Attch 8 Base Offer Price Breakdown 1 Page Excel Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DA--FY26: NRM (PROJ: 548-22-100) BB Remove and Replace Public Address System Federal contract opportunity
Solicitation number
36C24826Q0440
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This is a Base Offer Price Breakdown template for a construction project requiring detailed cost estimation across multiple work divisions. The form is structured to capture labor costs, material costs, and total costs organized by 24 construction divisions including General Requirements, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Offerors must enter all labor and material costs by division, with the template automatically calculating total division costs and subtotals.

The pricing template includes calculation fields for overhead percentage, profit percentage, and bond percentage, which are applied sequentially to generate the total base offer cost. The form specifies that offerors must provide additional price breakdowns to avoid lump sum entries, ensuring detailed government price analysis capability. The template is configured for the VA Medical Center West Palm Beach public address system replacement project (Project No. 548-22-100), with an estimated construction magnitude between $5,000,000 and $10,000,000, a 365-day performance period, firm fixed price contract type, and 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The solicitation was posted April 1, 2026, with proposals due April 30, 2026, at 10:00 AM.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--FY26: NRM (PROJ: 548-22-100) BB Remove and Replace Public Address System, newest first.
File Type Posted
S06 36C24826Q0440 0004 4.27.26.pdf PDF
RFI Responses 4.21.26.xlsx XLSX spreadsheet
36C24826Q0440 0003 4.21.26.pdf PDF
36C24826Q0440 0002.pdf PDF
36C24826Q0440 0001.pdf PDF
Attch 6 PPQ 4 Pages.pdf PDF
Attch 12 WD FL20260220 01.02.26.pdf PDF
Attch 11 Info Security 3 Pages.pdf PDF
Attch 7 A.3 Price Cost Schedule 1 Page.pdf PDF
Attch 5 Drawings 36 Pages.pdf PDF
Attch 2 Project Narrative 62 Pages.pdf PDF
Attch 4 Site Plan 1 Page.pdf PDF
Attch 3 Project Specs 1192 Pages.pdf PDF
Attch 1 SOW 548-22-100.pdf PDF
36C24826Q0440_1.pdf PDF
Attch 10 EMR 1 Page.pdf PDF
Attch 9 LOS 2 Pages.pdf PDF
36C24826Q0440.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis