About this file

This presolicitation notice describes a federal contract opportunity to correct facility condition assessment deficiencies at the historical chapel building at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses and has an estimated value between $2 million and $5 million. The scope of work includes selective demolition, abatement of environmental hazards including mold, lead-based paint and asbestos-containing materials, as well as restoration, modification and new construction of interior and exterior building features. Systems and components to be addressed comprise the roof, walls, stairs, concrete work, landscaping, lighting, HVAC, electrical, plumbing, fire suppression, data and communications. The solicitation is expected to publish on October 15th, 2021 and close on November 16th, 2021. The NAICS code is 236220 and size standard is $39.5 million. Questions must be submitted in writing to the identified contracting specialist by the specified date.

View the file

Other files

File Type Posted
36C24921B0017 0007.pdf PDF
36C24921B0017 0006.pdf PDF
36C24921B0017 0005.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part2.pdf PDF
070150.74 Rehabilitation of EPDM Roofing.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part1.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part4.pdf PDF
RFI Bldg 13 Chapel.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part3.pdf PDF
Mt Home Chapel B13 - Amendment 0005_Part5.pdf PDF
36C24921B0017 0004.docx DOCX document
36C24921B0017 0003.docx DOCX document
36C24921B0017 0002.pdf PDF
Pre-Bid Sign-In Sheet Bldg. 13 Chapel 11-29-2021.pdf PDF
ACM LBP Survey Report.pdf PDF
Lead-Based Paint Removal Plan.pdf PDF
VA Church Report.pdf PDF
Organ Evaluation Report.pdf PDF
Site Investigation Report.pdf PDF
36C24921B0017 0001.docx DOCX document
Asbestos Removal Plan.pdf PDF
Mt Home Chapel B13 - Bid Documents_Part1.pdf PDF
WD TN20210111 1-1-2021.pdf PDF
Mt Home Chapel B13 - Bid Documents_Part3.pdf PDF
Mt Home Chapel B13 - Bid Documents_Part4.pdf PDF
36C24921B0017_1.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
MtHome Chapel BID Specifications 10.28.2021.pdf PDF
VHA Supp Contract Req Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.pdf PDF
RFI Form - Mt. Home Chapel B13.docx DOCX document
Mt Home Chapel B13 - Bid Documents_Part2.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

James H. Quillen VA Medical Center, Project 621-20-101

AE Correct FCA Deficiencies with Historical Chapel Bldg 13

Amendment 0005 - 11-01-20

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 00b Quality Control Reports

01 45 29 Testing Laboratory Services 11-18

01 57 19 Temporary Environmental Controls 01-21

01 74 19 Construction Waste Management 01-21

01 81 13 Sustainable Construction Requirements 10-17

DIVISION 02 – EXISTING CONDITIONS

02 82 11 Traditional Asbestos Abatement 05-21

02 83 33.13 Lead-Based Paint Removal and Disposal 05-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 02-16

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

05 50 01 Metal Cross

05 50 02 Chapel Bell Restoration

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

Amendment 0005 - 11-01-20

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 01-21

06 00 02 Wood Restoration 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 01-21

07 01 50.74 Rehabilitation of EPDM Roofing

07 11 13 Bituminous Dampproofing 01-21

07 12 00 Built-Up Bituminous Waterproofing 01-21

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 31 26 Slate Shingles 01-21

07 51 00 Built-Up Bituminous Roofing 08-18

07 60 00 Flashing and Sheet Metal 01-21

07 72 00 Roof Accessories 01-21

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 51 13 Aluminum Windows 04-20

08 71 00 Door Hardware 04-20

08 71 00b Door Hardware Attachment 1

08 88 00 Glazing 01-21

DIVISION 09 – FINISHES

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 24 00 Portland Cement Plastering 01-21

09 26 00 Veneer Plastering 01-21

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 66 16 Terrazzo Floor Tile 10-15

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 12 – FURNISHINGS

12 17 00 Leaded Stained-Glass Windows - Restoration

DIVISION 13 - SPECIAL CONSTRUCTION

Amendment 0005 - 11-01-20

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

DIVISION 21 - FIRE SUPPRESSION

21 13 16 Dry-Pipe Sprinkler Systems 01-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

22 05 19 Meters and Gages for Plumbing Piping 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 11 00 Facility Water Distribution 11-19

22 13 00 Facility Sanitary and Vent Piping 09-20

22 14 00 Facility Storm Drainage 09-15

22 33 00 Electric Domestic Water Heaters 09-20

22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 09 23 Direct-Digital Control System for HVAC 08-20

23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 25 00 HVAC Water Treatment 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 37 00 Air Outlets and Inlets 02-20

23 81 00 Decentralized Unitary HVAC Equipment 03-20

23 82 00 Convection Heating and Cooling Units 03-20

23 82 16 Air Coils 03-20

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 41 00 Facility Lightning Protection 01-17

Amendment 0005 - 11-01-20

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

31 31 16 Termite Control

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 17 23 Pavement Markings 08-16

DIVISION 33 – UTILITIES

33 46 13 Foundation Drainage 10-11

File details come from the government source that posted it. Updated .