E

E-E

S-E

E-E

S-E

"ø

8"ø

6"ø

8"ø

"ø

E-E

S-E

"ø

"ø

6"ø

6"ø

"ø

"ø

S-E

E-E

6"ø

8"ø

E-E

E-E

S-E

E-E

S-E

E-E

8"ø

6"ø

E-E

24"x8"

14"x12"

S-E

S-E

S-E

S-E

S-E

E-E

"x

"x

8"x8"

6"ø

E-E 80 6

"ø

S-E

"ø

"ø

S-E

E-E

"x

E-E

S-E

E-E

12"x10"

EX. EAB

1-7

12"ø E-E

E-E

10"ø S-E 300S-E

E-E

E-E

S-E

S-E

8"x8"

"øS-E

S-E

E-E

E-E

"x

E-E

S-E

S-E

E-E

6"x6"

6"x6"

6"x6"

E-E

12"x8"

S-E

S-E

E-E

E-E

S-E

S-E

"x

10"x10"

S-E

S-E

S-E

S-E

S-E

S-E

EX. VAV

1-6

"ø

"ø

E-E

E-E

S-E

S-E

T-E

T-E

T-E

S-E

S-E

E-E 450 12"x8"

S-E

S-E

S-E

S-E

6"x6"

REMOVE

DUCTWORK/EQUIPMENT AS

INDICATED IN MECHANICAL

ROOM.

20"x20" INTAKE UP TO

EX. GIH-1

14"x8"

40"x24" SUPPLY DUCT

UP TO EX. AHU-1

E-E

E-E

12"Ø EXHAUST

DUCT UP

16"x16" EXHAUST

DUCT UP TO EX. EF-2

EX. UH-1

36"x24" EXHAUST DUCT

UP TO EX. EF-1

R E

M O

V E

D U

C T

W O

R K

/E Q

U

IP

M E

N T

A S

I N

D

IC

A T

E D

I N

T H

IS

A

R E

A

12"Ø EXHAUST DUCT DN

TO CART WASH.

BALANCED AT 500 CFM.

28.228.324.1 35343332313029282623.8 2524

KEYPLAN

SCALE: 1" = 100'-0"

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

GENERAL REMOVAL NOTES:

A. THE REMOVAL DRAWINGS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF

REMOVALS, BUT SHALL NOT BE HELD TO BE ALL

INCLUSIVE.

B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISTING

THE AREA TO BECOME FAMILIAR WITH THE EXISTING

CONDITIONS. VERIFY SIZE, LOCATION, AND USAGE OF

EXISTING UTILITIES PRIOR TO REMOVAL. FOR FURTHER

INFORMATION WITH REGUARD TO THE EXTEND OF

REMOVALS, SEE THE CONSTURCTION DRAWINGS AND THE

ARCHITECTURAL DRAWINGS WHICH SHOW WORK TO BE

PERFORMED.

C. OWNER SHALL BE GIVEN FIRST CHOICE ON ALL

EQUIPMENT BEING REMOVED THAT WILL NOT BE

RELOCATED. CONTRACTOR SHALL REVIEW THE EXISTING

EQUIPMENT WITH OWNER. EQUIPMENT BEING REMOVED

OR RELOCATED SHALL BE REMOVED IN A MANNER THAT

REUSE IS POSSIBLE AND STORED AS DIRECTED BY

OWNER. ALL OTHER EQUIPMENT SHALL BECOME THE

PROPERTY OF THE CONTRACTOR AND SHALL BE

REMOVED & DISPOSED OF FROM THE SITE BY THE

CONTRACTOR.

D. CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS,

CEILINGS, ETC. WHERE REQUIRED BY THE REMOVAL OF

EQUIPMENT, DUCTWORK, AND ACCESSORIES. PATCHING

SHALL MATCH EXISTING CONSTRUCTION & FINISHES.

COORDINATE ALL PATCHING AND FINISHES WITH

ARCHITECT. PATCHING OF FIRE WALLS SHALL MEET THE

RATING AND SHALL BE INSTALLED PER ARCHITECTURAL

SPECIFICATION.

E. IF EQUIPMENT TO REMAIN MUST BE REMOVED DUE TO

REMOVAL OR CONSTRUCTION, THE EQUIPMENT SHALL BE

RELOCATED IN A MANNER THAT IS ACCEPTABLE BY THE

ARCHITECT/ENGINEER.

F. PROPER CONNECTIONS, MATERIALS, AND SIZES OF

DUCTWORK/PIPING SHALL BE MADE BACK TO MAINS AS

INDICATED BY THE HATCHING. WORK ASSOCIATED WITH

THE MAINS SHALL BE DONE DURING OFF HOURS.

G. REMOVE COMPLETELY ALL EXISTING HVAC EQUIPMENT,

ALL ASSOCIATED PIPING, CONTROLS, AND SUPPORTS

BEING MADE OBSOLETE BY THIS CONSTRUCTION. REMOVAL

OF HVAC DUCTWORK AND PIPING SHALL BE MADE BACK TO

MAINS AS INDICATED BY THE HATCHING. WORK

ASSOCIATED WITH THE MAINS SHALL BE DONE DURING OFF

HOURS.

H. CONTRACTOR SHALL BE RESPONSIBLE TO KEEP ALL

PHASES OF CONSTRUCTION AREA UNDER A NEGATIVE

MODE AND SHALL BE CERTIFIED. PROVIDE A DIGITAL

PRESSURE DIFFERENTIAL MEASUREMENT WITH

INDICATION TO 0.01 INCHES OF PRESSURE DIFFERENTIAL

OUTSIDE THE CONSTRUCTION AREA THAT MEASURES THE

PRESSURE WITHIN THE CONSTRUCTION SITE. GAUGE

SHALL BE READ AND SIGNED BY THE CONTRACTOR

INDICATING NEGATIVE PRESSURE IN THE CONSTRUCTION

AREA. WHEN THE BUILDING AIR DISTRIBUTION SYSTEM IS

USED TO MAINTAIN NEGATIVE MODE, THE CONTRACTOR

SHALL PROVIDE TEMPORARY FILTER MEDIA ON ALL

RETURN AND EXHAUST OPENINGS IN THE CONSTRUCTION

AREA. THE FILTER MEDIA SHALL BE REPLACED WHEN

DIRTY OR WHEN DIRECTED BY THE ARCHITECT.

AIR AND WATER BALANCING

SCOPE:

1. RECORD AIR FLOW READINGS AT EACH EXISTING

TERMINAL UNIT CONNECTION, GRILLES/DIFFUSERS,

EXHAUST FANS AND AT THE EXISTING/RELOCATED

EQUIPMENT (AHU'S, EF'S, ETC.) WITHIN THE PROJECT

AREA BEFORE REMOVAL WORK BEGINS. WATER FLOW

READINGS SHALL ALSO BE RECORDED FOR EACH

TERMINAL UNIT WITHIN THE PROJECT AREA AND AT THE

HEATING HOT WATER/ CHILLED WATER PUMPS.

DISCHARGE AIR TEMPERATURE OF THE TERMINAL UNITS

AND CABINET HEATERS SHALL BE RECORDED WITH THE

HOT WATER CONTROL VALVE FULL OPEN.

2. BALANCE TERMINAL UNITS WITH DUCT MODIFICATIONS TO

THE VALUES INDICATED AT THE DIFFUSERS/GRILLES

BEING INSTALLED/RELOCATED AND/OR TO THE INITIAL

READINGS AT THE DIFFUSERS/GRILLES THAT ARE

EXISTING TO REMAIN. HEATING HOT WATER SHALL BE

BALANCED AT THESE TERMINAL UNITS AND CABINET

HEATERS AS REQUIRED TO MAINTAIN LEAVING AIR

TEMPERATURES.

3. UPON COMPLETION OF THE PIPING AND DUCT

MODIFICATIONS, RECORD FINAL AIR AND WATER FLOW

RATES WITHIN THE PROJECT AREA AND EXISTING

BASEMENT SPS, THE AIR HANDLING UNITS, THE EXHAUST

FANS, AND AT THE HEATING HOT WATER/CHILLED WATER

PUMPS. TOTAL AIR AND WATER FLOW RATES WITHIN THE

PROJECT AREA, EXISTING BASEMENT SPS, AND AT THE

SOURCE EQUIPMENT SHALL BE WITHIN 5% OF EXISTING

CONDITION/DESIGN FLOW RATES.

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .