About this file

This document is a complete set of 100% Construction Documents for a Remove and Replace Public Address System project at West Palm Beach VAMC, located at 7305 North Military Trail, West Palm Beach, FL 33410-6400. The project is identified as VA PROJECT #548-22-100 and was prepared by Apogee Consulting Group, P.A., with documents dated December 14, 2022.

The project scope involves the complete removal and replacement of the existing public address and mass notification system (PAMNS) across multiple buildings and floors of the medical center. The basis of design utilizes a Biamp Vocia paging system with components including amplifier chassis (VA-8600), message servers (MS-1), text-to-speech servers (TTS-1), telephone interface servers (VOIP-1/POTS-1), and fire alarm interface devices (GPIO-1). The system encompasses approximately 1,800 speakers distributed across basement through tenth floors of Building 1, plus additional coverage in Buildings 15, 16, 18, 19, and 21. Key deliverables include 32 sheets of technology and general drawings showing speaker placements, riser diagrams, equipment rack details, headend equipment locations in multiple telecom rooms (BC-202, 2B-302C, 5B-302C, 8A-302C, and 1H-103), cabling details, and control station locations. The contractor is responsible for coordination of all system programming and message database setup with the VA, providing spare devices (3% of total or 10 spares minimum per device type), field verification of speaker locations to comply with 2x ceiling height spacing requirements, and compliance with NFPA 101 Life Safety Code, NFPA 99 Healthcare Facilities Code, and VA-adopted building standards.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--FY26: NRM (PROJ: 548-22-100) BB Remove and Replace Public Address System, newest first.
File Type Posted
S06 36C24826Q0440 0004 4.27.26.pdf PDF
RFI Responses 4.21.26.xlsx XLSX spreadsheet
36C24826Q0440 0003 4.21.26.pdf PDF
36C24826Q0440 0002.pdf PDF
36C24826Q0440 0001.pdf PDF
Attch 12 WD FL20260220 01.02.26.pdf PDF
Attch 11 Info Security 3 Pages.pdf PDF
Attch 7 A.3 Price Cost Schedule 1 Page.pdf PDF
Attch 2 Project Narrative 62 Pages.pdf PDF
Attch 4 Site Plan 1 Page.pdf PDF
Attch 3 Project Specs 1192 Pages.pdf PDF
Attch 1 SOW 548-22-100.pdf PDF
36C24826Q0440_1.pdf PDF
Attch 6 PPQ 4 Pages.pdf PDF
Attch 10 EMR 1 Page.pdf PDF
Attch 9 LOS 2 Pages.pdf PDF
Attch 8 Base Offer Price Breakdown 1 Page Excel Form.xlsx XLSX spreadsheet
36C24826Q0440.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP

PROJECT IMAGEPROJECT LOCATION MAP

AS NOTED

/1 /2

:3

:3

A

M C

U s e rs \l b a ja ri a s \D o c u m e n ts

\A

-0

W e s t_

P a lm

B e a c h

-R e p la c e

P A

M N

S -F

L lb a ja ri a s S

Z L

D E

.r v t

G-001

COVER

1 4LMB

REMOVE AND REPLACE

PUBLIC ADDRESS SYSTEM

WEST PALM BEACH VAMC

7305 NORTH MILITARY TRAIL

WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

548-22-10022-038

REMOVE AND REPLACE PUBLIC ADDRESS

SYSTEM

WEST PALM BEACH VAMC

7305 NORTH MILITARY TRAIL

WEST PALM BEACH FL, 33410-6400

VA PROJECT #: 548-22-100

DJR

DRAWING LIST

GENERAL

G-001 COVER 1 4

G-002 GENERAL INFORMATION 2 4

G-003 ICRA INFORMATION AND DETAILS 3 4

G-004 PRE-CONSTRUCTION RISK ASSESSMENT FORMS 4 4

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 32

T-101 BASEMENT FLOOR SE PAMNS 2 32

T-102 BASEMENT FLOOR CENT PAMNS 3 32

T-103 BASEMENT FLOOR NW PAMNS 4 32

T-104 BASEMENT FLOOR E PAMNS 5 32

T-105 CLC NE PAMNS 6 32

T-106 CLC SW PAMNS 7 32

T-111 FIRST FLOOR SE PAMNS 8 32

T-112 FIRST FLOOR CENT PAMNS 9 32

T-113 FIRST FLOOR NW PAMNS 10 32

T-114 FIRST FLOOR E PAMNS 11 32

T-115 FIRST FLOOR S PAMNS 12 32

T-121 SECOND FLOOR SE PAMNS 13 32

T-122 SECOND FLOOR CENT PAMNS 14 32

T-123 SECOND FLOOR NW PAMNS 15 32

T-131 THIRD FLOOR SE PAMNS 16 32

T-132 THIRD FLOOR CENT PAMNS 17 32

T-133 THIRD FLOOR NW PAMNS 18 32

T-141 FOURTH FLOOR SE PAMNS 19 32

T-142 FOURTH FLOOR CENT PAMNS 20 32

T-143 FOURTH FLOOR NW PAMNS 21 32

T-151 FIFTH FLOOR PAMNS SE 22 32

T-152 FIFTH FLOOR PAMNS NW 23 32

T-161 SIXTH FLOOR PAMNS 24 32

T-171 SEVENTH FLOOR PAMNS 25 32

T-181 EIGHTH FLOOR PAMNS 26 32

T-191 NINTH FLOOR PAMNS 27 32

T-192 TENTH FLOOR PAMNS 28 32

T-401 TECHNOLOGY ENLARGEMENTS 29 32

T-402 TECHNOLOGY ENLARGEMENTS 30 32

T-501 TECHNOLOGY DETAILS 31 32

T-601 PAMNS RISER DIAGRAM 32 32

CAMPUS LOCATION

PROJECT LOCATION

DocuSign Envelope ID: 88475F19-AD36-411D-B79A-CDEEC92A0411

12/16/2022

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO

PARTICIPATE IN VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND

STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES

BELOW)

• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NATIONAL ELECTRICAL CODE (NEC)

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

STANDARD (PG-18-13)

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE

VA MASTER CONSTRUCTION SPECIFICATION.

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION

FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY

HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

A. REFER TO ELECTRICAL DRAWINGS FOR

INFORMATION CONCERNING POWER, LIGHTING AND

COMMUNICATION SYSTEM(S).

B. REFER TO ELECTRICAL DRAWING FOR FIRE ALARM

NOTIFICATION AND EMERGENCY EGRESS LIGHTING

LOCATIONS.

C. THIS PROJECT IS ALL PUBLIC ADDRESS SYSTEM

RENOVATION. NO CHANGES ARE MADE TO EGRESS

PATHS OR FIRE RATINGS OUTSIDE THE

CONSTRUCTION LIMITS.

D. SPRAY APPLIED FIREPROOFING PRESENT ON

STRUCTURAL MEMBERS AND FLOOR/ROOF DECK

ABOVE. REPAIR OR REPLACE ALL FIREPROOFING

DAMAGED AS A RESULT OF CONSTRUCTION.

E. SEE ICRA TYPICAL CONDITIONS APPLICABLE

THROUGHOUT ROOMS AND CORRIDORS ON SHEET

1/G-003.

DEMOLITION KEYNOTE

WINDOW TYPE

TOILET ACCESSORY

ROOF PITCH SYMBOL

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

1 #

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR/VA

AND CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.

PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO

WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO

BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR/VA PRIOR TO BIDDING.

WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR

GREATER QUANTITY OF WORK.

5. THE CONTRACTOR SHALL NOTIFY THE COR/VA IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND

ACTUAL FIELD CONDITIONS, NOTIFY THE COR/VA PRIOR TO PROCEEDING WITH THE WORK.

7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN.

8. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

9. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS

PROJECT.

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT

PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO

PROCEEDING WITH NEW CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE

WITH COR/VA.

4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.

5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR/VA.

6. NOTIFY COR/VA OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO

MATCH EXISTING.

7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)

REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.

8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.

10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL

SYSTEMS.

11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR/VA, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE

PROJECT.

12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT

ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR/VA.

13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA AND ARCHITECT OF ANY

CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.

14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE COR/VA UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE COR/VA WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE COR/VA OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR

REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.

15. CONTRACTOR SHALL NOTIFY COR/VA OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE

MATERIALS AND FINISHES TO MATCH EXISTING.

16. COORDINATE WITH COR/VA FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.

COORDINATE WITH COR/VA FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND

CONTRACTOR USE OF FREIGHT ELEVATOR (AS REQUIRED).

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

AS NOTED

/1 /2

:3

:4

A

M C

U s e rs \l b a ja ri a s \D o c u m e n ts

\A

-0

W e s t_

P a lm

B e a c h

-R e p la c e

P A

M N

S -F

L lb a ja ri a s S

Z L

D E

.r v t

G-002

GENERAL INFORMATION

2 4LMB

REMOVE AND REPLACE

PUBLIC ADDRESS SYSTEM

WEST PALM BEACH VAMC

7305 NORTH MILITARY TRAIL

WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

548-22-10022-038

DJR

GENERAL SYMBOL LEGEND CODE STANDARDS AND EXECUTIVE ORDERSLIFE SAFETY GENERAL NOTES

ARCHITECTURAL SYMBOL LEGEND

ABBREVIATIONS

GENERAL NOTES

DEMOLITION NOTES

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V .I

.F

V .I

.F

V.I.F.

V .I .F

E X

IS

T

IN

G

W A

L L

V .I .F

E X

IS

T

IN

G

W A

L L

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L E

X D

U C

T

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR RENOVATION BUILDING 1,

BASEMENT FLOOR

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

NOTE:

THIS PROJECT CONSTITUTES MULTIPLE BUILDINGS AND

FLOORS. SEE FLOOR PLANS FOR APPROPRIATE

LOCATIONS TO REFLECT ON EACH ILSM SIGNAGE.

DUST CONTROL PLAN NOTES

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 5A.

1. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR

MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS

INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS

CONTROL

2. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

2A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND

ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC

AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;

THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND

THE CONSTRUCTION STAGING/PREP AREA.

3A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.

EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.

IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY

PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE

USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.

FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT

OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE

COR/VA.

3B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

3C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL

BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION

PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

4. AIR SYSTEM FLOW: THE COR/VA VERIFY AND ACKNOWLEDGE

CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE

OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS

COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW

FROM CLEAN TO DIRTY AREAS.

4A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE

AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL

PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER

CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE

(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY

VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A

PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO

PREVENT CONTAMINATION OF THE DUCTS.

4B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

4C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-

CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR/VA.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED

AREAS

5. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE

FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION

AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR

AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE

DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE

APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT

(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS

TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM

DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR

REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

5A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,

VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS

DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.

ICRA NOTES

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Bldg. #69 Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

AREA OF WORK

CORRIDOR

PLASTIC SHEET ICRA

BARRIER

ZIPPER DOOR

EXISTING DOOR

STICKY MATS

WORK WITHIN ENTIRE ROOM

PLASTIC SHEET ICRA BARRIER

ZIPPER DOOR

STICKY MAT

WORK WITHIN LARGER SPACE

CORRIDOR

PLASTIC SHEET ICRA

BARRIER

ZIPPER DOOR

WORK IN CORRIDOR

AREA OF WORK

STICKY MATSEXISTING WALL

20'-0" MAX

C L E

A R

M

IN

AREA OF WORK

NOTE: ICRA AND LIFE SAFETY FLOOR PLANS SHOW SOME

SPECIFIC LOCATIONS WHERE ICRA BARRIERS ARE REQUIRED.

OTHER WORK MAY REQUIRE ICRA BARRIERS, AND THESE

DETAILS PROVIDE TYPICAL GUIDANCE FOR CONSTRUCTING

ICRA BARRIERS.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

AS NOTED

/1 /2

:3

:5

A

M C

U s e rs \l b a ja ri a s \D o c u m e n ts

\A

-0

W e s t_

P a lm

B e a c h

-R e p la c e

P A

M N

S -F

L lb a ja ri a s S

Z L

D E

.r v t

G-003

ICRA INFORMATION AND DETAILS

3 4LMB

REMOVE AND REPLACE

PUBLIC ADDRESS SYSTEM

WEST PALM BEACH VAMC

7305 NORTH MILITARY TRAIL

WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

548-22-10022-038

DJR

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 1/2" = 1'-0"

CROSS SECTION "A"

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

THIS MATRIX NEEDS TO BE VERIFIED WITH THE COR/VA, PRIOR TO

IMPLEMENTATION, AS THE COR/VA MAY HAVE THEIR OWN ICRA MATRIX.

Scale: 1/4" = 1'-0"

TYPICAL ICRA CONDITIONS

EXISTING WALL TO REMAIN

EXISTING DOOR TO REMAIN

TEMPORARY DOOR

TEMPORARY WALL

DEMOLISH WALL

DEMOLISH DOOR

DEMOLISH WINDOW

EXISTING WINDOW TO REMAIN

ICRA LEGEND

TEMPORARY WALL

TEMPORARY DOOR

(TO BE DISCUSSED)

TEMPORARY WALL AND DOOR

GRAPHICS COULD BE ADJUSTED

PER PROJECT. ONE COULD USE

THE REVIT MODEL OR "FIELD

REGION" TO SHOW AREAS*

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

AS NOTED

/1 /2

:3

:3

A

M C

U s e rs \l b a ja ri a s \D o c u m e n ts

\A

-0

W e s t_

P a lm

B e a c h

-R e p la c e

P A

M N

S -F

L lb a ja ri a s S

Z L

D E

.r v t

G-004

PRE-CONSTRUCTION RISK

ASSESSMENT FORMS

4 4LMB

REMOVE AND REPLACE

PUBLIC ADDRESS SYSTEM

WEST PALM BEACH VAMC

7305 NORTH MILITARY TRAIL

WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

548-22-10022-038

DJR

UPDATE CLC HVAC SYS.

B

HIGHEST RISK

Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary.

Environmental conditions that could affect human health, such as sewage, mold, asbestos, gray water and black water will require Class of Precautions IV for LOW and MEDIUM Risk Groups and Class of Precautions V for HIGH and HIGHEST Risk Groups.

*Type C [Medium Risk Groups] and Type D [Low Risk Groups] work areas [Class III precautions] that cannot be sealed and completely isolated from occupied patient care spaces should be elevated to include negative air exhaust requirements as listed in Class IV Precautions.

TECHNOLOGY SYMBOL LEGEND

DATA OUTLET - N-4 PR UTP

TELCO OUTLET - N-4 PR UTP

SYMBOL HEIGHT DESCRIPTION

18"

48"

N

FOUR POST OIT EQUIPMENT RACK

OIT EQUIPMENT CABINET

NURSE CALL EQUIPMENT CABINETNCE

LADDER CABLE TARY

N

FLOOR BOX FOR DATA

6' TO TOP

FLOOR

GROUND BUS

FLOOR

FLOOR

ABOVE

CEILING

18"

4'x8'x3/4" FIRE RATED TTB8"

FLOOR TWO POST OIT EQUIPMENT RACK

CEILING MOUNTED SPEAKERCEILING

WALL MOUNTED SPEAKER96"

S

S

(N - QUANTITY)

(N - QUANTITY)

VOLUME CONTROL48"VC

PAGING CONSOLE48"PS

PAGING CABINETFLOORPA

WALL MOUNTED HORNAS NOTEDS

DEVICES WITH THE FOLLOWING TAGS ARE AS INDICATED:

E: EXISTING DEVICES TO REMAIN. PROVIDE NEW CABLING AND CONDUIT AS NEEDED.

D: EXISTING DEVICES TO BE DEMOLISHED BY THE CONTRACTOR.

R: EXISTING DEVICES TO BE REPLACED WITH NEW BY THE CONTRACTOR.

N: NEW DEVICES TO BE PROVIDED AND INSTALLED BY THE CONTRACTOR.

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.

SEE DRAWINGS FOR MORE INFORMATION.

NOTE: NOT ALL SYMBOLS ARE USED.

JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED

AS

NOTED

J

TECHNOLOGY GENERAL NOTES

1. PROVIDE COMMUNICATIONS DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA

STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT

SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL

LISTING REQUIREMENT AND APPLICABLE BUILDING CODES.

4. PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION

METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.

5. COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607B OR 607A - GROUNDING AND BONDING REQUIREMENTS

FOR TELECOMMUNICATIONS IN COMMERCIAL BUILDING.

6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568B - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING

STANDARD.

7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569B - COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS

PATHWAYS AND SPACES.

8. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

9. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

10. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

11. COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION.

12. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.

PRODUCTS DEEMED EQUAL AND APPROVED BY THE COR WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN

ACT".

13. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

14. PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED. ALL SPEAKER CABLING FOR THE PUBLIC

ADDRESS SYSTEM SHALL BE RUN IN CONDUIT.

15. PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY

TESTING AGENCY.

16. NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE

MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.

17. PROVIDE TIA/EIA CAT 6 COPPER OUTLETS AND CONNECTORS.

18. ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6 KEYSTONE JACK WIRED PER T568A OR T568B AS DIRECTED

BY THE VA COR.

19. LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS

SET FORTH BY THE VA HOSPITAL OIT.

20. PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.

21. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.

22. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

23. DEVICES PLACED IN INTERCOMMUNICATION ROOM TO BE MOUNTED ON FIRE RETARDANT PLYWOOD.

24. BASIS OF DESIGN UTILIZED IN THIS DESIGN IS THE BIAMP VOCIA PAGING SYSTEM. ALTERNATES TO THE BASIS OF DESIGN ARE ACCEPTABLE UPON MEETING OR EXCEEDING THE FUNCTIONALITY OF THE SYSTEM AS

DESIGNED.

25. CONTRACTOR SHALL TRACK AND NOTE ORDER OF SPEAKERS AND DEVICES IN SPEAKER CIRCUITS, AND

PROVIDE RECORD DRAWINGS INDICATING THE ORDERING OF DEVICES.

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

BOD BASIS OF DESIGN

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVC DIGITAL VOICE COMMAND

DVR DIGITAL VIDEO RECORDER

E EXISTING DEVICES

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

ETR EXISTING TO REMAIN

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MM MULTI MODE FIBER

NAC NETWORK APPLIANCE CIRCUIT PANEL

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

NS NO SCALE

NTS NOT TO SCALE

NVR NETWORK VIDEO RECORDER

TECHNOLOGY ABBREVIATIONS LIST

OC ON CENTER

OIT OFFICE OF INFORMATION TECHNOLOGY

PACS PHYSICAL ACCESS CONTROL SYSTEM

PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM

PB PUSH BUTTON

PBB PRIMARY BONDING BUSBAR

PDU RACK POWER DISTRIBUTION UNITS

POE POWER OVER ETHERNET

PR PAIR

RBB RACK BONDING BUSBAR

RX REQUEST TO EXIT

SBB SECONDARY BONDING BUSBAR

SEP SERVICE ENTRANCE PROTECTION

SLC SIGNALING LINE CIRCUIT

SM SINGLE MODE FIBER

TBB TELECOM BONDING CONDUCTOR

TEL TELEPHONE

TGB TELECOM GROUND BUS BAR

TM TELEMONITORING

TMGB TELECOM MAIN GROUND BUS BAR

TP TWISTED PAIR

TR TELECOM ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

WM WIRE MANAGEMENT

WAP WIRELESS ACCESS POINT

UL UNDERWRITERS LABORATORY

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

CABLES AND CONNECTORS COLOR LEGEND

DESCRIPTION

ITEM JACK CABLE PATCH CABLES

DATA/COMPUTER BLUE BLUE BLUE

I.D. NOTES

C 4 PAIR CABLE

CONDUIT

FIBER - MULTI-MODE

FIBER - SINGLE-MODE

SOUND SYSTEM

BLACK

IVORY

N/A

AQUA

YELLOW

GREEN

AQUA

YELLOW

N/A

FO

FO

SS

6/12/24/36

6/12

MULTI COLOR

CONDUCTORS

BLUE

BLUE

BLUE

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA

STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL

ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING HARDWARE TO

SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT DURING

CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT

MANUFACTURER'S SPECIFICATIONS.

11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S SCREW

TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE- ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR

FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRD

PARTY TESTING AGENCY.

17. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE GOVERNMENT, SHALL BE

PROVIDED.

18. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

19. MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

20. FEEDER TAGS APPENDED WITH 'VD' ARE UPSIZED IN AMPACITY DUE TO VOLTAGE DROP.

120V DUPLEX RECEPTACLE

RECEPTACLE MODIFIERS:

AC: 3" ABOVE COUNTERTOP/BACKSPLASH

GFI: GROUND FAULT CURRENT INTERRUPTER

WP: WEATHERPROOF ENCLOSURE

DED: DEDICATED CIRCUIT

120V DUPLEX RECEPTACLE EMERGENCY OUTLET

AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE

120V QUADRUPLEX RECEPTACLE EMERGENCY

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

JUNCTION BOX, WALL MOUNTED, PURPOSE AS NOTED

DISCONNECT SWITCH NON-FUSED

DISCONNECT SWITCH FUSED

SINGLE POLE WALL SWITCH: 48" AFF STANDARD UNO

SYMBOL HEIGHT DESCRIPTION

18"

18"

18"

18"

AS

NOTED

72" TOP

72" TOP

SWITCH MODIFIERS:

M: MOTOR-RATED

48"

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

TOP: HEIGHT TO TOP OF DEVICE

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERSEDE THOSE LISTED HERE.

SPECIAL RECEPTACLE

EQUIPMENT CONNECTION

AS

NOTED

E

208V DUPLEX RECEPTACLE18"

18"

120V DUPLEX RECEPTACLE FLOOR BOX

120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX

OUTLET AND COVER PLATE SHALL BE RED IN COLOR

120V QUADRUPLEX RECEPTACLE FLOOR BOX

120V QUADUPLEX RECEPTACLE EMERGENCY

FLOOR BOX OUTLET AND COVER PLATE SHALL BE

RED IN COLOR

CLNG

J

J

J

JUNCTION BOX, CEILING MOUNTED, PURPOSE AS

NOTED

JUNCTION BOX, FLOOR MOUNTED, PURPOSE AS

NOTED

120V SIMPLEX RECEPTACLE18"

ELECTRICAL SYMBOL LEGEND

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:0

:2

P M

C U s e rs \p n e u e n s c h w a n d e r\ D o c u m e n ts

\E

-0

W e s t_

P a lm

B e a c h

-R e p la c e

P

A M

N S

-F L p n e u e n s c h w a n d e r.

rv t

T-001

TECHNOLOGY GENERAL NOTES,

SYMBOL LEGEND, AND

ABBREVIATIONS

1 32JDM

REMOVE AND REPLACE

PUBLIC ADDRESS SYSTEM

WEST PALM BEACH VAMC

7305 NORTH MILITARY TRAIL

WEST PALM BEACH FL, 33410-6400 DECEMBER 14, 2022

100% CONSTRUCTION DOCUMENTS

548-22-10022-038

JDM

ELECTRICAL GENERAL NOTES

12/15/2022 12/15/2022

S R

S D

S D

S D

S R

S D

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S D

S D

S D

S R

S R

S R

S

S R

S R

ELEC

TOIL

WAIT

HAC

TOIL

PREP

PREP

PREP

PET CT

EQUIP

CONTROL

READ

C

C

C

EXAM/ OFFICE

PHYSICS OFFICE

EXAM/ OFFICE

HOT LAB

EXAM/ OFFICE

EXAM/ OFFICE

CLOSET

F E

C

1-9

1-8

1-3

BA-95

BA-94

BA-93

BA-92

BA-91

BA-90

BA-89

BA-88

BA-87

BA-86

BA-85

BA-84

BA-83

BA-96

BA-82

BA-80

BA-81

BA-21

BA-19

BA-20

HDI VAULT

BA-25

LINAC 1

BA-17

CT/SIM

CONTROL

1-1 C

BA-52

ISO RM

BA-13

DATA

BA-14

CR. CRT.

BA-10

ENTRY

VESTIBULE

BA-11

LOBBY

1-2 C

1-7 C

1-6 C

1-5 C

1-4 C

P.E.

BA-66

PATIENT

EDUCATION

BA-53

PATIENT

TOILET

BA-64

WOMENS

TOILET

BA-63

MENS

TOILET

BA-62

BLOOD

DRAW

BA-61

STAFF

TOILET

BA-59

CONFERENCE/

BREAK

ROOM

BA-58

MIXING/

CLEANING/

PREP

ROOM

BA-57

ANTEROOM

BA-56

PHARMACIST

BA-54

PATIENT

TOILET

BA-51

STORAGE

BA-50

INFUSION

BA-49

JANITOR

BA-48

SOCIAL

WORKER/

EXAM

BA-47

SOILED

UTILITY

BA-46

DIET/

EXAM

BA-44

CLEAN

UTILITY

BA-43

OFFICE

BA-42

OFFICE

BA-41

EXAM

BA-39

EXAM

BA-38

EXAM

BA-37

BONE

MARROW/

EXAM

BA-36

OFFICE

BA-34

EXAM

BA-33

N.P.

BA-32

ELEC.

BA-31

OFFICE/

TUMOR

REGISTER

BA-28

ELEVATOR

EQUIP.

69 SF

BA-27

STAFF

TOILET

BA-26

PHYSICIST

BA-24

DOSIMETRIST

BA-18

CT/SIM

BA-16

W. TOIL./

SUBWTNG/

CHNGNG

BA-15

M. TOIL./

SUBWTNG/

CHNGNG

BA-12

RECEPTION/

STAFF

MI-41MI-41

S R

S R

S R

2'-0"

CORR.

DOCK

LIFT

RECEIVING AND

SHIPPING DOCK

DOCK 1

STAIR 11

DOCK

LEVELER

DOCK

LEVELER

ARCH

ABOVE

OFFICE

STORE-

KEEPER

BA-210

ROLL-UP

DOOR SIZE

10'-0"WX10'-0"H

RECEIVING

AND ISSUE

OFFICE

BA-208

FLAMABLE

STORAGE

BA-206

STAFF

TLT.

BA-204

BA-202

DIALYSIS

STORAGE

HAC

CONTROL

SUBSTANCE

STORAGE

BA-203

MECHANICAL

BA-302

MED GAS

BA-303

MED GAS

BA-301

EXCESS

PROPERTY

STORAGE

BA-212

UNPOSTED STOCK

HOLDING AREA

WAREHOUSE

RECEIVING

BA-201

RECEIVING AND

ISSUE AREA

SUBSISTENCE

STORAGE

WAREHOUSE

STORAGE

BA-201

MEDICAL/

GENERAL

STORAGE

STAIR 3

MAIL ROOM

BA-215A

FORMS

STORAGE

BA-215BIOMED

WORKSTATION

BA-201A

DOCK 2

ANTE-

ROOM

BA-304

REFRIGERAT

BODY

HOLDING

BA-304A

STORAGE

BA-306

LAB/PATH

BA-310

EMS

BA-312

CORR.

BA-C4

MECHANICAL

BB-304 CHIEF

LOGISTIC

BB-306

STAIR 5

SOILED

SERVICE

LOBBY

BB-302

PNEUMATIC

TUBE

FAN ROOM

BB-302A

CORR.

BA-C3

VEST.

BA-271

FEMALE

TOILETS

SHOWERS

BA-271A

MALE

LOCKERS

BA-272

MALE TLTS.

SHOWERS

BA-272A

VEST.

BA-272

BA-262BA-261A

CORR.

BA-C1

BA-108

DISTRIB.

SECTION

BA-106

PROGRAM

COORDINATOR

BA-106A

DISP. ADMIN.

SCHEDULING

MAS CONTROL

BA-104

CONSOLE ROOM

BB-206

STORAGE

BB-209

MANGEMENT

BA-106C

MAS

ADMIN

SUPERV

BA-103

CHIEF

BB-207

TRANSC.

SUPERV.

BA-105

DGR.

COORD.

BA-107

TRANSCRIPTIONS

BA-109

BA-102

GENERAL

OFFICE

BA-102

SUPPLY/EQUIP.

STORAGE

BA-251

MACHINE

BA-110

TELEPHONE

SWITCHGEAR

BA-112

ELECT

ROOM

BA-114

E.T.O. CYLINDER

STORAGE

BA-223

PREPARATION

ASSEMBLY

BA-251A

ETO

VESTIBULE

BA-223

AUTO

CART

WASH

BA-225

MANUAL

EQUP.

WASH

BA-227

CORR.

BA-221

MALE

STAFF

TLT.

BA-233A

DECONTAMINATION

ROOM

BA-221

MACH.

ROOM

BA-215B

CORR.

BA-C3

HAC

BA-229

LOUNGE

BA-232

MALE

STAFF

LKRS.

BA-233 CHIEF

PAD

BA-242

CORR.

BA-231

STAFF LKRS.

FEMALE

BA-234

FEMALE

STAFF TLT.

BA-234A

CORR.

BA-241

HAC

BA-243

CLEAN

RECEIVING

AND

BREAKOUT

BA-241

SUPPLY

BA-254

BREAK

ROOM

BA-252

CORR.

BA-C2

INV.

MANAGER

BA-245A

COMPUTER

DATA

HANDLING

EQUIP.

BA-245B

PAD/

DISTRUBITION

BA-245

PAD

SUPERVISOR

BA-245C

AUTO

CART

DRYING

EQUIPMENT

STORAGE AND

TESTING AREA

STERILE/

NON-STERILE

STORAGE

AREA

STORAGE

CORR.

TRASH

CHUTE

ABOVE

POLICE

OPERATIONS

BA-261

MEDICAL

RESEARCH

STORAGE

FOR ENLARGED PLAN OF THIS

AREA SEE DWG.1-86

V.P.

DN

RAILING

SERVICE

OFFICE

BA-261C

MATERIAL

STAIR #2

EMERGENCY

DOOR

STAIR 4

ETO

VESTIBULE

BA-223

BA-308

BA-95 BA-97 BA-99

LOGISTIC

SUPPLY SERV.

WAREHOUSE

ADMIN.

OFFICES/CUBICALS

SUPPLY PROCCESSING &

DIST.

W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000

W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000

2'-0"

CORR.

DOCK

LIFT

RECEIVING AND

SHIPPING DOCK

DOCK 1

STAIR 11

DOCK

LEVELER

DOCK

LEVELER

ARCH

ABOVE

OFFICE

STORE-

KEEPER

BA-210

ROLL-UP

DOOR SIZE

10'-0"WX10'-0"H

RECEIVING

AND ISSUE

OFFICE

BA-208

FLAMABLE

STORAGE

BA-206

STAFF

TLT.

BA-204

BA-202

DIALYSIS

STORAGE

HAC

CONTROL

SUBSTANCE

STORAGE

BA-203

MECHANICAL

BA-302

MED GAS

BA-303

MED GAS

BA-301

EXCESS

PROPERTY

STORAGE

BA-212

UNPOSTED STOCK

HOLDING AREA

WAREHOUSE

RECEIVING

BA-201

RECEIVING AND

ISSUE AREA

SUBSISTENCE

STORAGE

WAREHOUSE

STORAGE

BA-201

MEDICAL/

GENERAL

STORAGE

STAIR 3

MAIL ROOM

BA-215A

FORMS

STORAGE

BA-215BIOMED

WORKSTATION

BA-201A

DOCK 2

ANTE-

ROOM

BA-304

REFRIGERAT

BODY

HOLDING

BA-304A

STORAGE

BA-306

LAB/PATH

BA-310

EMS

BA-312

CORR.

BA-C4

MECHANICAL

BB-304 CHIEF

LOGISTIC

BB-306

STAIR 5

SOILED

SERVICE

LOBBY

BB-302

PNEUMATIC

TUBE

FAN ROOM

BB-302A

CORR.

BA-C3

VEST.

BA-271

FEMALE

TOILETS

SHOWERS

BA-271A

MALE

LOCKERS

BA-272

MALE TLTS.

SHOWERS

BA-272A

VEST.

BA-272

BA-262BA-261A

CORR.

BA-C1

BA-108

DISTRIB.

SECTION

BA-106

PROGRAM

COORDINATOR

BA-106A

DISP. ADMIN.

SCHEDULING

MAS CONTROL

BA-104

CONSOLE ROOM

BB-206

STORAGE

BB-209

MANGEMENT

BA-106C

MAS

ADMIN

SUPERV

BA-103

CHIEF

BB-207

TRANSC.

SUPERV.

BA-105

DGR.

COORD.

BA-107

TRANSCRIPTIONS

BA-109

BA-102

GENERAL

OFFICE

BA-102

SUPPLY/EQUIP.

STORAGE

BA-251

MACHINE

BA-110

TELEPHONE

SWITCHGEAR

BA-112

ELECT

ROOM

BA-114

E.T.O. CYLINDER

STORAGE

BA-223

PREPARATION

ASSEMBLY

BA-251A

ETO

VESTIBULE

BA-223

AUTO

CART

WASH

BA-225

MANUAL

EQUP.

WASH

BA-227

CORR.

BA-221

MALE

STAFF

TLT.

BA-233A

DECONTAMINATION

ROOM

BA-221

MACH.

ROOM

BA-215B

CORR.

BA-C3

HAC

BA-229

LOUNGE

BA-232

MALE

STAFF

LKRS.

BA-233 CHIEF

PAD

BA-242

CORR.

BA-231

STAFF LKRS.

FEMALE

BA-234

FEMALE

STAFF TLT.

BA-234A

CORR.

BA-241

HAC

BA-243

CLEAN

RECEIVING

AND

BREAKOUT

BA-241

SUPPLY

BA-254

BREAK

ROOM

BA-252

CORR.

BA-C2

INV.

MANAGER

BA-245A

COMPUTER

DATA

HANDLING

EQUIP.

BA-245B

PAD/

DISTRUBITION

BA-245

PAD

SUPERVISOR

BA-245C

AUTO

CART

DRYING

EQUIPMENT

STORAGE AND

TESTING AREA

STERILE/

NON-STERILE

STORAGE

AREA

STORAGE

CORR.

TRASH

CHUTE

ABOVE

POLICE

OPERATIONS

BA-261

MEDICAL

RESEARCH

STORAGE

FOR ENLARGED PLAN OF THIS

AREA SEE DWG.1-86

V.P.

DN

RAILING

SERVICE

OFFICE

BA-261C

MATERIAL

STAIR #2

EMERGENCY

DOOR

STAIR 4

ETO

VESTIBULE

BA-223

BA-308

BA-95 BA-97 BA-99

LOGISTIC

SUPPLY SERV.

WAREHOUSE

ADMIN.

OFFICES/CUBICALS

SUPPLY PROCCESSING &

DIST.

W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000

W k Chr,Ambi,Std-Ht,Std Tilt, Adj Arms 831.0000

S N

S N

S N

S N

S

S

S

S

S

S

S

S N

S N

S

NS

R

S R

S N

S R

S N

S N

S N

S N

S N

S D

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S R

S

S S

S

S S

S

S

S

S R

S R

S R

S

S N

S N

S S

S S

S S

S S

S S

S

S SS S

S SS

S SS S S

S S

S S

S

S S

S S

S S

S S

S

S S

S

S SS S S S S

S

S SS

S SS

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

PAGING ZONE '15-18' PAGING ZONE 'BA'

PAGING ZONE '15-18' PAGING ZONE 'BA'

PAGING ZONE 'BA'

PAGING ZONE 'BA' PAGING ZONE 'BB'

PAGING ZONE 'BD'

1/T-101

2/T-104

N

N

N

N

N

N

N

R

R

R R

N N

N

N

N +12'

+9' +9' +9'

1/T-101

16' R

16'

16' 16'

16'16'

ABBREVIATED SYMBOL

LEGEND

SYMBOL HEIGHT DESCRIPTION

CEILING MOUNTED SPEAKERCEILING

WALL MOUNTED SPEAKER96"

S

S

VOLUME CONTROL48"VC

PAGING CONSOLE48"PS

PAGING CABINETFLOORPA

WALL MOUNTED HORNAS NOTEDS

DEVICES WITH THE FOLLOWING TAGS ARE AS

INDICATED:

E: EXISTING DEVICES TO REMAIN. PROVIDE NEW

CABLING AND CONDUIT AS NEEDED.

D: EXISTING DEVICES TO BE DEMOLISHED BY

THE CONTRACTOR.

R: EXISTING DEVICES TO BE REPLACED WITH

NEW BY THE CONTRACTOR.

N: NEW DEVICES TO BE PROVIDED AND

INSTALLED BY THE CONTRACTOR.

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS

NOTED OTHERWISE. HEIGHTS INDICATED IN PLANS

SHALL SUPERSEDE THOSE LISTED HERE.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .