16.1045 - 2020.7.16 - Addendum 1 Revised Sheets.pdf

PDF 15 MB Posted

Attached to
Y1DA--Expand First Floor B-1 for PACT - 610-311
Solicitation number
36C25020B0004
Issued by

About this file

This document provides details on a federal solicitation opportunity. The solicitation number is 36C25020B0004 for the project named "Y1DA--Expand First Floor B-1 for PACT - 610-311". The opportunity type is a solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 to expand the first floor of B-1 for PACT at location 610-311. Responses to the solicitation are due on an unspecified date, and the award date is also unspecified. The solicitation seeks contractor services to expand the first floor of the specified building for the PACT program at the listed Veterans Affairs location, but does not provide pricing terms, set asides, incumbent contractor information or other salient details.

View the file

Other files

File Type Posted
2020.8.6. Add 3 088000 - Glazing.docx DOCX document
16.1045 - 2020.8.6. Add 3 Civil Sheets.pdf PDF
2020.8.6. Add 3 061000 - Rough Carpentry.docx DOCX document
36C25020B0004 0008.docx DOCX document
16.1045 - 2020.8.6 Addendum 3 Responses.pdf PDF
2020.8.6. Add 3 090600 - SCHEDULE OF FINISHES.docx DOCX document
16.1045 - 2020.8.6. Add 3 Arch Sheets.pdf PDF
2020.8.6. Add 3 083616.13 - BARN DOOR.doc DOC document
16.1045 - 2020.8.6 Revised Sheet MI102.pdf PDF
36C25020B0004 0007.docx DOCX document
36C25020B0004 0006.docx DOCX document
36C25020B0004 0005.pdf PDF
RFI - 7-30-2020.pdf PDF
Masking due to COVID.pdf PDF
RFI - 7-31-2020.pdf PDF
RFI - 7-29-2020.pdf PDF
08 44 13 - Glazed Aluminum Curtain Walls.pdf PDF
16.1045 - 2020.7.28 - Addendum 2.pdf PDF
16965 - PD101 - BASEMENT PLUMBING REMOVAL PLAN.pdf PDF
36C25020B0004 0004.pdf PDF
16965 - PL101 - BASEMENT PLUMBING PLAN.pdf PDF
RFI Form AHS 1 Plumbing.pdf PDF
RFI Form AHS 4 Plumbing.pdf PDF
RFI Form AHS 3 Plumbing.pdf PDF
RFI Form AHS 2 Plumbing.pdf PDF
16.1045 - 2020.7.16 - Addendum 1 Description.pdf PDF
36C25020B0004 0003.pdf PDF
36C25020B0004 0002.docx DOCX document
Sign-in Sheet Sub-Contractors.pdf PDF
Sign-in Sheet Prime Contractors 7-7-2020.pdf PDF
36C25020B0004 0001.docx DOCX document
36C25020B0004.docx DOCX document
610-311 FW Primary Care Drawings STRUCTURAL.pdf PDF
610-311 FW Primary Care Drawings ARCHITECTURAL.pdf PDF
610-311_6.24.2020_FW Primary Care Drawings GENERAL.pdf PDF
610-311 FW Primary Care Drawings MEP.pdf PDF
610-311 FW Primary Care Drawings CIVIL.pdf PDF
36C25020B0004_2.docx DOCX document
Wage Determination - Highway 6-12-20.pdf PDF
36C25020B0004_3.docx DOCX document
Spec Volume 1 - 610-311.pdf PDF
Wage Determination - Building 6-12-20.pdf PDF
Spec Volume 2 - 610-311.pdf PDF
Contractor Certification Regarding Safety and Environmental.pdf PDF
RFI Form.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA

MAP

VICINITY MAP

CAMPUS MAP

FORT WAYNE VA CAMPUS

FORT WAYNE VA CAMPUS

N

N

N

AREA OF

EXPANSION

EXISTING

PRIMARY CARE -

1ST FLOOR AREA

R A

N D

A

LL

A D

R

IV

E

LAKE AVENUE

BUILDING 1

BLDG 2

BLDG 3

B 7

B 10

B 6B 5

DEDUCTIVE BID ALTERNATE SUMMARY

A.

B.

C.

D.

E.

F.

G.

H.

I.

OMIT ADDITIONAL PARKING AREA AND ALL ASSOCIATED SITE WORK FROM PROJECT SCOPE

OMIT FROM PROJECT SCOPE THE NEW PRIMARY CARE ENTRANCE VESTIBULE AND ASSOCIATED ROOF, DOORS, CURTAIN WALL, ETC. OMIT ALSO THE SMALLER 'CONNECTION' CANOPY; THE LARGER DROP OFF CANOPY IS TO REMAIN. THE MAIN PATH TO THE PRIMARY CARE SUITE SHALL BE THROUGH THE BUILDING'S

MAIN ENTRANCE.

OMIT EXTENSION OF STAIRWAY 1-C-ST1 ABOVE FIRST FLOOR ROOF. OMIT NEW STAIRWAY AND HANDRAIL EXTENSION IN STAIR 1-C-ST2, EXISTING STAIR SHALL REMAIN. PROVIDE ROOF HATCH IN STAIRWAY 1-C-ST1 FOR ROOF ACCESS, REFER TO SPECIFICATIONS. FIRST FLOOR ROOF SHALL EXTEND TO PARAPET ABOVE

OMITTED STAIRWAY EXTENSION TO CREATE A SINGLE, LEVEL ROOF SURFACE.

OMIT INSULATED METAL WALL PANEL WHERE INDICATED ON GI106 FROM PROJECT SCOPE AND REPLACE WITH 2" RIGID INSULATION AND BRICK VENEER; REFER TO SIMILAR WALL SECTIONS FOR CONSTRUCTION.

REMOVE SUNSHADES FROM SCOPE OF PROJECT.

OMIT SLIDING EXAM DOOR ASSEMBLIES AND STOREFRONT DOOR SYSTEMS, INCLUDING ACCESS

CONTROLS, FROM INTERIOR SCOPE OF PROJECT. PROVIDE HOLLOW METAL FRAMES, SOLID CORE WOOD

SWING DOORS, AND STORAGE LOCKSET IN LIEU OF OMITTED SLIDING DOORS.

OMIT FROM PROJECT SCOPE 15'-0" (1 BAY) OF THE DROP OFF CANOPY FROM THE EAST END

OMIT FROM PROJECT SCOPE 30'-0" (2 BAYS) OF THE DROP OFF CANOPY FROM THE EAST END

OMIT REMAINING PORTION OF LARGE DROP OFF CANOPY (3 BAYS).

OMIT SELECT LANDSCAPING COMPONENTS, REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.

FULL DESCRIPTIONS AND ADDITIONAL INFORMATION INDICATED ON SHEETS GI105, GI106, GI107, AND SPECIFICATIONS

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN.

46204

317.800.6388 | WWW.GUIDONDESIGN.COMSUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING,

INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\t s a n d e rs \D o c u m e n ts

\1 .1

F W

P ri m a ry

C a re A ts a n d e rs g u id o n d e s ig n .c o m

.r v t

1 AMENDMENT NO.1 2020/07/16

CONSTRUCTION DOCUMENTS

GI000

TSKA/JG

COVER SHEET

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

VA NORTHERN INDIANA HEALTHCARE SYSTEM,

FORT WAYNE, IN

VA PROJECT NO. 610-311

EXPAND BUILDING 1

1ST FLOOR PRIMARY CARE

CONSTRUCTION DOCUMENTS

APRIL 16, 2019

SHEET LIST

SHEET # SHEET NAME

LS501 LANDSCAPE DETAILS

STRUCTURAL SHEETS

SI001 ABBREVIATIONS AND SYMBOLS

SI002 GENERAL STRUCTURAL NOTES

SI003 LOAD MAPS

SF101 EXISTING FIRST FLOOR FRAMING PLAN

SF102 SECOND FLOOR FRAMING PLAN

SF103 SECOND FLOOR SLAB REINFORCEMENT TIE PLAN

SF104 HIGH ROOF FRAMING PLAN

SF201 CANOPY SECTIONS

SF202 WALL ELEVATIONS

SF401 ENLARGED FRAMING PLANS

SF501 TYPICAL FRAMING SECTIONS AND DETAILS

SF502 FRAMING SECTIONS AND DETAILS

SF601 CONCRETE BEAM SCHEDULE

SF602 CONCRETE JOIST SCHEDULE

SF603 CONCRETE COLUMN SCHEDULE AND DETAILS

SF901 ISOMETRICS

ARCHITECTURAL

AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AD101 BASEMENT DEMOLITION PLAN

AD102 1ST FLOOR AND BASEMENT ROOF DEMOLITION PLAN

AD201 DEMOLITION BUILDING ELEVATIONS - SOUTH

AD202 DEMOLITION BUILDING ELEVATIONS - EAST, WEST, AND NORTH

AD311 DEMOLITION WALL SECTIONS

AD312 DEMOLITION WALL SECTIONS

AS100 OVERALL SITE PLAN

AS101 BASEMENT CONSTRUCTION PLAN

AS102 1ST FLOOR DIMENSION PLAN

AS103 1ST FLOOR CONSTRUCTION PLAN

AS104 1ST FLOOR ROOF AND 2ND FLOOR CONSTRUCTION PLAN

AS105 2ND FLOOR ROOF AND 3RD FLOOR CONSTRUCTION PLAN

AS106 ARCHITECTURAL SITE PLAN AND CANOPY PLAN

AS111 1ST FLOOR REFLECTED CEILING PLAN

AS201 BUILDING ELEVATIONS

AS202 BUILDING ELEVATIONS

AS203 BUILDING ELEVATION - WEST AND ENLARGED CANOPY ELEVATIONS

AS311 WALL SECTIONS - NEW 1ST FLOOR - VESTIBULE

AS312 WALL SECTIONS - NEW 1ST FLOOR - RELIEF AIR CHASE AND UTILITY CHASE

AS313 WALL SECTIONS - NEW 1ST FLOOR

AS314 WALL SECTIONS

AS315 WALL SECTIONS - EXISTING 1ST FLOOR

AS321 STAIR PLANS AND SECTIONS

AS401 ENLARGED TOILET PLANS AND ELEVATIONS

AS402 ENLARGED PLANS AND ELEVATIONS

AS501 PLAN DETAILS

AS502 WALL SECTION DETAILS - BASE

AS503 WALL SECTION DETAILS - HEAD

AS504 WALL SECTION DETAILS - PARAPET

AS505 ROOF DETAILS

AS506 CANOPY & EXTERIOR SIGN DETAILS

AS601 DOOR AND WINDOW SCHEDULES

AS602 DOOR AND WINDOW ELEVATIONS AND DETAILS

AS603 FINISH SCHEDULES & SIGNAGE TYPES

AS604 SIGNAGE PLAN

AS901 INTERIOR SECTIONS AND DETAILS

AS902 INTERIOR SECTIONS AND DETAILS

AF101 1ST FLOOR FLOOR FINISH PLAN

AF102 1ST FLOOR WALL FINISH PLAN

AF103 ENLARGED FLOOR FINISH PLANS

AQ101 1ST FLOOR EQUIPMENT PLAN

FIRE PROTECTION

FP100 FIRE PROTECTION NOTES, DETAILS, & DIAGRAM

FP101 BASEMENT FIRE PROTECTION PLAN

FP102 FIRST FLOOR FIRE PROTECTION PLAN

PLUMBING

PD101 BASEMENT PLUMBING REMOVAL PLAN

PD102 FIRST FLOOR PLUMBING REMOVAL PLAN

PL100 PLUMBING, LEGEND, DETAILS & NOTES

PL101 FOUNDATION PLUMBING PLAN

PL102 BASEMENT PLUMBING PLAN

PL103 FIRST FLOOR PLUMBING PLAN

PL104 ROOF PLUMBING PLAN

PL105 DIAGRAMS & ENLARGED PLUMBING PLANS

PL106 WASTE & VENT PIPING DIAGRAM

MECHANICAL

MD101 BASEMENT MECHANICAL DUCT REMOVAL PLAN

MD102 FIRST FLOOR MECHANICAL DUCT REMOVAL PLAN

MD103 SECOND FLOOR MECHANICAL REMOVAL PLAN

MD111 BASEMENT MECHANICAL PIPING REMOVAL PLAN

MD112 FIRST FLOOR MECHANICAL PIPING REMOVAL PLAN

MH101 BASEMENT MECHANICAL DUCT PLAN

MH102 FIRST FLOOR MECHANICAL DUCT PLAN

MH103 SECOND FLOOR ROOF MECHANICAL PLAN

MH301 MECHANICAL SECTIONS

MI101 MECHANICAL ABBREVIATIONS AND LEGEND

MI102 MECHANICAL SCHEDULES

MI103 MECHANICAL DETAILS

MI104 MECHANICAL DETAILS

MI105 MECHANICAL DETAILS

MI106 MECHANICAL DETAILS

MI107 CHILLED WATER FLOW DIAGRAMS

MI108 HOT WATER FLOW DIAGRAM

MI109 TEMP CONTROL

MI110 TEMP CONTROL

MI111 TEMP CONTROL

MI112 TEMP CONTROL

MP101 BASEMENT MECHANICAL PIPING PLAN

MP102 FIRST FLOOR MECHANICAL PIPING PLAN

ELECTRICAL

ED100 ELECTRICAL GENERAL NOTES, LEGEND, AND KEY PLANS

ED101 FIRST FLOOR ELECTRICAL REMOVAL PLAN

EJ101 ELECTRICAL DATA & COMMUNICATIONS DETAILS

EJ102 ELECTRICAL DETAILS

EJ103 ELECTRICAL DETAILS

EJ104 LIGHTING SCHEDULE, MOTOR CONTROL SCHEDULE & DIAGRAMS

EL101 FIRST FLOOR LIGHTING PLAN

EP101 BASEMENT POWER AND SYSTEMS PLAN

EP102 FIRST FLOOR POWER PLAN

EP103 SECOND FLOOR AND ROOF POWER PLAN

EP104 PANEL SCHEDULES

EP105 PANEL SCHEDULES

EP110 ELECTRICAL ONE-LINE DIAGRAM

ES101 SITE LIGHTING PLAN

EY102 FIRST FLOOR SYSTEMS PLAN

EY103 FIRST FLOOR VGIA WIRLESS ACCESS PLAN

SHEET LIST

SHEET # SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 BASEMENT LIFE SAFETY PLAN AND INFECTION CONTROL PLANS

GI102 1ST FLOOR LIFE SAFETY FLOOR PLAN

GI103 1ST FLOOR INFECTION CONTROL / PHASING PLANS

GI104 CONSTRUCTION LOGISTICS SITE PLAN

GI105 DEDUCTIVE BID ALTERNATES 'A' AND 'B'

GI106 DEDUCTIVE BID ALTERNATES 'C' AND 'D'

GI107 DEDUCTIVE BID ALTERNATES 'E' AND 'H'

CIVIL

VF101 TOPOGRAPHIC SURVEY

CC001 GENERAL CIVIL NOTES

CD101 DEMOLITION PLAN

CS101 SITE PLAN

CS102 SITE PLAN - ALTERNATE A

CS501 SITE DETAILS

CS502 SITE DETAILS

CG101 GRADING PLAN

CG102 GRADING SECTIONS

CG103 GRADING PLAN - ALTERNATE A

CU101 UTILITY PLAN

CU102 STORMWATER PROFILES

CU103 UTILITY PLAN ALT - ALTERNATE A

CU501 UTILITY DETAILS

CU502 UNDERGROUND STORAGE DETAILS

CU503 UNDERGROUND STORAGE DETAILS

CJ101 EROSION CONTROL PLAN

CJ501 EROSION CONTROL DETAILS

CJ502 SWPPP

LS101 LANDSCAPE PLAN

LS102 LANDSCAPE PLAN

Contact:Contact:Contact:Contact: Contact:

BCCLT

WILLIAM HOSMON, PE

MECHANICAL ENGINEER

MECHANICAL,

ELECTRICAL &

PLUMBING

GUIDON DESIGN INC.

MARK VANDERWOUDE, PE

STRUCTURAL ENGINEER

STRUCTURAL

ENGINEER

GUIDON DESIGN INC.

STACEY PAUL, PE

SR. PROJECT MANAGER

1221 N. Pennsylvania Indianapolis, IN 46202 p: 317.800.6388 x 104 e:spaul@guidondesign.com

CIVIL

ENGINEER

VA NORTHERN INDIANA HEALTH

CARE SYSTEM

OWEN WATLEY

COR, ENGINEERING SERVICES

2121 Lake Ave Fort Wayne, Indiana 46805 p: 765-603-7023 e: owen.watley@va.gov

OWNER

GUIDON DESIGN INC.

JOEL FARMER, AIA ACHA

PRINCIPAL, VICE PRESIDENT OF ARCHITECTURE

PROJECT MANAGER

1221 N. Pennsylvania Indianapolis, IN 46202 p: 317.800.6388 x 146 e: jfarmer@guidondesign.com

ARCHITECT

1221 N. Pennsylvania Indianapolis, IN 46202 p: 317.800.6388 x 119 e: mvanderwoude@guidondesign.com

4031 Transportation Drive Fort Wayne, In 46818 p: (812) 423-4407 e: hosmon@bcclt.com

TYLER SANDERS, RA

PROJECT ARCHITECT

p: 317.800.6388 x 126 e: tsanders@guidondesign.com

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

CC001

GENERAL CIVIL NOTES

7/17/2020ADDENDUM 1

18"

BUILDING 1

5-STORY BRICK BUILDING

F.F. ELEV: 759.19

BUILDING 16

1-STORY BLOCK BUILDING

METAL SIGN

METAL SIGN

METAL SIGN

8" BRICK

WALL

METAL SIGN

GATE

BASEMENT

FF: 759.19

L

2'x2'

METAL LID

8" BRICK

WALL

PARK 3

ASPHALT

ASPHALT

ASPHALT

CONC

0 4020

CD101

DEMOLITION PLAN

N

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

ADDENDUM 1 7/17/2020

METAL SIGN

8" BRICK

WALL

2'x2'

METAL LID

ASPHALT

ASPHALT

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

0 4020

N

CS101

SITE PLAN

8" BRICK

WALL

2'x2'

METAL LID

ASPHALT

ASPHALT

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

CS102

SITE PLAN - ALTERNATE A

0 4020

N

24"

BUILDING 1

5-STORY BRICK BUILDING

F.F. ELEV: 759.19

BUILDING 16

1-STORY BLOCK BUILDING

METAL SIGN

8" BRICK

WALL

METAL SIGN

10" CONC. WALL &

CHAIN-LINK FENCE

GATE

BASEMENT

FF: 759.19

30"x30"

METAL LID

L

L

L

30"x30"

METAL LID

2'x2'

METAL LID

8" BRICK

WALL

PARK 3

ASPHALT

ASPHALT

CONC

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

0 4020

N

CS103

SITE PLAN

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

CS503

SITE DETAILS

8" BRICK

WALL

2'x2'

METAL LID

WALL

ASPHALT

ASPHALT

CONC

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

CG101

GRADING PLAN

0 4020

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

CG102

GRADING SECTIONS

8" BRICK

WALL

2'x2'

METAL LID

ASPHALT

ASPHALT

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

CG103

GRADING PLAN - ALTERNATE A

0 4020

BUILDING 1

5-STORY BRICK BUILDING

F.F. ELEV: 759.19

BUILDING 16

1-STORY BLOCK BUILDING

METAL SIGN

METAL SIGN

METAL SIGN

8" BRICK

WALL

BASEMENT

FF: 759.19

L

2'x2'

METAL LID

8" BRICK

WALL

PARK 3

ASPHALT

ASPHALT

ASPHALT

CONC

0 4020

N

CU101

UTILITY PLAN

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

CU102

STORMWATER PROFILES

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

8" BRICK

WALL

2'x2'

METAL LID

ASPHALT

ASPHALT

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

CU103

UTILITY PLAN - ALTERNATE A

0 4020

24"

BUILDING 1

5-STORY BRICK BUILDING

F.F. ELEV: 759.19

BUILDING 16

1-STORY BLOCK BUILDING

METAL SIGN

METAL SIGN

METAL SIGN

8" BRICK

WALL

METAL SIGN

BASEMENT

FF: 759.19

L

2'x2'

METAL LID

8" BRICK

WALL

PARK 3

ASPHALT

ASPHALT

ASPHALT

CONC

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

0 4020

CJ101

EROSION CONTROL PLAN

8" BRICK

WALL

2'x2'

METAL LID

ASPHALT

ASPHALT

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

0 2010

LS101

LANDSCAPE PLAN

N

N

N

N

8" BRICK

WALL

2'x2'

METAL LID

ASPHALT

ASPHALT

AS

SHOWN

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN. 46204

317.800.6388 | WWW.GUIDONDESIGN.COM

SUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING, INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C :\U se rs

\ts an de rs

\D oc um en ts \1

6.

FW

P rim ar y C ar e_ ts an de rs

.rv t

CONSTRUCTION DOCUMENTS

DWCKJC2020/07/17

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

STATE OF

PE 10302594

ST

AC

EY L. PAUL

RE

GISTERED

INDIA NA

PROFESSI ONAL EN

GI

N

EE

R

0 2010

LS102

LANDSCAPE PLAN - ALT. G

N

N

N

N

UP

UP

XX

WW

WW

YY

ZZ

A

B

B.5

23.9

23.9

28.2

28.2

30.1

30.1

30.5

30.5

31.9

31.9

32.9

32.9

33.9

33.9

35.1

35.1

36.2

36.2

C

C

A.4

AD202

AD311

AD312

AD312

AD312

AD312

WOMENS

LOCKER

ROOM

B-C-103A

MENS

LOCKER

ROOM

B-C-103B

SPS

ASSISTANT

OFFICE

B-C-103D

PREP/ASSEMBLY

B-C-106C

STERILE/

NON-STERILE

STORAGE

B-C-113

HAC

B-C-106G

STORAGE

(FUTURE

DUMBWAITER)

B-C-106F

STORAGE

(FUTURE

EQUIP.

ROOM)

B-C-113A

MENS

LOCKER

ROOM

B-C-109A

WOMENS

LOCKER

ROOM

B-C-109B

CORRIDOR

B-C-C3

HAC

B-C-114

OFFICE

B-C-116

OFFICE

(FUTURE

ELEVATOR)

B-C-EL3

STORAGE

(FUTURE

EQUIP

ROOM)

B-C-101

STORAGE

(FUTURE

DUMBWAITER)

B-C-102B

ROOM

WATER

TREATMENT

49C

WAREHOUSE

B-C-115

STERILIZER

ACCESS

B-C-106D

LOGISTICS

DIRECTOR

C-112B

LOGISTICS

CLERICAL

B-C-112

LOGISTICS

SUPERVISOR

B-C-112A

PURCHASING

B-C-111

VESTIBULE

B-C-110

CORRIDOR

B-C-C2

PPE AREA

B-C-106A

CONERENCE

ROOM /

TRAINING

B-C-105

OIT CLOSET

B-C-107

SPS

DIRECTOR

B-C-104A

CUBICLE,

CLERICAL

STAFF

B-C-104

SCOPE

STERILIZATION

B-C-106E

OFFICE

(FUTURE

ELEVATOR)

B-C-EL2

OFFICE

(FUTURE

ELEVATOR)

B-C-EL1

HAC

B-C-102A

CORRIDOR

B-C-C1

LOUNGE

B-C-103

PPE AREA

B-C-103C

CHILLER

B-C-100

STAIR 1

B-C-ST1

ELECTRICAL

B-C-108

LOUNGE,

STAFF

B-C-109

SCOPE

DECONTAMINATION

B-C-102C

DECONTAMINATION

B-C-102

AUTOMATIC

CART

WASH

B-C-102D

CART PREP

B-C-106B

STAIRS

B-C-ST2

PHARMACY

STORAGE

OIT

53A

BIOMETRICS

MAIL ROOM

575859C59B59A

51 52

45B

49B

28.324.1

28.5

28.628.6

28.728.7

28.8

28.928.9

35343332313029282623.8 2524

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

DEMOLITION NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

REMOVE METAL STUD AND/OR BLOCK AND GWB PARTITION BELOW WINDOW OR DOOR COMPLETE.

CONSTRUCTION ABOVE WINDOW AND CEILING CONSTRUCTION SHALL REMAIN.

REMOVE METAL STUD AND GWB PARTITION COMPLETELY.

REMOVE DOOR AND FRAME COMPLETELY. DELIVER DOOR AND HARDWARE TO VA.

REMOVE ACOUSTICAL PANEL CEILING COMPLETELY WITHIN INDICATED ROOM, OR BACK TO EXTENT INDICATED BY DEMOLITION PLAN NOTE 6. CEILING REMOVAL INCLUDES CEILING MOUNTED ITEMS INCLUDING LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. REFER TO MEP DRAWINGS FOR ADDITIONAL

SCOPE OF REMOVAL.

REMOVE CARPET OR RESILIENT FLOORING, RESILIENT BASE, AND ASSOCIATED ADHESIVE COMPLETE DOWN TO CONCRETE FLOOR SLAB WITHIN INDICATED ROOM OR TO EXTENT INDICATED BY DEMOLITION

PLAN NOTE 6.

DASHED LINE INDICATES APPROXIMATE EXTENT OF DEMOLITION. COORDINATE WITH NEW WORK FOR

ADDITIONAL INFORMATION.

REMOVE WALL PROTECTION AND/OR HANDRAILS / GUARDRAILS.

REMOVE PLUMBING FIXTURE AND ASSOCIATED ACCESSORIES COMPLETE. RETURN TO VA.

REMOVE ALL WALL MOUNTED ITEMS THIS ROOM.

REMOVE WINDOW ASSEMBLY INCLUDING MOUNTING HARDWARE COMPLETE.

REMOVE MASONRY CLADDING COMPLETE INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL CONCRETE. BLOCK AND/OR METAL STUDS TO REMAIN. SCOPE OF REMOVAL SHALL BE FROM FIRST FLOOR SLAB UP TO STEEL LINTEL ABOVE WINDOWS ON FIRST FLOOR. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. REFER TO DEMOLITION WALL SECTIONS AS

NOTED.

REMOVE EXISTING WALL CONSTRUCTION COMPLETE FROM FIRST FLOOR SLAB UP TO EXISTING STEEL

LINTEL AND BETWEEN COLUMNS. THIS REMOVAL SHALL INCLUDE METAL STUD AND BLOCK

CONSTRUCTION, SHEATHING, INSULATION, CLADDING, HARDWARE, AND ACCESSORIES. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A

SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. SEE NEW WORK FOR ADDITIONAL

INFORMATION. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN INTEGRITY OF CONSTRUCTION TO

REMAIN.

REMOVE AND SALVAGE ALL ROOF DRAINS IN BASEMENT ROOF FOR REINSTALLATION IN FIRST FLOOR ROOF, REFER TO PLUMBING DRAWINGS. PROVIDE NEW ROOF DRAINS MATCHING EXISTING IF SALVAGED

MATERIAL EXHIBITS ANY DAMAGE.

REMOVE / RELOCATE MECHANICAL EQUIPMENT, REFER TO MECHANICAL DRAWINGS.

REMOVE METAL SCREEN WALL AND TUBE POSTS COMPLETELY, INCLUDING ATTACHMENT PLATES /

HARDWARE. EMBEDS FLUSH W/ FACE OF WALL TO REMAIN.

REMOVE LOUVER COMPLETELY, VERIFY WITH VA WHETHER LOUVERS ARE TO BE TURNED OVER TO VA

OR DISPOSED. REFER TO WALL SECTIONS FOR INFILL CONSTRUCTION.

REMOVE METAL PANEL SYSTEM COMPLETELY BACK TO STRUCTURAL ELEMENTS.

INTERIOR/EXTERIOR STAIR ASSEMBLIES TO BE REMOVED.

REMOVE METAL STUD AND METAL PANEL PARAPET, INCLUDING CANT, COMPLETELY DOWN TO FIRST

FLOOR SLAB IN PREPARATION FOR FIRST FLOOR ADDITION.

REMOVE AREA OF METAL DECK FOR VERTICAL PENETRATIONS.

REMOVE ROOFING ASSEMBLY IN ITS ENTIRETY INCLUDING EPDM MEMBRANE, RECOVERY BOARD, 4" RIGID INSULATION, COPING, FLASHING, BLOCKING, ETC. DOWN TO CONCRETE DECK IN PREPARATION FOR FIRST FLOOR ADDITION. MAINTAIN WATER TIGHT CONDITIONS TO PREVENT WATER ENTERING

FINISHED SPACES BELOW.

REMOVE CEILING TILES, GRID SHALL REMAIN.

REMOVE PORTION OF GUARDRAIL AND HANDRAIL TO ACCOMMODATE NEW STAIR AND ASSOCIATED

GUARDRAIL AND HANDRAIL. REFER TO CONSTRUCTION PLAN.

REMOVE WALL MOUNTED DOWN LIGHT.

REMOVE AND SALVAGE MED GAS VALVES FOR REINSTALLATION.

REMOVE WALKWAY PADS COMPLETE.

CAREFULLY REMOVE SECURITY CAMERA AND SALVAGE FOR REINSTALLATION. CONTRACTOR TO

REINSTALL AND RETURN TO OPERATION SAME-DAY.

REMOVE THIN SET FLOOR AND WALL CERAMIC TILE.

OUTLINE OF EXISTING VERTICAL CHASE TO BE EXTENDED FROM BASEMENT PROJECT.

OUTLINE OF EXISTING VERTICAL CHASE TO BE INFILLED. REFER TO NEW WORK AND STRUCTURAL

DRAWINGS.

OUTLINE OF EXISTING CONCRETE SLAB TO BE REMOVED TO ACCOMMODATE NEW VERTICAL CHASE.

REFER TO NEW WORK.

CAREFULLY REMOVE WALL MOUNTED ARTWORK AND RETURN TO VA.

CAREFULLY REMOVE WALL SWITCH AND FIRE ALARM DEVICES TO ACCOMMODATE NEW WORK. SALVAGE

FOR REUSE.

EXISTING WALL SCONCE TO REMAIN.

REMOVE COUNTERTOP AND ASSOCIATED CASEWORK COMPLETE.

REMOVE MASONRY CLADDING COMPLETELY INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL BLOCK. BLOCK AND/OR METAL STUDS SHALL REMAIN. SCOPE OF REMOVAL SHALL BE FROM STEEL LINTEL ABOVE WINDOWS TO STEEL LINTEL ABOVE WINDOWS ON FLOOR ABOVE, OR AS INDICATED

ON ELEVATIONS.

REMOVE EQUIPMENT AND FURNITURE THIS ROOM INCLUDING, BUT NOT LIMITED TO, WALL MOUNTED

CLOCK, COAT HOOKS, MAGAZINE RACKS, CHAIRS, CODE BLUE PULL CORD, AND COMPUTERS.

CONTRACTOR SHALL REINSTALL IN NEW CONSTRUCTION, REFER TO FURNITURE PLAN.

CAREFULLY REMOVE CANOPY COMPLETE TO ACCOMMODATE FIRST FLOOR ADDITION, INCLUDING ALL

GUTTERS AND DOWNSPOUTS.

EXISTING ELECTRICAL PANEL TO REMAIN.

CAREFULLY REMOVE ALL NON-STRUCTURAL ELEMENTS OF EXISTING CANOPY INCLUDING METAL

FRAMING, INSULATION, ROOFING MEMBRANES, GUTTER, DOWNSPOUT, SOFFIT, FASCIA, AND FLASHING, ETC. STRUCTURAL ELEMENTS SHALL REMAIN, INCLUDING EMBED PLATES, CHANNEL BEAMS, STEEL

ANGLES, METAL DECK, BENT PLATES, ETC.

CAREFULLY REMOVE PORTIONS OF FLOORING ONLY FOR INSTALLATION OF NEW WALL AND OPENING, REFER TO NEW WORK. CONTRACTOR SHALL PROVIDE A FINISHED CONDITION IN NEW CONSTRUCTION.

REMOVE ENTIRE STUD AND EIFS WALL TO ALLOW ACCESS TO NEW DUCT WORK AND AREAWAY. REFER

TO MECHANICAL DRAWINGS.

REMOVE PORTION OF WINDOW TO ACCOMMODATE NEW PTAC UNIT. G.C. SHALL INITIATE MEETING WITH ARCHITECT, WINDOW AND PTAC INSTALLER TO CONFIRM COURSE OF ACTION. REFER TO MECHANICAL

DRAWINGS.

REFERS TO SHEETS AD101, AD102, AD201, AND AD202

DEMOLITION GENERAL NOTES CONT'D

REFERS TO SHEETS AD101, AD102, AD201, AND AD202

IN AREAS AFFECTED BY DEMOLITION THAT ALIGN TO AREAS TO REMAIN, DEMOLITION SHALL BE COMPLETED IN A MANNER SUCH THAT NEWLY APPLIED FINISHES ARE INSTALLED IN A SEAMLESS

APPLICATION.

FOR ABOVE CEILING WORK WHERE CEILINGS ARE EXISTING TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR AT HIS/HER EXPENSE. GYPSUM BOARD CEILINGS SHALL BE PATCHED AND PAINTED TO MATCH EXISTING CEILING COLOR. FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY, THE CONTRACTOR SHALL RETURN ANY EXISTING CEILING TO REMAIN TO LIKE NEW CONDITION. THIS SHALL INCLUDE REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING PANELS, WITHIN AND BEYOND PROJECT LIMITS.

COORDINATE FULL SCOPE OF ABOVE CEILING WORK WITH ENGINEERING AND VENDOR DRAWINGS.

WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH

PER NEW FLOORING MANUFACTURER'S RECOMMENDATIONS.

FOR FURNITURE, FIXTURES, EQUIPMENT, AND WALL MOUNTED ACCESSORIES REQUIRED TO BE

REMOVED TO ACCOMMODATE CONSTRUCTION, WHETHER SPECIFICALLY NOTED OR NOT, SALVAGE

FOR REINSTALLATION OR RETURN TO OWNER INCLUDING MOUNTING HARDWARE.

COORDINATE REMOVAL OF OXYGEN, VACUUM, NURSE CALL AND SPECIAL ELECTRICAL ITEMS WITH

ENGINEERING DRAWINGS.

CAREFULLY REMOVE ALL WALL MOUNTED EQUIPMENT / ACCESSORIES FROM WALLS NOTED TO BE

REMOVED. SALVAGE FOR REUSE AND/OR RETURN TO VA.

REFER TO DEMOLITION ELEVATIONS AND WALL SECTIONS FOR ADDITIONAL DEMOLITION SCOPE OF

WORK.

ALL ITEMS THAT ARE INDICATED FOR REMOVAL AND REINSTALLATION MUST BE DOCUMENTED BY THE CONTRACTOR AS TO EXISTING CONDITION / QUALITY PRIOR TO REMOVAL, AND SUCH DOCUMENTATION SHALL BE PROVIDED TO THE VA PRIOR TO REMOVAL UPON REINSTALLATION, IF THE SALVAGED ITEMS

ARE FOUND TO NOT BE IN THE SAME CONDITION AS THEY WERE PRIOR TO REMOVAL, THE

CONTRACTOR SHALL PROVIDE A NEW ITEM OF EQUAL OR HIGHER QUALITY AND PERFORMANCE TO THE

VA, AT NO COST TO THE VA. THE SALVAGED ITEMS SHALL ALSO BE RETURNED TO THE VA.

ASBESTOS ABATEMENT: REVIEW 'Ft. Wayne VAMC Asbestos Reinspection 2016' DOCUMENT PROVIDED WITH CONSTRUCTION DOCUMENTS FOR EXTERIOR WINDOW CAULK ASSUMED TO INCLUDE ASBESTOS.

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

E.

F.

G.

H.

DEMOLITION GENERAL NOTES CONT'D

REFERS TO SHEETS AD101, AD102, AD201, AND AD202

EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH THE DIMENSION FLOOR PLAN AS101,

CONSTRUCTION FLOOR PLAN AS 103 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.

DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE APPROXIMATE AND ARE

INTENDED TO GIVE A GENERAL SCOPE OF WORK TO BE REMOVED OR TEMPORARILY REMOVED TO

ACCOMMODATE NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF NEW

CONSTRUCTION.

CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION ASSEMBLIES IN THEIR

ENTIRETY, UNLESS OTHER WISE NOTED, TO ACCOMMODATE NEW CONSTRUCTION.

MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE NEW FINISHES. PATCHED

SURFACES SHALL BE SMOOTH AND UNDETECTABLE.

A.

B.

C.

D.

DEMOLITION GENERAL NOTES

REFERS TO SHEETS AD101, AD102, AD201, AND AD202

COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND REPAIR NECESSARY

TO COMPLETE NEW AND REMODEL CONSTRUCTION SHALL BE INCLUDED. CONTRACTOR SHALL

REMOVE EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK. CONTRACTOR SHALL VISIT

THE SITE AND VERIFY ALL QUANTITIES AND ITEMS REQUIRED TO BE REMOVED.

REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION SYSTEMS AND DRAWING

NOMENCLATURE.

EXISTING COLUMNS WITHIN THE PROJECT BOUNDARY SHALL REMAIN.

SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE PREFORMED SHALL BE REVIEWED BY COR PRIOR TO CUTTING TO VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS

EXIST. SUCH CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

Drawing Title

Approved for Design Concept:

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

ARCHITECT/ENGINEERS:

VA NORTHERN INDIANA - FW

#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

B

A

C

D

E

F

1 2 3 4 5 6 7 9

F

E

D

C

B

A

97 8654321

OFFICE OF

FACILITIES

MANAGEMENT

VA Project Number

JAMES A. BROYLES, COR 610-311

GUIDON DESIGN INC.

905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN.

46204

317.800.6388 | WWW.GUIDONDESIGN.COMSUSTAINABLE ARCHITECTURE + ENGINEERING

PROJECT LEAD

Architect, Structural and Civil Engineer

VA NORTHERN INDIANA HEALTH CARE SYSTEM

FORT WAYNE CAMPUS

FORT WAYNE, INDIANA

MEP Engineer

4031 TRANSPORTATION DR.

FORT WAYNE, IN 46818

(260) 918-3045

DESIGN-AIRE ENGINEERING,

INC.

220 N COLLEGE AVE

INDIANAPOLIS, IN 46202

(317) 464-9090

Commissioning Agent

C U s e rs

\t s a n d e rs \D o c u m e n ts

\1 .1

F W

P ri m a ry

C a re A ts a n d e rs g u id o n d e s ig n .c o m

.r v t

1 AMENDMENT NO.1 2020/07/16

CONSTRUCTION DOCUMENTS

AD101

TJSKLA

BASEMENT DEMOLITION PLAN

2019/4/16

16.1045EXPAND BUILDING 1 - 1ST FLOOR

PRIMARY CARE

SCALE: 1/8" = 1'-0"AD101

1 BASEMENT DEMOLITION PLAN

SCALE: 1" = 100'-0"

KEY PLAN

DN

DN

DN

XX

WWWW

YY

ZZ

A

B

B.5

23.9

23.9

28.2 30.1

30.1

30.5

30.5

31.9

31.9

32.9

32.9

33.9

33.9

36.2

36.2

C

AD201

2 2

4 5

PRIMARY CARE SUITE BOUNDARY

PROCEDURE

RN 2

EXAM 2-2

EXAM 2-1

169A

CLERK 2

RN 1

EXAM 1-2

EXAM 1-1

172A

CLERK 1

GENERAL WAITING

PYXIS

CORRIDOR

1E-1

SMALL CONFERENCE

DIETICIAN

OFFICE

OFFICE

PUBLIC TOILET

HAC

OFFICE

RN

STAIR /

VESTIBULE

1-B-ST3

CLERK 6

STAFF TOILET

EXAM 6-1

148B

EXAM 6-2

148A

TELEHEALTH

MECHANICAL

CORRIDOR

1E-2

SOILED

OFFICE

CLERK 5

EXAM 5-1

EXAM 5-2

154A

RN 5

PHARM. OFFICE

RN 4

EXAM 4-2

EXAM 4-1

158A

CLERK 4

CLERK 3

RN 3

EXAM 3-1

EXAM 3-2

162A

BEH. HEALTH

OFFICE

PHARM. OFFICE

CLEAN UTILITY

169 OFFICE

STAIR

1E-1E

CORRIDOR

1E-3

4 5 4 5

4 5

STAIRS

1-C-ST1

10 10 10 10 10

10 10

101010

111111

BASEMENT ROOF

17 17

AD202

38 38

AD201

AD202

A.4

GENERATOR BUILDING 16

AD202

AD311

AD311

AD312

AD312

AD312

Sim

AD312

AD312

AD311

AD311

AD311

AD311

Sim

AD311

AD311

AD312

Sim

AD312

Sim3

AD312

Sim

TYP. @ WINDOWS

GRID LINE 'C'

TYP.

REMOVE BACK TO EDGE OF WINDOW

REMOVE

CANOPY ABOVE

AS NOTED

REMOVE

CANOPY ABOVE

AS NOTED

REMOVE

CANOPY ABOVE

AS NOTED

3 3

4 4

4 3

13 13

TYP.

FEC

4 5

NO SLAB TO BE

POURED TO

ACCOMMODATE

RELIEF AIR

CHASE

12 11

EDGE OF SLAB FOR 1ST

FLOOR VESTIBULE

4 5

EXISTING CANOPY ABOVE TO REMAIN

AD311

3737 37 37

OA

AI

NOTE: CONTRACTOR SHALL PROVIDE

TEMPORARY CONSTRUCTION AS REQ'D TO

MAINTAIN AIR INTAKE (AI) AND OUTSIDE AIR

(OA)TO AHU 1-E1 DURING CONSTRUCTION ,

RE: MECHANICAL. CONTRACTOR SHALL

ERECT AND MAINTAIN AN ALTERNATIVE AIR

INTAKE TO PREVENT DUST, FUMES,

INSECTS, AND RAIN FROM ENTERING THE

MECHANICAL ROOM 147

AHU 1-E1

WORK SHOWN IN THIS

AREA SHALL BE BY

VA - NIC

WORK SHOWN IN THIS

AREA SHALL BE BY VA -

NIC

WORK SHOWN IN THIS

AREA SHALL BE BY VA -

NIC

35343332313029282623.8 2524

AREA OF 1ST FLOOR

PRIMARY CARE

EXPANSION

GENERATOR BUILDING 16

HOSPITAL BUILDING 1

1 EAST WING

N

EXISTING PRIMARY CARE

MAIN

ENTRANCE

I.

J.

K.

L.

M.

N.

O.

P.

Q.

R.

DEMOLITION NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

REMOVE METAL STUD AND/OR BLOCK AND GWB PARTITION BELOW WINDOW OR DOOR COMPLETE.

CONSTRUCTION ABOVE WINDOW AND CEILING CONSTRUCTION SHALL REMAIN.

REMOVE METAL STUD AND GWB PARTITION COMPLETELY.

REMOVE DOOR AND FRAME COMPLETELY. DELIVER DOOR AND HARDWARE TO VA.

REMOVE ACOUSTICAL PANEL CEILING COMPLETELY WITHIN INDICATED ROOM, OR BACK TO EXTENT INDICATED BY DEMOLITION PLAN NOTE 6. CEILING REMOVAL INCLUDES CEILING MOUNTED ITEMS INCLUDING LIGHT FIXTURES, FIRE ALARM DEVICES, ETC. REFER TO MEP DRAWINGS FOR ADDITIONAL

SCOPE OF REMOVAL.

REMOVE CARPET OR RESILIENT FLOORING, RESILIENT BASE, AND ASSOCIATED ADHESIVE COMPLETE DOWN TO CONCRETE FLOOR SLAB WITHIN INDICATED ROOM OR TO EXTENT INDICATED BY DEMOLITION

PLAN NOTE 6.

DASHED LINE INDICATES APPROXIMATE EXTENT OF DEMOLITION. COORDINATE WITH NEW WORK FOR

ADDITIONAL INFORMATION.

REMOVE WALL PROTECTION AND/OR HANDRAILS / GUARDRAILS.

REMOVE PLUMBING FIXTURE AND ASSOCIATED ACCESSORIES COMPLETE. RETURN TO VA.

REMOVE ALL WALL MOUNTED ITEMS THIS ROOM.

REMOVE WINDOW ASSEMBLY INCLUDING MOUNTING HARDWARE COMPLETE.

REMOVE MASONRY CLADDING COMPLETE INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL CONCRETE. BLOCK AND/OR METAL STUDS TO REMAIN. SCOPE OF REMOVAL SHALL BE FROM FIRST FLOOR SLAB UP TO STEEL LINTEL ABOVE WINDOWS ON FIRST FLOOR. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. REFER TO DEMOLITION WALL SECTIONS AS

NOTED.

REMOVE EXISTING WALL CONSTRUCTION COMPLETE FROM FIRST FLOOR SLAB UP TO EXISTING STEEL

LINTEL AND BETWEEN COLUMNS. THIS REMOVAL SHALL INCLUDE METAL STUD AND BLOCK

CONSTRUCTION, SHEATHING, INSULATION, CLADDING, HARDWARE, AND ACCESSORIES. ASSUME 4" OF SIMILAR REMOVAL BELOW FIRST FLOOR SLAB IS REQUIRED TO ACCOMMODATE SLAB INFILL FOR A

SMOOTH TRANSITION FROM EXISTING BUILDING TO NEW. SEE NEW WORK FOR ADDITIONAL

INFORMATION. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN INTEGRITY OF CONSTRUCTION TO

REMAIN.

REMOVE AND SALVAGE ALL ROOF DRAINS IN BASEMENT ROOF FOR REINSTALLATION IN FIRST FLOOR ROOF, REFER TO PLUMBING DRAWINGS. PROVIDE NEW ROOF DRAINS MATCHING EXISTING IF SALVAGED

MATERIAL EXHIBITS ANY DAMAGE.

REMOVE / RELOCATE MECHANICAL EQUIPMENT, REFER TO MECHANICAL DRAWINGS.

REMOVE METAL SCREEN WALL AND TUBE POSTS COMPLETELY, INCLUDING ATTACHMENT PLATES /

HARDWARE. EMBEDS FLUSH W/ FACE OF WALL TO REMAIN.

REMOVE LOUVER COMPLETELY, VERIFY WITH VA WHETHER LOUVERS ARE TO BE TURNED OVER TO VA

OR DISPOSED. REFER TO WALL SECTIONS FOR INFILL CONSTRUCTION.

REMOVE METAL PANEL SYSTEM COMPLETELY BACK TO STRUCTURAL ELEMENTS.

INTERIOR/EXTERIOR STAIR ASSEMBLIES TO BE REMOVED.

REMOVE METAL STUD AND METAL PANEL PARAPET, INCLUDING CANT, COMPLETELY DOWN TO FIRST

FLOOR SLAB IN PREPARATION FOR FIRST FLOOR ADDITION.

REMOVE AREA OF METAL DECK FOR VERTICAL PENETRATIONS.

REMOVE ROOFING ASSEMBLY IN ITS ENTIRETY INCLUDING EPDM MEMBRANE, RECOVERY BOARD, 4" RIGID INSULATION, COPING, FLASHING, BLOCKING, ETC. DOWN TO CONCRETE DECK IN PREPARATION FOR FIRST FLOOR ADDITION. MAINTAIN WATER TIGHT CONDITIONS TO PREVENT WATER ENTERING

FINISHED SPACES BELOW.

REMOVE CEILING TILES, GRID SHALL REMAIN.

REMOVE PORTION OF GUARDRAIL AND HANDRAIL TO ACCOMMODATE NEW STAIR AND ASSOCIATED

GUARDRAIL AND HANDRAIL. REFER TO CONSTRUCTION PLAN.

REMOVE WALL MOUNTED DOWN LIGHT.

REMOVE AND SALVAGE MED GAS VALVES FOR REINSTALLATION.

REMOVE WALKWAY PADS COMPLETE.

CAREFULLY REMOVE SECURITY CAMERA AND SALVAGE FOR REINSTALLATION. CONTRACTOR TO

REINSTALL AND RETURN TO OPERATION SAME-DAY.

REMOVE THIN SET FLOOR AND WALL CERAMIC TILE.

OUTLINE OF EXISTING VERTICAL CHASE TO BE EXTENDED FROM BASEMENT PROJECT.

OUTLINE OF EXISTING VERTICAL CHASE TO BE INFILLED. REFER TO NEW WORK AND STRUCTURAL

DRAWINGS.

OUTLINE OF EXISTING CONCRETE SLAB TO BE REMOVED TO ACCOMMODATE NEW VERTICAL CHASE.

REFER TO NEW WORK.

CAREFULLY REMOVE WALL MOUNTED ARTWORK AND RETURN TO VA.

CAREFULLY REMOVE WALL SWITCH AND FIRE ALARM DEVICES TO ACCOMMODATE NEW WORK. SALVAGE

FOR REUSE.

EXISTING WALL SCONCE TO REMAIN.

REMOVE COUNTERTOP AND ASSOCIATED CASEWORK COMPLETE.

REMOVE MASONRY CLADDING COMPLETELY INCLUDING TIES, SHEATHING, INSULATION, ETC. BACK TO STRUCTURAL BLOCK. BLOCK AND/OR METAL STUDS SHALL REMAIN. SCOPE OF REMOVAL SHALL BE FROM STEEL LINTEL ABOVE WINDOWS TO STEEL LINTEL ABOVE WINDOWS ON FLOOR ABOVE, OR AS INDICATED

ON ELEVATIONS.

REMOVE EQUIPMENT AND FURNITURE THIS ROOM INCLUDING, BUT NOT LIMITED TO, WALL MOUNTED

CLOCK, COAT HOOKS, MAGAZINE RACKS, CHAIRS, CODE BLUE PULL CORD, AND COMPUTERS.

CONTRACTOR SHALL REINSTALL IN NEW CONSTRUCTION, REFER TO FURNITURE PLAN.

CAREFULLY REMOVE CANOPY COMPLETE TO ACCOMMODATE FIRST FLOOR ADDITION, INCLUDING ALL

GUTTERS AND DOWNSPOUTS.

EXISTING ELECTRICAL PANEL TO REMAIN.

CAREFULLY REMOVE ALL NON-STRUCTURAL ELEMENTS OF EXISTING CANOPY INCLUDING METAL

FRAMING, INSULATION, ROOFING MEMBRANES, GUTTER, DOWNSPOUT, SOFFIT, FASCIA, AND FLASHING, ETC. STRUCTURAL ELEMENTS SHALL REMAIN, INCLUDING EMBED PLATES, CHANNEL BEAMS, STEEL

ANGLES, METAL DECK, BENT PLATES, ETC.

CAREFULLY REMOVE PORTIONS OF FLOORING ONLY FOR INSTALLATION OF NEW WALL AND OPENING, REFER TO NEW WORK. CONTRACTOR SHALL PROVIDE A FINISHED CONDITION IN NEW CONSTRUCTION.

REMOVE ENTIRE STUD AND EIFS WALL TO ALLOW ACCESS TO NEW DUCT WORK AND AREAWAY. REFER

TO MECHANICAL DRAWINGS.

REMOVE PORTION OF WINDOW TO ACCOMMODATE NEW PTAC UNIT. G.C. SHALL INITIATE MEETING WITH ARCHITECT, WINDOW AND PTAC INSTALLER TO CONFIRM COURSE OF ACTION. REFER TO MECHANICAL

DRAWINGS.

REFERS TO SHEETS AD101, AD102, AD201, AND AD202

DEMOLITION GENERAL NOTES CONT'D

REFERS TO SHEETS AD101, AD102, AD201, AND AD202

IN AREAS AFFECTED BY DEMOLITION THAT ALIGN TO AREAS TO REMAIN, DEMOLITION SHALL BE COMPLETED IN A MANNER SUCH THAT NEWLY APPLIED FINISHES ARE INSTALLED IN A SEAMLESS

APPLICATION.

FOR ABOVE CEILING WORK WHERE CEILINGS ARE EXISTING TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR AT HIS/HER EXPENSE. GYPSUM BOARD CEILINGS SHALL BE PATCHED AND PAINTED TO MATCH EXISTING CEILING COLOR.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .