This document is a complete set of 100% Construction Documents for a Remove and Replace Public Address System project at West Palm Beach VAMC, located at 7305 North Military Trail, West Palm Beach, FL 33410-6400. The project is identified as VA PROJECT #548-22-100 and was prepared by Apogee Consulting Group, P.A., with documents dated December 14, 2022.
The project scope involves the complete removal and replacement of the existing public address and mass notification system (PAMNS) across multiple buildings and floors of the medical center. The basis of design utilizes a Biamp Vocia paging system with components including amplifier chassis (VA-8600), message servers (MS-1), text-to-speech servers (TTS-1), telephone interface servers (VOIP-1/POTS-1), and fire alarm interface devices (GPIO-1). The system encompasses approximately 1,800 speakers distributed across basement through tenth floors of Building 1, plus additional coverage in Buildings 15, 16, 18, 19, and 21. Key deliverables include 32 sheets of technology and general drawings showing speaker placements, riser diagrams, equipment rack details, headend equipment locations in multiple telecom rooms (BC-202, 2B-302C, 5B-302C, 8A-302C, and 1H-103), cabling details, and control station locations. The contractor is responsible for coordination of all system programming and message database setup with the VA, providing spare devices (3% of total or 10 spares minimum per device type), field verification of speaker locations to comply with 2x ceiling height spacing requirements, and compliance with NFPA 101 Life Safety Code, NFPA 99 Healthcare Facilities Code, and VA-adopted building standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 36C24826Q0440 0004 4.27.26.pdf | ||
| RFI Responses 4.21.26.xlsx | XLSX spreadsheet | |
| 36C24826Q0440 0003 4.21.26.pdf | ||
| 36C24826Q0440 0002.pdf | ||
| 36C24826Q0440 0001.pdf | ||
| Attch 12 WD FL20260220 01.02.26.pdf | ||
| Attch 11 Info Security 3 Pages.pdf | ||
| Attch 7 A.3 Price Cost Schedule 1 Page.pdf | ||
| Attch 2 Project Narrative 62 Pages.pdf | ||
| Attch 4 Site Plan 1 Page.pdf | ||
| Attch 3 Project Specs 1192 Pages.pdf | ||
| Attch 1 SOW 548-22-100.pdf | ||
| 36C24826Q0440_1.pdf | ||
| Attch 6 PPQ 4 Pages.pdf | ||
| Attch 10 EMR 1 Page.pdf | ||
| Attch 9 LOS 2 Pages.pdf | ||
| Attch 8 Base Offer Price Breakdown 1 Page Excel Form.xlsx | XLSX spreadsheet | |
| 36C24826Q0440.docx | DOCX document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP
PROJECT IMAGEPROJECT LOCATION MAP
AS NOTED
/1 /2
:3
:3
A
M C
U s e rs \l b a ja ri a s \D o c u m e n ts
\A
-0
W e s t_
P a lm
B e a c h
-R e p la c e
P A
M N
S -F
L lb a ja ri a s S
Z L
D E
.r v t
G-001
COVER
1 4LMB
REMOVE AND REPLACE
PUBLIC ADDRESS SYSTEM
WEST PALM BEACH VAMC
7305 NORTH MILITARY TRAIL
WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022
100% CONSTRUCTION DOCUMENTS
548-22-10022-038
REMOVE AND REPLACE PUBLIC ADDRESS
SYSTEM
WEST PALM BEACH VAMC
7305 NORTH MILITARY TRAIL
WEST PALM BEACH FL, 33410-6400
VA PROJECT #: 548-22-100
DJR
DRAWING LIST
GENERAL
G-001 COVER 1 4
G-002 GENERAL INFORMATION 2 4
G-003 ICRA INFORMATION AND DETAILS 3 4
G-004 PRE-CONSTRUCTION RISK ASSESSMENT FORMS 4 4
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 32
T-101 BASEMENT FLOOR SE PAMNS 2 32
T-102 BASEMENT FLOOR CENT PAMNS 3 32
T-103 BASEMENT FLOOR NW PAMNS 4 32
T-104 BASEMENT FLOOR E PAMNS 5 32
T-105 CLC NE PAMNS 6 32
T-106 CLC SW PAMNS 7 32
T-111 FIRST FLOOR SE PAMNS 8 32
T-112 FIRST FLOOR CENT PAMNS 9 32
T-113 FIRST FLOOR NW PAMNS 10 32
T-114 FIRST FLOOR E PAMNS 11 32
T-115 FIRST FLOOR S PAMNS 12 32
T-121 SECOND FLOOR SE PAMNS 13 32
T-122 SECOND FLOOR CENT PAMNS 14 32
T-123 SECOND FLOOR NW PAMNS 15 32
T-131 THIRD FLOOR SE PAMNS 16 32
T-132 THIRD FLOOR CENT PAMNS 17 32
T-133 THIRD FLOOR NW PAMNS 18 32
T-141 FOURTH FLOOR SE PAMNS 19 32
T-142 FOURTH FLOOR CENT PAMNS 20 32
T-143 FOURTH FLOOR NW PAMNS 21 32
T-151 FIFTH FLOOR PAMNS SE 22 32
T-152 FIFTH FLOOR PAMNS NW 23 32
T-161 SIXTH FLOOR PAMNS 24 32
T-171 SEVENTH FLOOR PAMNS 25 32
T-181 EIGHTH FLOOR PAMNS 26 32
T-191 NINTH FLOOR PAMNS 27 32
T-192 TENTH FLOOR PAMNS 28 32
T-401 TECHNOLOGY ENLARGEMENTS 29 32
T-402 TECHNOLOGY ENLARGEMENTS 30 32
T-501 TECHNOLOGY DETAILS 31 32
T-601 PAMNS RISER DIAGRAM 32 32
CAMPUS LOCATION
PROJECT LOCATION
DocuSign Envelope ID: 88475F19-AD36-411D-B79A-CDEEC92A0411
12/16/2022
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND
STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES
BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
STANDARD (PG-18-13)
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE
VA MASTER CONSTRUCTION SPECIFICATION.
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
A. REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING AND
COMMUNICATION SYSTEM(S).
B. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
C. THIS PROJECT IS ALL PUBLIC ADDRESS SYSTEM
RENOVATION. NO CHANGES ARE MADE TO EGRESS
PATHS OR FIRE RATINGS OUTSIDE THE
CONSTRUCTION LIMITS.
D. SPRAY APPLIED FIREPROOFING PRESENT ON
STRUCTURAL MEMBERS AND FLOOR/ROOF DECK
ABOVE. REPAIR OR REPLACE ALL FIREPROOFING
DAMAGED AS A RESULT OF CONSTRUCTION.
E. SEE ICRA TYPICAL CONDITIONS APPLICABLE
THROUGHOUT ROOMS AND CORRIDORS ON SHEET
1/G-003.
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1 #
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR/VA
AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR/VA PRIOR TO BIDDING.
WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR
GREATER QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR/VA IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR/VA PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
9. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR/VA.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR/VA.
6. NOTIFY COR/VA OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO
MATCH EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR/VA, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE
PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR/VA.
13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE COR/VA UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE COR/VA WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE COR/VA OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR
REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
15. CONTRACTOR SHALL NOTIFY COR/VA OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
16. COORDINATE WITH COR/VA FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR/VA FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND
CONTRACTOR USE OF FREIGHT ELEVATOR (AS REQUIRED).
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
AS NOTED
/1 /2
:3
:4
A
M C
U s e rs \l b a ja ri a s \D o c u m e n ts
\A
-0
W e s t_
P a lm
B e a c h
-R e p la c e
P A
M N
S -F
L lb a ja ri a s S
Z L
D E
.r v t
G-002
GENERAL INFORMATION
2 4LMB
REMOVE AND REPLACE
PUBLIC ADDRESS SYSTEM
WEST PALM BEACH VAMC
7305 NORTH MILITARY TRAIL
WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022
100% CONSTRUCTION DOCUMENTS
548-22-10022-038
DJR
GENERAL SYMBOL LEGEND CODE STANDARDS AND EXECUTIVE ORDERSLIFE SAFETY GENERAL NOTES
ARCHITECTURAL SYMBOL LEGEND
ABBREVIATIONS
GENERAL NOTES
DEMOLITION NOTES
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR RENOVATION BUILDING 1,
BASEMENT FLOOR
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
NOTE:
THIS PROJECT CONSTITUTES MULTIPLE BUILDINGS AND
FLOORS. SEE FLOOR PLANS FOR APPROPRIATE
LOCATIONS TO REFLECT ON EACH ILSM SIGNAGE.
DUST CONTROL PLAN NOTES
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 5A.
1. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
2. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
2A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
3A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.
IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE
USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT
OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE
COR/VA.
3B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
3C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL
BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION
PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
4. AIR SYSTEM FLOW: THE COR/VA VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE
OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY AREAS.
4A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
4B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
4C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR/VA.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
5. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
5A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
AREA OF WORK
CORRIDOR
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
EXISTING DOOR
STICKY MATS
WORK WITHIN ENTIRE ROOM
PLASTIC SHEET ICRA BARRIER
ZIPPER DOOR
STICKY MAT
WORK WITHIN LARGER SPACE
CORRIDOR
PLASTIC SHEET ICRA
BARRIER
ZIPPER DOOR
WORK IN CORRIDOR
AREA OF WORK
STICKY MATSEXISTING WALL
20'-0" MAX
C L E
A R
M
IN
AREA OF WORK
NOTE: ICRA AND LIFE SAFETY FLOOR PLANS SHOW SOME
SPECIFIC LOCATIONS WHERE ICRA BARRIERS ARE REQUIRED.
OTHER WORK MAY REQUIRE ICRA BARRIERS, AND THESE
DETAILS PROVIDE TYPICAL GUIDANCE FOR CONSTRUCTING
ICRA BARRIERS.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
AS NOTED
/1 /2
:3
:5
A
M C
U s e rs \l b a ja ri a s \D o c u m e n ts
\A
-0
W e s t_
P a lm
B e a c h
-R e p la c e
P A
M N
S -F
L lb a ja ri a s S
Z L
D E
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 4LMB
REMOVE AND REPLACE
PUBLIC ADDRESS SYSTEM
WEST PALM BEACH VAMC
7305 NORTH MILITARY TRAIL
WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022
100% CONSTRUCTION DOCUMENTS
548-22-10022-038
DJR
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
THIS MATRIX NEEDS TO BE VERIFIED WITH THE COR/VA, PRIOR TO
IMPLEMENTATION, AS THE COR/VA MAY HAVE THEIR OWN ICRA MATRIX.
Scale: 1/4" = 1'-0"
TYPICAL ICRA CONDITIONS
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
TEMPORARY DOOR
TEMPORARY WALL
DEMOLISH WALL
DEMOLISH DOOR
DEMOLISH WINDOW
EXISTING WINDOW TO REMAIN
ICRA LEGEND
TEMPORARY WALL
TEMPORARY DOOR
(TO BE DISCUSSED)
TEMPORARY WALL AND DOOR
GRAPHICS COULD BE ADJUSTED
PER PROJECT. ONE COULD USE
THE REVIT MODEL OR "FIELD
REGION" TO SHOW AREAS*
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
AS NOTED
/1 /2
:3
:3
A
M C
U s e rs \l b a ja ri a s \D o c u m e n ts
\A
-0
W e s t_
P a lm
B e a c h
-R e p la c e
P A
M N
S -F
L lb a ja ri a s S
Z L
D E
.r v t
G-004
PRE-CONSTRUCTION RISK
ASSESSMENT FORMS
4 4LMB
REMOVE AND REPLACE
PUBLIC ADDRESS SYSTEM
WEST PALM BEACH VAMC
7305 NORTH MILITARY TRAIL
WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022
100% CONSTRUCTION DOCUMENTS
548-22-10022-038
DJR
UPDATE CLC HVAC SYS.
B
HIGHEST RISK
Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary.
Environmental conditions that could affect human health, such as sewage, mold, asbestos, gray water and black water will require Class of Precautions IV for LOW and MEDIUM Risk Groups and Class of Precautions V for HIGH and HIGHEST Risk Groups.
*Type C [Medium Risk Groups] and Type D [Low Risk Groups] work areas [Class III precautions] that cannot be sealed and completely isolated from occupied patient care spaces should be elevated to include negative air exhaust requirements as listed in Class IV Precautions.
TECHNOLOGY SYMBOL LEGEND
DATA OUTLET - N-4 PR UTP
TELCO OUTLET - N-4 PR UTP
SYMBOL HEIGHT DESCRIPTION
18"
48"
N
FOUR POST OIT EQUIPMENT RACK
OIT EQUIPMENT CABINET
NURSE CALL EQUIPMENT CABINETNCE
LADDER CABLE TARY
N
FLOOR BOX FOR DATA
6' TO TOP
FLOOR
GROUND BUS
FLOOR
FLOOR
ABOVE
CEILING
18"
4'x8'x3/4" FIRE RATED TTB8"
FLOOR TWO POST OIT EQUIPMENT RACK
CEILING MOUNTED SPEAKERCEILING
WALL MOUNTED SPEAKER96"
S
S
(N - QUANTITY)
(N - QUANTITY)
VOLUME CONTROL48"VC
PAGING CONSOLE48"PS
PAGING CABINETFLOORPA
WALL MOUNTED HORNAS NOTEDS
DEVICES WITH THE FOLLOWING TAGS ARE AS INDICATED:
E: EXISTING DEVICES TO REMAIN. PROVIDE NEW CABLING AND CONDUIT AS NEEDED.
D: EXISTING DEVICES TO BE DEMOLISHED BY THE CONTRACTOR.
R: EXISTING DEVICES TO BE REPLACED WITH NEW BY THE CONTRACTOR.
N: NEW DEVICES TO BE PROVIDED AND INSTALLED BY THE CONTRACTOR.
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.
SEE DRAWINGS FOR MORE INFORMATION.
NOTE: NOT ALL SYMBOLS ARE USED.
JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED
AS
NOTED
J
TECHNOLOGY GENERAL NOTES
1. PROVIDE COMMUNICATIONS DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA
STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT
SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL
LISTING REQUIREMENT AND APPLICABLE BUILDING CODES.
4. PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION
METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.
5. COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607B OR 607A - GROUNDING AND BONDING REQUIREMENTS
FOR TELECOMMUNICATIONS IN COMMERCIAL BUILDING.
6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568B - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING
STANDARD.
7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569B - COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS
PATHWAYS AND SPACES.
8. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.
9. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.
10. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.
11. COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION.
12. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE COR WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN
ACT".
13. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
14. PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED. ALL SPEAKER CABLING FOR THE PUBLIC
ADDRESS SYSTEM SHALL BE RUN IN CONDUIT.
15. PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY
TESTING AGENCY.
16. NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE
MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.
17. PROVIDE TIA/EIA CAT 6 COPPER OUTLETS AND CONNECTORS.
18. ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6 KEYSTONE JACK WIRED PER T568A OR T568B AS DIRECTED
BY THE VA COR.
19. LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS
SET FORTH BY THE VA HOSPITAL OIT.
20. PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.
21. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.
22. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".
23. DEVICES PLACED IN INTERCOMMUNICATION ROOM TO BE MOUNTED ON FIRE RETARDANT PLYWOOD.
24. BASIS OF DESIGN UTILIZED IN THIS DESIGN IS THE BIAMP VOCIA PAGING SYSTEM. ALTERNATES TO THE BASIS OF DESIGN ARE ACCEPTABLE UPON MEETING OR EXCEEDING THE FUNCTIONALITY OF THE SYSTEM AS
DESIGNED.
25. CONTRACTOR SHALL TRACK AND NOTE ORDER OF SPEAKERS AND DEVICES IN SPEAKER CIRCUITS, AND
PROVIDE RECORD DRAWINGS INDICATING THE ORDERING OF DEVICES.
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISH FLOOR
BOD BASIS OF DESIGN
CCTV CLOSED CIRCUIT TELEVISION
COAX COAXIAL CABLE
COMM COMMUNICATION
COR CONTRACTING OFFICER REPRESENTATIVE
DC DOOR CONTACT SWITCH
DN DOWN
DO DOOR OPERATOR
DVC DIGITAL VOICE COMMAND
DVR DIGITAL VIDEO RECORDER
E EXISTING DEVICES
EEB EMERGENCY EXIT BUTTON
EL ELECTRICAL STRIKE
ETR EXISTING TO REMAIN
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FAAP FIRE ALARM ANNUNCIATOR PANEL
FO FIBER OPTIC
FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL
IT INTERCOMMUNICATION ROOM
MATV MASTER ANTENNA TELEVISION
MM MULTI MODE FIBER
NAC NETWORK APPLIANCE CIRCUIT PANEL
N NEW DEVICES
NCA NETWORK CONTROL ANNUNCIATOR
NS NO SCALE
NTS NOT TO SCALE
NVR NETWORK VIDEO RECORDER
TECHNOLOGY ABBREVIATIONS LIST
OC ON CENTER
OIT OFFICE OF INFORMATION TECHNOLOGY
PACS PHYSICAL ACCESS CONTROL SYSTEM
PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM
PB PUSH BUTTON
PBB PRIMARY BONDING BUSBAR
PDU RACK POWER DISTRIBUTION UNITS
POE POWER OVER ETHERNET
PR PAIR
RBB RACK BONDING BUSBAR
RX REQUEST TO EXIT
SBB SECONDARY BONDING BUSBAR
SEP SERVICE ENTRANCE PROTECTION
SLC SIGNALING LINE CIRCUIT
SM SINGLE MODE FIBER
TBB TELECOM BONDING CONDUCTOR
TEL TELEPHONE
TGB TELECOM GROUND BUS BAR
TM TELEMONITORING
TMGB TELECOM MAIN GROUND BUS BAR
TP TWISTED PAIR
TR TELECOM ROOM
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
WM WIRE MANAGEMENT
WAP WIRELESS ACCESS POINT
UL UNDERWRITERS LABORATORY
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
CABLES AND CONNECTORS COLOR LEGEND
DESCRIPTION
ITEM JACK CABLE PATCH CABLES
DATA/COMPUTER BLUE BLUE BLUE
I.D. NOTES
C 4 PAIR CABLE
CONDUIT
FIBER - MULTI-MODE
FIBER - SINGLE-MODE
SOUND SYSTEM
BLACK
IVORY
N/A
AQUA
YELLOW
GREEN
AQUA
YELLOW
N/A
FO
FO
SS
6/12/24/36
6/12
MULTI COLOR
CONDUCTORS
BLUE
BLUE
BLUE
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA
STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING
CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL
ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING HARDWARE TO
SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT DURING
CONSTRUCTION.
8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT
MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S SCREW
TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE- ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR
FINAL CONNECTIONS.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRD
PARTY TESTING AGENCY.
17. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE GOVERNMENT, SHALL BE
PROVIDED.
18. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
19. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".
20. FEEDER TAGS APPENDED WITH 'VD' ARE UPSIZED IN AMPACITY DUE TO VOLTAGE DROP.
120V DUPLEX RECEPTACLE
RECEPTACLE MODIFIERS:
AC: 3" ABOVE COUNTERTOP/BACKSPLASH
GFI: GROUND FAULT CURRENT INTERRUPTER
WP: WEATHERPROOF ENCLOSURE
DED: DEDICATED CIRCUIT
120V DUPLEX RECEPTACLE EMERGENCY OUTLET
AND COVER PLATE SHALL BE RED IN COLOR
120V QUADRUPLEX RECEPTACLE
120V QUADRUPLEX RECEPTACLE EMERGENCY
OUTLET AND COVER PLATE SHALL BE RED IN COLOR
JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED
DISCONNECT SWITCH NON-FUSED
DISCONNECT SWITCH FUSED
SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO
SYMBOL HEIGHT DESCRIPTION
18"
18"
18"
18"
AS
NOTED
72" TOP
72" TOP
SWITCH MODIFIERS:
M: MOTOR-RATED
48"
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
TOP: HEIGHT TO TOP OF DEVICE
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.
SPECIAL RECEPTACLE
EQUIPMENT CONNECTION
AS
NOTED
E
208V DUPLEX RECEPTACLE18"
18"
120V DUPLEX RECEPTACLE FLOOR BOX
120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX
OUTLET AND COVER PLATE SHALL BE RED IN COLOR
120V QUADRUPLEX RECEPTACLE FLOOR BOX
120V QUADUPLEX RECEPTACLE EMERGENCY
FLOOR BOX OUTLET AND COVER PLATE SHALL BE
RED IN COLOR
CLNG
J
J
J
JUNCTION BOX, CEILING MOUNTED, PURPOSE AS
NOTED
JUNCTION BOX, FLOOR MOUNTED, PURPOSE AS
NOTED
120V SIMPLEX RECEPTACLE18"
ELECTRICAL SYMBOL LEGEND
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:0
:2
P M
C U s e rs \p n e u e n s c h w a n d e r\ D o c u m e n ts
\E
-0
W e s t_
P a lm
B e a c h
-R e p la c e
P
A M
N S
-F L p n e u e n s c h w a n d e r.
rv t
T-001
TECHNOLOGY GENERAL NOTES,
SYMBOL LEGEND, AND
ABBREVIATIONS
1 32JDM
REMOVE AND REPLACE
PUBLIC ADDRESS SYSTEM
WEST PALM BEACH VAMC
7305 NORTH MILITARY TRAIL
WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022
100% CONSTRUCTION DOCUMENTS
548-22-10022-038
JDM
ELECTRICAL GENERAL NOTES
12/15/2022 12/15/2022
S R
S D
S D
S D
S R
S D
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S D
S D
S D
S R
S R
S R
S
S R
S R
ELEC
TOIL
WAIT
HAC
TOIL
PREP
PREP
PREP
PET CT
EQUIP
CONTROL
READ
C
C
C
EXAM/ OFFICE
PHYSICS OFFICE
EXAM/ OFFICE
HOT LAB
EXAM/ OFFICE
EXAM/ OFFICE
CLOSET
F E
C
1-9
1-8
1-3
BA-95
BA-94
BA-93
BA-92
BA-91
BA-90
BA-89
BA-88
BA-87
BA-86
BA-85
BA-84
BA-83
BA-96
BA-82
BA-80
BA-81
BA-21
BA-19
BA-20
HDI VAULT
BA-25
LINAC 1
BA-17
CT/SIM
CONTROL
1-1 C
BA-52
ISO RM
BA-13
DATA
BA-14
CR. CRT.
BA-10
ENTRY
VESTIBULE
BA-11
LOBBY
1-2 C
1-7 C
1-6 C
1-5 C
1-4 C
P.E.
BA-66
PATIENT
EDUCATION
BA-53
PATIENT
TOILET
BA-64
WOMENS
TOILET
BA-63
MENS
TOILET
BA-62
BLOOD
DRAW
BA-61
STAFF
TOILET
BA-59
CONFERENCE/
BREAK
ROOM
BA-58
MIXING/
CLEANING/
PREP
ROOM
BA-57
ANTEROOM
BA-56
PHARMACIST
BA-54
PATIENT
TOILET
BA-51
STORAGE
BA-50
INFUSION
BA-49
JANITOR
BA-48
SOCIAL
WORKER/
EXAM
BA-47
SOILED
UTILITY
BA-46
DIET/
EXAM
BA-44
CLEAN
UTILITY
BA-43
OFFICE
BA-42
OFFICE
BA-41
EXAM
BA-39
EXAM
BA-38
EXAM
BA-37
BONE
MARROW/
EXAM
BA-36
OFFICE
BA-34
EXAM
BA-33
N.P.
BA-32
ELEC.
BA-31
OFFICE/
TUMOR
REGISTER
BA-28
ELEVATOR
EQUIP.
69 SF
BA-27
STAFF
TOILET
BA-26
PHYSICIST
BA-24
DOSIMETRIST
BA-18
CT/SIM
BA-16
W. TOIL./
SUBWTNG/
CHNGNG
BA-15
M. TOIL./
SUBWTNG/
CHNGNG
BA-12
RECEPTION/
STAFF
MI-41MI-41
S R
S R
S R
2'-0"
CORR.
DOCK
LIFT
RECEIVING AND
SHIPPING DOCK
DOCK 1
STAIR 11
DOCK
LEVELER
DOCK
LEVELER
ARCH
ABOVE
OFFICE
STORE-
KEEPER
BA-210
ROLL-UP
DOOR SIZE
10'-0"WX10'-0"H
RECEIVING
AND ISSUE
OFFICE
BA-208
FLAMABLE
STORAGE
BA-206
STAFF
TLT.
BA-204
BA-202
DIALYSIS
STORAGE
HAC
CONTROL
SUBSTANCE
STORAGE
BA-203
MECHANICAL
BA-302
MED GAS
BA-303
MED GAS
BA-301
EXCESS
PROPERTY
STORAGE
BA-212
UNPOSTED STOCK
HOLDING AREA
WAREHOUSE
RECEIVING
BA-201
RECEIVING AND
ISSUE AREA
SUBSISTENCE
STORAGE
WAREHOUSE
STORAGE
BA-201
MEDICAL/
GENERAL
STORAGE
STAIR 3
MAIL ROOM
BA-215A
FORMS
STORAGE
BA-215BIOMED
WORKSTATION
BA-201A
DOCK 2
ANTE-
ROOM
BA-304
REFRIGERAT
BODY
HOLDING
BA-304A
STORAGE
BA-306
LAB/PATH
BA-310
EMS
BA-312
CORR.
BA-C4
MECHANICAL
BB-304 CHIEF
LOGISTIC
BB-306
STAIR 5
SOILED
SERVICE
LOBBY
BB-302
PNEUMATIC
TUBE
FAN ROOM
BB-302A
CORR.
BA-C3
VEST.
BA-271
FEMALE
TOILETS
SHOWERS
BA-271A
MALE
LOCKERS
BA-272
MALE TLTS.
SHOWERS
BA-272A
VEST.
BA-272
BA-262BA-261A
CORR.
BA-C1
BA-108
DISTRIB.
SECTION
BA-106
PROGRAM
COORDINATOR
BA-106A
DISP. ADMIN.
SCHEDULING
MAS CONTROL
BA-104
CONSOLE ROOM
BB-206
STORAGE
BB-209
MANGEMENT
BA-106C
MAS
ADMIN
SUPERV
BA-103
CHIEF
BB-207
TRANSC.
SUPERV.
BA-105
DGR.
COORD.
BA-107
TRANSCRIPTIONS
BA-109
BA-102
GENERAL
OFFICE
BA-102
SUPPLY/EQUIP.
STORAGE
BA-251
MACHINE
BA-110
TELEPHONE
SWITCHGEAR
BA-112
ELECT
ROOM
BA-114
E.T.O. CYLINDER
STORAGE
BA-223
PREPARATION
ASSEMBLY
BA-251A
ETO
VESTIBULE
BA-223
AUTO
CART
WASH
BA-225
MANUAL
EQUP.
WASH
BA-227
CORR.
BA-221
MALE
STAFF
TLT.
BA-233A
DECONTAMINATION
ROOM
BA-221
MACH.
ROOM
BA-215B
CORR.
BA-C3
HAC
BA-229
LOUNGE
BA-232
MALE
STAFF
LKRS.
BA-233 CHIEF
PAD
BA-242
CORR.
BA-231
STAFF LKRS.
FEMALE
BA-234
FEMALE
STAFF TLT.
BA-234A
CORR.
BA-241
HAC
BA-243
CLEAN
RECEIVING
AND
BREAKOUT
BA-241
SUPPLY
BA-254
BREAK
ROOM
BA-252
CORR.
BA-C2
INV.
MANAGER
BA-245A
COMPUTER
DATA
HANDLING
EQUIP.
BA-245B
PAD/
DISTRUBITION
BA-245
PAD
SUPERVISOR
BA-245C
AUTO
CART
DRYING
EQUIPMENT
STORAGE AND
TESTING AREA
STERILE/
NON-STERILE
STORAGE
AREA
STORAGE
CORR.
TRASH
CHUTE
ABOVE
POLICE
OPERATIONS
BA-261
MEDICAL
RESEARCH
STORAGE
FOR ENLARGED PLAN OF THIS
AREA SEE DWG.1-86
V.P.
DN
RAILING
SERVICE
OFFICE
BA-261C
MATERIAL
STAIR #2
EMERGENCY
DOOR
STAIR 4
ETO
VESTIBULE
BA-223
BA-308
BA-95 BA-97 BA-99
LOGISTIC
SUPPLY SERV.
WAREHOUSE
ADMIN.
OFFICES/CUBICALS
SUPPLY PROCCESSING &
DIST.
W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000
W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000
2'-0"
CORR.
DOCK
LIFT
RECEIVING AND
SHIPPING DOCK
DOCK 1
STAIR 11
DOCK
LEVELER
DOCK
LEVELER
ARCH
ABOVE
OFFICE
STORE-
KEEPER
BA-210
ROLL-UP
DOOR SIZE
10'-0"WX10'-0"H
RECEIVING
AND ISSUE
OFFICE
BA-208
FLAMABLE
STORAGE
BA-206
STAFF
TLT.
BA-204
BA-202
DIALYSIS
STORAGE
HAC
CONTROL
SUBSTANCE
STORAGE
BA-203
MECHANICAL
BA-302
MED GAS
BA-303
MED GAS
BA-301
EXCESS
PROPERTY
STORAGE
BA-212
UNPOSTED STOCK
HOLDING AREA
WAREHOUSE
RECEIVING
BA-201
RECEIVING AND
ISSUE AREA
SUBSISTENCE
STORAGE
WAREHOUSE
STORAGE
BA-201
MEDICAL/
GENERAL
STORAGE
STAIR 3
MAIL ROOM
BA-215A
FORMS
STORAGE
BA-215BIOMED
WORKSTATION
BA-201A
DOCK 2
ANTE-
ROOM
BA-304
REFRIGERAT
BODY
HOLDING
BA-304A
STORAGE
BA-306
LAB/PATH
BA-310
EMS
BA-312
CORR.
BA-C4
MECHANICAL
BB-304 CHIEF
LOGISTIC
BB-306
STAIR 5
SOILED
SERVICE
LOBBY
BB-302
PNEUMATIC
TUBE
FAN ROOM
BB-302A
CORR.
BA-C3
VEST.
BA-271
FEMALE
TOILETS
SHOWERS
BA-271A
MALE
LOCKERS
BA-272
MALE TLTS.
SHOWERS
BA-272A
VEST.
BA-272
BA-262BA-261A
CORR.
BA-C1
BA-108
DISTRIB.
SECTION
BA-106
PROGRAM
COORDINATOR
BA-106A
DISP. ADMIN.
SCHEDULING
MAS CONTROL
BA-104
CONSOLE ROOM
BB-206
STORAGE
BB-209
MANGEMENT
BA-106C
MAS
ADMIN
SUPERV
BA-103
CHIEF
BB-207
TRANSC.
SUPERV.
BA-105
DGR.
COORD.
BA-107
TRANSCRIPTIONS
BA-109
BA-102
GENERAL
OFFICE
BA-102
SUPPLY/EQUIP.
STORAGE
BA-251
MACHINE
BA-110
TELEPHONE
SWITCHGEAR
BA-112
ELECT
ROOM
BA-114
E.T.O. CYLINDER
STORAGE
BA-223
PREPARATION
ASSEMBLY
BA-251A
ETO
VESTIBULE
BA-223
AUTO
CART
WASH
BA-225
MANUAL
EQUP.
WASH
BA-227
CORR.
BA-221
MALE
STAFF
TLT.
BA-233A
DECONTAMINATION
ROOM
BA-221
MACH.
ROOM
BA-215B
CORR.
BA-C3
HAC
BA-229
LOUNGE
BA-232
MALE
STAFF
LKRS.
BA-233 CHIEF
PAD
BA-242
CORR.
BA-231
STAFF LKRS.
FEMALE
BA-234
FEMALE
STAFF TLT.
BA-234A
CORR.
BA-241
HAC
BA-243
CLEAN
RECEIVING
AND
BREAKOUT
BA-241
SUPPLY
BA-254
BREAK
ROOM
BA-252
CORR.
BA-C2
INV.
MANAGER
BA-245A
COMPUTER
DATA
HANDLING
EQUIP.
BA-245B
PAD/
DISTRUBITION
BA-245
PAD
SUPERVISOR
BA-245C
AUTO
CART
DRYING
EQUIPMENT
STORAGE AND
TESTING AREA
STERILE/
NON-STERILE
STORAGE
AREA
STORAGE
CORR.
TRASH
CHUTE
ABOVE
POLICE
OPERATIONS
BA-261
MEDICAL
RESEARCH
STORAGE
FOR ENLARGED PLAN OF THIS
AREA SEE DWG.1-86
V.P.
DN
RAILING
SERVICE
OFFICE
BA-261C
MATERIAL
STAIR #2
EMERGENCY
DOOR
STAIR 4
ETO
VESTIBULE
BA-223
BA-308
BA-95 BA-97 BA-99
LOGISTIC
SUPPLY SERV.
WAREHOUSE
ADMIN.
OFFICES/CUBICALS
SUPPLY PROCCESSING &
DIST.
W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000
W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000
S N
S N
S N
S N
S
S
S
S
S
S
S
S N
S N
S
NS
R
S R
S N
S R
S N
S N
S N
S N
S N
S D
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S R
S
S S
S
S S
S
S
S
S R
S R
S R
S
S N
S N
S S
S S
S S
S S
S S
S
S SS S
S SS
S SS S S
S S
S S
S
S S
S S
S S
S S
S
S S
S
S SS S S S S
S
S SS
S SS
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
PAGING ZONE '15-18' PAGING ZONE 'BA'
PAGING ZONE '15-18' PAGING ZONE 'BA'
PAGING ZONE 'BA'
PAGING ZONE 'BA' PAGING ZONE 'BB'
PAGING ZONE 'BD'
1/T-101
2/T-104
N
N
N
N
N
N
N
R
R
R R
N N
N
N
N +12'
+9' +9' +9'
1/T-101
16' R
16'
16' 16'
16'16'
ABBREVIATED SYMBOL
LEGEND
SYMBOL HEIGHT DESCRIPTION
CEILING MOUNTED SPEAKERCEILING
WALL MOUNTED SPEAKER96"
S
S
VOLUME CONTROL48"VC
PAGING CONSOLE48"PS
PAGING CABINETFLOORPA
WALL MOUNTED HORNAS NOTEDS
DEVICES WITH THE FOLLOWING TAGS ARE AS
INDICATED:
E: EXISTING DEVICES TO REMAIN. PROVIDE NEW
CABLING AND CONDUIT AS NEEDED.
D: EXISTING DEVICES TO BE DEMOLISHED BY
THE CONTRACTOR.
R: EXISTING DEVICES TO BE REPLACED WITH
NEW BY THE CONTRACTOR.
N: NEW DEVICES TO BE PROVIDED AND
INSTALLED BY THE CONTRACTOR.
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS
NOTED OTHERWISE. HEIGHTS INDICATED IN PLANS
SHALL SUPERSEDE THOSE LISTED HERE.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .