Houston PPI - 1.pdf

PDF 114 KB Posted

Attached to
Y1PC--Houston National Cemetery Phase 5 Expansion
Solicitation number
36C10F20R0055
Issued by

About this file

This document contains a pre-proposal inquiry log and related federal contract solicitation for the Phase 5 expansion of the Houston National Cemetery. The solicitation seeks a contractor to construct additional gravesites and improvements including approximately 14,000 preplaced crypt full casket gravesites, 350 oversize crypts, 2,000 traditional in-ground cremains sites, 8,000 columbarium niches, a 300-grave hybrid natural burial area and ossuary. Additional requirements include new entrance gates, roads, parking, utilities and an updated irrigation system. Work must be completed within 730 calendar days of notice to proceed for a project cost between $20-50 million. The applicable NAICS code is 237990 and size standard is $39.5 million. The solicitation is a 100% service-disabled veteran-owned small business set-aside issued by the Department of Veterans Affairs Office of Construction and Facilities Management. Pre-proposal questions are due by July 24, 2020 and proposals are due August 10, 2020. Offerors must register in the Vendor Information Pages database.

View the file

Other files

File Type Posted
Houston Revised CLIN Breakdown.pdf PDF
Houston PPI - 2.pdf PDF
Houston_ACM Survey_Final_10.10.2018.pdf PDF
Houston_LBP Survey_Final_10.10.2018.pdf PDF
Houston Site Visit Sign-in Sheet.pdf PDF
ATTACHMENT 3 - Houston Pre-Proposal Inquiry (PPI) Form.docx DOCX document
ATTACHMENT 2_PAST PERF QUEST HOUSTON.docx DOCX document
18_211-215_851PC2048_HNC_BD_Plans.pdf PDF
17_206-210_851PC2048_HNC_BD_Plans.pdf PDF
16_196-205_851PC2048_HNC_BD_Plans.pdf PDF
Houston NC_Phase II ESA Report_FINAL_12212018.pdf PDF
Houston National Cemetery Cx Plan - V4 - 5-5-20.pdf PDF
851PC2048_HNC_SWP3_ FULL.PDF PDF
851PC2048_HNC_SWP3_101-191.pdf PDF
851PC2048_HNC_CD2_Submittal Register.pdf PDF
851PC2048_HNC_SWP3_1-100.pdf PDF
Final 36C10F20R0055_3 (7-9-2020).pdf PDF
09_121-130_851PC2048_HNC_BD_Plans.pdf PDF
11_136-140_851PC2048_HNC_BD_Plans.pdf PDF
851PC2048_HNC_BD_Specs Volume 2.pdf PDF
08_106-120_851PC2048_HNC_BD_Plans.pdf PDF
12_141-150_851PC2048_HNC_BD_Plans.pdf PDF
15_181-195_851PC2048_HNC_BD_Plans.pdf PDF
14_166-180_851PC2048_HNC_BD_Plans.pdf PDF
07_91-105_851PC2048_HNC_BD_Plans.pdf PDF
13_151-165_851PC2048_HNC_BD_Plans.pdf PDF
03_31-45_851PC2048_HNC_BD_Plans.pdf PDF
851PC2048_HNC_BD_Specs Volume 1.pdf PDF
10_131-135_851PC2048_HNC_BD_Plans.pdf PDF
02_16-30_851PC2048_HNC_BD_Plans.pdf PDF
Houston - Building Wage Determination.pdf PDF
04_46-60_851PC2048_HNC_BD_Plans.pdf PDF
01_1-15_851PC2048_HNC_BD_Plans.pdf PDF
06_76-90_851PC2048_HNC_BD_Plans.pdf PDF
05_61-75_851PC2048_HNC_BD_Plans.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI SUBMISSSION LOG

SOLICITATION NUMBER 36C10F200055

PRE- PROPOSAL INQUIRY (PPI) FORM

HOUSTON NATIONAL CEMETERY PHASE 5 EXPANSION

Question No.

Reference (Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Solicitation

CLIN 1 & 2

Can the various bid items be better identified? Unable to decide what exactly goes in CLIN 1 and CLIN 2.

CLIN 1 contains a breakout for all General Requirements and Indirect costs for the project, and Early Turnover scope costs.

CLIN 2 contains all remaining contract scope, with exception of crypt costs (CLIN 3).

Gen.

Requirements

PP.1.2

Statement of Bid – CLIN items listed there do not match the Bidding Documents in the Solicitation.

Cannot address this comment as it does not contain specific reference to portions of the “bidding documents” that do not match the CLIN items.

Plan Sheet

CS-AA108

(pg.168)

New fans for Committal Shelters – Model and size not given, also not shown in electrical drawings.

Fans shall be 8’ in diameter.

Model will not be provided. Fan must meet specifications.

Location, wiring, and mounting of fans is shown on sheet CS-EP 101.

Plan Sheet

CD-103

(pg. 15)

Will any lead paint and asbestos abatement be required before demolition of the buildings?

Yes, asbestos and lead-based paint abatement are required.

Surveys have been uploaded to FBO with this response.

Plan Sheet

CD-103

(pg.15)

What is the chemical composition of the soil contaminants. This will determine where they can be disposed and cost.

Please refer to the Environmental Site Assessment conducted by Booze Allen Hamilton contained in the Solicitation. If additional testing is necessary, Contractor must account for it.

Plan Sheet

CD-103

(pg. 15)

Do we demo any fences and pens at the Farm-House Demo? Or just the structures?

Demolition applies to structures only.