16965 - PD101 - BASEMENT PLUMBING REMOVAL PLAN.pdf
PDF 591 KB Posted
- Attached to
- Y1DA--Expand First Floor B-1 for PACT - 610-311
- Solicitation number
- 36C25020B0004
About this file
The document contains a basement plumbing removal plan drawing and related federal contract opportunity for expanding the first floor of Building 1 at the VA Northern Indiana Health Care System campus in Fort Wayne, Indiana. The drawing depicts the layout of existing basement plumbing systems to be removed as part of the expansion project. The related federal contract opportunity is soliciting bids to expand the first floor B-1 area for the Primary Care Advanced Clinic Telehealth program under Solicitation Number 36C25020B0004 from the Department of Veterans Affairs Veterans Health Administration VISN 10.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XX
WW
ZZ
A
B
B.5
C
23.9 30.1 30.5 31.9 32.9 33.9 35.1 36.2 37
2"V-UP
4"W-UP&DN
FD WC
LV
2"W
LV
4"W
3"V-UP&DNLV
LV
LV
CW
HW
HR
YY
4"W-DN
3"W-UP
A.4
RELOCATE PIT
& DUPLEX PUMP,
CONTROLS, ETC.
STM
S T
M
S T
M S T
M
S T
M
STM
STM
6"
6"4"
6"
6"
8"
6"
2"
4" 8"
6"
6"
6"
6"
6"
4" 6"
OD RD
OD RD
OD
RD
OD
RD
OD
RD
3"V-4"VTR
4"W-DN
RD
6"
3"V-4"VTR
3"V-4"VTR
8"
2" 2"
4"W-DN
OD
RD
6"W-DN
6"W-DN
8"STM-DN 6"STM-DN
6"STM-DN
4"W-DN
OD
8" DISCHARGE
ABOVE GRADE
6"W-DN
8"STM-DN
8" DISCHARGE
ABOVE GRADE
6"STM-DN
6" DISCHARGE
ABOVE GRADE
WCO
4" 3"
1 1/2"
2"
3"
2"
3"
2"
2"
4"
2"
2"
4"
4"
PHARMACY
STORAGE
B-2
STAIR
53A
OIT
BIOMETRICS
ROOM
B-1
STAIR
5859C
59B59A
60A
60B
46 47
45 45B
ROOM
49C
WATER
TREATMENT
B-C-101
STORAGE
(FUTURE
EQUIP
ROOM) B-C-102B
STORAGE
(FUTURE
DUMBWAITER)
B-C-102C
SCOPE
DECONTAMINATION
B-C-106E
SCOPE
STERILIZATION
B-C-102
DECONTAMINATION
B-C-103A
WOMENS
LOCKER
ROOM
B-C-103B
MENS
LOCKER
ROOM
B-C-106C
PREP/ASSEMBLY
B-C-106G
HAC
B-C-106F
STORAGE
(FUTURE
DUMBWAITER)
B-C-113A
STORAGE
(FUTURE
EQUIP.
ROOM)
B-C-113
STERILE/
NON-STERILE
STORAGE
B-C-112
LOGISTICS
CLERICAL
B-C-114
HAC
B-C-116
OFFICE
B-C-109B
WOMENS
LOCKER
ROOM
B-C-109A
MENS
LOCKER
ROOM
B-C-109
LOUNGE,
STAFF
B-C-106F
STORAGE
(FUTURE
DUMBWAITER)
B-C-106A
PPE
AREA
B-C-106B
CART
PREP
1 1/2"CW
1"HW
3/4"HR-UP
B-C-EL3
OFFICE
(FUTURE
ELEVATOR)
B-C-103C
PPE
AREA
B-C-103D
SPS
ASSISTANT
OFFICE
RELIEF
AIR
CHASE
STM
C W
H W
H R
HW
HW
H
R
CW
HW
C W
H W
H R
HR
CW
HW
HR
HW
CW
2 1/2" 2"
3/4"
3/4"
2 1/2"
2" 3/4"
1"
1"
3/4" 2"
1 1/2" 2"
1/2"
1 1/4" 3/4"
28.2 28.324.1 C3 35343332313029282623.8 2524
FCO
AD AD
STM
4"
4"
PIPING IN THIS AREA
BELOW BASEMENT FLOOR
KEY NOTES:
SEE DWG PL100 FOR REMOVAL NOTES1
KEYPLAN
SCALE: 1" = 100'-0"
AREA OF 1ST FLOOR
PRIMARY CARE
EXPANSION
GENERATOR BUILDING 16
HOSPITAL BUILDING 1
1 EAST WING
N
EXISTING PRIMARY CARE
MAIN
ENTRANCE
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
ARCHITECT/ENGINEERS:
VA NORTHERN INDIANA - FW
#1 o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
JAMES A. BROYLES, COR 610-311
VA NORTHERN INDIANA HEALTH CARE SYSTEM
FORT WAYNE CAMPUS
FORT WAYNE, INDIANA
GUIDON DESIGN INC.
905 N. CAPITOL AVE. SUITE 100 | INDIANAPOLIS, IN.
46204
317.800.6388 | WWW.GUIDONDESIGN.COMSUSTAINABLE ARCHITECTURE + ENGINEERING
PROJECT LEAD
Architect, Structural and Civil Engineer MEP Engineer
4031 TRANSPORTATION DR.
FORT WAYNE, IN 46818
(260) 918-3045
DESIGN-AIRE ENGINEERING,
INC.
220 N COLLEGE AVE
INDIANAPOLIS, IN 46202
(317) 464-9090
Commissioning Agent
C U s e rs
\b a rt s c h
\D o c u m e n ts \1
V
A F t W a y n e
R d e ta c h e d b a rt s c h
Y E
F Q
.r v t
2 RFI #1 2020/07/28
CONSTRUCTION DOCUMENTS
PD101
MABCJM
BASEMENT PLUMBING REMOVAL PLAN
2019/4/16
16.1045EXPAND BUILDING 1 - 1ST FLOOR
PRIMARY CARE
SCALE: 1/8" = 1'-0"
BASEMENT PLUMBING REMOVAL PLAN
12" 0 5'
SCALE: 1/8"=1'-0"
10' 15'
W
IL
L IAM J HOSMO
N
P R O F
ESS IONAL ENG
IN
E E R
R
EG
I STERED
I N D I A NA
No.
STATE OF
19447
2020/7/28
| Sheets |
| PD101 - BASEMENT PLUMBING REMOVAL PLAN |
| PL101 - BASEMENT PLUMBING PLAN |
File details come from the government source that posted it. Updated .