16965 - PL101 - BASEMENT PLUMBING PLAN.pdf
PDF 942 KB Posted
- Attached to
- Y1DA--Expand First Floor B-1 for PACT - 610-311
- Solicitation number
- 36C25020B0004
About this file
This document contains plans for a basement plumbing project at a Department of Veterans Affairs medical center. The plans show the layout of existing and new plumbing lines in the basement, including water, sanitary waste, and storm drainage piping. Key areas that will be serviced include a decontamination room, locker rooms, a sterile storage area, and space for a future elevator. Notable project details include installing visual site stations to monitor for moisture, connecting drain pans under new piping to a building management system, and tying into existing waste lines below the basement floor. The related federal contract opportunity is to expand the first floor of Building B-1 at the VA medical center to create more primary care exam rooms, as part of the PACT initiative.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CW
HW
HR
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
FD
FD
LV WC
EXST 4"
EXST 2"
EXST LVEXST LV
WC LV
WC2"W
YY
UR
CO
EXST 4"W-DN
EXST 3"W-UP
EXST 4"W-UP&DN
A.4
FD
CAP EXST
1 1/2"CW
1"HW
3/4"HR
2"CW
1 1/4"HW
3/4"HR-UP
3"CW
2 1/2"HW
1 1/2"HR-UP
C W
H W
H R
3"
2 1/2" 1 1/2"
EXST 4"W-DN
CO
COEC
2"W 2"
4"
2" 4"
3"
2"
3" 3"
FD FD
2"W
1 1/2"V-UP
4"W
SK
4"W
2"
3"
4"
EXST 6"W-DN
5"STM-UP
3"V-UP
4"W-UP
EXST 6"
EXST 6"W-DN
EXST 6"
EXST 6"
S T
M
EXST 6"
EXST 8"
EXST 6"
EXST 2"
2" 4"
2" 4"
SKSK
1 1/2" 1 1/2"
4"
CO
CO
5"STM-UP
4"W-UP
3"V-UP
DRAIN PAN W/
WATER SENSOR
MONITOR/BMS
FUTURE
ELEVATOR
SK
CO
4"W-UP 3"V-UP
4"STM-UP
4"
4"
CO
4"W
SKSK SK4"
DOUBLE
WALL PIPE
4"STM-UP
4"W-UP 3"V-UP
FUTURE
ELEVATOR
CO
EXST 6"W-DN
4"
4"
4"W-UP
5"STM-UP
3"V-UP
EXST 3"
EXST 3"
1 1/2"2"3"
4"
SKSKSKSK
DOUBLE
WALL PIPE
SKSK
2"
1 1/2"
VISUAL
STATION/BMSVISUAL
STATION/BMS
4"
RELOCATED
SUMP PUMP & PIT
5"STM-UP
3"V-UP
4"W-UP
1 1/2"
4"
4"W
SK SK SK SK
1 1/2"
CO 2" 2" 1 1/2"
SK
1 1/2"1 1/2"
EXST 4"W-DN
2"
2"
2"
SKSKSK
2"
4"
SK
CO
DOUBLE WALL PIPE
DOUBLE WALL PIPE
4"V-UP
EXST 6"W-DN
5"STM-UP
3"
SK
CO
4"
4"
2"
4"
EXST 4" EXST 3"
EXST 1 1/2"
EXST 2"
2"
4"
4"
EXST 6"STM-DN
EXST 6"STM-DNEXST 8"STM-DN
4"W-UP
EXST 3"
49C
WATER
TREATMENT
ROOM 82
BIOMETRICS
53A
OIT
PHARMACY
STORAGE
B-2
STAIR
59C59B 59A
60A
60B
ROOM
B-C-102
DECONTAMINATION
B-C-103D
SPS
ASSISTANT
OFFICE
B-C-106C
PREP/ASSEMBLY
B-C-103A
WOMENS
LOCKER
ROOM
B-C-103B
MENS
LOCKER
ROOM
B-C-113
STERILE/
NON-STERILE
STORAGEB-C-106G
HAC
B-C-114
HAC
B-C-116
OFFICE
B-C-112
LOGISTICS
CLERICAL
B-C-C3
CORRIDOR
B-C-EL3
OFFICE
(FUTURE
ELEVATOR)
B-C-109B
WOMENS
LOCKER
ROOM
B-C-109A
MENS
LOCKER
ROOM
B-C-109
LOUNGE,
STAFF
B-C-106A
PPE
AREA
B-C-106E
SCOPE
STERILIZATION
B-C-102C
SCOPE
DECONTAMINATION
B-C-101
STORAGE
(FUTURE
EQUIP
ROOM) B-C-102B
STORAGE
(FUTURE
DUMBWAITER)
4"
3"
4"
3"
3"
4"
4"
3"
4"
4" 4"
2"
EXST 4"W-DN
EXST WCO
B-C-106F
STORAGE
(FUTURE
DUMBWAITER)
B-C-106B
CART
PREP
B-C-102D
AUTOMATIC
CART
WASH
3"
1 1/2"
CO
4"
3"
VISUAL STATION/BMS
DRAIN PAN W/
WATER SENSOR
MONITOR/BMS
1 1/2"
4"
6"
CO
CO
VISUAL
STATION/BMS
C W
H W
H R
HW
HW
CW
HW
H R
H W
C W
HR
CW
HW
HR
HW
CW
EXST 2"
EXST 1 1/4"
EXST 1/2"
EXST 3/4"
EXST 3/4"
EXST 2"
EXST 2 1/2"
3/4" HOSE
BIBB
EXST 3/4" EXST 2"
EXST 1 1/2"
EXST 1"
EXST 1"
28.2 35343332313029282623.8 2524
3/4"
3/4"CW MAKE-UP
FOR HVAC SYSTEM
1 1/2"
EXST 2"
4"
EX AD
EXST 4"
PIPING IN THIS AREA
BELOW BASEMENT FLOOR
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
KEY NOTES:
LOCATE VISUAL SITE STATION 6" BELOW CEILING EXPOSED ON
WALL. PROVIDE MOISTURE SENSOR AND CONNECT MOISTURE
SENSOR TO HOSPITAL BUILDING MANAGEMENT SYSTEM.
DRAIN PAN SHALL BE MINIMUM OF 4" HIGH. LOCATE DRAIN PAN
UNDER NEW PIPING. DRAIN PAN SHALL BE MINIMUM OF TWO
TIMES THE PIPE SIZE. PROVIDE MOISTURE SENSOR AND
CONNECT MOISTURE SENSOR TO HOSPITAL BUILDING
MANAGMENT SYSTEM.
SEE DRAWING PL100 FOR ADDITIONAL NOTES.
DRAIN BOX FOR 1" CONDENSATE LINE. DRAIN BOX, GUY GRAY,
MODEL# DBSS2DLV. CONNECT 2" WASTE LINE TO EXISTING
WASTE LINE UNDER SLAB.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN.
46204
317.800.6388 | WWW.GUIDONDESIGN.COMSUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING,
INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\b a rt s c h
\D o c u m e n ts \1
V
A F t W a y n e
R d e ta c h e d b a rt s c h
Y E
F Q
.r v t
2 RFI #1 2020/07/28
CONSTRUCTION DOCUMENTS
PL101
MABCJM
BASEMENT PLUMBING PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
BASEMENT PLUMBING PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
19447
2020/7/28
| Sheets |
| PD101 - BASEMENT PLUMBING REMOVAL PLAN |
| PL101 - BASEMENT PLUMBING PLAN |
File details come from the government source that posted it. Updated .