610-311_6.24.2020_FW Primary Care Drawings GENERAL.pdf
PDF 17 MB Posted
- Attached to
- Y1DA--Expand First Floor B-1 for PACT - 610-311
- Solicitation number
- 36C25020B0004
About this file
This document package includes construction documents and specifications for an expansion of the first floor primary care clinic at the VA Northern Indiana Health Care System campus in Fort Wayne, Indiana. The project scope involves building a new addition over an existing basement area to accommodate additional sterile processing department space. The expansion will increase the size of the outpatient primary care clinic. Construction will be of Type I-B noncombustible materials according to NFPA 101 Life Safety Code requirements. Work is to be completed in multiple phases while maintaining operations in occupied areas of the facility. The solicitation number provided is 36C25020B0004 for the project titled "Y1DA--Expand First Floor B-1 for PACT - 610-311" being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA
MAP
VICINITY MAP
CAMPUS MAP
FORT WAYNE VA CAMPUS
FORT WAYNE VA CAMPUS
N
N
N
AREA OF
EXPANSION
EXISTING
PRIMARY CARE -
1ST FLOOR AREA
R A
N D
A
LL
A D
R
IV
E
LAKE AVENUE
BUILDING 1
BLDG 2
BLDG 3
B 7
B 10
B 6B 5
DEDUCTIVE BID ALTERNATE SUMMARY
A.
B.
C.
D.
E.
F.
G.
H.
I.
OMIT ADDITIONAL PARKING AREA AND ALL ASSOCIATED SITE WORK FROM PROJECT SCOPE
OMIT FROM PROJECT SCOPE THE NEW PRIMARY CARE ENTRANCE VESTIBULE AND
ASSOCIATED ROOF, DOORS, CURTAIN WALL, ETC. OMIT ALSO THE SMALLER 'CONNECTION'
CANOPY; THE LARGER DROP OFF CANOPY IS TO REMAIN. THE MAIN PATH TO THE PRIMARY
CARE SUITE SHALL BE THROUGH THE BUILDING'S MAIN ENTRANCE.
OMIT EXTENSION OF STAIRWAY 1-C-ST1 ABOVE FIRST FLOOR ROOF. OMIT NEW STAIRWAY
AND HANDRAIL EXTENSION IN STAIR 1-C-ST2, EXISTING STAIR SHALL REMAIN. PROVIDE
ROOF HATCH IN STAIRWAY 1-C-ST1 FOR ROOF ACCESS, REFER TO SPECIFICATIONS. FIRST
FLOOR ROOF SHALL EXTEND TO PARAPET ABOVE OMITTED STAIRWAY EXTENSION TO
CREATE A SINGLE, LEVEL ROOF SURFACE.
OMIT INSULATED METAL WALL PANEL WHERE INDICATED ON GI106 FROM PROJECT SCOPE
AND REPLACE WITH 2" RIGID INSULATION AND BRICK VENEER; REFER TO SIMILAR WALL
SECTIONS FOR CONSTRUCTION. REMOVE SUNSHADES FROM SCOPE OF PROJECT.
OMIT SLIDING EXAM DOOR ASSEMBLIES AND STOREFRONT DOOR SYSTEMS, INCLUDING
ACCESS CONTROLS, FROM INTERIOR SCOPE OF PROJECT. PROVIDE HOLLOW METAL
FRAMES, SOLID CORE WOOD SWING DOORS, AND STORAGE LOCKSET IN LIEU OF OMITTED
SLIDING DOORS.
OMIT FROM PROJECT SCOPE 15'-0" (1 BAY) OF THE DROP OFF CANOPY FROM THE EAST END
OMIT FROM PROJECT SCOPE 30'-0" (2 BAYS) OF THE DROP OFF CANOPY FROM THE EAST
END
OMIT REMAINING PORTION OF LARGE DROP OFF CANOPY (3 BAYS).
OMIT SELECT LANDSCAPING COMPONENTS, REFER TO CIVIL DRAWINGS FOR ADDITIONAL
INFORMATION.
FULL DESCRIPTIONS AND ADDITIONAL INFORMATION INDICATED ON SHEETS GI105, GI106, GI107, AND
SPECIFICATIONS
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN.
46204
317.800.6388 | WWW.GUIDONDESIGN.COMSUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING,
INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\t s a n d e rs \D o c u m e n ts
\1 .1
F W
P ri m a ry
C a re A ts a n d e rs g u id o n d e s ig n .c o m
.r v t
CONSTRUCTION DOCUMENTS
GI000
TSKA/JG
COVER SHEET
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
VA NORTHERN INDIANA HEALTHCARE SYSTEM,
FORT WAYNE, IN
VA PROJECT NO. 610-311
EXPAND BUILDING 1
1ST FLOOR PRIMARY CARE
CONSTRUCTION DOCUMENTS
APRIL 16, 2019
SHEET LIST
SHEET # SHEET NAME
LS501 LANDSCAPE DETAILS
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD101 BASEMENT DEMOLITION PLAN
AD102 1ST FLOOR AND BASEMENT ROOF DEMOLITION PLAN
AD201 DEMOLITION BUILDING ELEVATIONS - SOUTH
AD202 DEMOLITION BUILDING ELEVATIONS - EAST, WEST, AND NORTH
AD311 DEMOLITION WALL SECTIONS
AD312 DEMOLITION WALL SECTIONS
AS100 OVERALL SITE PLAN
AS101 BASEMENT CONSTRUCTION PLAN
AS102 1ST FLOOR DIMENSION PLAN
AS103 1ST FLOOR CONSTRUCTION PLAN
AS104 1ST FLOOR ROOF AND 2ND FLOOR CONSTRUCTION PLAN
AS105 2ND FLOOR ROOF AND 3RD FLOOR CONSTRUCTION PLAN
AS106 ARCHITECTURAL SITE PLAN AND CANOPY PLAN
AS111 1ST FLOOR REFLECTED CEILING PLAN
AS201 BUILDING ELEVATIONS
AS202 BUILDING ELEVATIONS
AS203 BUILDING ELEVATION - WEST AND ENLARGED CANOPY ELEVATIONS
AS311 WALL SECTIONS - NEW 1ST FLOOR - VESTIBULE
AS312 WALL SECTIONS - NEW 1ST FLOOR - RELIEF AIR CHASE AND UTILITY
CHASE
AS313 WALL SECTIONS - NEW 1ST FLOOR
AS314 WALL SECTIONS
AS315 WALL SECTIONS - EXISTING 1ST FLOOR
AS321 STAIR PLANS AND SECTIONS
AS401 ENLARGED TOILET PLANS AND ELEVATIONS
AS402 ENLARGED PLANS AND ELEVATIONS
AS501 PLAN DETAILS
AS502 WALL SECTION DETAILS - BASE
AS503 WALL SECTION DETAILS - HEAD
AS504 WALL SECTION DETAILS - PARAPET
AS505 ROOF DETAILS
AS506 CANOPY & EXTERIOR SIGN DETAILS
AS601 DOOR AND WINDOW SCHEDULES
AS602 DOOR AND WINDOW ELEVATIONS AND DETAILS
AS603 FINISH SCHEDULES & SIGNAGE TYPES
AS604 SIGNAGE PLAN
AS901 INTERIOR SECTIONS AND DETAILS
AS902 INTERIOR SECTIONS AND DETAILS
AF101 1ST FLOOR FLOOR FINISH PLAN
AF102 1ST FLOOR WALL FINISH PLAN
AF103 ENLARGED FLOOR FINISH PLANS
AQ101 1ST FLOOR EQUIPMENT PLAN
FIRE PROTECTION
FP100 FIRE PROTECTION NOTES, DETAILS, & DIAGRAM
FP101 BASEMENT FIRE PROTECTION PLAN
FP102 FIRST FLOOR FIRE PROTECTION PLAN
PLUMBING
PD101 BASEMENT PLUMBING REMOVAL PLAN
PD102 FIRST FLOOR PLUMBING REMOVAL PLAN
PL100 PLUMBING, LEGEND, DETAILS & NOTES
PL101 FOUNDATION PLUMBING PLAN
PL102 BASEMENT PLUMBING PLAN
PL103 FIRST FLOOR PLUMBING PLAN
PL104 ROOF PLUMBING PLAN
PL105 DIAGRAMS & ENLARGED PLUMBING PLANS
PL106 WASTE & VENT PIPING DIAGRAM
MECHANICAL
MD101 BASEMENT MECHANICAL DUCT REMOVAL PLAN
MD102 FIRST FLOOR MECHANICAL DUCT REMOVAL PLAN
MD103 SECOND FLOOR MECHANICAL REMOVAL PLAN
MD111 BASEMENT MECHANICAL PIPING REMOVAL PLAN
MD112 FIRST FLOOR MECHANICAL PIPING REMOVAL PLAN
MH101 BASEMENT MECHANICAL DUCT PLAN
MH102 FIRST FLOOR MECHANICAL DUCT PLAN
MH103 SECOND FLOOR ROOF MECHANICAL PLAN
MH301 MECHANICAL SECTIONS
MI101 MECHANICAL ABBREVIATIONS AND LEGEND
MI102 MECHANICAL SCHEDULES
MI103 MECHANICAL DETAILS
MI104 MECHANICAL DETAILS
MI105 MECHANICAL DETAILS
MI106 MECHANICAL DETAILS
MI107 CHILLED WATER FLOW DIAGRAMS
MI108 HOT WATER FLOW DIAGRAM
MI109 TEMP CONTROL
MI110 TEMP CONTROL
MI111 TEMP CONTROL
MI112 TEMP CONTROL
MP101 BASEMENT MECHANICAL PIPING PLAN
MP102 FIRST FLOOR MECHANICAL PIPING PLAN
ELECTRICAL
ED100 ELECTRICAL GENERAL NOTES, LEGEND, AND KEY PLANS
ED101 FIRST FLOOR ELECTRICAL REMOVAL PLAN
EJ101 ELECTRICAL DATA & COMMUNICATIONS DETAILS
EJ102 ELECTRICAL DETAILS
EJ103 ELECTRICAL DETAILS
EJ104 LIGHTING SCHEDULE, MOTOR CONTROL SCHEDULE & DIAGRAMS
EL101 FIRST FLOOR LIGHTING PLAN
EP101 BASEMENT POWER AND SYSTEMS PLAN
EP102 FIRST FLOOR POWER PLAN
EP103 SECOND FLOOR AND ROOF POWER PLAN
EP104 PANEL SCHEDULES
EP105 PANEL SCHEDULES
EP110 ELECTRICAL ONE-LINE DIAGRAM
ES101 SITE LIGHTING PLAN
EY102 FIRST FLOOR SYSTEMS PLAN
EY103 FIRST FLOOR VGIA WIRLESS ACCESS PLAN
SHEET LIST
SHEET # SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 BASEMENT LIFE SAFETY PLAN AND INFECTION CONTROL PLANS
GI102 1ST FLOOR LIFE SAFETY FLOOR PLAN
GI103 1ST FLOOR INFECTION CONTROL / PHASING PLANS
GI104 CONSTRUCTION LOGISTICS SITE PLAN
GI105 DEDUCTIVE BID ALTERNATES 'A' AND 'B'
GI106 DEDUCTIVE BID ALTERNATES 'C' AND 'D'
GI107 DEDUCTIVE BID ALTERNATES 'E' AND 'H'
CIVIL
VF101 TOPOGRAPHIC SURVEY
CC001 GENERAL CIVIL NOTES
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS102 SITE PLAN - ALTERNATE A
CS501 SITE DETAILS
CS502 SITE DETAILS
CG101 GRADING PLAN
CG102 GRADING SECTIONS
CG103 GRADING PLAN - ALTERNATE A
CU101 UTILITY PLAN
CU102 STORMWATER PROFILES
CU103 UTILITY PLAN ALT - ALTERNATE A
CU501 UTILITY DETAILS
CU502 UNDERGROUND STORAGE DETAILS
CU503 UNDERGROUND STORAGE DETAILS
CJ101 EROSION CONTROL PLAN
CJ501 EROSION CONTROL DETAILS
CJ502 SWPPP
LS101 LANDSCAPE PLAN
LS102 LANDSCAPE PLAN
Contact:Contact:Contact:Contact
Contact:
BCCLT
WILLIAM HOSMON, PE
MECHANICAL ENGINEER
MECHANICAL,
ELECTRICAL &
PLUMBING
GUIDON DESIGN INC.
MARK VANDERWOUDE, PE
STRUCTURAL ENGINEER
STRUCTURAL
ENGINEER
GUIDON DESIGN INC.
DAVID COUNSELL, PE
CIVIL ENGINEER
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 109 e:dcounsell@guidondesign.com
CIVIL
ENGINEER
VA NORTHERN INDIANA
HEALTH CARE SYSTEM
JAMES A. BROYLES
COR, ENGINEERING SERVICES
1700 E. 38th St.
Marion, IN 46953 p: 765-674-3321 x 73592 e: james.broyles@va.gov
OWNER
GUIDON DESIGN INC.
KARI ALLEN, AIA
HEALTHCARE ARCHITECT,
PROJECT MANAGER
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 112 e: kallen@guidondesign.com
ARCHITECT
905 North Capitol Avenue Suite 100 Indianapolis, IN 46204 p: 317.800.6388 x 119 e: mvanderwoude@guidondesign.com
4031 Transportation Drive Fort Wayne, In 46818 p: (812) 423-4407 e: hosmon@bcclt.com
UP
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
GENERATOR BUILDING 16
CHILLER
B-C-100
ROOM
STAIR 1
B-C-ST1
LOUNGE
B-C-103
SPS ASSISTANT
OFFICE
B-C-103D
PREP/ASSEMBLY
B-C-106C
WOMENS LOCKER
ROOM
B-C-103A
MENS LOCKER
ROOM
B-C-103B
STERILIZER ACCESS
B-C-106D
WAREHOUSE
B-C-115
STERILE/
NON-STERILE
STORAGE
B-C-113
H A
C
B -C
-1
G
STORAGE (FUTURE
DUMBWAITER)
B-C-106F
STORAGE (FUTURE
EQUIP. ROOM)
B-C-113A
ELECTRICAL
B-C-108
LOUNGE, STAFF
B-C-109
O
IT
C
LO
S E
T
B -C
-1
PPE AREA
B-C-106A
CART PREP
B-C-106B
CONERENCE ROOM /
TRAINING
B-C-105
SPS DIRECTOR
B-C-104A
CUBICLE, CLERICAL
STAFF
B-C-104
OFFICE (FUTURE
ELEVATOR)
B-C-EL2
OFFICE (FUTURE
ELEVATOR)
B-C-EL1
STORAGE (FUTURE
EQUIP ROOM)
B-C-101
HAC
B-C-102A
STORAGE (FUTURE
DUMBWAITER)
B-C-102B
SCOPE
DECONTAMINATION
B-C-102C
SCOPE
STERILIZATION
B-C-106E
AUTOMATIC CART
WASH
B-C-102D
DECONTAMINATION
B-C-102
CORRIDOR
B-C-C2
VESTIBULE
B-C-110
MENS LOCKER
ROOM
B-C-109A
WOMENS LOCKER
ROOM
B-C-109B
O
FF
IC
E
(F U
TU
R
E E
LE
V
A
TO
R
B -C
-E L
PURCHASING
B-C-111
CORRIDOR
B-C-C3
LOGISTICS
CLERICAL
B-C-112
LOGISTICS
SUPERVISOR
B-C-112A
LOGISTICS
DIRECTOR
C-112B
H A
C
B -C
-1
OFFICE
B-C-116
STAIRS
B-C-ST2
PHARMACY
STORAGE
OIT
53A
BIOMETRICS
MAIL ROOM
49B
WATER TREATMENT
49C
45B
59A 59B 59C 58
EXIT
EXIT
EXIT
STAIR DOES NOT EXIT
IMMEDIATELY TO EXTERIOR
EXISTING EXTERIOR
RETAINING WALL
TRAVEL DISTANCE = 77'-6"
44A
42A
45A
60B
60A
46 47
63A
CORRIDOR
B-C-C1
STAIRS
B-C-ST2
WOMENS LOCKER
ROOM
B-C-103A
MENS LOCKER
ROOM
B-C-103B
SPS ASSISTANT
OFFICE
B-C-103D
PREP/ASSEMBLY
B-C-106C
STERILE/
NON-STERILE
STORAGE
B-C-113
HAC
B-C-106G
STORAGE (FUTURE
DUMBWAITER)
B-C-106F
STORAGE (FUTURE
EQUIP. ROOM)
B-C-113A
MENS LOCKER
ROOM
B-C-109A
WOMENS LOCKER
ROOM
B-C-109B
CORRIDOR
B-C-C3
HAC
B-C-114
OFFICE
B-C-116
OFFICE (FUTURE
ELEVATOR)
B-C-EL3
STORAGE (FUTURE
EQUIP ROOM)
B-C-101
STORAGE (FUTURE
DUMBWAITER)
B-C-102B
ROOM
WATER TREATMENT
49C
WAREHOUSE
B-C-115
STERILIZER ACCESS
B-C-106D
LOGISTICS
DIRECTOR
C-112B
LOGISTICS
CLERICAL
B-C-112
LOGISTICS
SUPERVISOR
B-C-112A
PURCHASING
B-C-111
VESTIBULE
B-C-110
CORRIDOR
B-C-C2
PPE AREA
B-C-106A
CONERENCE ROOM /
TRAINING
B-C-105
OIT CLOSET
B-C-107
SPS DIRECTOR
B-C-104A
CUBICLE, CLERICAL
STAFF
B-C-104
SCOPE
STERILIZATION
B-C-106E
OFFICE (FUTURE
ELEVATOR)
B-C-EL2
OFFICE (FUTURE
ELEVATOR)
B-C-EL1
HAC
B-C-102A
CORRIDOR
B-C-C1
LOUNGE
B-C-103
PPE AREA
B-C-103C
CHILLER
B-C-100
STAIR 1
B-C-ST1
ELECTRICAL
B-C-108
LOUNGE, STAFF
B-C-109
SCOPE
DECONTAMINATION
B-C-102C
DECONTAMINATION
B-C-102
AUTOMATIC CART
WASH
B-C-102D
CART PREP
B-C-106B
PHARMACY
STORAGE
OIT
53A
BIOMETRICS
MAIL ROOM
575859C59B59A
45B
49B 51 52
60A
60B
STAIR
B-1
STAIR
B-2
ABOVE CEILING WORK REQUIRED IN THIS AREA. REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION
B1 B2
B3
B4
INFECTION CONTROL AND PHASING LEGEND
TEMPORARY WALLS TO BE PROVIDED AS A
BARRIER BETWEEN AREAS OF WORK AND
OCCUPIED PORTIONS OF THE BUILDING. SEE
PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
BEYOND PRIMARY PROJECT SCOPE
BOUNDARY. REFER TO DRAWINGS AND
DETAILS FOR WORK REQUIRED IN THIS AREA.
PRIMARY CARE SUITE BOUNDARY
AREA OF PHASE 1 WORK. THE MAIN BODY OF
WORK SHALL BE COMPLETED DURING PHASE 1
INCLUDING THE 1ST FLOOR ADDITION.
WORK SHOWN IN THIS AREA BY VA - NOT IN CONTRACT
PHASING GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
PROJECT SHALL BE COMPLETED IN 2 MAIN PHASES. SEE INFECTION CONTROL /
PHASING FLOOR PLAN FOR LOCATIONS.
SCHEDULE AND TIME OF CONSTRUCTION WORK FOR ALL PHASES SHALL BE
APPROVED BY COR AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN.
PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE. THIS INCLUDES WORK REQUIRED ABOVE AND BELOW
THE FLOOR PLAN OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK OUTSIDE OF INDICATED PROJECT BOUNDARY AND IN THE
BASEMENT IS REQUIRED - COORDINATE WORK RESTRICTIONS WITH VA. CEILING
TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED
BY CONTRACTOR. FOR WORK IN VA OCCUPIED SPACES, CONTRACTOR SHALL
REPLACE CEILING TILES OR USE VA APPROVED TEMPORARY MATERIALS IN PLACE
OF CEILING TILES TO ALLOW VA ACTIVITES TO CONTINUE UNTIL CONTRACTORS
NEXT TASK IN A PARTICULAR AREA. CONTRACTOR TO SUBMIT SCHEDULE THAT
INDICATES WORK FOR SPECIFIC AREAS AND COORDINATE WITH THE VA FOR
ACCESS.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING
NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF OPERATION.
WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN THE
HOURS OF 6:00 AM AND 5:00 PM AND AS AGREED UPON BY COR SO AS NOT TO
DISTURB SLEEPING PATIENTS IN OTHER AREAS OF THE HOSPITAL. EVERY EFFORT
SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
GRAPHIC REPRESENTATION OF AREAS OF WORK AND/OR PHASING PLANS ARE
NOT SUITABLE FOR USE BY THE CONTRACTOR TO ESTIMATE DISTANCES /
QUANTITIES THAT MAY BE REQUIRED TO BE INSTALLED IN THE ACTUAL BUILDING.
CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND MEASURE ALL FIELD
CONDITIONS TO INCLUDE (E) ITEMS TO REMAIN THAT THE VA MIGHT NEED
ACCESSIBLE E.G. SWITCHES, CONTROLS, DOORS, ACCESS PANELS,
THERMOSTATS, AIR SUPPLY, AIR RETURN, ETC.
EXISTING PROJECT AREAS WILL BE OCCUPIED BY STAFF AND VETERANS
THROUGHOUT CONSTRUCTION. ALL/ANY WORK REQUIRED IN VA OCCUPIED SPACE
MUST BE SCHEDULED WITH THE COR.
REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS FOR
ADDITIONAL INFORMATION.
REFERS TO SHEETS GI101 AND GI103
AREA OF PHASE 2A, 2B, AND 2C WORK, 1ST
FLOOR ONLY. PHASE 2 WORK IS WITHIN THE
EXISTING BUILDING AND SHALL BEGIN ONCE
PHASE 1 HAS BEEN COMPLETED.
CONTRACTOR SHALL BE REQUIRED TO
COORDINATE PHASE 2 WORK WITH THE COR
AND SUBPHASES SHALL NOT BE ASSUMED
TO BE PERFORMED SIMULTANEOUSLY.
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: HIGHEST
CLASS OF PRECAUTION MATRIX: IV
PROVIDE IC TEMPORARY BARRIER WALL CONSTRUCTION PER NFPA 241. REFER
TO DETAILS 2/GI102 AND 3/GI102.
PROVIDE IC TEMPORARY CONSTRUCTION DOOR WITH CARD READER ACCESS.
REFER TO ELEVATION 3/GI103. ACCESS CONTROL IS NOT A PART OF AND IS NOT
CONNECTED TO VA PACS/PIN SYSTEM.
DOOR OPENING SHALL BE CUT AND INSTALLED DURING OFF HOURS SUCH THAT
ROOMS REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.
INTENT IS THAT ABOVE CEILING WORK IN STERILE PROCESSING STORAGE IN
BASEMENT IS MINIMIZED.
TEMPORARY WALLS IN EXISTING EXAM ROOMS SHALL BE ALIGNED WITH
BULKHEAD ABOVE SUCH THAT ACOUSTIC CEILING GRID IS UNAFFECTED AND
ENCROACHMENT INTO OPERATIONAL ROOMS IS MINIMIZED, TYPICAL.
1.
2.
3.
4.
5.
REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD
VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE CEILING
WORK REQUIRED ON THE 1ST FLOOR AND ON THE LOWER LEVEL.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER WALL
CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY IC
BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE APPROXIMATE.
CONTRACTOR SHALL PROVIDE DRAWING TO COR AND PATIENT SAFETY/
INFECTION CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS IN
PLACE.
PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH
TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS
DIRECTED BY VA.
PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTI-
PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP
TO 30 GALLONS.
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING INGRESS/EGRESS TO THE
PROJECT AREA FROM THE EXTERIOR OF THE BUILDING AND WILL NOT BE
PERMITTED TO UTILIZE ANY PORTION OF THE EXISTING VA BUILDING TO MOVE
LABOR OR MATERIALS THROUGH.
- ALL NEW MATERIAL TRANSPORTED WITHIN EXISTING 1-EAST
SHALL BE COVERED WITH 4 MIL. POLY SHEET.
-FOR DEMOLITION MATERIAL REMOVED FROM EXISTING 1-EAST,
ROUTE SHALL BE VA APPROVED, IN ENCLOSED DUMPSTER CART
DESIGNED FOR SUCH PURPOSE, WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE THE
INDICATED PHASE BOUNDARY.
ASBESTOS ABATEMENT: REVIEW THE 'Ft. Wayne VAMC Asbestos Reinspection
2016' DOCUMENT PROVIDED WITH THE CONSTRUCTION DOCUMENTS FOR
EXTERIOR WINDOW CAULK ASSUMED TO CONTAIN ASBESTOS. REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
INFECTION CONTROL GENERAL NOTES
REFERS TO SHEETS GI101 AND GI103
REFERS TO SHEETS GI101 AND GI103
BASEMENT ACCESS NOTES
B1.
B2.
B3.
B4.
CONTRACTOR'S ACCESS TO BASEMENT LEVEL WILL BE LIMITED.
AREAWAY: CONTRACTOR MAY UTILIZE THIS TO MOVE MATERIALS AND
EQUIPMENT.
STAIR B-C-ST1: THIS IS CONSIDERED TO BE A FINISHED SPACE AND AS
SUCH ANY DAMAGE CAUSED BY THE CONTRACTOR TO THE FINISHES OR
MATERIALS WILL BE REPAIRED BY THE CONTRACTOR TO THE
SATISFACTION OF THE VA. VA TO PROVIDE A KEY TO THIS STAIRWAY DOOR.
DOUBLE DOORS EAST END: ACKNOWLEDGED AS THE MOST PROBABLE
ACCESS POINT TO THE BASEMENT WHICH ALSO OPENS INTO FINISHED
SPACE. DAMAGE CAUSED BY THE CONTRACTOR TO THE FINISHES SHALL
BE REPAIRED BY THE CONTRACTOR. CONTRACTOR SHALL HAVE ACCESS
THROUGH THIS PAIR OF DOORS. ONLY WHEEL CARTS WITH NON-MARRING
WHEELS WILL BE ALLOWED INSIDE.
NO CONTRACTOR ACCESS AT THIS POINT.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .1
F W
P ri m a ry
C a re ts a n d e rs g u id o n d e s ig n .c o m
.r v t
CONSTRUCTION DOCUMENTS
GI101
TSKA/JG
BASEMENT LIFE SAFETY PLAN AND
INFECTION CONTROL PLANS
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 1/16" = 1'-0"GI101
1 BASEMENT LIFE SAFETY FLOOR PLAN
SCALE: 1/16" = 1'-0"GI101
2 BASEMENT INFECTION CONTROL / PHASING FLOOR PLAN
N
115 114
120 120A
121B 121D 121E 121F 121G
109D
109C
194A 193
188 187A
186A
107A
108109
130127 128 129
126 128A 1
133 135
A157 A158
A163
A164
A102 A103 A118
A105 A120
A122 A121
A119
A117
A140
A143
A142
A141
A102A A101
A153
A151
A148
A150
A152
A147
A149
A155
A154
A145 A144
A127
A128
A132
A106
A108
A110
A107
A116
A114
A112
A111
A113
A115 A131 A133 A135 A136
A
A129
A138 A
A139
A124
A126A109
A137 A127A
A125
A123
A
A B
A
A104
A A
A B
A165 A166
A168
A169B
A169A
A159
A156E A156D
A156C
A156A
A156B
A156
A156F
123 123A 123B 123C
189190
BC
B
G
106107
A156D
STR #1
STR #2
UP
UP
DN
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED.
FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, NFPA 101
SHALL BE USED EXCLUSIVELY IN INSTANCES OF CONFLICT.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, THE VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM
WIDE.
CODE REVIEW
THE 2015 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE
INTERNATIONAL BUILDING CODE HAS BEEN USED.
PROJECT SCOPE
THE PROJECT SCOPE INCLUDES THE BUILDING OF A FIRST FLOOR ADDITION OVER A BASEMENT WHICH ACCOMMODATES A STERILE PROCESSING DEPARTMENT. THE ADDITION SHALL BE AN EXPANSION OF THE EXISTING OUTPATIENT PRIMARY CARE CLINIC. THE EXPANDED SPACE SHALL BE A BUSINESS OCCUPANCY, BUT THE OVERALL CONSTRUCTION SHALL ALIGN WITH I-2, INSTITUTIONAL OCCUPANCY REQUIREMENTS. THERE IS ONE WAITING AREA WITH AN OCCUPANCY COUNT OVER 50, WHICH WILL BE REVIEWED AS AN A-ASSEMBLY OCCUPANCY. OVERALL BUILDING INFRASTRUCTURE AND SYSTEMS SHALL BE MAINTAINED TO COMPLY WITH HEALTHCARE CHAPTER 19 AND IBC 2015.
THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2015 IBC.
CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE I-B CONSTRUCTION AS FOLLOWS:
1.OCCUPANCY TYPE:
EXISTING HOSPITAL: I-2 HOSPITAL OCCUPANCY IBC CHAPTER 3, HEALTHCARE LSC CHAPTER 18
BUILDING EXPANSION FLOOR 1: B BUSINESS IBC CHAPTER 3, BUSINESS LSC CHAPTER 38.
2.CONSTRUCTION TYPE:
EXISTING HOSPITAL: I-B (IBC CHAPTER 5), TYPE II (222) (LSC)
PROJECT SCOPE: I-B (IBC CHAPTER 5), TYPE II (222) (LSC)
3. FIRE RESISTIVE RATINGS TYPE IB/ I(222) CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 2 HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, 0-1-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0 HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE (IBC 602.2) >4 STORIES (5 TOTAL STORIES PLANNED FOR FUTURE)
4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC 2015.
5. ALLOWABLE HEIGHT: 180 FT (IBC, TABLE 504.3)
6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 5 (IBC, TABLE 504.4)
7. ALLOWABLE AREA: BASED UPON I-B I-2 OCCUPANCY AND NON-COMBUSTIBLE, TYPE I-B FULLY SPRINKLED: ALLOWABLE AREA: 45,000 (IBC, TABLE 506.2)
8. NO BUILDING SEPARATION IS CREATED OR MODIFIED.
9. OCCUPANCY SEPARATION: A 2 HOUR OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE CLINIC SUITE AND MAIN HOSPITAL.
10. MEANS OF EGRESS SECTION.
• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES
• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.
• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED
• MAXIMUM TRAVEL DISTANCE: 300 FEET, (INCLUDES ADDITIONAL 50 FEET DUE TO AREA BEING PROTECTED BY A FIRE SPRINKLER SYSTEM)
• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET
• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET.
• MEANS OF EGRESS SHALL BE ILLUMINATED BY EMERGENCY LIGHTING.
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS. BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2015 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2013 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM,
2016 EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2016 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2016 EDITION.
NFPA 54 NATIONAL FUEL GAS CODE, 2015 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA
PROCESSING EQUIPMENT, 2017 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND
VENTILATING SYSTEMS, 2015 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION
NFPA 96
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION
NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION
NFPA 101, LIFE SAFETY CODE, 2015 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.
NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, &
DEMOLITION OPERATIONS, 2013 EDITION
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS,
2017 EDITION
ASHRAE 0 - 2005 COMMISSIONING PROCESS
ASHRAE 1.1 - 2007 HVAC & R TECHNICAL REQUIREMENTS FOR COMMISSIONING PROCESS
ASHRAE 55- 2004 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY
ASHRAE 62.1 - 2007 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
ASHRAE 90.1-2007 HVAC SYSTEMS
ASHRAE 180 - 2009 VENTILATION FOR HEALTH CARE FACILITIES
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
ADA ACCESSIBILITY GUIDELINES (ADAAG), 2004
ADA STANDARDS FOR ACCESSIBLE DESIGN, 2010
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF
NFPA 5000 AND NFPA 900
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,
ENERGY, AND TRANSPORTATION MANAGEMENT.
GOVERNING CODESCODE ANALYSIS - NFPA 101, CHAPTER 38 FOR CLINIC, CHAPTER 19 FOR BUILDING
11. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD IS SEVERE PER LSC CHAPTER 38, SUCH AS SOILED HOLDING, PROTECTION IS PROVIDED WITH AN AUTOMATIC EXTINGUISHING SYSTEM. THE SPACE SHALL ALSO BE ENCLOSED WITH SMOKE PARTITIONS IN ACCORDANCE WITH SECTION 8.4.
12. THE EXIT FOR EXISTING STAIR 1-B-ST3 WILL NO LONGER DISCHARGE DIRECTLY OUTSIDE THE BUILDING. PER LSC SECTION 7.7.2. THIS STAIR IS REQUIRED FOR EXITING FROM THE 5TH FLOOR AS THIS IS THE ONLY STAIR ON THIS, THE EAST SIDE OF THE BUILDING ON THE 5TH FLOOR.
THE EXIT FOR EXISTING STAIR 1-B-ST3 IS SHOWN TO DISCHARGE THROUGH INTERIOR BUILDING AREAS (THE LOBBY AREA) OF THE PRIMARY
CARE ADDITION AND WILL MEET THE FOLLOWING PROVISIONS:
- 7.7.2 EXIT DISCHARGE THROUGH INTERIOR BUILDING AREAS EXITS SHALL BE PERMITTED TO DISCHARGE THROUGH
INTERIOR BUILDING AREAS, PROVIDED THAT THE ALL THE FOLLOWING ARE MET:
(1) NOT MORE THAN 50% OF THE REQUIRED NUMBER OF EXITS, AND NOT MORE THAN 50% OF THE REQUIRED EGRESS CAPACITY, SHALL DISCHARGE THROUGH INTERIOR AREAS ON ANY LEVEL OF DISCHARGE.
(2) EACH LEVEL OF DISCHARGE SHALL DISCHARGE DIRECTLY OUTSIDE AT THE FINISHED GROUND LEVEL OR DISCHARGE DIRECTLY OUTSIDE AND PROVIDE ACCESS TO THE FINISHED GROUND LEVEL BY OUTSIDE STAIRS
OR OUTSIDE RAMPS.
(3) THE INTERIOR EXIT DISCHARGE SHALL LEAD TO A FREE AND UNOBSTRUCTED WAY TO THE EXTERIOR OF THE BUILDING, AND SUCH WAY SHALL BE READILY VISIBLE AND IDENTIFIABLE FROM THE POINT OF DISCHARGE
FROM THE EXIT.
(4) THE INTERIOR EXIT DISCHARGE SHALL BE PROTECTED BY THE FOLLOWING METHOD: (A) THE LEVEL OF DISCHARGE SHALL BE PROTECTED THROUGHOUT BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN
ACCORDANCE WITH SECTION 9.7.
(5) THE ENTIRE AREA ON THE LEVEL OF DISCHARGE SHALL BE SEPARATED FROM AREAS BELOW BY CONSTRUCTION HAVING A FIRE RESISTANCE RATING NOT LESS THAN THAT REQUIRED FOR THE EXIT
ENCLOSURE. FOR THIS PROJECT, THIS IS A 2-HOUR RATING.
IN ADDITION, THE BASEMENT FLOOR UP THROUGH FLOOR 4 DO NOT EXCEED THE 50% LIMIT TO NUMBER OF EXITS OR EGRESS CAPACITY AS
INDICATED IN NFPA 101 7.7.2 (1).
13. INTERIOR FINISH, SECTION. WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND
CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS.
- CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
- CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.
- CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450
FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.
FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME
RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.
UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590
14. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.
15. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED. THE SYSTEM SHALL BE BY MANUAL MEANS.
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS.
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• FIRE ALARM CONTROL PANEL MUST BE FROM THE LIFE SAFETY PANEL
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM.
16. FIRE SUPPRESSION/SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.
17. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.
18. REQUIRED EGRESS CAPACITY IS BASED ON OCCUPANT LOAD PER EXIT. 475 TOTAL OCCUPANTS / 4 EXITS (2 HORIZONTAL EXITS, 2 STAIR
EXITS) = 119 OCCUPANTS PER EXIT.
IBC 1005.3.1 EXCEPTION FOR GROUP B AND FULLY SPRINKLED: STAIRWAY CAPACITY REQUIRED = 119 OCCUPANTS X 0.2" = 23.8" (1'-
11.8") STAIRWAY CAPACITY AVAILABLE >3'-0".
IBC 1005.3.2 EXCEPTION FOR GROUP B AND FULLY SPRINKLED: OTHER EGRESS COMPONENT CAPACITY REQUIRED = 119
OCCUPANTS X 0.15 = 17.85" (1'-5.85")
OTHER EGRESS COMPONENT CAPACITY >6'-0"
20005 SF
100201
B
2572 SF
15171
A CLINIC
WAITING
FECFEC
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
DIAGONAL DISTANCE = 263' -0 1/2"
EXIT SEPARATION DISTANCE = 157'-8"
EG
RES
S T
RAVE
L
DIS
TA
NCE
1' -9
PRIMARY CARE SUITE BOUNDARY
ELECTRICAL
1-C-140
DW
1-C-123
STAIRS
1-C-ST2
MED ROOM 1
1-C-124
TEAM ROOM
(FUTURE ELEV.)
1-C-EL3
TRAINING ROOM
EXAM 34
158A
HYBRID 33
158CONSULT 32
HYBRID 31
CONSULT 30
EXAM 29
154A
HYBRID 28
CONSULT 26
1-C-144
INTAKE 3
P. TOILET 3
SOILED UTILITY
162A
EQUIP STORAGE 3
STAIR
1E-1E
CLEAN UTILITY 2
CONSULT 35
PROCEDURE 2
PR. TOILET
167A
PROCEDURE 1
TELEDERM
169A
TELERETINAL
TELEHEALTH
SHARED MED APP
STORAGE
SHARED GROUP
ROOM 2
175A
NURSE MANAGER
MECHANICAL
PATIENT EDUCATION
STAIR
1-B-ST3
PATIENT CORR. 3
1E-3
STAIRS
1-C-ST1
SMALL
CONFERENCE
STAFF LOUNGE
MEN'S TESTING
138B
ELIGIBILITY
138A
PATIENT
REGISTRATION
MED ROOM 3
P. TOILET 2
1-C-132
DW
1-C-133
EXAM 21
1-C-136
EXAM 22
1-C-137
CONSULT 27
CLEAN UTILITY 1
1-C-145
EXAM 25
1-C-143
EXAM 24
1-C-142
HYBRID 23
1-C-138
EXAM 15
1-C-125EXAM 14
1-C-126
HYBRID 13
1-C-127
EXAM 12
1-C-128
CONSULT 11
1-C-129
OIT
1-C-139
INTAKE 2
1-C-130
CONSULT 19
1-C-119
CONSULT 18
1-C-120
CONSULT 17
1-C-121
CONSULT 16
1-C-122
TEAM ROOM
HYBRID 36
EQUIP. STOR.
1-C-118
INTAKE 1
1-C-103
MULTIPURPOSE
1-C-115
STAFF LOUNGE
1-C-116
M. STAFF TOILET
1-C-146
W. STAFF TOILET
1-C-147
OPEN OFFICE
1-C-117
OPEN OFFICE
1-C-148
PATIENT CORR. 1
1-C-C1
PATIENT CORR. 2
1-C-C2
RECEPTION
1-C-102
FAMILY TOILET
VESTIBULE
1-C-100
CORRIDOR
1E-1
CORRIDOR
1E-4
EXAM 37
HYBRID 7
1-C-111
HYBRID 4
1-C-107
EXAM 8
1-C-112
P. TOILET 1
1-C-110
EXAM 6
1-C-109
EXAM 5
1-C-108
EXAM 3
1-C-106
NEG. PRESSURE
HYBRID 1
1-C-104
EXAM 10
1-C-114
EXAM 9
1-C-113
EXAM 2
1-C-105
GENERATOR BUILDING 16
EGRESS TRAVEL DISTANCE 187' EGRESS TRAVEL DISTANCE 61'
WOMEN'S PUBLIC
TOILET
MEN'S PUBLIC
TOILET
EXIT
EXIT
EXIT
EXIT
176A
178101
LOCKERS
A169
FA
100A
MULTI-PURPOSE
WAITING
1-C-101
CONCIERGE
1-C-101A
KIOSKS
1-C-101C
COFFEE
1-C-101D
TEAM ROOM
(FUTURE ELEV.)
1-C-EL1-2
EGRESS CORRIDOR
1-C-C4
285 SF
A
327 SF
A
303 SF
A
514 SF
A
TEMPORARY FLOOR WILL NOT BE
RATED DUE TO RATING OF WALLS
AND DOOR OPENING
BASEMENT EXIT BELOW
TO GROUND LEVEL
PROVIDES DIRECT
DISCHARGE
BASEMENT
EXIT DOORS TO
GROUND LEVEL DOES
NOT PROVIDE DIRECT DISCHARGE
EXIT TO
GROUND LEVEL PROVIDES
DIRECT DISCHARGE
TABLE 7.2.2.2.1.2 OCCUPANCY LOAD
FOR OVERALL BUILDING EXPANSION
<20000 PERSONS PER FLOOR. STAIR
WIDTH REQUIREMENTS 44"
EXISTING FIRST FLOOR PER VA STATEMENT OF
CONDITIONS B-BUSINESS OCCUPANCY
FUTURE HAC
148A
CORRIDOR
1-C-C5
HYBRID 20
1-C-135
MED ROOM 2
1-C-141
STAFF CORR.
1-C-C3
STORAGE
1-C-134WAITING
FEC
FECFEC
FEC
FEC
FEC TEMPORARY FLOOR
WILL NOT BE RATED
DUE TO RATING OF
WALLS AND DOOR
OPENING
UTILITY SHAFT
RELIEF AIR CHASE
SHARED GROUP
ROOM
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EXIT ACCESS
FIRE EXTINGUISHER AND CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
BEYOND PRIMARY PROJECT SCOPE
BOUNDARY, THOUGH WORK MAY NEED
TO BE COMPLETED IN THIS AREA TO
ACCOMMODATE PRIMARY SCOPE.
INDICATED WORK IN DRAWINGS AND
DETAILS IN THIS AREA SHALL BE
COMPLETED BY THE VA - N.I.C.
PRIMARY CARE SUITE BOUNDARY
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .1
F W
P ri m a ry
C a re ts a n d e rs g u id o n d e s ig n .c o m
.r v t
CONSTRUCTION DOCUMENTS
GI102
TSKA/JG
1ST FLOOR LIFE SAFETY FLOOR PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
LIFE SAFETY OCCUPANCY COUNT
AREA SF OCC OCC FACTOR # OF OCC
FIRST FLOOR LEVEL
CLINIC 20005 SF B 100 201
WAITING 2572 SF A 15 171
SM. CONFERENCE 285 SF A 15 19
SHARED GROUP RM 1 327 SF A 15 22
SHARED GROUP RM 2 303 SF A 15 21
MULTIPURPOSE 514 SF A 15 35
24006 SF 469
24006 SF 469PRIMARY CARE SUITE TOTAL:
SCALE: 1/16" = 1'-0"GI102
1 1ST FLOOR LIFE SAFETY FLOOR PLAN
SCALE: 1" = 100'-0"
KEY PLANN
GROSS ADDITION TOTAL: 16,213 SF
TOTAL DOOR WIDTH CAPACITY = 475 PERSONS OVERALL CLINIC X 0.2 EQUALS 95"
DOOR WIDTH PROVIDED 60" + 36" + 36" = 132"
DN
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT
5/8" TYPE X GYPSUM BOARD, JOINTS
SEALED WITH FIRE TAPE, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS FASTENED
ALONG TOP AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING
CEILING
PUBLIC
SIDE
45 MIN. FIRE RATED METAL DOOR
ASSEMBLY AND FRAME WITH SEALS,
CARD READER AND HARDWARE
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES TO PROHIBIT THE
MIGRATION OF DUST, DIRT, AIR, AND
ODORS
SEAL ALL EDGES TO PROHIBIT THE
MIGRATION OF DUST, DIRT, AIR, AND
ODORS
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE
ABOVE
VA / OSHA TEMPORARY SIGNAGE
MED ROOM 2
1-C-141
ELECTRICAL
1-C-140
DW
1-C-123
STAIRS
1-C-ST2
TEAM ROOM
(FUTURE ELEV.)
1-C-EL3
TRAINING ROOM
EXAM 34
158A
HYBRID 33
CONSULT 32
HYBRID 31
CONSULT 30
EXAM 29
154A
HYBRID 28
CONSULT 26
1-C-144
INTAKE 3
P. TOILET 3
SOILED UTILITY
162A
EQUIP STORAGE 3
STAIR
1E-1E
CLEAN UTILITY 2
CONSULT 35
PROCEDURE 2
PR. TOILET
167APROCEDURE 1
TELEDERM
169A
TELERETINAL
TELEHEALTH
SHARED MED APP
STORAGE
NURSE MANAGER
MECHANICAL
PATIENT EDUCATION
STAIR
1-B-ST3
PATIENT CORR. 3
1E-3
STAIRS
1-C-ST1
SMALL
CONFERENCE
STAFF LOUNGE
MEN'S TESTING
138B
ELIGIBILITY
138A
176A
MED ROOM 3
P. TOILET 2
1-C-132
DW
1-C-133
EXAM 21
1-C-136
EXAM 22
1-C-137
CONSULT 27
CLEAN UTILITY 1
1-C-145
EXAM 25
1-C-143
EXAM 24
1-C-142
HYBRID 23
1-C-138
EXAM 15
1-C-125
EXAM 14
1-C-126
HYBRID 13
1-C-127
EXAM 12
1-C-128
CONSULT 11
1-C-129
OIT
1-C-139
INTAKE 2
1-C-130
CONSULT 19
1-C-119
CONSULT 18
1-C-120
CONSULT 17
1-C-121
CONSULT 16
1-C-122
MED ROOM 1
1-C-124
TEAM ROOM
HYBRID 36
EQUIP. STOR.
1-C-118
INTAKE 1
1-C-103
MULTIPURPOSE
1-C-115
STAFF LOUNGE
1-C-116
M. STAFF TOILET
1-C-146
W. STAFF TOILET
1-C-147
OPEN OFFICE
1-C-117
OPEN OFFICE
1-C-148
PATIENT CORR. 1
1-C-C1
PATIENT CORR. 2
1-C-C2
RECEPTION
1-C-102
FAMILY TOILET
VESTIBULE
1-C-100
BOUNDARY OF PRIMARY
CARE SUITE
GENERATOR BUILDING 16
NEG. PRESSURE
HYBRID 1
1-C-104
EXAM 2
1-C-105
EXAM 3
1-C-106
HYBRID 4
1-C-107
EXAM 5
1-C-108
EXAM 6
1-C-109
P. TOILET 1
1-C-110
HYBRID 7
1-C-111
EXAM 8
1-C-112
EXAM 9
1-C-113
EXAM 10
1-C-114
CORRIDOR
1E-4
EXAM 37
SHARED GROUP
ROOM 2
175A
CORRIDOR
1E-1
MEN'S PUBLIC
TOILET
WOMEN'S PUBLIC
TOILET
WORK SHOWN IN THIS
AREA BY VA - NOT IN
CONTRACT
WORK SHOWN IN THIS
AREA BY VA - NOT IN
CONTRACT
TEAM ROOM
(FUTURE ELEV.)
1-C-EL1-2
EGRESS CORRIDOR
1-C-C4
WAITING
WAITING
1-C-101
COFFEE
1-C-101D
CONCIERGE
1-C-101A
KIOSKS
1-C-101C
HYBRID 20
1-C-135
STAFF CORR.
1-C-C3
WORK SHOWN IN THIS
AREA BY VA - NOT IN
CONTRACT
STORAGE
1-C-134
FUTURE HAC
148A
5 5
DO NOT UTILIZE ANY PORTION
OF THE EXISTING VA BUILDING
TO MOVE LABOR OR
MATERIALS THROUGH
2B2A 2C
UTILITY
SHAFT
RELIEF AIR
CHASE
1 1
TYP. TYP. TYP. TYP.
SHARED GROUP
ROOM
1 1
2 2
4'-0" MIN.
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: D
PATIENT RISK GROUP: HIGHEST
CLASS OF PRECAUTION MATRIX: IV
PROVIDE IC TEMPORARY BARRIER WALL CONSTRUCTION PER NFPA 241. REFER
TO DETAILS 2/GI102 AND 3/GI102.
PROVIDE IC TEMPORARY CONSTRUCTION DOOR WITH CARD READER ACCESS.
REFER TO ELEVATION 3/GI103. ACCESS CONTROL IS NOT A PART OF AND IS NOT
CONNECTED TO VA PACS/PIN SYSTEM.
DOOR OPENING SHALL BE CUT AND INSTALLED DURING OFF HOURS SUCH THAT
ROOMS REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.
INTENT IS THAT ABOVE CEILING WORK IN STERILE PROCESSING STORAGE IN
BASEMENT IS MINIMIZED.
TEMPORARY WALLS IN EXISTING EXAM ROOMS SHALL BE ALIGNED WITH
BULKHEAD ABOVE SUCH THAT ACOUSTIC CEILING GRID IS UNAFFECTED AND
ENCROACHMENT INTO OPERATIONAL ROOMS IS MINIMIZED, TYPICAL.
1.
2.
3.
4.
5.
REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND FIELD
VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE CEILING
WORK REQUIRED ON THE 1ST FLOOR AND ON THE LOWER LEVEL.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER WALL
CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY IC
BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE APPROXIMATE.
CONTRACTOR SHALL PROVIDE DRAWING TO COR AND PATIENT SAFETY/
INFECTION CONTROL REPRESENTATIVE ONCE ICRA PROTOCOLS AND PLAN IS IN
PLACE.
PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH
TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS
DIRECTED BY VA.
PROVIDE THE REQUIRED VA AND OSHA TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC, MULTI-
PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS UP
TO 30 GALLONS.
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING INGRESS/EGRESS TO THE
PROJECT AREA FROM THE EXTERIOR OF THE BUILDING AND WILL NOT BE
PERMITTED TO UTILIZE ANY PORTION OF THE EXISTING VA BUILDING TO MOVE
LABOR OR MATERIALS THROUGH.
- ALL NEW MATERIAL TRANSPORTED WITHIN EXISTING 1-EAST
SHALL BE COVERED WITH 4 MIL. POLY SHEET.
-FOR DEMOLITION MATERIAL REMOVED FROM EXISTING 1-EAST,
ROUTE SHALL BE VA APPROVED, IN ENCLOSED DUMPSTER CART
DESIGNED FOR SUCH PURPOSE, WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE THE
INDICATED PHASE BOUNDARY.
ASBESTOS ABATEMENT: REVIEW THE 'Ft. Wayne VAMC Asbestos Reinspection
2016' DOCUMENT PROVIDED WITH THE CONSTRUCTION DOCUMENTS FOR
EXTERIOR WINDOW CAULK ASSUMED TO CONTAIN ASBESTOS. REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
INFECTION CONTROL GENERAL NOTES
REFERS TO SHEETS GI101 AND GI103
REFERS TO SHEETS GI101 AND GI103
INFECTION CONTROL AND PHASING LEGEND
TEMPORARY WALLS TO BE PROVIDED AS A
BARRIER BETWEEN AREAS OF WORK AND
OCCUPIED PORTIONS OF THE BUILDING. SEE
PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
BEYOND PRIMARY PROJECT SCOPE
BOUNDARY. REFER TO DRAWINGS AND
DETAILS FOR WORK REQUIRED IN THIS AREA.
PRIMARY CARE SUITE BOUNDARY
AREA OF PHASE 1 WORK. THE MAIN BODY OF
WORK SHALL BE COMPLETED DURING PHASE 1
INCLUDING THE 1ST FLOOR ADDITION.
WORK SHOWN IN THIS AREA BY VA - NOT IN CONTRACT
PHASING GENERAL NOTES
A.
B.
C.
D.
E.
F.
G.
H.
PROJECT SHALL BE COMPLETED IN 2 MAIN PHASES. SEE INFECTION CONTROL /
PHASING FLOOR PLAN FOR LOCATIONS.
SCHEDULE AND TIME OF CONSTRUCTION WORK FOR ALL PHASES SHALL BE
APPROVED BY COR AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN.
PROVIDE PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE. THIS INCLUDES WORK REQUIRED ABOVE AND BELOW
THE FLOOR PLAN OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK OUTSIDE OF INDICATED PROJECT BOUNDARY AND IN THE
BASEMENT IS REQUIRED - COORDINATE WORK RESTRICTIONS WITH VA. CEILING
TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED
BY CONTRACTOR. FOR WORK IN VA OCCUPIED SPACES, CONTRACTOR SHALL
REPLACE CEILING TILES OR USE VA APPROVED TEMPORARY MATERIALS IN PLACE
OF CEILING TILES TO ALLOW VA ACTIVITES TO CONTINUE UNTIL CONTRACTORS
NEXT TASK IN A PARTICULAR AREA. CONTRACTOR TO SUBMIT SCHEDULE THAT
INDICATES WORK FOR SPECIFIC AREAS AND COORDINATE WITH THE VA FOR
ACCESS.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED DURING
NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF OPERATION.
WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN THE
HOURS OF 6:00 AM AND 5:00 PM AND AS AGREED UPON BY COR SO AS NOT TO
DISTURB SLEEPING PATIENTS IN OTHER AREAS OF THE HOSPITAL. EVERY EFFORT
SHALL BE MADE TO KEEP NOISE AND VIBRATION TO A MINIMUM.
GRAPHIC REPRESENTATION OF AREAS OF WORK AND/OR PHASING PLANS ARE
NOT SUITABLE FOR USE BY THE CONTRACTOR TO ESTIMATE DISTANCES /
QUANTITIES THAT MAY BE REQUIRED TO BE INSTALLED IN THE ACTUAL BUILDING.
CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY AND MEASURE ALL FIELD
CONDITIONS TO INCLUDE (E) ITEMS TO REMAIN THAT THE VA MIGHT NEED
ACCESSIBLE E.G. SWITCHES, CONTROLS, DOORS, ACCESS PANELS,
THERMOSTATS, AIR SUPPLY, AIR RETURN, ETC.
EXISTING PROJECT AREAS WILL BE OCCUPIED BY STAFF AND VETERANS
THROUGHOUT CONSTRUCTION. ALL/ANY WORK REQUIRED IN VA OCCUPIED SPACE
MUST BE SCHEDULED WITH THE COR.
REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS FOR
ADDITIONAL INFORMATION.
REFERS TO SHEETS GI101 AND GI103
AREA OF PHASE 2A, 2B, AND 2C WORK, 1ST
FLOOR ONLY. PHASE 2 WORK IS WITHIN THE
EXISTING BUILDING AND SHALL BEGIN ONCE
PHASE 1 HAS BEEN COMPLETED.
CONTRACTOR SHALL BE REQUIRED TO
COORDINATE PHASE 2 WORK WITH THE COR
AND SUBPHASES SHALL NOT BE ASSUMED
TO BE PERFORMED SIMULTANEOUSLY.
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .1
F W
P ri m a ry
C a re ts a n d e rs g u id o n d e s ig n .c o m
.r v t
CONSTRUCTION DOCUMENTS
GI103
TSKA/JG
1ST FLOOR INFECTION CONTROL /
PHASING PLANS
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1 1/2" = 1'-0"GI103
2 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241
SCALE: 1/4" = 1'-0"GI103
3 TEMPORARY INFECTION CONTROL WALL AND DOOR
SCALE: 3/32" = 1'-0"GI103
1 1ST FLOOR INFECTION CONTROL / PHASING FLOOR PLAN
SCALE: 1" = 100'-0"
KEY PLAN
X X
X X
X X
X
X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X X
X X
X X
X X
X X
X X
X XX X X
X
X
X
X
X
X
X
X X
X X
X
X
X X
X X
X
X
X
X
X
X
X
X
X XX X X
X
X
X
X
X
X
X
X
X
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
STAGING & PARKING LEGEND
FIRST FLOOR EXPANSION
EXISTING AREA OF
BUILDING 1
FENCING WITH GATE
EXISTING BUILDING 1
PROVIDE
CONSTRUCTION
FENCE WITH
GATES AS NOTED
AROUND SITE
FUTURE DOCK.
DO NOT INSTALL ANY
IMPROVEMENTS IN
THIS AREA
CONTRACTOR SHALL AVOID
SOIL COMPACTION AS
PRACTICABLE THIS AREA
PROVIDE CONCRETE WASHOUT
LOCATION. COORDINATE LOCATION
WITH COR.
X X
BUILDING 1
EXPANSION
THIS GATE SHALL BE
CONTRACTOR'S SOLE
ACCESS POINT
X
NO CONTRACTOR TRAFFIC BEYOND
THIS BOUNDARY
SOLE CONTRACTOR
ENTRANCE TO FACILITY
CONTRACTOR'S SECURED AREA.
CONTRACTORS SHALL PARK WITHIN FENCED WORK AREA ONLY
GENERATOR BUILDING 16
LAKE AVE
CONSTRUCTION
SIGN
CONTRACTOR TO PROVIDE
BARRICADE AND SIGNAGE INSIDE
OF BUILDING 16 TO ALERT VA
STAFF TO NOT USE DOORS ON
EAST END OF BUILDING 16
PROVIDE GATE
FOR EMERGENCY
EXIT
NO CONTRACTOR
ACCESS
C
ALL LETTERING
TO BE
PAINTED BLACK
WITH
EXCEPTION OF
PROJECT TITLE
WHICH IS TO BE
BLUE
PAINT BORDER
MEMBER
BLACK ENAMEL
2"x4" [51x102mm]
FRAME AND
BRACES IN
SAME PLANE
METAL FACE
WHITE ENAMEL
2"x4" [51x102mm]
FRAME AND
BRACE IN BACK
BORDER MEMBER
PAINTED BLACK
BACKGROUND TO
BE PAINTED WHITE
METAL FACE
STRETCH METAL
FACE TIGHT, TURN
OVER FRAME AND
SECURE WITH FLAT
HEAD DEFORMED
NAILS.
LETTERING TO BE
HELVETICA STYLE 1 1/2"
[38mm] HIGH TO BE
CENTERED HORIZONTAL
NOTE:
ANY SEAM IN METAL TO
BE FLAT SEAM - SEAMS TO BE
HORIZONTAL AND OCCUR
BETWEEN LINES OF LETTERING.
4"x4" [102x102mm]
POSTS
PAINTED
WHITE
SECTION ON CENTERLINEELEVATION
A/E TO PROVIDE DIGITAL
LOGO AND ADDRESS
THIS SPACE FOR PROJECT TITLE
LETTERING TO BE HELVETICA TYPE 5"
HIGH CENTERED BETWEEN LETTERING
ABOVE AND BELOW ONE OR TWO LINES
DESIGNED AND SUPERVISED BY:
DEPARTMENT OF VETERANS
AFFAIRS WASHINGTON D.C.
GENERAL CONTRACTOR
L
GC TO PROVIDE DIGITAL
LOGO AND ADDRESS
8'-0"
2"
M
A X
6' -0
M A
X
3' -0
A
V E
R A
G E
4' -0
M
IN
CONSTRUCTION LOGISTICS GENERAL NOTES
CONTRACTOR TO PROTECT CLEANOUTS FROM DAMAGE AND
MATERIAL.
CONSTRUCTION FENCE LOCATION AND LAYOUT IS INDICATED
FOR PRICING PURPOSES. FINAL DIMENSIONS AND LAYOUT OF
FENCE TO BE DETERMINED BY CONTRACTOR WITH
APPROVED OF VA COR.
A.
B.
BLUE
BLUE
OUTLINE
WITH WHITE
INTERIOR
JOINT
BRACING
RED
WHITE
BLUE
BRACING SEE
CONSTRUCTION
SIGN DETAIL
01010-1
4"x4" POST
IF SIGN IS INSTALLED
ON GRADE
FIN. GRADE
WOOD STRIPS
ELEVATION
CONTRACTOR'S NAME
THE LIFE YOU SAVE MAY BE YOUR OWN
WITHOUT A LOST TIME ACCIDENT
0 DAYSHAS WORKED
THIS PROJECT
ON SAFETY
in
ZERO
4'-0"
3' -0
V
A R
IE
S
0 0
-3
/4
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .1
F W
P ri m a ry
C a re ts a n d e rs g u id o n d e s ig n .c o m
.r v t
CONSTRUCTION DOCUMENTS
GI104
TSKA/JG
CONSTRUCTION LOGISTICS SITE PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1" = 100'-0"
KEY PLAN
N
SCALE: 3/64" = 1'-0"GI104
1 CONSTRUCTION LOGISTICS SITE PLAN
SCALE: 1" = 1'-0"GI104
2 CONSTRUCTION SIGN
SCALE: 1 1/2" = 1'-0"GI104
3 SAFETY SIGN
DN
LAKE AVENUE
DN
UP
B
DASHED LINES INDICATE APPROXIMATE
AREA OF REDUCED SCOPE OF WORK. THIS
PLAN REFLECTS CONDITION UPON
ACCEPTANCE OF ALTERNATE 'B'.
A
DASHED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .