This document contains a pre-proposal inquiry log and related federal contract solicitation for the Phase 5 expansion of the Houston National Cemetery. The solicitation seeks a contractor to construct additional gravesites and improvements including approximately 14,000 preplaced crypt full casket gravesites, 350 oversize crypts, 2,000 traditional in-ground cremains sites, 8,000 columbarium niches, a 300-grave hybrid natural burial area and ossuary. Additional requirements include new entrance gates, roads, parking, utilities and an updated irrigation system. Work must be completed within 730 calendar days of notice to proceed for a project cost between $20-50 million. The applicable NAICS code is 237990 and size standard is $39.5 million. The solicitation is a 100% service-disabled veteran-owned small business set-aside issued by the Department of Veterans Affairs Office of Construction and Facilities Management. Pre-proposal questions are due by July 24, 2020 and proposals are due August 10, 2020. Offerors must register in the Vendor Information Pages database.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI SUBMISSSION LOG
SOLICITATION NUMBER 36C10F200055
PRE- PROPOSAL INQUIRY (PPI) FORM
HOUSTON NATIONAL CEMETERY PHASE 5 EXPANSION
Question No.
Reference (Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
Solicitation
CLIN 1 & 2
Can the various bid items be better identified? Unable to decide what exactly goes in CLIN 1 and CLIN 2.
CLIN 1 contains a breakout for all General Requirements and Indirect costs for the project, and Early Turnover scope costs.
CLIN 2 contains all remaining contract scope, with exception of crypt costs (CLIN 3).
Gen.
Requirements
PP.1.2
Statement of Bid – CLIN items listed there do not match the Bidding Documents in the Solicitation.
Cannot address this comment as it does not contain specific reference to portions of the “bidding documents” that do not match the CLIN items.
Plan Sheet
CS-AA108
(pg.168)
New fans for Committal Shelters – Model and size not given, also not shown in electrical drawings.
Fans shall be 8’ in diameter.
Model will not be provided. Fan must meet specifications.
Location, wiring, and mounting of fans is shown on sheet CS-EP 101.
Plan Sheet
CD-103
(pg. 15)
Will any lead paint and asbestos abatement be required before demolition of the buildings?
Yes, asbestos and lead-based paint abatement are required.
Surveys have been uploaded to FBO with this response.
Plan Sheet
CD-103
(pg.15)
What is the chemical composition of the soil contaminants. This will determine where they can be disposed and cost.
Please refer to the Environmental Site Assessment conducted by Booze Allen Hamilton contained in the Solicitation. If additional testing is necessary, Contractor must account for it.
Plan Sheet
CD-103
(pg. 15)
Do we demo any fences and pens at the Farm-House Demo? Or just the structures?
Demolition applies to structures only.