This document includes a lead-based paint removal plan and related federal contract opportunity. The lead-based paint removal plan outlines requirements for a project at the James H. Quillen VA Medical Center in Mountain Home, TN to correct all facility condition assessment deficiencies in the Historical Chapel building 13. The plan details lead control area requirements, work procedures, disposal of lead wastes, and submittal requirements.

The related federal contract opportunity is a solicitation to furnish all labor, materials, equipment and supervision to complete the work outlined in the lead-based paint removal plan. Requirements include selective demolition, abatement of environmental hazards including mold, lead-based paint and asbestos containing materials, modification, restoration and new construction of roofing, walls, stairs, sidewalks, lighting, mechanical and electrical systems. The estimated value is between $2-5 million. The solicitation is expected to be posted on October 15, 2021 and close on November 16, 2021. This is a 100% set aside for service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
36C24921B0017 0007.pdf PDF
36C24921B0017 0006.pdf PDF
36C24921B0017 0005.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part2.pdf PDF
070150.74 Rehabilitation of EPDM Roofing.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part1.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part4.pdf PDF
000110 - Table of Contents.pdf PDF
RFI Bldg 13 Chapel.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part3.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part5.pdf PDF
36C24921B0017 0004.docx DOCX document
36C24921B0017 0003.docx DOCX document
36C24921B0017 0002.pdf PDF
Pre-Bid Sign-In Sheet Bldg. 13 Chapel 11-29-2021.pdf PDF
ACM LBP Survey Report.pdf PDF
VA Church Report.pdf PDF
Organ Evaluation Report.pdf PDF
Site Investigation Report.pdf PDF
36C24921B0017 0001.docx DOCX document
Asbestos Removal Plan.pdf PDF
Mt Home Chapel B13 - Bid Documents_Part1.pdf PDF
WD TN20210111 1-1-2021.pdf PDF
Mt Home Chapel B13 - Bid Documents_Part3.pdf PDF
Mt Home Chapel B13 - Bid Documents_Part4.pdf PDF
36C24921B0017_1.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
MtHome Chapel BID Specifications 10.28.2021.pdf PDF
VHA Supp Contract Req Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.pdf PDF
RFI Form - Mt. Home Chapel B13.docx DOCX document
Mt Home Chapel B13 - Bid Documents_Part2.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 13 Renovations Project No. 621-20-101

Lead-Based Paint Section 02 83 33 - 1

Lead-Based Paint Section 02 83 33

1.0 GENERAL REQUIREMENTS

1.1. Background Information

Lead-based paint (LBP) and lead-containing paint (LCP) is present on various surfaces throughout the building. Any of the Contractor activities that may generate leaded dust or impact a leaded surface shall be responsible for regulating their work area so that dust migration is contained properly within the regulated area. Once the work is complete, the Contractor shall be responsible for the proper clean up and disposal of leaded dust and materials. The goal is to provide a safe working environment minimizing exposure to lead-containing dusts.

The following plan outlines work practices required at this site. This work will be contracted under a single contract and other specifications, drawings, and general provisions of the contract referenced under other specifications provided by Architect shall apply.

1.2. Scope of Work

A. The scope of work includes the removal and disposal of lead-containing or lead-based coatings that are scheduled for removal within the demolition drawings.

Lead-based paint/primer coated items/debris shall be managed and disposed of in accordance with all applicable local, state, and federal regulations and as approved by the Owner and Architect. The following is required as well as other requirements specified elsewhere in this document.

1. Lead-containing paint present during cutting or demolition operations.

Contractor shall prepare a plan to address areas in which cutting on lead-containing materials will occur. Contractors work plan shall include, but not be limited to, the following: worker protection, environmental/site impact, and disposal. The work plan shall be submitted to the Owner and Architect for review prior to initiating work. Waste shall be disposed of as specified elsewhere in this document.

B. Authorized workers: All workers performing work must be appropriate trained and licensed (if applicable) for the tasks being performed.

C. Discovery of other previously unidentified, potentially hazardous materials. If potentially hazardous materials, such as containers with unknown contents, suspected asbestos-containing and lead-containing components, or other

Lead-Based Paint Section 02 83 33 - 2 potentially hazardous materials are discovered during the course of the work, the Contractor shall cease work in the affected area and immediately notify the Architect and the Owner. The Architect and/or the Owner will assess the materials, collecting representative samples if necessary, and advise the Contractor when work in this area may be resumed. Once a waste determination has been made, the Contractor will be responsible for the proper management of this material in accordance with state and federal regulations.

D. Owner shall provide for USDOT Hazardous Materials rule qualified personnel (i.e., “Hazmat Employees”) to sign uniform hazardous materials manifests for any wastes generated during the project. Contractor shall be responsible for all other regulatory components of the waste management process, subject to the approval of the Owner, to include onsite waste identification, management, transport, and disposal/recycling of waste.

E. Contractor must furnish all permits, labor, material, services, insurance, tools, equipment (including, but not limited to, power and water), and notifications in accordance with EPA, OSHA, State, and all other applicable agencies to complete the work scoped. It is the Contractor’s responsibility to be aware of and obtain all permits necessary to complete the scope of work.

F. Where in the performance of the Work, workers, supervisory personnel, subcontractors, or consultants may encounter, disturb, or otherwise function in the immediate vicinity of any identified lead-containing materials, take appropriate continuous measures as necessary to protect all building occupants from the potential hazard of exposure to airborne lead. Such measures will include the procedures and methods described herein, and compliance with regulations of applicable federal, state, and local agencies.

G. In event of any apparent conflict among codes, standards, or this plan, Contractor shall refer the conflict to the Owner or Architect for written resolution.

1.3. Coordination

A. Coordinate demolition operations included in various Sections of these Specifications to assure efficient and orderly completion of each part of the Work.

Coordinate demolition operations included under different Sections that depend on each other for proper installation, connection, and operation.

B. Develop a directory of all entities involved in the project. Include the Contractor's principal staff assignments, including the Superintendent and other personnel in attendance at the site. Identify individuals, their duties and responsibilities. List business name, contact person, normal business and emergency telephone, cellular phone and fax numbers, and electronic and standard mail addresses.

Lead-Based Paint Section 02 83 33 - 3

C. Notify other entities at the job site of the nature of the lead activities, location of lead-containing materials, requirements relative to lead set forth in these specifications, and applicable regulations. Advance notification will be made to:

the Owner and Architect; employees who will perform lead abatement work or related activities, or who will be in the work area during the course of the work of this contract; and, employers of employees who work and/or will be working in adjacent areas during the course of the work of this contract.

D. Contingency Plan: Prepare a contingency plan for emergencies. Note that nothing in this specification should impede safe exiting or providing of adequate medical attention in the event of an emergency. Items to be addressed in the plan include, but are not limited to the following:

1. Fire

2. Accident

3. Life threatening injury

4. Non-life threatening injury

5. Rescue

6. Power Failure

7. Pressure differential system failure

8. Breach of containment

9. Electrical faults or shock

10. Excessive heat / cold (if/when such limits are specified)

11. Supplied air system failure

12. Water leaks

13. Waste spills

14. Unauthorized entry into work area

15. Elevated air samples outside of containment

16. Repairs inside containment

17. Toxic releases

The contingency plan will be submitted to the Owner and Architect for review at least 10 working days prior to the Contractor’s initial site mobilization.

1.4. Pre-Construction Conference

A. An initial progress meeting, recognized as "Pre-Construction Conference" will be convened by the Architect or Owner prior to start of any work. The preconstruction conference will be scheduled before start of construction, at a time convenient to the Owner and the Architect, but no later than 15 days after execution of the Agreement. Meet at the project site, or as otherwise directed, with General Superintendent, Owner, Architect, Project Administrator, and other entities

Lead-Based Paint Section 02 83 33 - 4 concerned with the lead paint work. 72 hours advance notice will be provided to all participants prior to convening Pre-Construction Conference.

B. Attendees: Authorized representatives of the Owner, Architect, and their consultants will be in attendance. An authorized representative of the Contractor and its superintendent; major subcontractors; manufacturers; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the Work.

C. Agenda: This is an organizational meeting, to review responsibilities and personnel assignments, to locate regulated areas and temporary facilities including power, light, water, etc. Items of significance that could affect progress will be discussed, including the following:

1. Tentative construction schedule.

2. Critical work sequencing.

3. Designation of responsible personnel.

4. Procedures for processing field decisions and Change Orders.

5. Procedures for processing Applications for Payment.

6. Distribution of Contract Documents.

7. Submittal of Shop Drawings, Product Data, and Samples.

8. Preparation of record documents.

9. Use of the premises.

10. Parking availability.

11. Office, work, and storage areas.

12. Equipment deliveries and priorities.

13. Safety procedures.

14. First aid.

15. Security.

16. Working hours.

1.5. References

A. Except to the extent that more explicit or more stringent requirements are written directly into the contract documents, all applicable codes, regulations, and standards have the same force and effect (and are made a part of the central documents by reference) as if copied directly into the contract documents, or as if published copies are bound herewith.

Lead-Based Paint Section 02 83 33 - 5

B. The current issue of each regulation, code and standard shall govern. Where conflict among requirements or with these specifications exists, the more stringent requirements shall apply.

C. U.S. Department of Labor, Occupational Safety and Health Administration, (OSHA), including but not limited to:

1. Occupational Exposure to Lead in Construction, Title 29, Part 1926, Section 62, of the Code of Federal Regulations.

2. Respiratory Protection: Title 29, Part 1910, Section 134 and Title 29, Part 1926, Section 103 of the Code of Federal Regulations.

3. Construction Industry: Title 29, Part 1926, of the Code of Federal Regulations.

4. Access of Employee Exposure and Medical Records: Title 29, Part 1910, Section 20 and Title 29, Part 1926, Section 33 of the Code of Federal Regulations.

5. Specifications for Accident Prevention Signs and Tags: Title 29, Part 1910, Section 145 of the Code of Federal Regulations.

6. Personal Protective Equipment: Title 29, Part 1910, Section 132 and Title 29, Part 1926, Sections 95 through 107 of the Code of Federal Regulations.

7. Hazard Communication: Title 29, Part 1910, Section 1200 and Title 29, Part 1926, Section 59 of the Code of Federal Regulations.

D. U.S. Environmental Protection Agency (EPA) including but not limited to:

1. Hazardous Wastes: CFR 40, Part 260-265.

2. SW-846, “Test Methods for Evaluating Solid Waste, Physical/Chemical

Methods”

E. U.S. Department of Transportation (DOT):

1. Specifications for Packaging: CFR 49, Part 178

F. American National Standards Institute (ANSI):

1. American National Standard for Respiratory Protection - Respirator Use-

Physical Qualifications for Personnel, Publication Z88.6-1984

2. Practices for Respiratory Protection - Publication Z88.2-1992

3. Fundamentals Governing the Design and Operation of Local Exhaust

Ventilation Systems - Publication Z9.2

G. American Society for Testing and Materials (ASTM):

1. ASTM D-1331 - 1989: Surface and Interfacial Tension of Solution of Surface

Active Agents.

H. Underwriters Laboratories, Inc. (UL):

1. UL 586 - 1985 (Rev 1988): High-Efficiency Particulate, Air Filter Units.

Lead-Based Paint Section 02 83 33 - 6

I. Tennessee Department of Environment and Conservation (TDEC) division of Solid Waste Management

1.6. Definitions

A. Action Level: Employee exposure, without regard to use of respirators, to an airborne concentration of lead of 30 micrograms per cubic meter (µg/m3) of air averaged over an 8-hour period. As used in this section, “30 micrograms per cubic meter of air" refers to the action level.

B. Area Monitoring: Sampling of lead concentrations within the lead control area and inside the physical boundaries which is representative of the airborne lead concentrations which may reach the breathing zone of personnel potentially exposed to lead.

C. Physical Boundary: Area physically roped or partitioned off around an enclosed lead control area to limit unauthorized entry of personnel. As used in this section, "inside boundary" shall mean the same as "outside lead control area."

D. Change Rooms and Shower Facilities: Rooms within the designated physical boundary around the lead control area equipped with separate storage facilities for clean protective work clothing and equipment and for street clothes which prevent cross-contamination.

E. Competent Person: A person capable of identifying lead hazards in the work area and is authorized by the Contractor to take corrective action.

F. Decontamination Room: Room for removal of contaminated personal protective equipment (PPE).

G. Delaminated Paint: A peeling or otherwise structurally compromised paint system that is subject under normal conditions to potentially release paint and primer particles, as well as those systems that are in such condition that they will likely release particles from the forces that are expected to act upon it.

H. Eight-Hour Time Weighted Average (TWA): Airborne concentration of lead averaged over an 8-hour workday to which an employee is exposed.

I. High Efficiency Particulate Air (HEPA) Filter Equipment: HEPA filtered vacuuming equipment with a UL 586 filter system capable of collecting and retaining lead-containing paint dust. A high efficiency particulate filter means 99.97 percent efficient against 0.3 micron size particles.

Lead-Based Paint Section 02 83 33 - 7

J. Lead: Metallic lead, inorganic lead compounds, and organic lead soaps. Excluded from this definition are other organic lead compounds.

K. Lead-Based Paint (LBP): Paint or other surface coating that contains lead in excess of 1.0 milligrams per centimeter squared utilizing X-ray Fluorescence techniques or 0.5% lead by weight by laboratory analysis. Paints or coatings meeting this definition are considered to be LBP by regulation and are subject to disposal standards.

L. Lead Containing Paint (LCP): Lead-based paint or other similar surfaces or coatings containing lead or lead compounds which contain detectable levels of lead and are regulated under the OSHA standard (29 CFR 1926.62). Any condition that causes exposure to lead from lead-contaminated dust, lead-contaminated soil, lead-based paint that is deteriorated or present in accessible surfaces, friction surfaces, or impact surfaces that would result in adverse human health effects.

M. Lead Control Area: An enclosed area or structure with full containment to prevent the spread of lead dust, paint chips, or debris of lead-containing paint removal operations. The lead control area is isolated by physical boundaries to prevent unauthorized entry of personnel.

N. PEL: Permissible Exposure Limit. The PEL for lead is 50 ug/m3 (0.05 mg/m3) for an 8-hour exposure.

O. Paint: Means paint and primer systems

P. Personal Sampling: Sampling of airborne lead concentrations within the breathing zone of an employee to determine the 8-hour time weighted average concentration in accordance with 29 CFR 1926.62. Samples shall be representative of the employee’s work tasks. Breathing zone shall be considered an area within a hemisphere, forward of the shoulders, with a radius of 6 to 9 inches and centered at the nose or mouth of an employee.

1.7. Submittals

A. Payment for work related to this section will not be issued until all documentation required is submitted.

B. Coordinate transmittal of different types of submittals for related elements of the Work so processing will not be delayed by the need to review submittals concurrently for coordination. The Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until all related

Lead-Based Paint Section 02 83 33 - 8 submittals are received. To avoid the need to delay Work as a result of the time required to process submittals, allow sufficient time for submittal review, including time for re-submittals. Allow 2 weeks for initial review. No extension of Contract Time will be authorized because of failure to transmit submittals to the Architect sufficiently in advance of the Work to permit processing. Submit three copies of each required submittal. The Architect will retain two, and will return the one marked with action taken and corrections or modifications required.

C. The Contractor shall be responsible for obtaining and maintaining all permits and certifications for the Work. All permits and certifications shall be maintained onsite for review if requested. The contractor shall submit permits and certifications to the Owner for recordkeeping prior to final payment.

D. Submit a detailed job-specific plan of the work procedures to be used in the demolition of building materials with lead-containing paint. The plan shall include a sketch showing the location, size, and details of lead control areas, location and details of decontamination rooms, change rooms, shower facilities, and mechanical ventilation system. Include air sampling, training and strategy, sampling methodology, frequency, duration of sampling, and qualifications of air monitoring personnel in the air sampling portion of the plan.

E. Notification: Notify the Owner and Architect of work schedule not less than 10 days prior to commencing any work. Notification is also required for any changes in work schedule. Provide 48 hours notification in any schedule changes.

F. Hazard Communication Program: The Contractor will submit evidence, if requested, of a written Hazard Communication Program as required by 29 CFR 1910.1200.

G. Respirator Program: Establish and implement a respirator program as required by ANSI Z88.2, 29 CFR 1910.134, and 29 CFR 1926.1101. Submit evidence of program, if requested.

H. Training: Submit to the Architect not less than 10 days prior to commencing any work documentation that the required EPA, OSHA and State training has been conducted. Prior to or at time of initial assignment to lead work, and at least annually thereafter, each employee shall be instructed with regard to the hazards of lead, safety and health precautions, the use and requirements for protective clothing, equipment, and respirators, and the additional requirements of 29 CFR

1926.62. Training shall fully cover engineering and other hazard control techniques and procedures.

Lead-Based Paint Section 02 83 33 - 9

I. Logs: Submit to the Architect a daily sign in sheet, a record of all employees and visitors who enter the lead control area, daily reports of the abatement activity compiled by the on-site supervisor, reports of unusual events, and accident reports.

J. Landfill Receipts: Submit to the Owner and Architect weight tickets, receipts, bills of lading, and/or waste manifests from the approved recycling and/or disposal facility. Submittals must be detailed, signed or stamped and dated by an agent of the recycling or disposal facility, and legible.

1.8. Daily Reports

A. The Contractor shall maintain daily logs and reports of job-site activities and personnel exposure monitoring at the site and shall provide copies to the Owner and Architect for review upon request.

B. Reporting Unusual Events: When an event of unusual and significant nature occurs at site (examples: failure of pressure differential system, rupture of temporary enclosures, equipment or power failure, high airborne fiber reading), prepare and submit a special report listing chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information.

C. Accident Reporting: Report all accidents to Owner and Architect. Prepare reports of significant accidents, at site and anywhere else work is in progress. Record and document data and actions; comply with industry standards. For this purpose, a significant accident is defined to include events where personal injury is sustained, property loss of substance is sustained, or where the event posed a significant threat of loss or personal injury. Contractor shall be responsible for the investigation of accidents, the generation of documentation, and the resolution of issues within its control.

Lead-Based Paint Section 02 83 33 - 10

2.0 PRODUCTS

2.1. Paint Removal Products

Submit applicable Safety Data Sheets for paint removal products used in paint removal work. Use the least toxic product suitable for the job and acceptable to the Owner and Architect.

2.2. Equipment

A. The Contractor shall make available three complete sets of personal protective equipment daily, as required herein, for entry to and inspection of the lead control area by the Owner's Representative or other appointed authorized safety or health personnel. The personal protective equipment furnished shall include disposable protective whole body covering, head covering, gloves, foot coverings, eye protection, and use of the Contractor's staging/decontamination area. The personal protective equipment shall remain the property of the Contractor.

B. Respirators: Select respirators approved by the National Institute for Occupational Safety and Health (NIOSH), Department of Health and Human Services, for use in atmospheres containing lead particulate. Respirator selection shall be in accordance with OSHA Regulation 29 CRF 1910.134.

C. Eye Protection: Furnish eye protection for personnel engaged in lead disturbance operations when the use of a full-face respirator is not required.

D. Protective Clothing: Personnel exposed to airborne concentrations of lead or lead compounds shall wear disposable protective whole body clothing, head coverings, gloves, and foot coverings. Cloth gloves may be worn for comfort, but shall not be used alone. Secure sleeves at the wrists and secure foot coverings at the ankles with duct tape.

E. Work Clothing: Cloth or nylon undergarments may be worn under the disposable protective coveralls.

F. Decontamination Systems: Provide a personnel decontamination staging area and an equipment decontamination staging area as described herein. Personnel entry/exit procedures shall be located adjacent to the regulated area as described in 29 CFR 1926.1101. Wastewater shall be captured, properly containerized, and a hazardous waste determination performed to address the Toxicity Characteristic (see Section 3.3.3); the material will then be managed properly, consistent with the waste determination. Leakage of contaminated or potentially contaminated

Lead-Based Paint Section 02 83 33 - 11 decontamination wastewater shall require immediate cessation of work activities until properly addressed and waste residue from the clean-up shall be properly managed (see Section 3.3.3).

G. Tools and Exhaust Systems: Provide the local exhaust in accordance with ANSI Z9.2 and as specified herein. Filters on vacuums and exhaust equipment shall be absolute HEPA filters and UL 586 labeled. Replace filters as required to maintain the efficiency of the system. Discarded filters shall be managed as discussed in Section 3.3.3.

H. Scaffolding: Provide scaffolding, ladders and/or staging, etc. as necessary to accomplish the work of this contract. Scaffolding may be of suspension type or standing type such as metal tube and coupler, tubular welded frame, pole or outrigger type or cantilever type. The type, erection and use of scaffolding shall comply with applicable OSHA provisions.

I. Temporary Water Service Connection: Connections to the Owner's water system shall include backflow protection. Valves shall be temperature and pressure rated for operation of the temperatures and pressures encountered. After completion of use, connections and fittings shall be removed without damage or alteration to existing water piping and equipment. Leaking or dripping valves shall be piped to the nearest drain or located over an existing sink or grade where water will not damage existing finishes or equipment. Provide separate hoses and/or/ pumps for shower water, without the possibility of cross connection.

J. Electrical Power Cords: Provide grounded extension cords. Use hard-service cords where exposed to abrasion and traffic. Provide waterproof connectors to connect separate lengths of electric cords if single lengths will not reach areas where construction activities are in progress. Do not exceed safe length-voltage ratio.

K. Lamps and Light Fixtures: Provide general service incandescent lamps or fluorescent lamps of wattage indicated or required for adequate illumination as required by the work or this section. Protect lamps with guard cages or tempered glass enclosures, where fixtures are exposed to breakage by construction operations. Provide vapor tight fixtures in work area and decontamination units.

Provide exterior fixtures where fixtures are exposed to the weather or moisture.

L. Grounded and Grounding Conductors, Including Ground Fault Circuit Interrupters (GFCI): All wiring design and protection shall conform to the specifications in OSHA Regulation 29 CFR 1926.404 et seq.

Lead-Based Paint Section 02 83 33 - 12

M. First Aid Supplies: Comply with governing regulations and recognized recommendations within the construction industry.

N. Fire Extinguishers: Provide hand-carried, portable, UL-rated, Class A fire extinguishers for temporary offices and similar spaces. In other locations, provide hand-carried, portable, UL-rated, Class ABC, dry-chemical extinguishers or a combination of extinguishers of NFPA-recommended classes for the exposures.

Comply with NFPA 10 and NFPA 241 for classification, extinguishing agent, and size required by location and class of fire exposure.

3.0 EXECUTION

3.1. Lead Control Area Requirements

A. Establish a lead control area in accordance with 29 CFR 1926.62.

B. Protection of Existing Work to Remain: Perform work without damage or contamination of adjacent areas. Where existing work is damaged or contaminated, restore work to its original condition.

C. Boundary Requirements: Provide physical boundaries around the lead control area by roping off the area or providing curtains, portable partitions, or other enclosures to ensure that airborne concentrations of lead will not reach 30 micrograms per cubic meter of air outside of the lead control area.

D. Change Room and Shower Facilities: Provide clean change rooms and shower facilities within the physical boundary around the designated lead control area in accordance with requirements of 29 CFR 1926.62.

E. To the extent feasible, use fixed local exhaust ventilation connected to HEPA filters or other collection systems, approved by the Owner or Architect. Local exhaust ventilation systems shall be designed, constructed, installed, and maintained in accordance with ANSI Z9.2.

F. Personnel Protection: Personnel shall wear and use protective clothing and equipment as specified herein. Eating, smoking, or drinking is not permitted in the lead control area. No one will be permitted in the lead control area unless they have been given appropriate training and protective equipment.

G. Warning Signs: Provide warning signs at approaches to lead control areas. Locate signs at such a distance that personnel may read the sign and take the necessary precautions before entering the area. Signs shall comply with the requirements of

29 CFR 1926.62.

Lead-Based Paint Section 02 83 33 - 13

3.2. Work Procedures

A. Submit to the Owner and Architect a lead-containing paint plan for this site. Use procedures and equipment required to limit occupational and environmental exposure to lead when lead-containing paint is removed/demolished in place in accordance with 29 CFR 1926.62, except as specified herein. Manual dry sanding, blasting with silica grit or open power tools on lead-based paint or lead-containing surfaces is not permitted.

B. Employee Monitoring: Monitoring of airborne concentrations of lead shall be in accordance with 29 CFR 1910.1025 and 29 CFR 1926.62. The contractor is responsible for OSHA compliance monitoring. Collect personal air monitoring samples on employees who are anticipated to have the greatest risk of exposure.

In addition, collect air monitoring samples on at least 25 percent of the work crew or a minimum of two employees, whichever is greater, during each work shift.

Results shall be made available to the Owner and Architect within 48 hours after air samples are collected. The Owner reserves the right to have the Architect conduct third-party monitoring of the contractor’s employees to verify lead exposure results.

C. Area Monitoring: The Owner’s representative may collect area monitoring samples within the work area to verify airborne lead levels. Sufficient area monitoring shall be conducted at the physical boundary to ensure unprotected personnel are not exposed above 30 micrograms per cubic meter of air. If the outside boundary lead levels are equal to or excess of 30 micrograms per cubic meter of air, work shall be stopped and the Contractor shall immediately correct the condition(s) causing the increased levels. If adjacent areas are contaminated, the contractor shall clean contaminated areas. Perform all such required cleaning or decontamination at no additional cost to Owner.

3.3. Disposal of Lead Wastes and Contaminated Debris

A. All waste removal from the work area/containment shall be transported in sealed containers. Monitor the path for any debris or broken bags. Fully clean area if accidental spill occurs.

B. Lead coated components in which the coating remains intact may be recycled or disposed at an approved facility. Contractor shall notify Owner and Architect of disposal location for approval prior to any material leaving site.

C. Project related items which cannot be cleaned (lead-contaminated waste, scrap, debris, bags, containers, equipment, and lead contaminated clothing, which may produce airborne concentrations of lead particles) shall be tested using a

Lead-Based Paint Section 02 83 33 - 14

Tennessee-certified laboratory by Toxicity Characteristic Leaching Procedure (TCLP, also referred to as EPA Method 1311 within SW-846), managed in accordance with the associated regulatory requirements, and transported and disposed at an approved facility based upon the results. TCLP testing should include all eight heavy metals listed in RCRA (commonly referred to as the “RCRA- 8”) due to the potential presence of other metals such as barium, cadmium, and chromium in paint and/or primer systems. Label the containers appropriately, in accordance with 29 CFR 1926.62 and 40 CFR 261.

All waste samples must be collected in a manner that will ensure that they are representative of the waste undergoing the hazardous waste determination.

Sampling methodology shall conform to the applicable requirements of EPA’s SW-846, entitled “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods.”

D. Lead paint waste shall be stored in U.S Department of Transportation (49 CFR

178) approved 55-gallon drums. Properly label the drum to identify the type of waste (49 CFR 172) and the date the drum was filled. The Owner will assign an area for interim storage of waste-containing drums. The Contractor shall test lead paint waste by TCLP (also referred to as EPA Method 1311 within SW-846) using a Tennessee-certified laboratory in order to properly profile the material into an appropriate approved disposal facility. The Contractor is responsible for the proper characterization, handling, management, transportation and disposal of the waste, consistent with the waste determination. Copies of all waste characterization analyses must be provided to the Owner and Architect within 48 hours of receipt by the Contractor.

All waste samples must be collected in a manner that will ensure that they are representative of the waste undergoing the hazardous waste determination.

Sampling methodology shall conform to the applicable requirements of EPA’s SW-846, entitled “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods.”

E. Handle, store, transport, and dispose lead or lead-contaminated waste in accordance with 40 CFR 260, 40 CFR 261, 40 CFR 262, 40 CFR 263, 40 CFR 264, and 40 CFR 265. Comply with land disposal restriction notification requirements as required by 40 CFR 268, as applicable. Contractor shall adhere to the more stringent hazardous waste management regulations, whether state or federally required.

F. Upon receipt, Contractor will submit one copy of each completed manifest, signed and dated by the generator, transporter, and disposal facility representatives in accordance with 40 CFR 262 to the Architect, who will in turn provide it to the Owner.

Lead-Based Paint Section 02 83 33 - 15

G. Contractor shall ensure transportation of hazardous waste is performed by a Tennessee licensed hazardous waste transporter.

H. Contractor shall ensure that all waste, whether hazardous or non-hazardous, is properly containerized, labeled, and protected from tampering and accidents. All waste containers shall be neatly maintained, with no residue on the container exteriors and securely closed at all times except when emptying and filling.

I. Contractor shall ensure that hazardous waste is properly containerized, labeled, etc. by an individual or individuals trained and qualified under the respective US Department of Transportation requirements. Records of the responsible individual’s training shall be provided to the Owner and Architect for file retention.

J. Contractor shall ensure that all waste shipment manifests are accurate and complete in accordance with the applicable regulation(s).

K. Contractor shall provide to the Owner and the Architect the total weight of hazardous waste generated during this project on a weekly basis.

END OF SECTION

1.0 GENERAL REQUIREMENTS
1.1. Background Information
1.2. Scope of Work
1.3. Coordination
1.4. Pre-Construction Conference
1.5. References
1.6. Definitions
1.7. Submittals
1.8. Daily Reports
2.0 PRODUCTS
2.1. Paint Removal Products
Submit applicable Safety Data Sheets for paint removal products used in paint removal work. Use the least toxic product suitable for the job and acceptable to the Owner and Architect.
2.2. Equipment
3.0 EXECUTION
3.1. Lead Control Area Requirements
3.2. Work Procedures
3.3. Disposal of Lead Wastes and Contaminated Debris