Attch 8 Base Offer Price Breakdown 1 Page Excel Form.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Y1DA--FY26: NRM (PROJ: 548-22-100) BB Remove and Replace Public Address System Federal contract opportunity
- Solicitation number
- 36C24826Q0440
About this file
This is a Base Offer Price Breakdown template for a construction project requiring detailed cost estimation across multiple work divisions. The form is structured to capture labor costs, material costs, and total costs organized by 24 construction divisions including General Requirements, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Offerors must enter all labor and material costs by division, with the template automatically calculating total division costs and subtotals.
The pricing template includes calculation fields for overhead percentage, profit percentage, and bond percentage, which are applied sequentially to generate the total base offer cost. The form specifies that offerors must provide additional price breakdowns to avoid lump sum entries, ensuring detailed government price analysis capability. The template is configured for the VA Medical Center West Palm Beach public address system replacement project (Project No. 548-22-100), with an estimated construction magnitude between $5,000,000 and $10,000,000, a 365-day performance period, firm fixed price contract type, and 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The solicitation was posted April 1, 2026, with proposals due April 30, 2026, at 10:00 AM.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 36C24826Q0440 0004 4.27.26.pdf | ||
| RFI Responses 4.21.26.xlsx | XLSX spreadsheet | |
| 36C24826Q0440 0003 4.21.26.pdf | ||
| 36C24826Q0440 0002.pdf | ||
| 36C24826Q0440 0001.pdf | ||
| Attch 6 PPQ 4 Pages.pdf | ||
| Attch 12 WD FL20260220 01.02.26.pdf | ||
| Attch 11 Info Security 3 Pages.pdf | ||
| Attch 7 A.3 Price Cost Schedule 1 Page.pdf | ||
| Attch 5 Drawings 36 Pages.pdf | ||
| Attch 2 Project Narrative 62 Pages.pdf | ||
| Attch 4 Site Plan 1 Page.pdf | ||
| Attch 3 Project Specs 1192 Pages.pdf | ||
| Attch 1 SOW 548-22-100.pdf | ||
| 36C24826Q0440_1.pdf | ||
| Attch 10 EMR 1 Page.pdf | ||
| Attch 9 LOS 2 Pages.pdf | ||
| 36C24826Q0440.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Base Offer Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis
File details come from the government source that posted it. Updated .