16.1045 - 2020.7.16 - Addendum 1 Revised Sheets.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--Expand First Floor B-1 for PACT - 610-311
- Solicitation number
- 36C25020B0004
About this file
This document provides details on a federal solicitation opportunity. The solicitation number is 36C25020B0004 for the project named "Y1DA--Expand First Floor B-1 for PACT - 610-311". The opportunity type is a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 to expand the first floor of B-1 for PACT at location 610-311. Responses to the solicitation are due on an unspecified date, and the award date is also unspecified. The solicitation seeks contractor services to expand the first floor of the specified building for the PACT program at the listed Veterans Affairs location, but does not provide pricing terms, set asides, incumbent contractor information or other salient details.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA
MAP
VICINITY MAP
CAMPUS MAP
FORT WAYNE VA CAMPUS
FORT WAYNE VA CAMPUS
N
N
N
AREA OF
EXPANSION
EXISTING
PRIMARY CARE -
1ST FLOOR AREA
R A
N D
A
LL
A D
R
IV
E
LAKE AVENUE
BUILDING 1
BLDG 2
BLDG 3
B 7
B 10
B 6B 5
DEDUCTIVE BID ALTERNATE SUMMARY
A.
B.
C.
D.
E.
F.
G.
H.
I.
OMIT ADDITIONAL PARKING AREA AND ALL ASSOCIATED SITE WORK FROM PROJECT SCOPE
OMIT FROM PROJECT SCOPE THE NEW PRIMARY CARE ENTRANCE VESTIBULE AND ASSOCIATED ROOF, DOORS, CURTAIN WALL, ETC. OMIT ALSO THE SMALLER 'CONNECTION' CANOPY; THE LARGER DROP OFF CANOPY IS TO REMAIN. THE MAIN PATH TO THE PRIMARY CARE SUITE SHALL BE THROUGH THE BUILDING'S
MAIN ENTRANCE.
OMIT EXTENSION OF STAIRWAY 1-C-ST1 ABOVE FIRST FLOOR ROOF. OMIT NEW STAIRWAY AND HANDRAIL EXTENSION IN STAIR 1-C-ST2, EXISTING STAIR SHALL REMAIN. PROVIDE ROOF HATCH IN STAIRWAY 1-C-ST1 FOR ROOF ACCESS, REFER TO SPECIFICATIONS. FIRST FLOOR ROOF SHALL EXTEND TO PARAPET ABOVE
OMITTED STAIRWAY EXTENSION TO CREATE A SINGLE, LEVEL ROOF SURFACE.
OMIT INSULATED METAL WALL PANEL WHERE INDICATED ON GI106 FROM PROJECT SCOPE AND REPLACE WITH 2" RIGID INSULATION AND BRICK VENEER; REFER TO SIMILAR WALL SECTIONS FOR CONSTRUCTION.
REMOVE SUNSHADES FROM SCOPE OF PROJECT.
OMIT SLIDING EXAM DOOR ASSEMBLIES AND STOREFRONT DOOR SYSTEMS, INCLUDING ACCESS
CONTROLS, FROM INTERIOR SCOPE OF PROJECT. PROVIDE HOLLOW METAL FRAMES, SOLID CORE WOOD
SWING DOORS, AND STORAGE LOCKSET IN LIEU OF OMITTED SLIDING DOORS.
OMIT FROM PROJECT SCOPE 15'-0" (1 BAY) OF THE DROP OFF CANOPY FROM THE EAST END
OMIT FROM PROJECT SCOPE 30'-0" (2 BAYS) OF THE DROP OFF CANOPY FROM THE EAST END
OMIT REMAINING PORTION OF LARGE DROP OFF CANOPY (3 BAYS).
OMIT SELECT LANDSCAPING COMPONENTS, REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
FULL DESCRIPTIONS AND ADDITIONAL INFORMATION INDICATED ON SHEETS GI105, GI106, GI107, AND SPECIFICATIONS
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN.
46204
317.800.6388 | WWW.GUIDONDESIGN.COMSUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING,
INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\t s a n d e rs \D o c u m e n ts
\1 .1
F W
P ri m a ry
C a re A ts a n d e rs g u id o n d e s ig n .c o m
.r v t
1 AMENDMENT NO.1 2020/07/16
CONSTRUCTION DOCUMENTS
GI000
TSKA/JG
COVER SHEET
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
VA NORTHERN INDIANA HEALTHCARE SYSTEM,
FORT WAYNE, IN
VA PROJECT NO. 610-311
EXPAND BUILDING 1
1ST FLOOR PRIMARY CARE
CONSTRUCTION DOCUMENTS
APRIL 16, 2019
SHEET LIST
SHEET # SHEET NAME
LS501 LANDSCAPE DETAILS
STRUCTURAL SHEETS
SI001 ABBREVIATIONS AND SYMBOLS
SI002 GENERAL STRUCTURAL NOTES
SI003 LOAD MAPS
SF101 EXISTING FIRST FLOOR FRAMING PLAN
SF102 SECOND FLOOR FRAMING PLAN
SF103 SECOND FLOOR SLAB REINFORCEMENT TIE PLAN
SF104 HIGH ROOF FRAMING PLAN
SF201 CANOPY SECTIONS
SF202 WALL ELEVATIONS
SF401 ENLARGED FRAMING PLANS
SF501 TYPICAL FRAMING SECTIONS AND DETAILS
SF502 FRAMING SECTIONS AND DETAILS
SF601 CONCRETE BEAM SCHEDULE
SF602 CONCRETE JOIST SCHEDULE
SF603 CONCRETE COLUMN SCHEDULE AND DETAILS
SF901 ISOMETRICS
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD101 BASEMENT DEMOLITION PLAN
AD102 1ST FLOOR AND BASEMENT ROOF DEMOLITION PLAN
AD201 DEMOLITION BUILDING ELEVATIONS - SOUTH
AD202 DEMOLITION BUILDING ELEVATIONS - EAST, WEST, AND NORTH
AD311 DEMOLITION WALL SECTIONS
AD312 DEMOLITION WALL SECTIONS
AS100 OVERALL SITE PLAN
AS101 BASEMENT CONSTRUCTION PLAN
AS102 1ST FLOOR DIMENSION PLAN
AS103 1ST FLOOR CONSTRUCTION PLAN
AS104 1ST FLOOR ROOF AND 2ND FLOOR CONSTRUCTION PLAN
AS105 2ND FLOOR ROOF AND 3RD FLOOR CONSTRUCTION PLAN
AS106 ARCHITECTURAL SITE PLAN AND CANOPY PLAN
AS111 1ST FLOOR REFLECTED CEILING PLAN
AS201 BUILDING ELEVATIONS
AS202 BUILDING ELEVATIONS
AS203 BUILDING ELEVATION - WEST AND ENLARGED CANOPY ELEVATIONS
AS311 WALL SECTIONS - NEW 1ST FLOOR - VESTIBULE
AS312 WALL SECTIONS - NEW 1ST FLOOR - RELIEF AIR CHASE AND UTILITY CHASE
AS313 WALL SECTIONS - NEW 1ST FLOOR
AS314 WALL SECTIONS
AS315 WALL SECTIONS - EXISTING 1ST FLOOR
AS321 STAIR PLANS AND SECTIONS
AS401 ENLARGED TOILET PLANS AND ELEVATIONS
AS402 ENLARGED PLANS AND ELEVATIONS
AS501 PLAN DETAILS
AS502 WALL SECTION DETAILS - BASE
AS503 WALL SECTION DETAILS - HEAD
AS504 WALL SECTION DETAILS - PARAPET
AS505 ROOF DETAILS
AS506 CANOPY & EXTERIOR SIGN DETAILS
AS601 DOOR AND WINDOW SCHEDULES
AS602 DOOR AND WINDOW ELEVATIONS AND DETAILS
AS603 FINISH SCHEDULES & SIGNAGE TYPES
AS604 SIGNAGE PLAN
AS901 INTERIOR SECTIONS AND DETAILS
AS902 INTERIOR SECTIONS AND DETAILS
AF101 1ST FLOOR FLOOR FINISH PLAN
AF102 1ST FLOOR WALL FINISH PLAN
AF103 ENLARGED FLOOR FINISH PLANS
AQ101 1ST FLOOR EQUIPMENT PLAN
FIRE PROTECTION
FP100 FIRE PROTECTION NOTES, DETAILS, & DIAGRAM
FP101 BASEMENT FIRE PROTECTION PLAN
FP102 FIRST FLOOR FIRE PROTECTION PLAN
PLUMBING
PD101 BASEMENT PLUMBING REMOVAL PLAN
PD102 FIRST FLOOR PLUMBING REMOVAL PLAN
PL100 PLUMBING, LEGEND, DETAILS & NOTES
PL101 FOUNDATION PLUMBING PLAN
PL102 BASEMENT PLUMBING PLAN
PL103 FIRST FLOOR PLUMBING PLAN
PL104 ROOF PLUMBING PLAN
PL105 DIAGRAMS & ENLARGED PLUMBING PLANS
PL106 WASTE & VENT PIPING DIAGRAM
MECHANICAL
MD101 BASEMENT MECHANICAL DUCT REMOVAL PLAN
MD102 FIRST FLOOR MECHANICAL DUCT REMOVAL PLAN
MD103 SECOND FLOOR MECHANICAL REMOVAL PLAN
MD111 BASEMENT MECHANICAL PIPING REMOVAL PLAN
MD112 FIRST FLOOR MECHANICAL PIPING REMOVAL PLAN
MH101 BASEMENT MECHANICAL DUCT PLAN
MH102 FIRST FLOOR MECHANICAL DUCT PLAN
MH103 SECOND FLOOR ROOF MECHANICAL PLAN
MH301 MECHANICAL SECTIONS
MI101 MECHANICAL ABBREVIATIONS AND LEGEND
MI102 MECHANICAL SCHEDULES
MI103 MECHANICAL DETAILS
MI104 MECHANICAL DETAILS
MI105 MECHANICAL DETAILS
MI106 MECHANICAL DETAILS
MI107 CHILLED WATER FLOW DIAGRAMS
MI108 HOT WATER FLOW DIAGRAM
MI109 TEMP CONTROL
MI110 TEMP CONTROL
MI111 TEMP CONTROL
MI112 TEMP CONTROL
MP101 BASEMENT MECHANICAL PIPING PLAN
MP102 FIRST FLOOR MECHANICAL PIPING PLAN
ELECTRICAL
ED100 ELECTRICAL GENERAL NOTES, LEGEND, AND KEY PLANS
ED101 FIRST FLOOR ELECTRICAL REMOVAL PLAN
EJ101 ELECTRICAL DATA & COMMUNICATIONS DETAILS
EJ102 ELECTRICAL DETAILS
EJ103 ELECTRICAL DETAILS
EJ104 LIGHTING SCHEDULE, MOTOR CONTROL SCHEDULE & DIAGRAMS
EL101 FIRST FLOOR LIGHTING PLAN
EP101 BASEMENT POWER AND SYSTEMS PLAN
EP102 FIRST FLOOR POWER PLAN
EP103 SECOND FLOOR AND ROOF POWER PLAN
EP104 PANEL SCHEDULES
EP105 PANEL SCHEDULES
EP110 ELECTRICAL ONE-LINE DIAGRAM
ES101 SITE LIGHTING PLAN
EY102 FIRST FLOOR SYSTEMS PLAN
EY103 FIRST FLOOR VGIA WIRLESS ACCESS PLAN
SHEET LIST
SHEET # SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 BASEMENT LIFE SAFETY PLAN AND INFECTION CONTROL PLANS
GI102 1ST FLOOR LIFE SAFETY FLOOR PLAN
GI103 1ST FLOOR INFECTION CONTROL / PHASING PLANS
GI104 CONSTRUCTION LOGISTICS SITE PLAN
GI105 DEDUCTIVE BID ALTERNATES 'A' AND 'B'
GI106 DEDUCTIVE BID ALTERNATES 'C' AND 'D'
GI107 DEDUCTIVE BID ALTERNATES 'E' AND 'H'
CIVIL
VF101 TOPOGRAPHIC SURVEY
CC001 GENERAL CIVIL NOTES
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS102 SITE PLAN - ALTERNATE A
CS501 SITE DETAILS
CS502 SITE DETAILS
CG101 GRADING PLAN
CG102 GRADING SECTIONS
CG103 GRADING PLAN - ALTERNATE A
CU101 UTILITY PLAN
CU102 STORMWATER PROFILES
CU103 UTILITY PLAN ALT - ALTERNATE A
CU501 UTILITY DETAILS
CU502 UNDERGROUND STORAGE DETAILS
CU503 UNDERGROUND STORAGE DETAILS
CJ101 EROSION CONTROL PLAN
CJ501 EROSION CONTROL DETAILS
CJ502 SWPPP
LS101 LANDSCAPE PLAN
LS102 LANDSCAPE PLAN
Contact:Contact:Contact:Contact: Contact:
BCCLT
WILLIAM HOSMON, PE
MECHANICAL ENGINEER
MECHANICAL,
ELECTRICAL &
PLUMBING
GUIDON DESIGN INC.
MARK VANDERWOUDE, PE
STRUCTURAL ENGINEER
STRUCTURAL
ENGINEER
GUIDON DESIGN INC.
STACEY PAUL, PE
SR. PROJECT MANAGER
1221 N. Pennsylvania Indianapolis, IN 46202 p: 317.800.6388 x 104 e:spaul@guidondesign.com
CIVIL
ENGINEER
VA NORTHERN INDIANA HEALTH
CARE SYSTEM
OWEN WATLEY
COR, ENGINEERING SERVICES
2121 Lake Ave Fort Wayne, Indiana 46805 p: 765-603-7023 e: owen.watley@va.gov
OWNER
GUIDON DESIGN INC.
JOEL FARMER, AIA ACHA
PRINCIPAL, VICE PRESIDENT OF ARCHITECTURE
PROJECT MANAGER
1221 N. Pennsylvania Indianapolis, IN 46202 p: 317.800.6388 x 146 e: jfarmer@guidondesign.com
ARCHITECT
1221 N. Pennsylvania Indianapolis, IN 46202 p: 317.800.6388 x 119 e: mvanderwoude@guidondesign.com
4031 Transportation Drive Fort Wayne, In 46818 p: (812) 423-4407 e: hosmon@bcclt.com
TYLER SANDERS, RA
PROJECT ARCHITECT
p: 317.800.6388 x 126 e: tsanders@guidondesign.com
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
CC001
GENERAL CIVIL NOTES
7/17/2020ADDENDUM 1
18"
BUILDING 1
5-STORY BRICK BUILDING
F.F. ELEV: 759.19
BUILDING 16
1-STORY BLOCK BUILDING
METAL SIGN
METAL SIGN
METAL SIGN
8" BRICK
WALL
METAL SIGN
GATE
BASEMENT
FF: 759.19
L
2'x2'
METAL LID
8" BRICK
WALL
PARK 3
ASPHALT
ASPHALT
ASPHALT
CONC
0 4020
CD101
DEMOLITION PLAN
N
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
ADDENDUM 1 7/17/2020
METAL SIGN
8" BRICK
WALL
2'x2'
METAL LID
ASPHALT
ASPHALT
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
0 4020
N
CS101
SITE PLAN
8" BRICK
WALL
2'x2'
METAL LID
ASPHALT
ASPHALT
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
CS102
SITE PLAN - ALTERNATE A
0 4020
N
24"
BUILDING 1
5-STORY BRICK BUILDING
F.F. ELEV: 759.19
BUILDING 16
1-STORY BLOCK BUILDING
METAL SIGN
8" BRICK
WALL
METAL SIGN
10" CONC. WALL &
CHAIN-LINK FENCE
GATE
BASEMENT
FF: 759.19
30"x30"
METAL LID
L
L
L
30"x30"
METAL LID
2'x2'
METAL LID
8" BRICK
WALL
PARK 3
ASPHALT
ASPHALT
CONC
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
0 4020
N
CS103
SITE PLAN
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
CS503
SITE DETAILS
8" BRICK
WALL
2'x2'
METAL LID
WALL
ASPHALT
ASPHALT
CONC
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
CG101
GRADING PLAN
0 4020
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
CG102
GRADING SECTIONS
8" BRICK
WALL
2'x2'
METAL LID
ASPHALT
ASPHALT
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
CG103
GRADING PLAN - ALTERNATE A
0 4020
BUILDING 1
5-STORY BRICK BUILDING
F.F. ELEV: 759.19
BUILDING 16
1-STORY BLOCK BUILDING
METAL SIGN
METAL SIGN
METAL SIGN
8" BRICK
WALL
BASEMENT
FF: 759.19
L
2'x2'
METAL LID
8" BRICK
WALL
PARK 3
ASPHALT
ASPHALT
ASPHALT
CONC
0 4020
N
CU101
UTILITY PLAN
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
CU102
STORMWATER PROFILES
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
8" BRICK
WALL
2'x2'
METAL LID
ASPHALT
ASPHALT
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
CU103
UTILITY PLAN - ALTERNATE A
0 4020
24"
BUILDING 1
5-STORY BRICK BUILDING
F.F. ELEV: 759.19
BUILDING 16
1-STORY BLOCK BUILDING
METAL SIGN
METAL SIGN
METAL SIGN
8" BRICK
WALL
METAL SIGN
BASEMENT
FF: 759.19
L
2'x2'
METAL LID
8" BRICK
WALL
PARK 3
ASPHALT
ASPHALT
ASPHALT
CONC
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
0 4020
CJ101
EROSION CONTROL PLAN
8" BRICK
WALL
2'x2'
METAL LID
ASPHALT
ASPHALT
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
0 2010
LS101
LANDSCAPE PLAN
N
N
N
N
8" BRICK
WALL
2'x2'
METAL LID
ASPHALT
ASPHALT
AS
SHOWN
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204
317.800.6388 | WWW.GUIDONDESIGN.COM
SUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING, INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C :\U se rs
\ts an de rs
\D oc um en ts \1
6.
FW
P rim ar y C ar e_ ts an de rs
.rv t
CONSTRUCTION DOCUMENTS
DWCKJC2020/07/17
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
STATE OF
PE 10302594
ST
AC
EY L. PAUL
RE
GISTERED
INDIA NA
PROFESSI ONAL EN
GI
N
EE
R
0 2010
LS102
LANDSCAPE PLAN - ALT. G
N
N
N
N
UP
UP
XX
WW
WW
YY
ZZ
A
B
B.5
23.9
23.9
28.2
28.2
30.1
30.1
30.5
30.5
31.9
31.9
32.9
32.9
33.9
33.9
35.1
35.1
36.2
36.2
C
C
A.4
AD202
AD311
AD312
AD312
AD312
AD312
WOMENS
LOCKER
ROOM
B-C-103A
MENS
LOCKER
ROOM
B-C-103B
SPS
ASSISTANT
OFFICE
B-C-103D
PREP/ASSEMBLY
B-C-106C
STERILE/
NON-STERILE
STORAGE
B-C-113
HAC
B-C-106G
STORAGE
(FUTURE
DUMBWAITER)
B-C-106F
STORAGE
(FUTURE
EQUIP.
ROOM)
B-C-113A
MENS
LOCKER
ROOM
B-C-109A
WOMENS
LOCKER
ROOM
B-C-109B
CORRIDOR
B-C-C3
HAC
B-C-114
OFFICE
B-C-116
OFFICE
(FUTURE
ELEVATOR)
B-C-EL3
STORAGE
(FUTURE
EQUIP
ROOM)
B-C-101
STORAGE
(FUTURE
DUMBWAITER)
B-C-102B
ROOM
WATER
TREATMENT
49C
WAREHOUSE
B-C-115
STERILIZER
ACCESS
B-C-106D
LOGISTICS
DIRECTOR
C-112B
LOGISTICS
CLERICAL
B-C-112
LOGISTICS
SUPERVISOR
B-C-112A
PURCHASING
B-C-111
VESTIBULE
B-C-110
CORRIDOR
B-C-C2
PPE AREA
B-C-106A
CONERENCE
ROOM /
TRAINING
B-C-105
OIT CLOSET
B-C-107
SPS
DIRECTOR
B-C-104A
CUBICLE,
CLERICAL
STAFF
B-C-104
SCOPE
STERILIZATION
B-C-106E
OFFICE
(FUTURE
ELEVATOR)
B-C-EL2
OFFICE
(FUTURE
ELEVATOR)
B-C-EL1
HAC
B-C-102A
CORRIDOR
B-C-C1
LOUNGE
B-C-103
PPE AREA
B-C-103C
CHILLER
B-C-100
STAIR 1
B-C-ST1
ELECTRICAL
B-C-108
LOUNGE,
STAFF
B-C-109
SCOPE
DECONTAMINATION
B-C-102C
DECONTAMINATION
B-C-102
AUTOMATIC
CART
WASH
B-C-102D
CART PREP
B-C-106B
STAIRS
B-C-ST2
PHARMACY
STORAGE
OIT
53A
BIOMETRICS
MAIL ROOM
575859C59B59A
51 52
45B
49B
28.324.1
28.5
28.628.6
28.728.7
28.8
28.928.9
35343332313029282623.8 2524
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
DEMOLITION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
REMOVE METAL STUD AND/OR BLOCK AND GWB PARTITION BELOW WINDOW OR DOOR COMPLETE.
CONSTRUCTION ABOVE WINDOW AND CEILING CONSTRUCTION SHALL REMAIN.
REMOVE METAL STUD AND GWB PARTITION COMPLETELY.
REMOVE DOOR AND FRAME COMPLETELY. DELIVER DOOR AND HARDWARE TO VA.
REMOVE ACOUSTICAL PANEL CEILING COMPLETELY WITHIN INDICATED ROOM, OR BACK TO EXTENT INDICATED BY DEMOLITION PLAN NOTE 6. CEILING REMOVAL INCLUDES CEILING MOUNTED ITEMS INCLUDING LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. REFER TO MEP DRAWINGS FOR ADDITIONAL
SCOPE OF REMOVAL.
REMOVE CARPET OR RESILIENT FLOORING, RESILIENT BASE, AND ASSOCIATED ADHESIVE COMPLETE DOWN TO CONCRETE FLOOR SLAB WITHIN INDICATED ROOM OR TO EXTENT INDICATED BY DEMOLITION
PLAN NOTE 6.
DASHED LINE INDICATES APPROXIMATE EXTENT OF DEMOLITION. COORDINATE WITH NEW WORK FOR
ADDITIONAL INFORMATION.
REMOVE WALL PROTECTION AND/OR HANDRAILS / GUARDRAILS.
REMOVE PLUMBING FIXTURE AND ASSOCIATED ACCESSORIES COMPLETE. RETURN TO VA.
REMOVE ALL WALL MOUNTED ITEMS THIS ROOM.
REMOVE WINDOW ASSEMBLY INCLUDING MOUNTING HARDWARE COMPLETE.
REMOVE MASONRY CLADDING COMPLETE INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL CONCRETE. BLOCK AND/OR METAL STUDS TO REMAIN. SCOPE OF REMOVAL SHALL BE FROM FIRST FLOOR SLAB UP TO STEEL LINTEL ABOVE WINDOWS ON FIRST FLOOR. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. REFER TO DEMOLITION WALL SECTIONS AS
NOTED.
REMOVE EXISTING WALL CONSTRUCTION COMPLETE FROM FIRST FLOOR SLAB UP TO EXISTING STEEL
LINTEL AND BETWEEN COLUMNS. THIS REMOVAL SHALL INCLUDE METAL STUD AND BLOCK
CONSTRUCTION, SHEATHING, INSULATION, CLADDING, HARDWARE, AND ACCESSORIES. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A
SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. SEE NEW WORK FOR ADDITIONAL
INFORMATION. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN INTEGRITY OF CONSTRUCTION TO
REMAIN.
REMOVE AND SALVAGE ALL ROOF DRAINS IN BASEMENT ROOF FOR REINSTALLATION IN FIRST FLOOR ROOF, REFER TO PLUMBING DRAWINGS. PROVIDE NEW ROOF DRAINS MATCHING EXISTING IF SALVAGED
MATERIAL EXHIBITS ANY DAMAGE.
REMOVE / RELOCATE MECHANICAL EQUIPMENT, REFER TO MECHANICAL DRAWINGS.
REMOVE METAL SCREEN WALL AND TUBE POSTS COMPLETELY, INCLUDING ATTACHMENT PLATES /
HARDWARE. EMBEDS FLUSH W/ FACE OF WALL TO REMAIN.
REMOVE LOUVER COMPLETELY, VERIFY WITH VA WHETHER LOUVERS ARE TO BE TURNED OVER TO VA
OR DISPOSED. REFER TO WALL SECTIONS FOR INFILL CONSTRUCTION.
REMOVE METAL PANEL SYSTEM COMPLETELY BACK TO STRUCTURAL ELEMENTS.
INTERIOR/EXTERIOR STAIR ASSEMBLIES TO BE REMOVED.
REMOVE METAL STUD AND METAL PANEL PARAPET, INCLUDING CANT, COMPLETELY DOWN TO FIRST
FLOOR SLAB IN PREPARATION FOR FIRST FLOOR ADDITION.
REMOVE AREA OF METAL DECK FOR VERTICAL PENETRATIONS.
REMOVE ROOFING ASSEMBLY IN ITS ENTIRETY INCLUDING EPDM MEMBRANE, RECOVERY BOARD, 4" RIGID INSULATION, COPING, FLASHING, BLOCKING, ETC. DOWN TO CONCRETE DECK IN PREPARATION FOR FIRST FLOOR ADDITION. MAINTAIN WATER TIGHT CONDITIONS TO PREVENT WATER ENTERING
FINISHED SPACES BELOW.
REMOVE CEILING TILES, GRID SHALL REMAIN.
REMOVE PORTION OF GUARDRAIL AND HANDRAIL TO ACCOMMODATE NEW STAIR AND ASSOCIATED
GUARDRAIL AND HANDRAIL. REFER TO CONSTRUCTION PLAN.
REMOVE WALL MOUNTED DOWN LIGHT.
REMOVE AND SALVAGE MED GAS VALVES FOR REINSTALLATION.
REMOVE WALKWAY PADS COMPLETE.
CAREFULLY REMOVE SECURITY CAMERA AND SALVAGE FOR REINSTALLATION. CONTRACTOR TO
REINSTALL AND RETURN TO OPERATION SAME-DAY.
REMOVE THIN SET FLOOR AND WALL CERAMIC TILE.
OUTLINE OF EXISTING VERTICAL CHASE TO BE EXTENDED FROM BASEMENT PROJECT.
OUTLINE OF EXISTING VERTICAL CHASE TO BE INFILLED. REFER TO NEW WORK AND STRUCTURAL
DRAWINGS.
OUTLINE OF EXISTING CONCRETE SLAB TO BE REMOVED TO ACCOMMODATE NEW VERTICAL CHASE.
REFER TO NEW WORK.
CAREFULLY REMOVE WALL MOUNTED ARTWORK AND RETURN TO VA.
CAREFULLY REMOVE WALL SWITCH AND FIRE ALARM DEVICES TO ACCOMMODATE NEW WORK. SALVAGE
FOR REUSE.
EXISTING WALL SCONCE TO REMAIN.
REMOVE COUNTERTOP AND ASSOCIATED CASEWORK COMPLETE.
REMOVE MASONRY CLADDING COMPLETELY INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL BLOCK. BLOCK AND/OR METAL STUDS SHALL REMAIN. SCOPE OF REMOVAL SHALL BE FROM STEEL LINTEL ABOVE WINDOWS TO STEEL LINTEL ABOVE WINDOWS ON FLOOR ABOVE, OR AS INDICATED
ON ELEVATIONS.
REMOVE EQUIPMENT AND FURNITURE THIS ROOM INCLUDING, BUT NOT LIMITED TO, WALL MOUNTED
CLOCK, COAT HOOKS, MAGAZINE RACKS, CHAIRS, CODE BLUE PULL CORD, AND COMPUTERS.
CONTRACTOR SHALL REINSTALL IN NEW CONSTRUCTION, REFER TO FURNITURE PLAN.
CAREFULLY REMOVE CANOPY COMPLETE TO ACCOMMODATE FIRST FLOOR ADDITION, INCLUDING ALL
GUTTERS AND DOWNSPOUTS.
EXISTING ELECTRICAL PANEL TO REMAIN.
CAREFULLY REMOVE ALL NON-STRUCTURAL ELEMENTS OF EXISTING CANOPY INCLUDING METAL
FRAMING, INSULATION, ROOFING MEMBRANES, GUTTER, DOWNSPOUT, SOFFIT, FASCIA, AND FLASHING, ETC. STRUCTURAL ELEMENTS SHALL REMAIN, INCLUDING EMBED PLATES, CHANNEL BEAMS, STEEL
ANGLES, METAL DECK, BENT PLATES, ETC.
CAREFULLY REMOVE PORTIONS OF FLOORING ONLY FOR INSTALLATION OF NEW WALL AND OPENING, REFER TO NEW WORK. CONTRACTOR SHALL PROVIDE A FINISHED CONDITION IN NEW CONSTRUCTION.
REMOVE ENTIRE STUD AND EIFS WALL TO ALLOW ACCESS TO NEW DUCT WORK AND AREAWAY. REFER
TO MECHANICAL DRAWINGS.
REMOVE PORTION OF WINDOW TO ACCOMMODATE NEW PTAC UNIT. G.C. SHALL INITIATE MEETING WITH ARCHITECT, WINDOW AND PTAC INSTALLER TO CONFIRM COURSE OF ACTION. REFER TO MECHANICAL
DRAWINGS.
REFERS TO SHEETS AD101, AD102, AD201, AND AD202
DEMOLITION GENERAL NOTES CONT'D
REFERS TO SHEETS AD101, AD102, AD201, AND AD202
IN AREAS AFFECTED BY DEMOLITION THAT ALIGN TO AREAS TO REMAIN, DEMOLITION SHALL BE COMPLETED IN A MANNER SUCH THAT NEWLY APPLIED FINISHES ARE INSTALLED IN A SEAMLESS
APPLICATION.
FOR ABOVE CEILING WORK WHERE CEILINGS ARE EXISTING TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR AT HIS/HER EXPENSE. GYPSUM BOARD CEILINGS SHALL BE PATCHED AND PAINTED TO MATCH EXISTING CEILING COLOR. FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY, THE CONTRACTOR SHALL RETURN ANY EXISTING CEILING TO REMAIN TO LIKE NEW CONDITION. THIS SHALL INCLUDE REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND BEYOND PROJECT LIMITS.
COORDINATE FULL SCOPE OF ABOVE CEILING WORK WITH ENGINEERING AND VENDOR DRAWINGS.
WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH
PER NEW FLOORING MANUFACTURER'S RECOMMENDATIONS.
FOR FURNITURE, FIXTURES, EQUIPMENT, AND WALL MOUNTED ACCESSORIES REQUIRED TO BE
REMOVED TO ACCOMMODATE CONSTRUCTION, WHETHER SPECIFICALLY NOTED OR NOT, SALVAGE
FOR REINSTALLATION OR RETURN TO OWNER INCLUDING MOUNTING HARDWARE.
COORDINATE REMOVAL OF OXYGEN, VACUUM, NURSE CALL AND SPECIAL ELECTRICAL ITEMS WITH
ENGINEERING DRAWINGS.
CAREFULLY REMOVE ALL WALL MOUNTED EQUIPMENT / ACCESSORIES FROM WALLS NOTED TO BE
REMOVED. SALVAGE FOR REUSE AND/OR RETURN TO VA.
REFER TO DEMOLITION ELEVATIONS AND WALL SECTIONS FOR ADDITIONAL DEMOLITION SCOPE OF
WORK.
ALL ITEMS THAT ARE INDICATED FOR REMOVAL AND REINSTALLATION MUST BE DOCUMENTED BY THE CONTRACTOR AS TO EXISTING CONDITION / QUALITY PRIOR TO REMOVAL, AND SUCH DOCUMENTATION SHALL BE PROVIDED TO THE VA PRIOR TO REMOVAL UPON REINSTALLATION, IF THE SALVAGED ITEMS
ARE FOUND TO NOT BE IN THE SAME CONDITION AS THEY WERE PRIOR TO REMOVAL, THE
CONTRACTOR SHALL PROVIDE A NEW ITEM OF EQUAL OR HIGHER QUALITY AND PERFORMANCE TO THE
VA, AT NO COST TO THE VA. THE SALVAGED ITEMS SHALL ALSO BE RETURNED TO THE VA.
ASBESTOS ABATEMENT: REVIEW 'Ft. Wayne VAMC Asbestos Reinspection 2016' DOCUMENT PROVIDED WITH CONSTRUCTION DOCUMENTS FOR EXTERIOR WINDOW CAULK ASSUMED TO INCLUDE ASBESTOS.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
E.
F.
G.
H.
DEMOLITION GENERAL NOTES CONT'D
REFERS TO SHEETS AD101, AD102, AD201, AND AD202
EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE DIMENSION FLOOR PLAN AS101,
CONSTRUCTION FLOOR PLAN AS 103 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE APPROXIMATE AND ARE
INTENDED TO GIVE A GENERAL SCOPE OF WORK TO BE REMOVED OR TEMPORARILY REMOVED TO
ACCOMMODATE NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF NEW
CONSTRUCTION.
CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION ASSEMBLIES IN THEIR
ENTIRETY, UNLESS OTHER WISE NOTED, TO ACCOMMODATE NEW CONSTRUCTION.
MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE NEW FINISHES. PATCHED
SURFACES SHALL BE SMOOTH AND UNDETECTABLE.
A.
B.
C.
D.
DEMOLITION GENERAL NOTES
REFERS TO SHEETS AD101, AD102, AD201, AND AD202
COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND REPAIR NECESSARY
TO COMPLETE NEW AND REMODEL CONSTRUCTION SHALL BE INCLUDED. CONTRACTOR SHALL
REMOVE EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR SHALL VISIT
THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED TO BE REMOVED.
REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION SYSTEMS AND DRAWING
NOMENCLATURE.
EXISTING COLUMNS WITHIN THE PROJECT BOUNDARY SHALL REMAIN.
SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE PREFORMED SHALL BE REVIEWED BY COR PRIOR TO CUTTING TO VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS
EXIST. SUCH CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN.
46204
317.800.6388 | WWW.GUIDONDESIGN.COMSUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING,
INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\t s a n d e rs \D o c u m e n ts
\1 .1
F W
P ri m a ry
C a re A ts a n d e rs g u id o n d e s ig n .c o m
.r v t
1 AMENDMENT NO.1 2020/07/16
CONSTRUCTION DOCUMENTS
AD101
TJSKLA
BASEMENT DEMOLITION PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"AD101
1 BASEMENT DEMOLITION PLAN
SCALE: 1" = 100'-0"
KEY PLAN
DN
DN
DN
XX
WWWW
YY
ZZ
A
B
B.5
23.9
23.9
28.2 30.1
30.1
30.5
30.5
31.9
31.9
32.9
32.9
33.9
33.9
36.2
36.2
C
AD201
2 2
4 5
PRIMARY CARE SUITE BOUNDARY
PROCEDURE
RN 2
EXAM 2-2
EXAM 2-1
169A
CLERK 2
RN 1
EXAM 1-2
EXAM 1-1
172A
CLERK 1
GENERAL WAITING
PYXIS
CORRIDOR
1E-1
SMALL CONFERENCE
DIETICIAN
OFFICE
OFFICE
PUBLIC TOILET
HAC
OFFICE
RN
STAIR /
VESTIBULE
1-B-ST3
CLERK 6
STAFF TOILET
EXAM 6-1
148B
EXAM 6-2
148A
TELEHEALTH
MECHANICAL
CORRIDOR
1E-2
SOILED
OFFICE
CLERK 5
EXAM 5-1
EXAM 5-2
154A
RN 5
PHARM. OFFICE
RN 4
EXAM 4-2
EXAM 4-1
158A
CLERK 4
CLERK 3
RN 3
EXAM 3-1
EXAM 3-2
162A
BEH. HEALTH
OFFICE
PHARM. OFFICE
CLEAN UTILITY
169 OFFICE
STAIR
1E-1E
CORRIDOR
1E-3
4 5 4 5
4 5
STAIRS
1-C-ST1
10 10 10 10 10
10 10
101010
111111
BASEMENT ROOF
17 17
AD202
38 38
AD201
AD202
A.4
GENERATOR BUILDING 16
AD202
AD311
AD311
AD312
AD312
AD312
Sim
AD312
AD312
AD311
AD311
AD311
AD311
Sim
AD311
AD311
AD312
Sim
AD312
Sim3
AD312
Sim
TYP. @ WINDOWS
GRID LINE 'C'
TYP.
REMOVE BACK TO EDGE OF WINDOW
REMOVE
CANOPY ABOVE
AS NOTED
REMOVE
CANOPY ABOVE
AS NOTED
REMOVE
CANOPY ABOVE
AS NOTED
3 3
4 4
4 3
13 13
TYP.
FEC
4 5
NO SLAB TO BE
POURED TO
ACCOMMODATE
RELIEF AIR
CHASE
12 11
EDGE OF SLAB FOR 1ST
FLOOR VESTIBULE
4 5
EXISTING CANOPY ABOVE TO REMAIN
AD311
3737 37 37
OA
AI
NOTE: CONTRACTOR SHALL PROVIDE
TEMPORARY CONSTRUCTION AS REQ'D TO
MAINTAIN AIR INTAKE (AI) AND OUTSIDE AIR
(OA)TO AHU 1-E1 DURING CONSTRUCTION ,
RE: MECHANICAL. CONTRACTOR SHALL
ERECT AND MAINTAIN AN ALTERNATIVE AIR
INTAKE TO PREVENT DUST, FUMES,
INSECTS, AND RAIN FROM ENTERING THE
MECHANICAL ROOM 147
AHU 1-E1
WORK SHOWN IN THIS
AREA SHALL BE BY
VA - NIC
WORK SHOWN IN THIS
AREA SHALL BE BY VA -
NIC
WORK SHOWN IN THIS
AREA SHALL BE BY VA -
NIC
35343332313029282623.8 2524
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
I.
J.
K.
L.
M.
N.
O.
P.
Q.
R.
DEMOLITION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
REMOVE METAL STUD AND/OR BLOCK AND GWB PARTITION BELOW WINDOW OR DOOR COMPLETE.
CONSTRUCTION ABOVE WINDOW AND CEILING CONSTRUCTION SHALL REMAIN.
REMOVE METAL STUD AND GWB PARTITION COMPLETELY.
REMOVE DOOR AND FRAME COMPLETELY. DELIVER DOOR AND HARDWARE TO VA.
REMOVE ACOUSTICAL PANEL CEILING COMPLETELY WITHIN INDICATED ROOM, OR BACK TO EXTENT INDICATED BY DEMOLITION PLAN NOTE 6. CEILING REMOVAL INCLUDES CEILING MOUNTED ITEMS INCLUDING LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. REFER TO MEP DRAWINGS FOR ADDITIONAL
SCOPE OF REMOVAL.
REMOVE CARPET OR RESILIENT FLOORING, RESILIENT BASE, AND ASSOCIATED ADHESIVE COMPLETE DOWN TO CONCRETE FLOOR SLAB WITHIN INDICATED ROOM OR TO EXTENT INDICATED BY DEMOLITION
PLAN NOTE 6.
DASHED LINE INDICATES APPROXIMATE EXTENT OF DEMOLITION. COORDINATE WITH NEW WORK FOR
ADDITIONAL INFORMATION.
REMOVE WALL PROTECTION AND/OR HANDRAILS / GUARDRAILS.
REMOVE PLUMBING FIXTURE AND ASSOCIATED ACCESSORIES COMPLETE. RETURN TO VA.
REMOVE ALL WALL MOUNTED ITEMS THIS ROOM.
REMOVE WINDOW ASSEMBLY INCLUDING MOUNTING HARDWARE COMPLETE.
REMOVE MASONRY CLADDING COMPLETE INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL CONCRETE. BLOCK AND/OR METAL STUDS TO REMAIN. SCOPE OF REMOVAL SHALL BE FROM FIRST FLOOR SLAB UP TO STEEL LINTEL ABOVE WINDOWS ON FIRST FLOOR. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. REFER TO DEMOLITION WALL SECTIONS AS
NOTED.
REMOVE EXISTING WALL CONSTRUCTION COMPLETE FROM FIRST FLOOR SLAB UP TO EXISTING STEEL
LINTEL AND BETWEEN COLUMNS. THIS REMOVAL SHALL INCLUDE METAL STUD AND BLOCK
CONSTRUCTION, SHEATHING, INSULATION, CLADDING, HARDWARE, AND ACCESSORIES. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A
SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. SEE NEW WORK FOR ADDITIONAL
INFORMATION. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN INTEGRITY OF CONSTRUCTION TO
REMAIN.
REMOVE AND SALVAGE ALL ROOF DRAINS IN BASEMENT ROOF FOR REINSTALLATION IN FIRST FLOOR ROOF, REFER TO PLUMBING DRAWINGS. PROVIDE NEW ROOF DRAINS MATCHING EXISTING IF SALVAGED
MATERIAL EXHIBITS ANY DAMAGE.
REMOVE / RELOCATE MECHANICAL EQUIPMENT, REFER TO MECHANICAL DRAWINGS.
REMOVE METAL SCREEN WALL AND TUBE POSTS COMPLETELY, INCLUDING ATTACHMENT PLATES /
HARDWARE. EMBEDS FLUSH W/ FACE OF WALL TO REMAIN.
REMOVE LOUVER COMPLETELY, VERIFY WITH VA WHETHER LOUVERS ARE TO BE TURNED OVER TO VA
OR DISPOSED. REFER TO WALL SECTIONS FOR INFILL CONSTRUCTION.
REMOVE METAL PANEL SYSTEM COMPLETELY BACK TO STRUCTURAL ELEMENTS.
INTERIOR/EXTERIOR STAIR ASSEMBLIES TO BE REMOVED.
REMOVE METAL STUD AND METAL PANEL PARAPET, INCLUDING CANT, COMPLETELY DOWN TO FIRST
FLOOR SLAB IN PREPARATION FOR FIRST FLOOR ADDITION.
REMOVE AREA OF METAL DECK FOR VERTICAL PENETRATIONS.
REMOVE ROOFING ASSEMBLY IN ITS ENTIRETY INCLUDING EPDM MEMBRANE, RECOVERY BOARD, 4" RIGID INSULATION, COPING, FLASHING, BLOCKING, ETC. DOWN TO CONCRETE DECK IN PREPARATION FOR FIRST FLOOR ADDITION. MAINTAIN WATER TIGHT CONDITIONS TO PREVENT WATER ENTERING
FINISHED SPACES BELOW.
REMOVE CEILING TILES, GRID SHALL REMAIN.
REMOVE PORTION OF GUARDRAIL AND HANDRAIL TO ACCOMMODATE NEW STAIR AND ASSOCIATED
GUARDRAIL AND HANDRAIL. REFER TO CONSTRUCTION PLAN.
REMOVE WALL MOUNTED DOWN LIGHT.
REMOVE AND SALVAGE MED GAS VALVES FOR REINSTALLATION.
REMOVE WALKWAY PADS COMPLETE.
CAREFULLY REMOVE SECURITY CAMERA AND SALVAGE FOR REINSTALLATION. CONTRACTOR TO
REINSTALL AND RETURN TO OPERATION SAME-DAY.
REMOVE THIN SET FLOOR AND WALL CERAMIC TILE.
OUTLINE OF EXISTING VERTICAL CHASE TO BE EXTENDED FROM BASEMENT PROJECT.
OUTLINE OF EXISTING VERTICAL CHASE TO BE INFILLED. REFER TO NEW WORK AND STRUCTURAL
DRAWINGS.
OUTLINE OF EXISTING CONCRETE SLAB TO BE REMOVED TO ACCOMMODATE NEW VERTICAL CHASE.
REFER TO NEW WORK.
CAREFULLY REMOVE WALL MOUNTED ARTWORK AND RETURN TO VA.
CAREFULLY REMOVE WALL SWITCH AND FIRE ALARM DEVICES TO ACCOMMODATE NEW WORK. SALVAGE
FOR REUSE.
EXISTING WALL SCONCE TO REMAIN.
REMOVE COUNTERTOP AND ASSOCIATED CASEWORK COMPLETE.
REMOVE MASONRY CLADDING COMPLETELY INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL BLOCK. BLOCK AND/OR METAL STUDS SHALL REMAIN. SCOPE OF REMOVAL SHALL BE FROM STEEL LINTEL ABOVE WINDOWS TO STEEL LINTEL ABOVE WINDOWS ON FLOOR ABOVE, OR AS INDICATED
ON ELEVATIONS.
REMOVE EQUIPMENT AND FURNITURE THIS ROOM INCLUDING, BUT NOT LIMITED TO, WALL MOUNTED
CLOCK, COAT HOOKS, MAGAZINE RACKS, CHAIRS, CODE BLUE PULL CORD, AND COMPUTERS.
CONTRACTOR SHALL REINSTALL IN NEW CONSTRUCTION, REFER TO FURNITURE PLAN.
CAREFULLY REMOVE CANOPY COMPLETE TO ACCOMMODATE FIRST FLOOR ADDITION, INCLUDING ALL
GUTTERS AND DOWNSPOUTS.
EXISTING ELECTRICAL PANEL TO REMAIN.
CAREFULLY REMOVE ALL NON-STRUCTURAL ELEMENTS OF EXISTING CANOPY INCLUDING METAL
FRAMING, INSULATION, ROOFING MEMBRANES, GUTTER, DOWNSPOUT, SOFFIT, FASCIA, AND FLASHING, ETC. STRUCTURAL ELEMENTS SHALL REMAIN, INCLUDING EMBED PLATES, CHANNEL BEAMS, STEEL
ANGLES, METAL DECK, BENT PLATES, ETC.
CAREFULLY REMOVE PORTIONS OF FLOORING ONLY FOR INSTALLATION OF NEW WALL AND OPENING, REFER TO NEW WORK. CONTRACTOR SHALL PROVIDE A FINISHED CONDITION IN NEW CONSTRUCTION.
REMOVE ENTIRE STUD AND EIFS WALL TO ALLOW ACCESS TO NEW DUCT WORK AND AREAWAY. REFER
TO MECHANICAL DRAWINGS.
REMOVE PORTION OF WINDOW TO ACCOMMODATE NEW PTAC UNIT. G.C. SHALL INITIATE MEETING WITH ARCHITECT, WINDOW AND PTAC INSTALLER TO CONFIRM COURSE OF ACTION. REFER TO MECHANICAL
DRAWINGS.
REFERS TO SHEETS AD101, AD102, AD201, AND AD202
DEMOLITION GENERAL NOTES CONT'D
REFERS TO SHEETS AD101, AD102, AD201, AND AD202
IN AREAS AFFECTED BY DEMOLITION THAT ALIGN TO AREAS TO REMAIN, DEMOLITION SHALL BE COMPLETED IN A MANNER SUCH THAT NEWLY APPLIED FINISHES ARE INSTALLED IN A SEAMLESS
APPLICATION.
FOR ABOVE CEILING WORK WHERE CEILINGS ARE EXISTING TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR AT HIS/HER EXPENSE. GYPSUM BOARD CEILINGS SHALL BE PATCHED AND PAINTED TO MATCH EXISTING CEILING COLOR.