This solicitation package outlines requirements for an expansion project at the VA Northern Indiana Health Care System campus in Fort Wayne, Indiana. The project involves expanding the first floor of Building 1 to add additional primary care capacity.
Key details include expanding an existing primary care suite by approximately 8,000 square feet. Construction work includes mechanical, electrical, and plumbing infrastructure upgrades. The solicitation package provides architectural drawings, mechanical drawings, and plumbing drawings detailing the existing conditions and work to be performed. The solicitation number is 36C25020B0004, with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 listed as the contracting agency. The estimated award date is not specified.
The document focuses on defining the technical scope of work required through construction drawings and notes. It does not include standard solicitation elements such as response dates, pricing terms, or small business set-aside designations.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION NOTES:
PROVIDE TAMPER SWITCHES ON ALL CONTROL VALVES.
PROVIDE MONITORED CONTROL VALVES AT THE BASE OF EACH RISER.
PROVIDE RECORD FLOW TEST PRIOR TO PREPARING SHOP DRAWINGS AND HYDRAULIC
CALCULATIONS. CONTRACTOR SHALL PROVIDE THE FIRE SUPPRESSION DESIGN CRITERIA
FORM AS PART OF THEIR STATE SUBMITTAL.
THE MAIN DRAINS FOR RISERS & FLOW TEST STATIONS SHALL TERMINATE TO AN
ACCEPTABLE FLOOR DRAIN THAT CAN ACCOMMODATE THE FLOW IN A MECHANICAL ROOM OR
TO FINISHED GRADE. PROIVDE SIGHT GLASS.
COORDINATE INSTALLATION OF ALL SYSTEMS WITH MECHANICAL (HVAC), PLUMBING, AND
ELECTRICAL SYSTEMS. CEILING CAVITY SPACE IS RESTRICTED AND INSTALLTION OF
DUCTWORK SHALL TAKE PRIORITY OVER ALL OTHER TRADES. NO EXTRA COMPENSATION
WILL BE ALLOWED TO COVER THE COST OF RELOCATING SYSTEMS FOUND ENCROACHING
ON SPACE REQUIRED BY MECHANICAL, PLUMBING, OR ELECTRICAL SYSTEMS.
PROVIDE SPRINKLERS ABOVE AND BELOW WIDE DUCTS (48" AND WIDER INCLUDING
INSULATION) PER NFPA 13 REQUIREMENTS. REFER TO HVAC DRAWINGS FOR ADDITIONAL
INFORMATION.
PIPING ARRANGEMENT AND SPRINKLER LOCATIONS ARE DIAGRAMMATIC AND ARE PROVIDED
FOR THE CONTRACTOR'S INFORMATION. EXACT ROUTING OF PIPING AND FINAL SIZING AND
LOCATION OF SPRINKLERS SHALL BE SELECTED BY THE CONTRACTOR TO ACCOUNT FOR
ACUTAL FIELD CONDITIONS. ALL AREAS SHALL BE PROTECTED UNLESS SPECIFICALLY NOTED
OTHERWISE. COORDINATE INSTALLATION WITH CEILING HEIGHTS AND SOFFITS. REFER TO
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
EXTENDED COVERAGE SPRINKLERS MAY BE UTILIZED. THE USE OF EXTENDED COVERAGE
SHALL BE CONFIRMED BY HYDRAULIC CALCULATIONS.
PIPING SHALL BE CONCEALED IN ALL FINISHED AREAS.
THIS BUILDING SHALL BE CONSIDERED LIGHT/ORDINARY HAZARD OCCUPANCY WITH
EXCEPTIONS PER NFPA 13, STATE, AND LOCAL CODES. DESIGN DENSITIES SHALL BE IN
ACCORDANCE WITH GOVERNMENT/VA REQUIREMENTS.
INSTALL SPRINKLER MAINS AS HIGH AS POSSIBLE IN CEILING CAVITIES. SOME BRANCH LINES
WILL REQUIRE ARM OVERS TO SUPPLY SPRINKLERS BELOW DUCTWORK. REFER TO
MECHANICAL DRAWINGS AND COORDINATE WITH THE MECHANICAL CONTRACTOR.
SPRINKLER PIPING SHALL BE SCHEDULE 10 STEEL FOR PIPING THAT IS 2-1/2" AND LARGER.
PROVIDE SCHEDULE 40 STEEL PIPING FOR 2" AND SMALLER UNLESS OTHERWISE NOTED.
THINWALL, LIGHTWALL, PRO-PRESS TYPE PIPING/FITTINGS WILL NOT BE ALLOWED.
PROVIDE PIPE LABELS FOR ALL SPRINKLER PIPING & DEVICES. LABELS SHALL READ "FIRE
PROTECTION PIPING".
PAINT ALL SPRINKLER PIPING THAT IS EXPOSED IN PUBLIC SPACES. COORDINATE WITH ALL
TRADES. COLOR SHALL BE RED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
E Q
E Q
36" 12"
NOTE:
INDICATES CENTERLINE OF
SPRINKLER HEAD
CL
CL
CL
CL
CL
CL
CL
24" X 48"
CEILING TILE
12" X 48"
CEILING TILE
36" 12"
EQ EQ
E Q
E Q
12" X 12"/24" X 24"
CEILING TILE
EQ EQ
E
Q E
Q
E Q
E Q
EQ EQ
24" X 48"
CEILING TILE
12" X 48"
CEILING TILE
SPRINKLER HEAD
(TYPICAL)
P
PRESSURE GAUGE
CAP FOR FUTURE
EXTENSION
4" STANDPIPE
PIPE SUPPORTINTERMDIATE LANDING
48"
2 1/2" HOSE VALVE
CAP & CHAIN
8"
1 1/2" MANUAL AIR VENT
RECESSED SPRINKLER
HEAD 165 DEGREES FAHRENHEIT TEMP(TYP)
1"X1/2"
REDUCING
COUPLING
ONE (1) INCH
DROP- LENGTH
AS REQUIRED
ONE (1) INCE ARM-
LENGTH AS REQUIRED
ONE (1)
INCH RISER-
LENGTH AS
REQUIRED
1/2" MAX
ROUTE TO OUTDOORS
CHECK VALVE
FEED MAIN
WATERFLOW SWITCH PRESSURE RELIEF
VALVE
PRESSURE GAUGE
INDICATING TYPE FLOOR
CONTROL VALVE WITH
SUPERVISORY SWITCH
RISER
FROM END OF
REMOTE
BRANCH LINE
TEST VALVE IN READILY
ACCESSIBLE LOCATION
45 DEGREE ELL
SMOOTH BORE CORROSION
RESISTANT OUTLET GIVING
FLOW EQUIVALENT TO ONE
SPRINKLER. DISCHARGE
TO SPLASH BLOCK.
P
ROOF
1ST FLOOR
BASEMENT
WEST EAST
EXST 6"
EXST 2 1/2"
EXST SPRINKLER
IN BASEMENT
EXST 2 1/2" HOSE
CONNECTION
2 1/2" HOSE
CONNECTION
6"
FLOW SWITCH
MONITORED
CONTROL VALVE
TO SPRINKLERS
ON FIRST FLOOR
6" CAPPED
FOR FUTURE
6" CAPPED
FOR FUTURE
6"
2 1/2" HOSE
CONNECTION
2 1/2" HOSE
CONNECTION
EXST 6"
MONITORED
CONTROL VALVE
1/2" MANUAL
AIR VENT
2" MAIN DRAIN
ROUTE TO EXTERIOR
1/2" MANUAL
AIR VENT
2" MAIN DRAIN
ROUTE TO EXTERIOR
1/2" MANUAL
AIR VENT
P
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
FP100
MABCJM
FIRE PROTECTION NOTES, DETAILS, &
DIAGRAM
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: NONE
SPRINKLER HEAD LOCATION
SCALE: NONE
STANDPIPE VALVE DIAGRAM
SCALE: NONE
RECESSED SPRINKLER HEAD
SCALE: NONE
FLOOR CONTROL VALVE
SCALE: NONE
INSPECTOR TEST
SCALE: NONE
FIRE RISER DIAGRAM
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
19447
2019/4/16
EXST 2 1/2"
HOSE CONNECTION
EXST 6"
6"FP-UP
6"FP-UP
EXST 6"
TO IN BASEMENT
SPRINKLER SYSTEM
EXST 6"
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
YY
A.4
2 1/2" HOSE
CONNECTION
REMOVE EXST
6" MAIN & 2 1/2"
HOSE CONNECTION
PHARMACY
STORAGE
53A
OIT
BIOMETRICS
ROOM
49B
B-1
STAIR
45B
60A
59A
59B
59C
B-C-109A
MENS
LOCKER
ROOM
B-C-109
LOUNGE,
STAFF
B-C-109B
WOMENS
LOCKER
ROOM
B-C-113
STERILE/
NON-STERILE
STORAGE
B-C-116
OFFICE
B-C-114
HAC
B-C-106G
HAC
B-C-113A
STORAGE
(FUTURE
EQUIP.
ROOM)B-C-106F
STORAGE
(FUTURE
DUMBWAITER)
B-C-102
DECONTAMINATION
B-C-102D
AUTOMATIC
CART
WASH
B-C-106E
SCOPE
STERILIZATION
B-C-102C
SCOPE
DECONTAMINATIONB-C-102B
STORAGE
(FUTURE
DUMBWAITER)
B-C-101
STORAGE
(FUTURE
EQUIP
ROOM)
B-C-103D
SPS
ASSISTANT
OFFICE
B-C-103B
MENS
LOCKER
ROOM
B-C-103A
WOMENS
LOCKER
ROOM
ROOM
49C
WATER
TREATMENT
B-C-106A
PPE
AREA
B-C-106B
CART
PREP
2"FP-DN
2" MAIN DRAIN TO
2'X2'X4" SPLASH
BLOCK ON GRADE
28.2 28.324.1 35343332313029282623.8 2524
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
INDICATES REMOVAL
FIRE PROTECTION WATER
CONNECTION POINT NEW
TO EXISITING
FIRE PROTECTION
FPW
FP
LEGEND
KEY NOTES:
SEE DRAWING FP102 FOR NOTES.1
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
FP101
MABCJM
BASEMENT FIRE PROTECTION PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
BASEMENT FIRE PROTECTION PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
DASHED LINE INDICATES AREA TO BE
PROVIDED WITH AN AUTOMATIC SPRINKLER
SYSTEM PER NFPA 13, STATE, AND LOCAL CODES.
SPRINKLER MAIN FOR FIRST
FLOOR SPRINKLER SYSTEM
6"FP-UP&DN
CAP 6"FP-UP FOR
FUTURE FLOORS
MODIFY EXISTING
SPRINKLER SYSTEM
2 1/2" HOSE
CONNECTION
6"FP-UP&DN
CAP 6"FP-UP
FOR FUTURE FLOORS
2 1/2" HOSE
CONNECTION
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
YY
A.4
MODIFY EXISTING
SPRINKLER SYSTEM
FUTURE ELEVATOR
FUTURE
DUMBWAITER
FUTURE DUMBWAITER
FUTURE DUMBWAITER
1-C-115
MULTIPURPOSE
1-C-116
STAFF
LOUNGE
1-C-114
EXAM 101-C-113
EXAM 9
1-C-112
EXAM 8
1-C-111
HYBRID
1-C-110
P.
TOILET
1-C-109
EXAM 61-C-108
EXAM 5
1-C-107
HYBRID
1-C-106
EXAM 3
1-C-105
EXAM 2
1-C-C1
PATIENT
CORR. 1
1-C-C1
PATIENT
CORR. 1
1-C-117
OPEN
OFFICE
1-C-117
OPEN
OFFICE
1-C-104
NEG.
PRESSURE
HYBRID
1-C-C5
CORRIDOR
UTILITY
SHAFT
1-C-ST1
STAIRS
1-C-102
RECEPTION
WAITING
MECHANICAL
FAMILY
TOILET
148A
FUTURE
HAC
NURSE
MANAGER
1-B-ST3
STAIR
P.
TOILET
INTAKE
CONSULT
MEN'S
PUBLIC
TOILET
PATIENT
EDUCATION
WOMEN'S
PUBLIC
TOILET
SMALL
CONFERENCE
? 175A
SHARED
GROUP
ROOM 2
176A
SHARED
MED
APP
STORAGE 171
TELEHEALTH
TELERETINAL 169A
TELEDERM 169
PROCEDURE
167A
PR.
TOILET
MED
ROOM 3
PROCEDURE
CONSULT
CLEAN
UTILITY
HYBRID
1E-3
PATIENT
CORR. 3
1E-1
CORRIDOR
HYBRID
28 154A
EXAM 29
CONSULT
HYBRID
CONSULT
HYBRID
158A
EXAM 34
1E-4
CORRIDOR
TEAM
ROOM
1E-3
PATIENT
CORR. 3
TRAINING
ROOM
EXAM 37
162A
SOILED
UTILITY163
EQUIP
STORAGE
1E-1E
STAIR
1-C-130
INTAKE
1-C-C2
PATIENT
CORR. 2
1-C-134
STORAGE
1-C-133
DW
1-C-132
P.
TOILET
1-C-EL1-2
TEAM
ROOM
(FUTURE
ELEV.)
1-C-135
HYBRID
1-C-136
EXAM 21
1-C-137
EXAM 22
1-C-138
HYBRID
1-C-141
MED
ROOM 2
1-C-140
ELECTRICAL
1-C-142
EXAM 24
1-C-154
SPECIALTY
1-C-139
OIT
1-C-143
EXAM 25
1-C-144
CONSULT
26 1-C-145
CLEAN
UTILITY
1-C-C3
STAFF
CORR.
1-C-147
W.
STAFF
TOILET
1-C-146
M.
STAFF
TOILET
1-C-ST2
STAIRS
1-C-148
OPEN
OFFICE
1-C-148
OPEN
OFFICE
1-C-124
MED
ROOM 1
1-C-123
DW
1-C-125
EXAM 15
1-C-126
EXAM 14
1-C-127
HYBRID
1-C-128
EXAM 12
1-C-129
CONSULT
11 1-C-122
CONSULT
16 1-C-121
CONSULT
1-C-120
CONSULT
1-C-119
CONSULT
1-C-118
EQUIP.
STOR.
RELIEF
AIR
CHASE
2" MAIN DRAIN-DN
TO EXTERIOR
PROVIDE 2'X2'X4" CONCRETE
SPLASH BLOCK
COORDINATE EXACT LOCATION
W/ ARCHITECT
28.2 28.324.1
C1
C3 C4 C5 C6 35343332313029282623.8 2524
C2 C7
1-C-100
VESTIBULE
KEY NOTES:
NO SPRINKLER MAINS OR MAIN BRANCH LINES
SHALL BE ROUTED IN THE FUTURE DUMBWAITER
OR ELEVATOR AREAS. PROVIDE SPRINKLERS TO
CONFORM TO NFPA 13.
ORDINARY HAZARD OCCUPANCY
RELOCATE EXISTING PIPING & PROVIDE NEW HEADS IN
ROOM TO PROVIDE FIRE PROTECTION FOR NEW ROOM
CONFIGURARTION.
DESIGN REQUIREMENTS SHALL MEET THE MINIMUM NFPA
13 DESIGN FOR:
DESIGN BUILDING FOR LIGHT HAZARD OCCUAPANCY
UNLESS OTHERWISE NOTES.
ORDINARY HAZARD, GROUP 1 AND AREAS WITH EXPOSED
COMBUSTIBLE CONSTRUCTION, THE DESIGN
REQUIREMENT SHALL BE A MINIMUM OF 0.15GPM/SQ.FT.
FOR THE HYDRAULIC REMOTE AREA OF 1500 SQ.FT.
ORDINARY HAZARD, GROUP 2 AND AREAS WITH EXPOSED
COMBUSTIBLE CONSTRUCTIO, THE DESIGN REQUIREMENT
SHALL BE A MINIMUM OF 0.2 GPM/SQ.FT. FOR THE
HYDRAULIC REMOTE AREA OF 1500 SQ.FT.
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
FP102
MABCJM
FIRST FLOOR FIRE PROTECTION PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
FIRST FLOOR FIRE PROTECTION PLAN 12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
2"V-UP
4"W-UP&DN
FD WC
LV
2"W
LV
4"W
3"V-UP&DN
LV
LV
LV
CW
HW
HR
YY
4"W-DN
3"W-UP
A.4
RELOCATE PIT
& DUPLEX PUMP,
CONTROLS, ETC.
STM
S T
M
S T
M S T
M
S T
M
STM
STM
6"
6"4"
6"
6"
8"
6"
2"
4" 8"
6"
6"
6"
6"
6"
4" 6"
OD RD
OD RD
OD
RD
OD
RD
OD
RD
3"V-4"VTR
4"W-DN
RD
6"
3"V-4"VTR
3"V-4"VTR
8"
2" 2"
4"W-DN
OD
RD
6"W-DN
6"W-DN
8"STM-DN 6"STM-DN
6"STM-DN
4"W-DN
OD
8" DISCHARGE
ABOVE GRADE
6"W-DN
8"STM-DN
8" DISCHARGE
ABOVE GRADE
6"STM-DN
6" DISCHARGE
ABOVE GRADE
WCO
4" 3"
1 1/2"
2"
3"
2"
3"
2"
2"
4"
2"
2"
4"
4"
PHARMACY
STORAGE
B-2
STAIR
53A
OIT
BIOMETRICS
ROOM
B-1
STAIR
5859C
59B59A
60A
60B
46 47
45 45B
ROOM
49C
WATER
TREATMENT
B-C-101
STORAGE
(FUTURE
EQUIP
ROOM) B-C-102B
STORAGE
(FUTURE
DUMBWAITER)
B-C-102C
SCOPE
DECONTAMINATION
B-C-106E
SCOPE
STERILIZATION
B-C-102
DECONTAMINATION
B-C-103A
WOMENS
LOCKER
ROOM
B-C-103B
MENS
LOCKER
ROOM
B-C-106C
PREP/ASSEMBLY
B-C-106G
HAC
B-C-106F
STORAGE
(FUTURE
DUMBWAITER)
B-C-113A
STORAGE
(FUTURE
EQUIP.
ROOM)
B-C-113
STERILE/
NON-STERILE
STORAGE
B-C-112
LOGISTICS
CLERICAL
B-C-114
HAC
B-C-116
OFFICE
B-C-109B
WOMENS
LOCKER
ROOM
B-C-109A
MENS
LOCKER
ROOM
B-C-109
LOUNGE,
STAFF
B-C-106F
STORAGE
(FUTURE
DUMBWAITER)
B-C-106A
PPE
AREA
B-C-106B
CART
PREP
1 1/2"CW
1"HW
3/4"HR-UP
B-C-EL3
OFFICE
(FUTURE
ELEVATOR)
B-C-103C
PPE
AREA
B-C-103D
SPS
ASSISTANT
OFFICE
RELIEF
AIR
CHASE
STM
C W
H W
H R
HW
HW
H
R
CW
HW
C W
H W
H R
HR
CW
HW
HR
HW
CW
2 1/2" 2"
3/4"
3/4"
2 1/2"
2" 3/4"
1"
1"
3/4" 2"
1 1/2" 2"
1/2"
1 1/4" 3/4"
28.2 28.324.1 C3 35343332313029282623.8 2524
KEY NOTES:
SEE DWG PL100 FOR REMOVAL NOTES1
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PD101
MABCJM
BASEMENT PLUMBING REMOVAL PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
BASEMENT PLUMBING REMOVAL PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
1 1/2"CW
1"HW
3/4"HR-UP&DN
3/4"
2"V-UP
2"V
4"W-DN
3"V
4"W-UP&DN
WC
LV
FD
LV
LV
LV
H R
CW
HW
HR
CW
H W
CAP
CAP
CAP
3"V 4"W
3"CW
2"HW-UP&DN
CW
HW
HR
CW
HW
HR
4"W
3"V-UP&DN
CAP
CAP
CAP
YY
3"W-UP
RD
OFD
RD OFD
RD OFD RD
OFD
RD
OFD
RD
OFD
RD
OFD
A.4
LV
EXST MEDICAL GAS
ZONE VALVE FOR
PROCEDURE ROOM
O
MA
MV
REMOVE MEDICAL
GAS OUTLETS
O
MA
MV
MECHANICAL
WAITING
FAMILY
TOILET
NURSE
MANAGER
1-B-ST3
STAIR
INTAKE
HYBRID
154A
EXAM 29
CONSULT
HYBRID
CONSULT
158A
EXAM 34 1E-4
CORRIDOR
TEAM
ROOM
TRAINING
ROOM
1E-3
PATIENT
CORR. 3
1E-1
CORRIDOR
SMALL
CONFERENCE
WOMEN'S
PUBLIC
TOILET
SHARED
MED
APP
STORAGE
TELEHEALTH
TELERETINAL
169A
TELEDERM 169
PROCEDURE
1 167A
PR.
TOILET
MED
ROOM 3
PROCEDURE
2 166
CONSULT
35 165
CLEAN
UTILITY
HYBRID
1E-1E
STAIR
EQUIP
STORAGE
3 162A
SOILED
UTILITY
EXAM 37
4"VTR
4"VTR
4"VTR
1 1/2" 1"
3/4"
1"
1" 1"
3/4"
2"2"
1 1/2"1"
3"
3/4"
1 1/4"
2"
3/4" 1"2"
1"
2"
1"
1"
2"
3/4"
1 1/2"
1"
3/4"
1/2" 1/2"
3/4"
28.2 28.324.1 35343332313029282623.8 2524
KEY NOTES:
SEE DWG PL100 FOR REMOVAL NOTES1
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PD102
MABCJM
FIRST FLOOR PLUMBING REMOVAL PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLUMBING REMOVAL PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
*ZURN MODELS ARE FOR MINIMUM QUALITY.
WATER HAMMER ARRESTER SCHEDULE
155-330
F
114-154
E
61-113
D
33-60
C
12-32
B
1-11
A
IDENTIFICATION
SERIES Z-1700
*ZURN MODEL
FIXTURE UNITS
ARRESTER
WATER HAMMER
ABBREVIATION
BMS BUILDING MANAGEMENT SYSTEM
CC COLD WATER CONNECTION
CO CLEANOUT
CW DOMESTIC COLD WATER
EC ELECTRIC WATER COOLER
EXST EXISTING
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
HR DOMESTIC HOT WATER RETURN
HW DOMESTIC HOT WATER
LV LAVATORY
MB MOP BASIN
OFD OVERFLOW DRAIN
RD ROOF DRAIN
SK COMMERCIAL SINK
STM STORM DRAINAGE
UR URINAL
V SANITARY VENT
VTR VENT THRU ROOF
W SANITARY WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
SANITARY WASTE
SANITARY VENT
STORM DRAINAGE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
SHUT-OFF VALVE
PRESSURE REDUCING VALVE
BALL VALVE
CHECK VALVE
CIRCUIT SETTER
STRAINER
BALANCING STATION
REDUCED PRESSURE BACKFLOW
PREVENTER
WATER HAMMER ARRESTOR
TRAP PRIMER
UNION
FLOW-IN DIRECTION OF ARROW
VALVE IN VERTICAL
RISER OR DROP
BRANCH CONNECTION
RISER DOWN
RISER UP
HOSE BIBB
WALL HYDRANT
RECIRCULATING PUMP
END CAP
CONNECTION POINT- NEW TO
EXISTING
INDICATES REMOVAL
OXYGEN
MEDICAL VACUUM
MEDICAL AIR
PRESSURE GAUGE
TEMPERATURE GAUGE
PIPING REMOVAL
PLUMBING FIXTURE REMOVAL
O2 (OXYGEN OUTLET)
MA (MEDICAL AIR OUTLET)
MV (MEDICAL VACUUM OUTLET)
STM
CW
HW
HR
A
2D
WATER CLOSET-
WALL HUNG
URINAL
LAVATORY-
WALL HUNG
LAVATORY-
VANITY
SINK-
SINGLE COMPARTMENT
ELECTRIC WATER
COOLER
MOP BASIN
FLOOR DRAIN
3D
SYMBOLS
PLUMBING LEGEND
O
MV
MA
P
T
LV
NOTES:
PROVIDE VALVE TAGS & PLASTIC LAMINATE IDENTIFICATION ON
CEILING FOR ALL NEW AND EXISTING VALVES AND EQUIPMENT
LOCATED WITHIN THE CONSTRUCTION LIMITS AS INDICATED IN
THE SPECIFICATIONS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE
AREA TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS.
VERIFY SIZE, LOCATION, AND USAGE OF EXISTING UTILITIES
PRIOR TO CONSTRUCTION. ROUTE PIPING AND CONNECT AS
REQUIRED.
CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS,
CEILING, ECT. WHERE REQUIRED FOR NEW CONSTRUCTION.
PATCHING SHALL MATCH EXISTING CONSTRUCTION & FINISHES.
COORDINATE ALL PATCHING AND FINISHES WITH ARCHITECT.
CONTRACTOR SHALL VERIFY REQUIREMENTS TO OWNER
PROVIDED EQUIPMENT WITH EQUIPMENT MANUFACTURE.
PROVIDE ALL UTILITIES & ACCESSORIES REQUIRED FOR THIS
EQUIPMENT FOR A COMPLETE OPERABLE SYSTEM.
PLUMBING FIXTURES & EQUIPMENT TO REMAIN OR RELOCATED
SHALL BE PROTECTED DURING CONSTRUCTION, AFTER
CONSTRUCTION CLEAN & CAULK ALL FIXTURES & EQUIPMENT TO
THE SATISFACTION OF THE OWNER.
SEAL ALL OPENINGS NEW & EXISTING AROUND PLUMBING &
UTILITY LINES PENETRATING FIRE WALLS. REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATION OF FIRE WALLS &
ARCHITECTURAL SPECS FOR MATERIAL & INSTALLATION.
REFER TO ARCHITECTURAL DRAWINGS FOR PHASING OF WORK.
1.
2.
3.
4.
5.
6.
7.
REMOVAL NOTES:
THE REMOVAL DRAWINGS SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF
DEMOLITION, BUT SHALL NOT BE HELD TO ALL INCLUSIVE.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING
THE AREA TO BECOME FAMILIAR WITH THE EXISTING
CONDITIONS. VERIFY SIZE, LOCATION, AND USAGE OF
EXISTING UTILITIES PRIOR TO REMOVAL.
FOR FURTHER INFORMATION WITH REGARD TO THE
EXTENT OF DEMOLITION & REMOVALS, SEE THE NEW
CONSTRUCTION DRAWINGS AND THE ARCHITECTURAL
DRAWINGS WHICH SHOW WORK TO BE PERFORMED.
OWNER SHALL BE GIVEN FIRST CHOICE ON ALL
EQUIPMENT BEING REMOVED THAT WILL NOT BE
RELOCATED. CONTRACTOR SHALL REVIEW THE EXISTING
EQUIPMENT WITH OWNER. EQUIPMENT BEING REMOVED
OR RELOCATED SHALL BE REMOVED IN A MANNER THAT
REUSE IS POSSIBLE AND STORED AS DIRECTED BY
OWNER. ALL OTHER EQUIPMENT SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED & DISPOSED OF FROM THE SITE BY THE
CONTRACTOR.
CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS,
CEILING, ETC.. WHERE REQUIRED BY THE REMOVAL OF
EQUIPMENT AND ACCESSORIES. PATCHING SHALL MATCH
EXISTING CONSTRUCTION & FINISHES. COORDINATE ALL
PATCHING AND FINISHES WITH ARCHITECT.
IF PLUMBING LINES SERVING PLUMBING EQUIPMENT TO
REMAIN MUST BE REMOVED DUE TO DEMOLITION OR NEW
CONSTRUCTION, THE UTILITIES SHALL BE RELOCATED IN A
MANNER THAT IS ACCEPTABLE BY THE
ARCHITECT/ENGINEER. PROPER SLOPE, MATERIALS, AND
SIZES OF PIPING SHALL BE MAINTAINED TO INSURE
EQUIPMENT IS MADE FULLY OPERATIONAL.
REMOVAL OF EXISTING UTILITIES SHALL BE MADE SO THAT
SERVICE TO OTHER AREAS UTILIZED BY THE OWNER ARE
NOT INTERRUPTED WITHOUT CONSENT FROM OWNER.
PROVIDE TEMPORARY VALVES AND TEMPORARY
SERVICES REQUIRED DURING DEMOLITION AND NEW
CONSTRUCTION.
REMOVE COMPLETE ALL EXISTING PLUMBING EQUIPMENT
AND ALL ASSOCIATED PIPING BEING MADE OBSOLETE BY
THIS CONSTRUCTION. REMOVAL OF PIPING SHALL BE
MADE BACK TO MAINS & CAPPED.
1.
2.
3.
4.
5.
6.
7.
8.
3/8" O.D.x12" LONG
FLEXIBLE SUPPLY
RISER
INSULATION
INSULATION SHALL BE MITERED
AND TAPED AT ALL CHANGES
IN DIRECTION
1/2" COPPER
TEE HANDLE
HANDLES SHALL BE
GIVEN TO OWNER UPON
COMPLETION OF PROJECT
1" MAX
INSULATION SHALL
BE MITERED AND
TAPED AT END JOINT
SERVICE STOP
LOOSE KEY
BUTTON
CHROME PLATED
ESCUTCHEON
1/2" COPPER
1/2" COPPER SOLDER X
1/2" COPPER SOLDER
PIPE POSITIONING UNIT
TYPICAL PIPING
LENGTH AS REQUIRED BY
QUANTITY AND SIZE OF PIPES
NOTES:
1. HANGER ROD, STRUT, NUTS, WASHER
AND PIPE STRAPS SHALL BE OF
ZINC COATED GALVANIZED MATERIALS
GALVANIZED DOUBLE
NUT WITH SINGLE WASHER
TYPICAL ON BOTH SIDES
OF STRUT
UNISTRUT CHANNEL
TYPICAL 10 GAUGE
GALVANIZED SHEET
METAL SADDLE
PIPING INSULATION
DO NOT CRUSH
GALVANIZED ALL-THREAD
CONTINUOUS ONE PIECE
HANGER ROD. COUPLING
OF RODS IS NOT PERMITTED
PIPE
WALL
PIPE
INSULATION
1/2" MIN.
PIPE
WALL
PIPE
INSULATION
1/2" MIN.
SLEEVE
INSULATION
FIRE STOPPING
INSULATION
SLEEVE
FINISHED APPEARANCE
PIPE
INSULATION
PIPE
FIRE STOPPING
FLOOR
INSULATION
1" MIN.
PIPE
INSULATION
PIPE
FIRE STOPPING
FLOOR
INSULATION
1" MIN.
PIPE RING
SILICON
SECURE PIPE RING
TO FLOOR
FIRE STOPPING
SLEEVE
SLEEVE
CORE DRILL
NOTES:
1. INSTALL FIRE STOP PER MANUFACTURERS RECOMMENDATION.
SEE PLAN FOR GPM
T
STRAINER
CHECK VALVE
BRASS
DOWNSPOUT
NOZZLE
ANCHOR TO WALL
WITH BRASS BOLTS
OVERFLOW
DRAIN
SEAL AIR &
WATER TIGHTMAX 6" AFF
CW
CW
3/8"
PIPING CONCEALED
IN WALL
FILTER & PIPING EXPOSED
TO ICEMAKER SECURE
TO WALL
5 MICRON WATER
FILTER W/ AIR
RELEASE FOR ICE MAKER
BACKFLOW
PREVENTER
DRAIN TO FD
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PL100
MABCJM
PLUMBING LEGEND, DETAILS & NOTES
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: NONE
TYPICAL SERVICE STOP INSTALLATION
SCALE: NONE
TRAPEZE PIPE HANGER DETAIL
SCALE: NONE
INTERIOR AND FLOOR PIPE SLEEVE DETAIL
SCALE: NONE
TYPICAL BALANCING STATION
SCALE: NONE
DOWNSPOUT NOZZLE DETAIL
SCALE: NONE
ICE MAKER DETAIL
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
YY
A.4
CD
3628.2 28.324.1
C1
C3 C4 C5 C6 35343332313029282623.8 2524
C2
VV
WB
2"
EXST 6"
EXST 6"
EXST 6"
FD
FD
EXST FCO
4"
4"
EXST 6"
EXST 8"
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PL101
MABCJM
FOUNDATION PLUMBING PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CAREW
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
19447
2019/4/16
SCALE: 1/8" = 1'-0"
FOUNDATION PLUMBING PLAN
CW
HW
HR
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
FD
FD
LV WC
EXST 4"
EXST 2"
EXST LVEXST LV
WC LV
WC2"W
YY
UR
CO
EXST 4"W-DN
EXST 3"W-UP
EXST 4"W-UP&DN
A.4
FD
CAP EXST
1 1/2"CW
1"HW
3/4"HR
2"CW
1 1/4"HW
3/4"HR-UP
3"CW
2 1/2"HW
1 1/2"HR-UP
C W
H W
H R
3"
2 1/2" 1 1/2"
EXST 4"W-DN
CO
COEC
2"W 2"
4"
2" 4"
3"
2"
3" 3"
FD FD
2"W
1 1/2"V-UP
4"W
SK
4"W
2"
3"
4"
EXST 6"W-DN
5"STM-UP
3"V-UP
4"W-UP
EXST 6"
EXST 6"W-DN
EXST 6"
EXST 6"
S T
M
EXST 6"
EXST 8"
EXST 6"
EXST 2"
2" 4"
2"
4"
SKSK
1 1/2" 1 1/2"
4"
CO
CO
5"STM-UP
4"W-UP
3"V-UP
DRAIN PAN W/
WATER SENSOR
MONITOR/BMS
FUTURE
ELEVATOR
SK
CO
4"W-UP 3"V-UP
4"STM-UP
4"
4"
CO
4"W
SKSK SK4"
DOUBLE
WALL PIPE
4"STM-UP
4"W-UP 3"V-UP
FUTURE
ELEVATOR
CO
EXST 6"W-DN
4"
4"
4"W-UP
5"STM-UP
3"V-UP
EXST 3"
EXST 3"
1 1/2"2"3"
4"
SKSKSKSK
DOUBLE
WALL PIPE
SKSK
2"
1 1/2"
VISUAL
STATION/BMSVISUAL
STATION/BMS
4"
RELOCATED
SUMP PUMP & PIT
5"STM-UP
3"V-UP
4"W-UP
1 1/2"
4"
4"W
SK SK SK SK
1 1/2"
CO 2" 2" 1 1/2"
SK
1 1/2"1 1/2"
EXST 4"W-DN
2"
2"
2"
SKSKSK
2"
4"
SK
CO
DOUBLE WALL PIPE
DOUBLE WALL PIPE
4"V-UP
EXST 6"W-DN
5"STM-UP
3"
SK
CO
4"
4"
2"
4"
EXST 4" EXST 3"
EXST 1 1/2"
EXST 2"
2"
4"
4"
EXST 6"STM-DN
EXST 6"STM-DNEXST 8"STM-DN
4"W-UP
EXST 3"
49C
WATER
TREATMENT
ROOM 82
BIOMETRICS
53A
OIT
PHARMACY
STORAGE
B-2
STAIR
59C59B 59A
60A
60B
ROOM
B-C-102
DECONTAMINATION
B-C-103D
SPS
ASSISTANT
OFFICE
B-C-106C
PREP/ASSEMBLY
B-C-103A
WOMENS
LOCKER
ROOM
B-C-103B
MENS
LOCKER
ROOM
B-C-113
STERILE/
NON-STERILE
STORAGEB-C-106G
HAC
B-C-114
HAC
B-C-116
OFFICE
B-C-112
LOGISTICS
CLERICAL
B-C-C3
CORRIDOR
B-C-EL3
OFFICE
(FUTURE
ELEVATOR)
B-C-109B
WOMENS
LOCKER
ROOM
B-C-109A
MENS
LOCKER
ROOM
B-C-109
LOUNGE,
STAFF
B-C-106A
PPE
AREA
B-C-106E
SCOPE
STERILIZATION
B-C-102C
SCOPE
DECONTAMINATION
B-C-101
STORAGE
(FUTURE
EQUIP
ROOM) B-C-102B
STORAGE
(FUTURE
DUMBWAITER)
4"
3"
4"
3"
3"
4"
4"
3"
4"
4" 4"
2"
EXST 4"W-DN
EXST WCO
B-C-106F
STORAGE
(FUTURE
DUMBWAITER)
B-C-106B
CART
PREP
B-C-102D
AUTOMATIC
CART
WASH
3"
1 1/2"
CO
4"
3"
VISUAL STATION/BMS
DRAIN PAN W/
WATER SENSOR
MONITOR/BMS
1 1/2"
4"
6"
CO
CO
VISUAL
STATION/BMS
C W
H W
H R
HW
HW
CW
HW
H R
H W
C W
HR
CW
HW
HR
HW
CW
EXST 2"
EXST 1 1/4"
EXST 1/2"
EXST 3/4"
EXST 3/4"
EXST 2"
EXST 2 1/2"
3/4" HOSE
BIBB
EXST 3/4" EXST 2"
EXST 1 1/2"
EXST 1"
EXST 1"
28.2 35343332313029282623.8 2524
3/4"
3/4"CW MAKE-UP
FOR HVAC SYSTEM
1 1/2"
EXST 2"
1/2"
1/2"
FDE
FDE
EXST FCO
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
KEY NOTES:
LOCATE VISUAL SITE STATION 6" BELOW CEILING EXPOSED ON
WALL. PROVIDE MOISTURE SENSOR AND CONNECT MOISTURE
SENSOR TO HOSPITAL BUILDING MANAGEMENT SYSTEM.
DRAIN PAN SHALL BE MINIMUM OF 4" HIGH. LOCATE DRAIN PAN
UNDER NEW PIPING. DRAIN PAN SHALL BE MINIMUM OF TWO
TIMES THE PIPE SIZE. PROVIDE MOISTURE SENSOR AND
CONNECT MOISTURE SENSOR TO HOSPITAL BUILDING
MANAGMENT SYSTEM.
SEE DRAWING PL100 FOR ADDITIONAL NOTES.
DRAIN BOX FOR 1" CONDENSATE LINE. DRAIN BOX, GUY GRAY,
MODEL# DBSS2DLV. CONNECT 2" WASTE LINE TO EXISTING
WASTE LINE UNDER SLAB.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PL102
MABCJM
BASEMENT PLUMBING PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
BASEMENT PLUMBING PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
GENERATOR BUILDING
Sim Sim
WORK SHOWN IN
THIS AREA SHALL
BE BY VA - NIC
3"CW
2 1/2"HW
1 1/2"HR-UP&DN
RISERS
4"W-UP&DN
3"V-UP&DN
5"STM-UP&DN
4"W-UP&DN 3"V-UP&DN
5"RD
4"W-UP&DN
3"V-UP&DN
5"STM-UP&DN
CAP 3"CW, 2 1/2"HW, &
1 1/2"HR AT CEILING
LINE FOR FUTURE FLOORS
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
P528 P528P528
P104
P528
P418
P528P528P528P528P528P528
P418
P104
P528
P528
P528 P528 P528
P528
P528
P528
P528
P418 P104
P.
TOILET
167A
PR.
TOILET
PROCEDURE
169A
TELEDERM170
TELERETINAL
PROCEDURE
CONSULT
CLEAN
UTILITY
HYBRID
1E-3
PATIENT
CORR. 3
1E-1E
STAIR
EQUIP
STORAGE
162A
SOILED
UTILITY
EXAM 37
TRAINING
ROOM
1E-1
CORRIDOR
1E-1
CORRIDOR
175A
SHARED
GROUP
ROOM 2
SHARED
MED
APP
STORAGE 171
TELEHEALTH
WOMEN'S
PUBLIC
TOILET
SMALL
CONFERENCE
MEN'S
PUBLIC
TOILET
1-B-ST3
STAIR
INTAKE
CONSULT
HYBRID
154A
EXAM 29
CONSULT
HYBRID
CONSULT
HYBRID
158A
EXAM 34
1E-4
CORRIDOR
TEAM
ROOM
1-C-148
OPEN
OFFICE
1-C-148
OPEN
OFFICE
1-C-ST2
STAIRS
1-C-147
W.
STAFF
TOILET
1-C-146
M.
STAFF
TOILET
1-C-116
STAFF
LOUNGE
1-C-115
MULTIPURPOSE
1-C-117
OPEN
OFFICE
1-C-117
OPEN
OFFICE
1-C-102
RECEPTION
1-C-C1
PATIENT
CORR. 1
1-C-104
NEG.
PRESSURE
HYBRID
1 1-C-105
EXAM 2
1-C-106
EXAM 3
1-C-107
HYBRID
1-C-108
EXAM 5
1-C-109
EXAM 6
1-C-111
HYBRID
1-C-110
P.
TOILET
1-C-112
EXAM 8 1-C-113
EXAM 9
1-C-114
EXAM 10
1-C-ST1
STAIRS
MECHANICAL
WAITING
EXST 2"
EXST 1" EXST 1"
EXST 3/4"
CW
HW
HR
EXST 1 1/2"
3/8"HW
1 1/2"V
3/8"CW-DN
(TYP SK)
EXST 2"
EXST
4"W
3"V-UP&DN
CW
HW
HR
NURSE
MANAGER
1-C-132
P.
TOILET
1-C-EL1-2
TEAM
ROOM
(FUTURE
ELEV.)
1-C-141
MED
ROOM 2
1-C-135
HYBRID
20 1-C-136
EXAM 21
1-C-137
EXAM 22
1-C-138
HYBRID
1-C-142
EXAM 24
1-C-143
EXAM 25
1-C-144
CONSULT
1-C-145
CLEAN
UTILITY
1-C-118
EQUIP.
STOR.
1-C-119
CONSULT
1-C-120
CONSULT
1-C-121
CONSULT
1-C-122
CONSULT
1-C-124
MED
ROOM 1
1-C-123
DW
1-C-125
EXAM 15
1-C-126
EXAM 141-C-127
HYBRID
1-C-128
EXAM 12
1-C-129
CONSULT
1-C-130
INTAKE
CW
HW
C W
H W
CW
H R
EXST 2"
1-C-C5
CORRIDOR
1-C-100
VESTIBULE
1-C-117
OPEN
OFFICE
1-C-C1
PATIENT
CORR. 1
148A
FUTURE
HAC
FAMILY
TOILET
1-C-139
OIT
5"STM-UP&DN
5"OFD
5"OFD
5"RD
5"OFD
5"RD
5"STM-DN
YY
3/8"HW
1 1/2"V
3/8"CW-DN
1"CW
2"V-DN P528P528P528
3/8"CW-
VALVE & CAP
1/2"HW
1 1/2"V
1/2"CW-DN
(TYP SK)
3/8"CW-VALVE &
CAP
P528
3/8"HW
1 1/2"V
3/8"CW-DN
(TYP SK)
HWHR
3/8"HW
1 1/2"V
3/8"CW-DN
(TYP SK)
3/8"HW
1 1/2"V
3/8"CW-DN
(TYP SK)
1"CW
2"V-DN
3/8"HW
1 1/2"V
3/8"CW-DN
A.4
CD
4"RD 4"OFD
5"RD
5"OFD
4"W-UP&DN
3"V-UP&DN
4"STM-UP&DN
4"RD
4"OFD
4"W-UP&DN
3"V-UP&DN
4"STM-UP&DN
THRU ROOF
4"STM-UP&DN
4"RD
4"OFD
1-C-154
SPECIALTY
1-C-140
ELECTRICAL
4"W-UP&DN
3"V-UP&DN
5"OFD
5"RD
5"STM-UP&DN
4"W-UP&DN
3"V-UP&DN
5"STM-UP&DN
THRU ROOF
S T
M
3 3
BALANCE
HR FOR
3 GPM
2"
1/2"O
1/2"MA
3/4"MV-DN
O
MA
MV
O
MA
MV
AA
A
A
AAA
A
A
1 1/2"
3/4"
2"
1 1/2"1 1/2"
2"
1/2" 1/2"
1 1/2"
1/2"
1/2"
2" 1 1/4"
1/2" 1/2" 1 1/2"
1 1/2" 2" 3"
1 1/2" 1"
1 1/4"
1" 2"2"2" 1 1/4"3/4"
1 1/2"
A A A A
A
6"
5"
6"STM-DN
S S
T M
6"STM-DN
6"
S S
T M
1 1/2" 1 1/2"2"
A
A
3/8"
A A
88 8
A
3/4" 1"
A
1" 8
A A
A AA
8 8 5"
STM
CO
CO
5"STM-DN
CO
4"
S T
M
EXST 3/4"
EXST 1"
EXST 1 1/2"
EXST 1"
EXST 1 1/2"
EXST 3/4"
H R
HW
CW
4"STM-THRU ROOF
5"STM-THRU ROOF
5"STM-THRU ROOF
5"STM-THRU ROOF
5"STM-THRU ROOF
SEE DOWNSPOUT
NOZZEL DETAIL 4
DWG PL100
SEE DOWNSPOUT
NOZZEL DETAIL 4
DWG PL100
SEE DOWNSPOUT
NOZZEL DETAIL 4
DWG PL100
1"1/2" 3/4"1"
1/2" 1/2"
3/4"
1 1/4"
H R
H W
C W
2"
4"
4"
4"
EXST 1 1/2"
EXST 1"
EXST 3/4"
EXST 1/2" EXST 1/2"
EXST 3/4"
3"RD
A
1-C-C3
STAFF
CORR.
1 1/2"
3"
3"2"
1 1/4"CW
3/4"HW-DN
1 1/2"
3/8"CW-DN
1/2" 1/2"
PL105
PL105
PL105
CW
HW
EXST 1"
EXST 1"
PL105
HW
CW
C W
H W
H R
1"
FUTURE ELEVATOR
SEE DOWNSPOUT
NOZZEL DETAIL 4
DWG PL100
6"STM-DN
S S
T M
6"
5"
CW
HW
CO
SHARED
GROUP
ROOM
PATIENT
EDUCATION
UTILITY
SHAFT
3"
28.2 28.324.1
C1
C3 C4 C5 C6 35343332313029282623.8 2524
C2 C7
VV
KEY NOTES:
CENTRAL STERILE AREA IS LOCATED IN BASEMENT UNDER THE
NEW ADDITION. CONTRACTOR SHALL COORDINATE ALL CORE
DRILLING OF SLAB WITH OWNER PRIOR TO WORK. ALL
COORDINATION AND ROUTING OF PIPING IN BASEMENT SHALL BE
DONE WITH THE OWNERS APPROVAL.
PROVIDE MEDICAL GAS OUTLETS. COORDINATE LOCATION OF
MEDICAL GAS OUTLET WITH ARCHITECTURAL DRAWINGS.
SEE DETAIL 8 ON DRAWING PL104 FOR WASTE & VENT RISER
DIAGRAM
SEE DETAIL 9 ON DRAWING PL100 FOR CW, HW & HR RISER
DIAGRAM.
FUTURE DUMB WAITER. NO PIPING SHALL BE ROUTED IN THIS
AREA.
FUTURE ELEVATOR. NO PIPING SHALL BE ROUTED IN THIS AREA.
SEE DWG PL100 FOR GENERAL NOTES.
PROVIDE SHUT-OFF VALVES HOT & COLD WATER.
SEE DETAIL 9 ON DRAWING PL105 FOR WASTE & VENT PIPING
DIAGRAM.
SEE DRAWING PL100 FOR ADDITIONAL NOTES.
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PL103
MABCJM
FIRST FLOOR PLUMBING PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLUMBING PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
YY
A.4
CD
4"W-THRU ROOF 3"VTR
5"STM-THRU ROOF
5"STM-THRU
ROOF
4"W-THRU ROOF
3"VTR
5"STM-THRU ROOF
5"STM-THRU
ROOF
4"W-THRU ROOF
3"VTR
4"STM-THRU ROOF
4"STM-THRU ROOF
4"W-THRU ROOF 3"VTR
5"STM-THRU ROOF
5"STM-THRU ROOF
4"W-THRU ROOF
3"VTR
4"STM-THRU ROOF
4"STM-THRU ROOF
4"W-THRU ROOF
3"VTR
5"STM-THRU ROOF
5"STM-THRU ROOF
4"W-THRU ROOF
3"VTR
5"STM-THRU ROOF
5"STM-THRU ROOF
4"RD
4"OFD
5"RD 5"OFD
5"RD 5"OFD 4"RD 4"OFD 4"RD 4"OFD
5"RD 5"OFD
5"RD
5"OFD5"RD 5"OFD
4193 SF 2740 SF 2673 SF
2189 SF1743 SF2492 SF
3084 SF
331 SF
3"RD
35 SF
28.2 28.324.1 35343332313029282623.8 2524
VV
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
KEY NOTES:
SEE DRAWING PL100 FOR ADDITIONAL NOTES.1
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PL104
MABCJM
ROOF PLUMBING PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
ROOF PLUMBING PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
B
B.5
P418
P104
EXST 2"
1"CW
2"V-DN
3/4"CW
1 1/2"V-DNP202
3/8"HW
1 1/2"V
3/8"CW-DN
A
A
EXST 2" 149
FAMILY
TOILET
28.2 28.328
30.5
P418P104
EXST 2"
2"
2"V
1"CW-DN
3/8"CW
1 1/2"V
3/8"HW-DN
EXST 1"
EXST 1"EXST 3/4"
CW
HW
HR
P.
TOILET
ZZ
A
YY
A.4
P104P103
FDC
P420P420
P420 P202
P104
FDC
P528
1-C-147
W.
STAFF
TOILET
1-C-146
M.
STAFF
TOILET
1-C-116
STAFF
LOUNGE
2"CW
1/2"HW-DN
3/8"CW-DN
FDC
ICE MAKER
B
AA
3"V-DN
C
23.9
WOMEN'S
PUBLIC
TOILET 143
MEN'S
PUBLIC
TOILET
P104
FDC
P202
P202
P103
P104
FDC
P103
P103
P103
P420
P420
P420
P420
P420
P420
EXST 4"W-UP&DN
3"V-UP&DN
1/2"CW
1/2"HW-DN
1 1/2"V-DN
WCO
3"V-DN
1 1/2"
3"
EXST 3"V-UP&DN
2"CW-DN
HW
CW
1 1/2"
P609
3"
1 1/2"
2"CW
1 1/4"HW
3/4"HR-DN
EXST
1 1/2"CW
1"HW
3/4"HR-UP
EXST 4"W-UP&DN
3/8"CW
1 1/2"V-DN
1 1/2"V-DN
1/2"CW
1/2"HW-DN
1/2"
24.1 2623.8 2524
HW
CW
LV
3/8"
WC
A
1"
1"
1 1/4"
1"
1 1/4"
HW
CW
WC
B
2"1 1/4" 1 1/2"
CW
HW
2" 1 1/2"
LV LV LV
3/8" 1/2"
WCWC
UR
3/4"
2"
1 1/2" 1"
2"
HW
CW
LV
3/8"
ROOF
1ST FLOOR
4"W
3"V
3"VTR
ROUTE 4" WASTE LINE 1'-0"
ABOVE ROOF FOR FUTURE EXTENSION
3"V-3"VTR ROUTE 4" VENT LINE
1'-0" ABOVE ROOF FOR FUTURE EXTENSION
SANITARY VENT PIPING
FROM 1ST FLOOR
EXST 4"W
3"
1ST FLOOR
ROOF
CAP 3"CW, 2 1/2"HW & 1 1/2" HR
ABOVE CEILING TO EXTEND
TO UPPER FLOOR IN THE FUTURE
3/4"
2"
1 1/4"44 HWFU
100 CW FU
3"
2 1/2"
1 1/2"
H W
C W
H R
3"CW, 2 1/2"HW &
1 1/2"HR IN BASEMENT
T
HR HW CW
EXST 4"CW, 3"HW
1 1/2"HR IN BASEMENT
3 GPM
EXST 1 1/2"
EXST 3"
EXST 4"
3/4" DRAIN VALVE
W/ THREADED CAP (TYP)
A
CW
HW
1/2"
LV LV LV
3/8" 1/2"
3/8"
EWC
WCWCWC
URUR
3/4"
WC
B
1""
2" 2"
1/2"
141 2"
C W
CW
HW2"
CW
HW
1/2"
LV LV LV
3/8" A
3/4"EXST 1"
EXST 1 1/2"
CW
HW
HR
HW
CW
EXST 3/4"
EXST 1 1/2"
EXST 1"
3/4"
1"
1 1/2"
2"
C W
H W
H R
HR
HW
CW
HR
HW
CW
BASEMENT
2"
1 1/4"
3/4"
EXST 4"
EXST 1 1/2"
EXST 3"
C W
H W
H R
EXST 1 1/2" EXST 1"
EXST 3/4"
1 GPM
KEY NOTES:
PROVIDE SHUT-OFF VALVES HOT & COLD WATER.
SEE DRAWING PL100 FOR ADDITIONAL NOTES.
SEE DRAWING PL100 FOR GENERAL NOTES.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PL105
MABCJM
DIAGRAMS & ENLARGED PLUMBING
PLANS
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING PLAN - FAMILY ROOM 149
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING PLAN - P. TOILET 151
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING PLAN - W. STAFF TOILET 147, M. STAFF TOILET 148, STAFF LOUNGE 116
SCALE: 1/4" = 1'-0"
ENLARGED PLUMBING PLAN - W. (141) & M. (143) PUBLIC TOILET
SCALE: NONE
WATER PIPING DIAGRAM
SCALE: NONE
WATER PIPING DIAGRAM
SCALE: NONE
TYPICAL WATER PIPING DIAGRAM FOR INDIVIDUAL LAVATORY OR SINK
SCALE: NONE
TYPICAL WASTE & VENT RISER DIAGRAM
NOTE: ALL RISERS SIMILAR
SCALE: NONE
MAIN CW, HW & HR RISER DIAGRAM
SCALE: NONE
WATER PIPING DIAGRAM
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
3"
4"
EXST 2"
EXST 2"
EXST 4"
EXST 2"
EXST 3"
EXST 2"
EXST 2"
EXST 2"
EXST 2"
2"
1 1/2" 1 1/2"
2"
2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
2"
4"
4"
3"
1 1/2"
1 1/2"
2"
3" 1 1/2"
3"
3"
2"
1 1/2" 1 1/2"
1 1/2"
1 1/2"1 1/2"
1 1/2"
2"
2"
4"
3"
1 1/2"
2"
1 1/2"
2"
1 1/2"
EXST 4"
2"
4"
2"
EXST 2"
EXST 2"
2"
1 1/2"
4" 4"
2"
3"
4"
1 1/2"
2"
1 1/2"
3"
4"
3"
4"
EXST 6"
EXST 6"
EXST 3"
EXST 6"
EXST 6"
CO
CO
CO
CO
CO
CO
1 1/2"
1 1/2" 1 1/2"
1 1/2"
2"
4"
1 1/2"
1 1/2"
2" 1 1/2"
3"
4"
2"
3" 2"
2"
1 1/2"
4" 2"
2"
4"
2"
2"
2" 4"
4"
3"
4"
3"
2"
3"
3"
4" 2"
4"
4"
EXST 6"
EXST 2"
1 1/2"
1 1/2"
4" 4"
CO
CO
3"
3" 2"
CO
WCO
EXST 4"
EXST 3"
2"
4"
2"
CO
EXST 3"
2"
4"
4"
2"
2"
CO
1 1/2"
2"
4"
4" 4"
2"
EXST 3"
3"
1 1/2"
3"
1 1/2"
1 1/2"
1 1/2"
3"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
2"
3"
EXST 3"
EXST 3"
2"
2" 2"
EXST 6"
4"
3"
3"
3"
3"
EXST 6"
4"
4"
3"V-3"VTR
3"V-3"VTR
3"V-3"VTR
3"V-3"VTR
3"V-3"VTR
3"V-3"VTR
4"
4"
2"
1 1/2"
1 1/2"
2"
3"2"
1 1/2"
1 1/2"
3"
3" 4"
2"
3"
3"
2"
3"V-3"VTR
4"
EXST 4"
EXST WCO
1 1/2"
2"
EXST 2"
EXST 4"
EXST 3"
112 113
116 146
CO
4"
4"
3"
1 1/2"
2"
1 1/2"
CO
1 1/2"
EXST 8"
EXST 6"
2"
EXST 6"
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\B a rt s c h \D o c u m e n ts
\1 V
A F t W a y n e R b a rt s c h .r v t
CONSTRUCTION DOCUMENTS
PL106
MABCJM
WASTE & VENT PIPING DIAGRAM
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: NONE
WASTE & VENT PIPING DIAGRAM
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
12"ø
"ø
12"ø
40"x24" 20"x14"
"x1
6"
34"x16"
36"x24"
"x
36"x24"
YY
A.4
EX. VAV
1-1
12"x10"
12"x12"
36"x24"
36"x24"
EX. EAB
1-2
12"x8"
"x
28"x16"
EX. VAV
1-14
16"x15" 16"x12"
12"x6"
12"x12"
"x
EX. VAV
1-15
14"x12"
"x
EX. VAV
1-11
"x
EX. VAV
1-10
EX. VAV
1-12
EX. VAV
1-13
"x
36"x14"
"x
24"x14"
"x
EX. VAV
1-16
"x
"x
"x
12"x10"
"x
"x
12"x10"
EX. VAV
1-7
EX. VAV
1-8
"x
34"x12" 18"x10"
"x
EX. VAV
1-3
"x
EX. VAV
1-9
12"x8"
EX. EAB
1-4
"x
"ø
"ø
12"ø 14"x8"
EX. VAV
1-4
EX. VAV
1-5
12"x10"
14"x12"
EX. VAV
1-2
12"x10"
EX. CUH
EX. CUH
EX. CUH
EX. CUH
EX. CUH EX. CUH
EX. CUH EX. CUH EX. CUH EX. CUH
E X
P
A C
-1
EX. CUH EX. CUH EX. CUH EX. CUH
S-E
E-E
E-E
E-E
E-E
10"x6"10"x6"
12"x10"
E-E
E-E
E-E
E-E
S-E
12"x6" S-E
12"x6" 12"x6" S-E
S-E
S-E
12"x6"
E-E
"x
E-E 100 6"ø
E-E
6"ø
E-E 50 7
"ø
S-E
"ø
10"x8"
EX. VAV
1-17
S-E
S-E
E-E
E-E
S-E
E-E
S-E
"ø
8"ø
6"ø
8"ø
"ø
E-E
S-E
"ø
"ø
6"ø
6"ø
"ø
"ø
S-E
E-E
6"ø
8"ø
E-E
E-E
S-E
E-E
S-E
E-E
8"ø
6"ø
E-E
24"x8"
14"x12"
S-E
S-E
S-E
S-E
S-E
E-E
"x
"x
8"x8"
6"ø
E-E 80 6
"ø
S-E
"ø
"ø
S-E
E-E
"x
E-E
S-E
E-E
12"x10"
EX. EAB
1-7
12"ø E-E
E-E
10"ø S-E 300S-E
E-E
E-E
S-E
S-E
8"x8"
"øS-E
S-E
E-E
E-E
"x
E-E
S-E
S-E
E-E
6"x6"
6"x6"
6"x6"
E-E
12"x8"
S-E
S-E
E-E
E-E
S-E
S-E
"x
10"x10"
S-E
S-E
S-E
S-E
S-E
S-E
EX. VAV
1-6
"ø
"ø
E-E
E-E
S-E
S-E
T-E
T-E
T-E
S-E
S-E
E-E 450 12"x8"
S-E
S-E
S-E
S-E
6"x6"
REMOVE
DUCTWORK/EQUIPMENT AS
INDICATED IN MECHANICAL
ROOM.
20"x20" INTAKE UP TO
EX. GIH-1
14"x8"
40"x24" SUPPLY DUCT
UP TO EX. AHU-1
E-E
E-E
12"Ø EXHAUST
DUCT UP
16"x16" EXHAUST
DUCT UP TO EX. EF-2
EX. UH-1
36"x24" EXHAUST DUCT
UP TO EX. EF-1
R E
M O
V E
D U
C T
W O
R K
/E Q
U
IP
M E
N T
A S
I N
D
IC
A T
E D
I N
T H
IS
A
R E
A
12"Ø EXHAUST DUCT DN
TO CART WASH.
BALANCED AT 500 CFM.
28.228.324.1 35343332313029282623.8 2524
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
GENERAL REMOVAL NOTES:
A. THE REMOVAL DRAWINGS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF
REMOVALS, BUT SHALL NOT BE HELD TO BE ALL
INCLUSIVE.
B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISTING
THE AREA TO BECOME FAMILIAR WITH THE EXISTING
CONDITIONS. VERIFY SIZE, LOCATION, AND USAGE OF
EXISTING UTILITIES PRIOR TO REMOVAL. FOR FURTHER
INFORMATION WITH REGUARD TO THE EXTEND OF
REMOVALS, SEE THE CONSTURCTION DRAWINGS AND THE
ARCHITECTURAL DRAWINGS WHICH SHOW WORK TO BE
PERFORMED.
C. OWNER SHALL BE GIVEN FIRST CHOICE ON ALL
EQUIPMENT BEING REMOVED THAT WILL NOT BE
RELOCATED. CONTRACTOR SHALL REVIEW THE EXISTING
EQUIPMENT WITH OWNER. EQUIPMENT BEING REMOVED
OR RELOCATED SHALL BE REMOVED IN A MANNER THAT
REUSE IS POSSIBLE AND STORED AS DIRECTED BY
OWNER. ALL OTHER EQUIPMENT SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND SHALL BE
REMOVED & DISPOSED OF FROM THE SITE BY THE
CONTRACTOR.
D. CUT, PATCH & REPAIR ALL OPENINGS IN WALLS, FLOORS,
CEILINGS, ETC. WHERE REQUIRED BY THE REMOVAL OF
EQUIPMENT, DUCTWORK, AND ACCESSORIES. PATCHING
SHALL MATCH EXISTING CONSTRUCTION & FINISHES.
COORDINATE ALL PATCHING AND FINISHES WITH
ARCHITECT. PATCHING OF FIRE WALLS SHALL MEET THE
RATING AND SHALL BE INSTALLED PER ARCHITECTURAL
SPECIFICATION.
E. IF EQUIPMENT TO REMAIN MUST BE REMOVED DUE TO
REMOVAL OR CONSTRUCTION, THE EQUIPMENT SHALL BE
RELOCATED IN A MANNER THAT IS ACCEPTABLE BY THE
ARCHITECT/ENGINEER.
F. PROPER CONNECTIONS, MATERIALS, AND SIZES OF
DUCTWORK/PIPING SHALL BE MADE BACK TO MAINS AS
INDICATED BY THE HATCHING. WORK ASSOCIATED WITH
THE MAINS SHALL BE DONE DURING OFF HOURS.
G. REMOVE COMPLETELY ALL EXISTING HVAC EQUIPMENT,
ALL ASSOCIATED PIPING, CONTROLS, AND SUPPORTS
BEING MADE OBSOLETE BY THIS CONSTRUCTION. REMOVAL
OF HVAC DUCTWORK AND PIPING SHALL BE MADE BACK TO
MAINS AS INDICATED BY THE HATCHING. WORK
ASSOCIATED WITH THE MAINS SHALL BE DONE DURING OFF
HOURS.
H. CONTRACTOR SHALL BE RESPONSIBLE TO KEEP ALL
PHASES OF CONSTRUCTION AREA UNDER A NEGATIVE
MODE AND SHALL BE CERTIFIED. PROVIDE A DIGITAL
PRESSURE DIFFERENTIAL MEASUREMENT WITH
INDICATION TO 0.01 INCHES OF PRESSURE DIFFERENTIAL
OUTSIDE THE CONSTRUCTION AREA THAT MEASURES THE
PRESSURE WITHIN THE CONSTRUCTION SITE. GAUGE
SHALL BE READ AND SIGNED BY THE CONTRACTOR
INDICATING NEGATIVE PRESSURE IN THE CONSTRUCTION
AREA. WHEN THE BUILDING AIR DISTRIBUTION SYSTEM IS
USED TO MAINTAIN NEGATIVE MODE, THE CONTRACTOR
SHALL PROVIDE TEMPORARY FILTER MEDIA ON ALL
RETURN AND EXHAUST OPENINGS IN THE CONSTRUCTION
AREA. THE FILTER MEDIA SHALL BE REPLACED WHEN
DIRTY OR WHEN DIRECTED BY THE ARCHITECT.
AIR AND WATER BALANCING
SCOPE:
1. RECORD AIR FLOW READINGS AT EACH EXISTING
TERMINAL UNIT CONNECTION, GRILLES/DIFFUSERS,
EXHAUST FANS AND AT THE EXISTING/RELOCATED
EQUIPMENT (AHU'S, EF'S, ETC.) WITHIN THE PROJECT
AREA BEFORE REMOVAL WORK BEGINS. WATER FLOW
READINGS SHALL ALSO BE RECORDED FOR EACH
TERMINAL UNIT WITHIN THE PROJECT AREA AND AT THE
HEATING HOT WATER/ CHILLED WATER PUMPS.
DISCHARGE AIR TEMPERATURE OF THE TERMINAL UNITS
AND CABINET HEATERS SHALL BE RECORDED WITH THE
HOT WATER CONTROL VALVE FULL OPEN.
2. BALANCE TERMINAL UNITS WITH DUCT MODIFICATIONS TO
THE VALUES INDICATED AT THE DIFFUSERS/GRILLES
BEING INSTALLED/RELOCATED AND/OR TO THE INITIAL
READINGS AT THE DIFFUSERS/GRILLES THAT ARE
EXISTING TO REMAIN. HEATING HOT WATER SHALL BE
BALANCED AT THESE TERMINAL UNITS AND CABINET
HEATERS AS REQUIRED TO MAINTAIN LEAVING AIR
TEMPERATURES.
3. UPON COMPLETION OF THE PIPING AND DUCT
MODIFICATIONS, RECORD FINAL AIR AND WATER FLOW
RATES WITHIN THE PROJECT AREA AND EXISTING
BASEMENT SPS, THE AIR HANDLING UNITS, THE EXHAUST
FANS, AND AT THE HEATING HOT WATER/CHILLED WATER
PUMPS. TOTAL AIR AND WATER FLOW RATES WITHIN THE
PROJECT AREA, EXISTING BASEMENT SPS, AND AT THE
SOURCE EQUIPMENT SHALL BE WITHIN 5% OF EXISTING
CONDITION/DESIGN FLOW RATES.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .