This is a solicitation for the Phase 5 expansion of Houston National Cemetery. The solicitation is being issued by the Department of Veterans Affairs Office of Construction and Facilities Management as a 100% Service-Disabled Veteran Owned Small Business set aside. The project scope includes approximately 50 acres of additional gravesites, 14,000 preplaced crypt full casket gravesites, 350 oversize pre-placed crypt casket gravesites, 2,000 traditional in-ground cremains sites, 8,000 columbarium niches, a 300-gravesite Hybrid Natural Burial Memorial Wall and Ossuary, new entrance, roads, parking and site improvements. The work will also upgrade the irrigation system and drainage. The construction cost is estimated between $20-50 million. The NAICS code is 237990. Proposals are due August 10, 2020. All offerors must be registered in Vendor Information Pages as a verified SDVOSB.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOUSTON NATIONAL CEMETERY PHASE 5
DEVELOPMENT
STORMWATER POLLUTION PREVENTION PLAN
Houston National Cemetery Phase 5 Development Houston, TX
Strormwater Pollution Prevention Plan (SWP3)
Project Number: 851PC2048
Prepared for:
US Department of Veterans Affairs
Office of Construction and Facilities
425 I Street, NW Suite 6W417B
Washington DC, 20001
November 2019
Prepared by
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Construction General Permit Stormwater Pollution Prevention Plan (SWP3) February 2018
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY • PO BOX 13087 • AUSTIN, TX 78711 -3087 T he T CEQ i s an equa l oppor t un i t y em pl oy e r . T he agency does no t a l l ow d i sc r im ina t i on on t he basi s of r ac e , c o l or , r e l i g i on , na t i onal or i g i n , sex , d i sabi l i t y , age, sex ual o r i ent a t i on, o r v et e r an s t a t us . I n c om pl i anc e wi t h t he Am er i c ans wi t h Di sab i l i t i es A c t , t h i s doc um en t m ay be r equest ed i n a l t erna t e f o rm a t s by c on t ac t i ng t he T CEQ at 512 - 239 - 0028 , f ax 512 - 239 - 4488, o r 1 - 800 - RE LA Y-T X (T DD) , o r by wr i t i ng PO B ox 13087, A ust i n T X 78711 - 3087 . W e aut ho r i z e y ou t o use o r r epr oduc e any o r i g i na l m a t er i a l c ont a i ned i n t h i s publ i c at i on — t ha t i s , any m a t er i a l we d i d not obt a i n f r om ot he r sou r c es . P l ease ac k nowl edge t he T CEQ as y ou r sou r ce . P r i n t ed on r ec yc l ed p ape r .
Texas Pollutant Discharge Elimination Systems (TPDES)
Construction Stormwater General Permit (TXR150000)
Stormwater Pollution Prevention Plan (SWP3)
Company: Gordon
Role: Civil Engineer
Project Name: Houston National Cemetery Phase 5 Development
Plan Date: May 23,2019
Stormwater Pollution Prevention Plan
2 - February 2018
Table of Contents Section Page
Certification Page: Primary and/or Secondary operator
Site/Project Description:
1. Nature of Construction and List of Pollutants Part III, Sect. F.1. (a-b)
2. Schedule or Sequence of Major Grading Activities
Part III, Sect. F.1.(c)
3. Acreage, Material Storage, and Soil Type Part III, Sect.F.1. (d-e)
4. Location Map Part III, Sect. F.1.(f)
5. Detailed Site Map Part III, Sect. F.1.g.(i)-(-ix)
6. Site Description, Support Facilities Part III, Sect. F.1.(h - i)
7. Copy of TXR150000 NOI, certificate, and/or site notice
Description of Best Management Practices:
8. Best Management Practices (BMPs), Erosion and Sediment Controls
Part III, Sect. F.2.a.(i)-(ii) and F.2. (c)
9. BMPs, Off-site Transfer of Pollutant Controls
Part III, Sect. F.2.a.(iii)
10. BMPs, Erosion Control and Stabilization Practices
Part III, Sect. F.2.b.(i)
11. Dates of Major Grading Activities and Construction Stoppage
Part III, Sect. F.2.b.ii (A)-(C), (iii-iv)
12. Sediment Control Practices Part III, Sect. F.2. (c)
13. Permanent Stormwater Controls Part III, Sect. F.3
14. Other Stormwater Controls Part III, Sect. F.4.(a)-(d)
15. Inspection of Controls Worksheets Part III, Sect. F.7
16. List of BMPs for Eligible Non-Stormwater Discharges Part III, Sect. F.8
17. Stormwater runoff from Concrete Batch Plants Part IV
18. Concrete Truck Washout Requirements, Part V
3 - February 2018
Certification Page I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Sign as required by 30 TAC 305.128
Signed: ________________________________ Date:
name title
If plan is shared by more than one entity:
Signed: __________________________________ Date: TPDES#:____________ name title
Signed: __________________________________ Date: TPDES#:____________ name title
Signed: __________________________________ Date: TPDES#:____________ name title
Primary Operators
4 - February 2018
Site Description
Section 1
Nature of Construction and List of Pollutants
Part III, Sect. F.1. (a)
Description of the general nature of construction activities:
The proposed site improvements for 'Houston National Cemetery Phase 5 Development' includes, but is not limited to, demolition of existing asphalt pavement and subbase materials, existing curb & gutter, existing storm drain infrastructure, and existing vegetation. The improvements include gravesite expansion, construction of additional memorial walls, irrigation extensions, repair of existing committal service shelter, electrical upgrades, asphalt pavement, concrete curb & gutter, concrete walks, storm drain infrastructure, site furnishings, and landscaping. The project is located in Harris county, Texas.
Part III, Sect. F.1. (b)
List of ALL potential pollutants and their sources:
Potential Pollutants Source
Sedimentation Construction area/disturbed soil
Refuse Dumpster area
Fuel Fueling area
Hydraulic Fluid Fueling area/ Construction Equipment
Biodegradable Cleaner (D2) Pressure Washer
5 - February 2018
Section 2
Construction Schedule
Part III Sect. F.1. (c)
Description of the intended schedule, or a sequence of the major activities that will be disturbing soil for the major portions of the site. Add or subtract rows as needed.
Name of
Operator
Phase of Project
Projected dates
Month/year
Activity
Disturbing Soil clearing, excavation, etc.
Location on-site where activity will be conducted
Acreage being disturbed
6 - February 2018
Section 3
Acreage, Material Storage, and Soil Type
Part III, Sect. F.1. (d)
The total acreage of the entire property and the total acreage where construction activity will occur. Include off-site material storage areas, overburden and stockpiles of dirt or aggregates, and borrow areas. Also, include the acreage for construction support activities, such as equipment staging or storage areas, and chemical storage areas.
Material Storage Material
(s)/Equipment
Acreage Location
Off-site
On-site Soil stockpile/Staging +/- 0.5 Acre Mid North
Overburden/Stockpiles of Dirt
Borrow Areas
Other areas used as part of the project
Construction Support
Activities
Total acreage of project property:
417.53 acres Total acreage of disturbed soil:
+/- 40 acres
Part III Sect. F.1. (e)
The soils on-site within the area of interest consist of Addicks Loam (Ad), Clodine Fine Sandy Loam (Cd), and Cyfair-Urban Land Complex (CyuA). See appendix D , Geotechnical Report.
7 - February 2018
Section 4
Location Map
Part III Sect. F.1. (f)
8 - February 2018
Section 5
Detailed Site Map(s)
Part III Sect. F.1.g (i)-(viii)
See Appendix A
9 - February 2018
Section 6
Site Description – Support Facilities
Part III Sect. F.1. (h)
A description of the activities and their locations of any asphalt plants, concrete batch plants or other activity supporting this construction site.
Facility Description Location
Asphalt Plant
Concrete Batch Plant
Other Support Activity
Part III Sect. F.1. (i)
List of receiving waters at or near the site that will be disturbed or that will receive discharges from the project’s disturbed areas.
Name of Receiving Will Receiving Water Be
Disturbed?
Location of Receiving water
Unnamed tributary to Halls
Bayou
No South, Southeast of site
10 - February 2018
Section 7
Copies of Construction General Permit (CGP) TXR150000 or description of location of CGP
NOI, certificate, and/or site notice
See Appendix B
11 - February 2018
Best Management Practices
Section 8
Best Management Practices (BMPs) Erosion and Sediment Controls
Part III Section F.2.a.(i)-(ii) and F.2. (c)
BMPs
Installed
Schedule of
BMP
installation
Location(s)
On-Site
Inspection/Maintenance
Schedule
Modifications/Replacement
Activities
Filer Fabric
Fence
Prior to beginning
Earth disturbance activities of impact area
See Erosion and
Sediment
Control plans
Every 14 calendar days and within 24 hours of the end of a storm event
0.5” or greater or at a minimum of once every
7 calendar days
Repair or replace immediately if inoperable or faulty.
Inlet
Protection
Prior to beginning
Earth disturbance activities of impact area
See Erosion and
Sediment
Control plans
Every 14 calendar days and within 24 hours of the end of a storm event
0.5” or greater or at a minimum of once every
7 calendar days
Sediment deposits should be removed after each storm event and no later than at such time as deposits reach 1/3rd the depth of basket
Repair or replace immediately if inoperable or faulty.
Outlet
Protection
Prior to beginning
Earth disturbance activities of impact area
See Erosion and
Sediment
Control plans
Every 14 calendar days and within 24 hours of the end of a storm event
0.5” or greater or at a minimum of once every
7 calendar days
Repair or replace immediately if inoperable or faulty.
Construction
Exit
Prior to beginning
Earth disturbance activities of impact area
See Erosion and
Sediment
Control plans
Every 14 calendar days and within 24 hours of the end of a storm event
0.5” or greater or at a minimum of once every
7 calendar days
Repair or replace immediately if inoperable or faulty.
Rip Rap Prior to beginning
Earth disturbance activities of impact area
See Erosion and
Sediment
Control plans
Lined waterways shall be inspected weekly for
3 months after installation.
Rip rap should be checked periodically for dislodged stones and to assure that scour does not occur beneath the rip rap layer.
Repair to correct this should be made immediately.
12 - February 2018
Are there sedimentation basins or traps?* If yes, list the measures taken to reduce the pollutants transported off-site by pumping activities.
Yes No
Prevention Measure Location
On-Site
Implementation
Date
* Part III Section F.6. (c) Sediment must be removed from sediment traps and basins no later than the time that the design capacity has been reduced by 50 percent.
13 - February 2018
Section 9
BMPs, Off-Site Transfer of Pollutant Controls
Part III Section F.2.a. (iii)
List of good housekeeping practices implemented to limit the off-site transport of litter, construction debris, and construction materials.
Litter Controls:
Good Housekeeping Activity Location(s) On-Site
Keep Refuse containers covered with lid Dumpster area
Inspect cleanliness of area Dumpster area
Construction Debris Controls:
Construction Material Controls:
Inspect cleanliness of area Equipment storage area
Inspect for proper storage of equipment Equipment storage area
14 - February 2018
Section 10
BMPs, Stabilization and Erosion Control Practices
Part III Section F.2.b. (i)
Stabilization and erosion control practices may include, but are not limited to: establishing temporary or permanent vegetation, mulching, geotextiles, sod stabilization, vegetative buffer strips, and protecting existing trees and vegetation. List practices used where they are located, when they will be implemented, and whether they are temporary (interim) or permanent.
Stabilization Practices Location On-Site Implementation Date Interim or Permanent
Temporary
Vegetation
As Shown on Plans During Construction Interim
Permanent Vegetation As Shown on Plans Final grade achieved Permanent
Geotextiles As Shown on Plans Final grade achieved Permanent
Tree Protection As Shown on Plans During Construction Interim
Sod Stabilization As Shown on Plans Final grade achieved Permanent
Section 11
Dates of Major Grading Activities and Construction Stoppage
Part III Section F.2.b. (ii) (A)-(C), (iii-iv)
If you do not list activities below, either attach documentation or state where records for the activities can be accessed:
Documentation attached? Yes No
Where can documentation be found (if not included in SWP3)?
Contact Person Phone Number
Dates when major grading activities will occur and locations on-site:
Activity Location Dates when Activity is Scheduled
Pond regrading Existing irrigation ponds (mid-site)
TBD
Rough grading Phase 5 expansion area
TBD
Final Grading Phase 5 expansion area
TBD
15 - February 2018
Dates when construction activity will temporarily or permanently cease:
Location on-site Date activity is to be stopped
Temporary or
Permanent?
Stabilization
Initiation Date
Section 12
Sediment Control Practices
Part III Section F.2. (c)
Will the project disturb 10 acres or more at one time? Yes No
If yes, is it feasible to install a sediment basin? Yes No
Calculate the volume of runoff from a 2-year, 24 hour storm event. Volume of sediment basin: No sediment basins are proposed
In determining feasibility have you considered (attach any additional justification in determining feasibility):
Site Factor Considered? Site Factor Considered?
Site Soils yes Precipitation pattern yes
Slope yes Site geometry yes
Available area yes Site vegetation yes
Public safety yes Geotechnical factors yes
Groundwater depth yes Infiltration capacity yes
Based on above information, sedimentation basin will be used OR is not feasible.
If a sediment basin is not feasible, list of alternative structural control practices that will be used:
Article II. Structural Control Used? Yes/No Location On-Site
A series of smaller sediment basins
Yes No
Silt fences Yes No See Erosion and Sediment
Control Plans
Vegetative buffer strips Yes No
Sediment traps Yes No
Filter Fabric Fence: Yes No See Erosion and Sediment
Control Plans
16 - February 2018
Article II. Structural Control Used? Yes/No Location On-Site
Inlet Protection Yes No See Erosion and Sediment
Control Plans
Outlet Protection: Yes No See Erosion and Sediment
Control Plans
17 - February 2018
Section 13
Permanent Stormwater Controls
Part III Section F.3
The following measures will be constructed to control post-construction runoff:
Control Measure Location on Project Site Control runoff from what areas
Existing irrigation ponds Mid-Site Developed areas adjacent to the existing irrigation ponds
Section 14
Other Stormwater Controls
Part III Section F.4. (a)
Control to minimize dust generation and off-site tracking of sediment:
Control Practice Used Location(s) On-Site
Temporary stabilization areas of land disturbance
Stabilized Construction Exit (at new entrance and new road connection) See
Erosion and Sediment Control Plan
18 - February 2018
Part III Section F.4. (b)
The following construction and waste materials will be stored on-site:
Materials Stored On-Site Average
Amount
Stored
Location On-Site Controls Used to
Prevent Pollutants
Hazardous waste materials: Equipment maintenance fluids, oil filter, paint and other petroleum products.
TBD Contractor laydown / staging area
Hazardous waste materials will be stored in appropriate and clearly marked containers and segregated from other non - waste materials
Construction material waste: Wood pallets, cardboard, etc.
TBD Refuse Area Weekly inspection of refuse area.
Nonhazardous building material: Wood, plastic, metal, pipe cuttings, etc
TBD Contractor laydown / staging area
Large stockpile items will be elevated on wood blocks to minimize contact with runoff. Weekly inspection of storage area.
Other Stormwater Controls
Part III Section F.4. (c)- (d)
Describe pollutant sources from areas other than construction (make additional copies of this worksheet as needed):
Type of pollutant source Pollutant(s) Control(s) or measure(s) used to minimize pollutants n/a n/a n/a
19 - February 2018
Describe the velocity dissipation devices that will be placed at discharge locations and/or along the length of any outfall channels:
Dissipation Device (hay bales, silt fence, pond, etc.)
Outfall Discharging to
(MS4, bar ditch, creek/stream)
At Outfall or Channel
(distance interval for channel)
Filter Fabric On-Site Irrigation Pond N/A
Outlet Protection On-Site Irrigation Pond N/A
Rip rap On-Site Irrigation Pond N/A
20 - February 2018
Section 15
Inspection of Controls Worksheets/Report
Part III Section F.7.
Complete this worksheet every seven days; OR, every 14 days and within 24 hours of a
0.5 inch rainfall event, and retain in your SWP3.
Inspector (name/title): Inspection Date: Day: Time: am/pm
Scope of inspection: 14 Day Inspection or Weekly Inspection
Day of week normally conducted: ____________ 0.5 inch Rainfall Event
Inspection Type: Inspected? (Y/N) Areas of Concern (Describe in detail in the narrative section)
Disturbed Soil Areas Yes No
Material Storage Areas Yes No
Structural Controls Yes No
Sediment & Erosion Controls Yes No
Entrance(s) and Exit(s) Yes No
21 - February 2018
Discharges:
Nature of discharge (silt, gravel, sand, other pollutant)
Location on-site discharge
Inspection of Controls Worksheets (contd.)
Part III Section F.7.
Best Management Practices Inspected: Add additional rows if needed.
BMP and Location OK (no action required)
BMP failed (describe failure)
Required
Maintenance
(describe corrective actions needed)
Additional BMPs Needed Location Best Management Practice Replacing Existing BMP?
22 - February 2018
Inspection Narrative Description/Certification
Part III Section F.7.
Complete this worksheet every seven days; OR, every 14 days and within 24 hours of a 0.5 inch rainfall event and retain in your SWP3.
Describe the inspector’s qualifications to conduct the inspections:
Describe how your inspection was conducted:
Describe all incidents of non-compliance (i.e. major discharges, BMP failures):
“I certify that the facility or site is in compliance with the stormwater pollution prevention plan and this permit.”
I further certify that I am authorized to sign this report under TCEQ rules at 30 TAC 305.128
(relating to Signatories to Reports)
Name/Title: Date:
Section 16
Eligible Non-Stormwater Discharges (listed in Part II.3. [a]-[h])
Part III, Sect. F.8
Eligible Non-stormwater Discharge
Used? Yes/No Pollution Prevention
Measure(s)
Implementation Date
Fire Fighting Activities Yes No
Fire Hydrant Flushing Yes No
Washing of Vehicles, Buildings, or Pavement without detergents or soap (see description in
Part II.3.[c])
Yes No
Dust Control Yes No
Potable Water Sources
(water line flushing)
Yes No
Air Conditioning
Condensate
Yes No
Uncontaminated
Ground/Spring Water
Yes No
Other? (List) Yes No
23 - February 2018
List any other non-stormwater discharge permitted by a separate NPDES, TPDES, or TCEQ
Permit.
Non-stormwater Discharge Pollution Prevention
Measure
Implementation Date
Section 17
Stormwater Runoff from Concrete Batch Plants
Part IV
N/A
Section 18
Concrete Truck Washout Requirements
Part V
Location of concrete washout area to by determined by RE/COR. Concrete Truck washout will be inspected that washout is functioning properly. Storm drains are to be protected from Concrete
Truck Washout. Supervisor will be notified immediately if Concrete Truck Washout is not functioning properly and all spills to be cleaned up.
Appendix A – Houston National Cemetery Phase 5
APPENDIX A
EROSION CONTROL PHASING PLANS AND DETAILS
GRADING AND DRAINAGE PLANS
4:1
4:1
4:1
4:1 4:1
4:1
4:1
NEW WELL/PUMP
(REFER TO IRRIGATION
DRAWINGS)
IP2
FF1
IP2
FF2
IP2
FF1IP2
FF1
FF1
FF1
FF1
TP
SC
OP
OP
OP
IP2
TP
OP
OP
SC
IP1
IP1
IP1
FF2
OP
TS
SR
SR
SR
SR
SR
SR
SR
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
EROSION AND SEDIMENT CONTROL
PLAN AREA 1
GC101
KEY MAP
(NOT TO SCALE)
SEQUENCE OF CONSTRUCTION:
PHASE I:
PHASE I OPERATIONS SHALL INCLUDE EROSION CONTROL MEASURES NEEDED TO DIVERT MAJOR OFF-SITE CLEAN WATER AND ON-SITE DRAINAGE FLOWS AROUND THE WORK AREAS AND CONTROL EROSION AND SEDIMENTATION ASSOCIATED WITH INITIAL CLEARING AND
GRADING OPERATIONS.
1. CONTACT TEXAS 811 AT 1-800-344-8377 OR BY DIALING 811 ON A TEXAS PHONE LINE OR TEXAS811.ORG, AT LEAST THREE WORKING
DAYS PRIOR TO BEGINNING WORK. LOCATE ALL UTILITIES.
2. STAKE/FLAG LIMITS OF CONSTRUCTION, SENSITIVE AREAS, AND TREES THAT ARE TO BE PRESERVED. LIMITS OF CONSTRUCTION
MUST REMAIN MARKED THROUGHOUT THE ENTIRE SITE DEVELOPMENT.
3. INSTALL TEMPORARY STONE ACCESS AND ESTABLISH A PROTECTED STAGING AND EQUIPMENT PARKING AREA (RE/COR TRAILER).
4. CLEAR AND GRUB AREAS FOR THE INSTALLATION OF PHASE I PERIMETER CONTROLS. ONLY THE MINIMUM AREAS NECESSARY TO
INSTALL PERIMETER EROSION CONTROL MEASURES SHALL BE CLEARED AND GRUBBED.
5. INSTALL PERIMETER CONTROLS SUCH AS PHASE I FILTER FABRIC FENCE. STABILIZE ALL EROSION AND SEDIMENT CONTROL
MEASURES IMMEDIATELY AFTER INSTALLATION. STABILIZE AREAS BETWEEN PERIMETER SEDIMENT CONTROL MEASURES AND
THE LIMITS OF CONSTRUCTION.
6. INSTALL TEMPORARY CONSTRUCTION FENCING PER SHEET 16 - TEMPORARY CONSTRUCTION FENCING PLAN AREA 1 AND 17 -
TEMPORARY CONSTRUCTION FENCING PLAN AREA 2.
7. CLEAR AND GRUB THE REMAINDER OF THE SITE. ALL UNSUITABLE MATERIAL (LOGS, BRUSH, VEGETATIVE MATTER, ETC.) WHICH WILL INTERFERE WITH THE GRADING AND/OR STABILITY OF FILL AREAS SHALL BE REMOVED AND/OR DISPOSED OF PROPERLY.
8. INSTALL ALL PHASE I INLET PROTECTION ON EXISTING STORM DRAIN INLETS AS SHOWN ON SHEETS 18 - EROSION AND SEDIMENT
CONTROL PLAN AREA 1 AND 19 - EROSION AND SEDIMENT CONTROL PLAN AREA 2.
9. RE-GRADE POND A. UTILIZE SURFACE ROUGHING AFTER ROUGH GRADING. THE EARTHEN EMBANKMENTS AS SHOWN WITH SYMBOL SHALL BE SEEDED AND MULCHED TO PROVIDE TEMPORARY STABILIZATION IMMEDIATELY AFTER INSTALLATION.
10. INSTALL PHASE II FILTER FABRIC TO NEWLY STABILIZED POND EMBANKMENT.
PHASE II:
THE PHASE II EROSION AND SEDIMENT CONTROL MEASURES ARE INTENDED FOR THE FINAL STAGES OF SITE DEVELOPMENT. PHASE I CONTROL MEASURES, WHICH ARE NOT IN CONFLICT WITH FINAL CONSTRUCTION AND PROVIDE EFFECTIVE CONTROL, SHALL REMAIN IN PLACE FOR FINAL DEVELOPMENT. THE CONTRACTOR SHALL FOLLOW THE COUNTY ENGINEERING DEPARTMENT'S DIRECTION IN PROVIDING ADDITIONAL CONTROL MEASURES NEEDED DURING THE DEVELOPMENT PROCESS, TO ENSURE THAT SEDIMENT IS PREVENTED FROM POLLUTING OFF-SITE AREAS, STREAMS AND/OR PROTECTED ON-SITE AREAS. THE FOLLOWING SEQUENCE OF
CONSTRUCTION IS SUGGESTED.
1. ROUGH GRADE THE SITE INCLUDING ROADWAYS, DRIVE AISLES, PARKING AREAS, AND SWALES.
2. BEGIN CONSTRUCTION OF BURIAL SECTIONS AND STRUCTURES.
3. THROUGHOUT CONSTRUCTION, INITIATE TEMPORARY OR PERMANENT STABILIZATION MEASURES IMMEDIATELY FOLLOWING THE
COMPLETION OF THE MOST RECENT LAND DISTURBING ACTIVITY. DISTURBED AREAS SHALL BE SEEDED AND MULCHED IF THEY
ARE TO REMAIN UNDISTURBED FOR 14 DAYS OR LONGER.
4. INSTALL UNDERGROUND UTILITIES, INCLUDING STORM SEWER, SANITARY SEWER AND WATER LINES.
5. INSTALL INLET PROTECTION AT ALL STORM DRAIN INLETS AS EACH STRUCTURE IS INSTALLED.
6. INSTALL RIP RAP-END SECTION AT EACH OUTLET STRUCTURE AS EACH STRUCTURE IS INSTALLED.
7. CONSTRUCT THE BASE PAVEMENT FOR ROADWAYS, DRIVE AISLES, AND PARKING AREAS, AND INSTALL CURB SECTIONS.
8. INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES AS NEEDED THROUGHOUT CONSTRUCTION.
9. FINAL GRADE ALL AREAS OF THE SITE LEAVING SEDIMENT CONTROLS IN PLACE AS NEEDED. SPREAD TOPSOIL OVER AREAS TO BE
SEEDED.
10. PERMANENTLY STABILIZE ALL AREAS NOT COVERED BY HARD COVER SUCH AS PAVEMENT OR BUILDINGS.
11. BEGIN REMOVAL OF EROSION AN SEDIMENT CONTROL BMP'S. NO EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
REMOVED UNTIL ALL UP-SLOPE AREAS THAT DRAIN TO THEM HAVE BEEN STABILIZED.
12. REMOVE REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL
OF TEMPORARY BMP'S.
TS
TP
FF1
SC
IP2
PHASE I FILTER FABRIC FENCE
TREE PROTECTION
STABILIZED CONSTRUCTION EXIT
PHASE II INLET PROTECTION
E&S KEY NOTE LEGEND:
KEY NO. DESCRIPTION DETAIL/PG
OP OUTLET PROTECTION
FF2 PHASE II FILTER FABRIC FENCE
IP1 PHASE I INLET PROTECTION
TS TEMPORARY SEEDING
SR SURFACE ROUGHENING
E&S GRAPHIC LEGEND:
LIMITS OF WORK
PHASE II FILTER FABRIC FENCE
STABILIZED CONSTRUCTION EXIT
PHASE II INLET PROTECTION
TREE PROTECTION
PHASE I FILTER FABRIC FENCE
PHASE I INLET PROTECTION
REINFORCED GRASSED
SPILLWAY ARMORING
NEW ROAD 'A'
NEW ROAD 'A'
NEW
TRAFFI C
CIRCLE
0+
1+
1+87
FF1 IP2
FF1
IP2
FF1
FF1
OP
IP1
FF1
FF1
OP
SR
SR
SR
SR
FF1
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
EROSION AND SEDIMENT CONTROL
PLAN AREA 2
GC102
KEY MAP
(NOT TO SCALE)
TP
FF1
SC
IP2
PHASE I FILTER FABRIC FENCE
TREE PROTECTION
STABILIZED CONSTRUCTION EXIT
PHASE II INLET PROTECTION
E&S KEY NOTE LEGEND:
KEY NO. DESCRIPTION DETAIL/PG
OP OUTLET PROTECTION
FF2 PHASE II FILTER FABRIC FENCE
IP1 PHASE I INLET PROTECTION
TS TEMPORARY SEEDING
SR SURFACE ROUGHENING
SEQUENCE OF CONSTRUCTION:
PHASE I:
PHASE I OPERATIONS SHALL INCLUDE EROSION CONTROL MEASURES NEEDED TO DIVERT MAJOR OFF-SITE CLEAN WATER AND ON-SITE DRAINAGE FLOWS AROUND THE WORK AREAS AND CONTROL EROSION AND SEDIMENTATION ASSOCIATED WITH INITIAL CLEARING AND
GRADING OPERATIONS.
1. CONTACT TEXAS 811 AT 1-800-344-8377 OR BY DIALING 811 ON A TEXAS PHONE LINE OR TEXAS811.ORG, AT LEAST THREE WORKING
DAYS PRIOR TO BEGINNING WORK. LOCATE ALL UTILITIES.
2. STAKE/FLAG LIMITS OF CONSTRUCTION, SENSITIVE AREAS, AND TREES THAT ARE TO BE PRESERVED. LIMITS OF CONSTRUCTION
MUST REMAIN MARKED THROUGHOUT THE ENTIRE SITE DEVELOPMENT.
3. INSTALL TEMPORARY STONE ACCESS AND ESTABLISH A PROTECTED STAGING AND EQUIPMENT PARKING AREA (RE/COR TRAILER).
4. CLEAR AND GRUB AREAS FOR THE INSTALLATION OF PHASE I PERIMETER CONTROLS. ONLY THE MINIMUM AREAS NECESSARY TO
INSTALL PERIMETER EROSION CONTROL MEASURES SHALL BE CLEARED AND GRUBBED.
5. INSTALL PERIMETER CONTROLS SUCH AS PHASE I FILTER FABRIC FENCE. STABILIZE ALL EROSION AND SEDIMENT CONTROL
MEASURES IMMEDIATELY AFTER INSTALLATION. STABILIZE AREAS BETWEEN PERIMETER SEDIMENT CONTROL MEASURES AND
THE LIMITS OF CONSTRUCTION.
6. INSTALL TEMPORARY CONSTRUCTION FENCING PER SHEET 16 - TEMPORARY CONSTRUCTION FENCING PLAN AREA 1 AND 17 -
TEMPORARY CONSTRUCTION FENCING PLAN AREA 2.
7. CLEAR AND GRUB THE REMAINDER OF THE SITE. ALL UNSUITABLE MATERIAL (LOGS, BRUSH, VEGETATIVE MATTER, ETC.) WHICH WILL INTERFERE WITH THE GRADING AND/OR STABILITY OF FILL AREAS SHALL BE REMOVED AND/OR DISPOSED OF PROPERLY.
8. INSTALL ALL PHASE I INLET PROTECTION ON EXISTING STORM DRAIN INLETS AS SHOWN ON SHEETS 18 - EROSION AND SEDIMENT
CONTROL PLAN AREA 1 AND 19 - EROSION AND SEDIMENT CONTROL PLAN AREA 2.
9. RE-GRADE POND A. UTILIZE SURFACE ROUGHING AFTER ROUGH GRADING. THE EARTHEN EMBANKMENTS AS SHOWN WITH SYMBOL SHALL BE SEEDED AND MULCHED TO PROVIDE TEMPORARY STABILIZATION IMMEDIATELY AFTER INSTALLATION.
10. INSTALL PHASE II FILTER FABRIC TO NEWLY STABILIZED POND EMBANKMENT.
PHASE II:
THE PHASE II EROSION AND SEDIMENT CONTROL MEASURES ARE INTENDED FOR THE FINAL STAGES OF SITE DEVELOPMENT. PHASE I CONTROL MEASURES, WHICH ARE NOT IN CONFLICT WITH FINAL CONSTRUCTION AND PROVIDE EFFECTIVE CONTROL, SHALL REMAIN IN PLACE FOR FINAL DEVELOPMENT. THE CONTRACTOR SHALL FOLLOW THE COUNTY ENGINEERING DEPARTMENT'S DIRECTION IN PROVIDING ADDITIONAL CONTROL MEASURES NEEDED DURING THE DEVELOPMENT PROCESS, TO ENSURE THAT SEDIMENT IS PREVENTED FROM POLLUTING OFF-SITE AREAS, STREAMS AND/OR PROTECTED ON-SITE AREAS. THE FOLLOWING SEQUENCE OF
CONSTRUCTION IS SUGGESTED.
1. ROUGH GRADE THE SITE INCLUDING ROADWAYS, DRIVE AISLES, PARKING AREAS, AND SWALES.
2. BEGIN CONSTRUCTION OF BURIAL SECTIONS AND STRUCTURES.
3. THROUGHOUT CONSTRUCTION, INITIATE TEMPORARY OR PERMANENT STABILIZATION MEASURES IMMEDIATELY FOLLOWING THE
COMPLETION OF THE MOST RECENT LAND DISTURBING ACTIVITY. DISTURBED AREAS SHALL BE SEEDED AND MULCHED IF THEY
ARE TO REMAIN UNDISTURBED FOR 14 DAYS OR LONGER.
4. INSTALL UNDERGROUND UTILITIES, INCLUDING STORM SEWER, SANITARY SEWER AND WATER LINES.
5. INSTALL INLET PROTECTION AT ALL STORM DRAIN INLETS AS EACH STRUCTURE IS INSTALLED.
6. INSTALL RIP RAP-END SECTION AT EACH OUTLET STRUCTURE AS EACH STRUCTURE IS INSTALLED.
7. CONSTRUCT THE BASE PAVEMENT FOR ROADWAYS, DRIVE AISLES, AND PARKING AREAS, AND INSTALL CURB SECTIONS.
8. INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES AS NEEDED THROUGHOUT CONSTRUCTION.
9. FINAL GRADE ALL AREAS OF THE SITE LEAVING SEDIMENT CONTROLS IN PLACE AS NEEDED. SPREAD TOPSOIL OVER AREAS TO BE
SEEDED.
10. PERMANENTLY STABILIZE ALL AREAS NOT COVERED BY HARD COVER SUCH AS PAVEMENT OR BUILDINGS.
11. BEGIN REMOVAL OF EROSION AN SEDIMENT CONTROL BMP'S. NO EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
REMOVED UNTIL ALL UP-SLOPE AREAS THAT DRAIN TO THEM HAVE BEEN STABILIZED.
12. REMOVE REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL
OF TEMPORARY BMP'S.
TS
E&S GRAPHIC LEGEND:
LIMITS OF WORK
PHASE II FILTER FABRIC FENCE
STABILIZED CONSTRUCTION EXIT
PHASE II INLET PROTECTION
TREE PROTECTION
PHASE I FILTER FABRIC FENCE
PHASE I INLET PROTECTION
REINFORCED GRASSED
SPILLWAY ARMORING
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
EROSION AND SEDIMENT CONTROL
NOTES AND DETAILS
GC500
EROSION AND SEDIMENT CONTROL NOTES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL
BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. HARRIS COUNTY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. HARRIS COUNTY MAY REQUIRE A WRITTEN SUBMITTAL OF
THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE RE/COR SHALL INVITE ALL CONTRACTORS, THE CEMETERY DIRECTOR, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE E&S PLAN, AND A REPRESENTATIVE
FROM THE LOCAL CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, TEXAS 811. SHALL BE NOTIFIED AT 1-800-344-8377 FOR THE LOCATION OF
EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE
PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN
WRITING FROM HARRIS COUNTY PRIOR TO IMPLEMENTATION.
5. PRIOR TO COMMENCING CLEARING AND GRADING, CONTRACTOR TO INSTALL PERIMETER EROSION
AND SEDIMENT CONTROLS.
6. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
7. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMP'S SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE
FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
8. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF WORK BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED BEFORE
CLEARING AND GRUBBING OPERATIONS BEGIN.
9. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL
NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
10. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT
APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND
SEDIMENT POLLUTION AND NOTIFY HARRIS COUNTY.
11. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR
DISPOSED OF IN ACCORDANCE WITH THE HARRIS COUNTY REGULATIONS.
12. ALL OFF-SITE WASTE AND BORROW AREAS (IF APPLICABLE) MUST HAVE AN E&S PLAN APPROVED BY
HARRIS COUNTY FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
13. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN
FILL.
14. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE
DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S SHALL BE MAINTAINED IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMP'S AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED WITHIN 24 HOURS. IF THE E&S BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR MODIFICATIONS OF THOSE
INSTALLED WILL BE REQUIRED TO BE IMPLEMENTED WITHIN 48 HOURS.
16. A LOG SHOWING DATES THAT E&S BMP'S WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO
REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
17. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE
DITCH, STORM SEWER, OR SURFACE WATER.
18. ALL SEDIMENT REMOVED FROM BMP'S SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE
PLAN DRAWINGS.
19. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES, 6 TO 12 INCHES ON COMPACTED SOILS, PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL
OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
20. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
21. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN
THICKNESS.
22. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH
THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
23. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
24. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT
STABILIZATION SPECIFICATIONS.
25. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER
OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST
ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO
SLUMPING, SLIDING, OR OTHER MOVEMENTS.
26. E&S BMP'S SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY HARRIS
COUNTY.
27. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL
DISTURBED AREAS, THE RE/COR SHALL REVIEW SITE FOR AN INSPECTION PRIOR TO
REMOVAL/CONVERSION OF THE E&S BMP'S.
28. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMP'S
MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER
MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMP'S SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH
REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
29. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE RE/COR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT TO SCHEDULE A
FINAL INSPECTION.
30. CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS. IN
NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS.
31. UPON REQUEST, THE APPLICANT OR HIS CONTRACTOR SHALL PROVIDE AN AS-BUILT (RECORD
DRAWING) FOR ANY SEDIMENT BASIN OR TRAP TO HARRIS COUNTY.
32. THE SOIL EROSION WILL BE MAINTAINED WEEKLY AND AFTER EVERY STORM EVENTS BY THE
CONTRACTOR.
SURFACE ROUGHENING INSTALLATION NOTES:
1. SEE PLAN VIEW FOR: LOCATION(S) OF SURFACE ROUGHENING
2. SURFACE ROUGHENING SHALL BE PROVIDED PROMPTLY AFTER COMPLETION OF FINISHED
GRADING (FOR AREAS NOT RECEIVING TOPSOIL) OR PRIOR TO TOPSOIL PLACEMENT OR ANY
FORECASTED RAIN EVENT
3. AREAS WHERE BUILDING FOUNDATIONS, PAVEMENT, OR SOD WILL BE PLACED WITHOUT DELAY
IN THE CONSTRUCTION SEQUENCE, SURFACE ROUGHENING IS NOT REQUIRED.
4. DISTURBED SURFACES SHALL BE ROUGHENED USING RIPPING OR TILLING EQUIPMENT ON THE
CONTOUR OR TRACKING UP AND DOWN A SLOPE USING EQUIPMENT TREADS.
5. A FARMING DISK SHALL NOT BE USED FOR SURFACE ROUGHENING.
TEMPORARY EROSION CONTROL SEEDING INSTALLATION NOTES:
1. SEEDING OF VEGETATION FILTER STRIP IS TO BE CONTAINED WITHIN A PROJECT CONSTRUCTION SITE. TEMPORARY SEEDING LOCATIONS ARE AS INDICATED ON PLANS. TEMPORARY SEEDING IS
INTENDED TO GERMINATE AND ESTABLISH WITHIN 10-14 DAYS. THE SPECIES USED IN THIS
SEEDING ARE NOT PERMANENT OR SHOULD BE INTEGRATED WITH A PERMANENT SEEDING OR
PLANTING.
2. SEEDS; CONFORM TO REQUIREMENTS OF USDA RULES AND REGULATIONS AS SET FORTH OF
FEDERAL SEED ACT AND TEXAS SEED LAW. USE SEED WHICH HAS BEE TREATED WITH AN
APPROVED FUNGICIDE. CONTAINER LABELS TO SHOW PURITY, GERMINATION, NAME AND TYPE
OF SEED, AND SOURCE OR ORIGIN. REFER TO TABLE FOR PLANTING DATE, TYPE, AND RATE.
TYPE
UNHULLED BERMUDA/ GRASS OATS/
WINTER RYE
MIX BERMUDA AND ANNUAL RYE IN
FOLLOWING PROPORTIONS
HULLED BERMUDA GRASS/ LOVE GRASS
ANNUAL MILLET GRASS
RATES OF APPLICATION
IN POUNDS PER ACRE
12:200
35-40
PLANTING DATE
JAN. 1 TO APR. 1
APR. 1 TO OCT. 1
OCT. 1 TO JAN. 1
APR. 1 TO NOV. 1
SECTION 16
1,000 IN-GROUND
CREMAINS SITES
(4'X4' PLOTS)
SECTION 15
1,000 IN-GROUND
CREMAINS SITES
(4'X4' PLOTS)
NEW
ENTRANCE
ROAD
MEMORIAL DRIVE EXTENSION
CONTRACTOR LAYDOWN
/STAGING AREA
0+00
1+00
2+00
3+00
4+00
5+00
6+00 7+00
8+00
9+00
0+
1+
1+
ALDINE WESTERN ROAD
24' ASPHALT ROAD
(65' RIGHT OF WAY)
CONTRACTOR PROVIDE A
SMOOTH TRANSITION AT
TIE-IN TO EX. PAVEMENT
CONTRACTOR PROVIDE A
SMOOTH TRANSITION AT
TIE-IN TO EX. PAVEMENT
CONTRACTOR PROVIDE A
SMOOTH TRANSITION AT
TIE-IN TO EX. PAVEMENT
4:1 MAX
EXISTING STORM SEWER TO REMAIN.
CONTRACTOR TO MAINTAIN EXISTING
STORM SEWER/STRUCTURES
THROUGHOUT CONSTRUCTION.
NORMAL
WSE=86.79
POND A
BOTTOM ELEV=82.00
NORMAL WSE=86.79
100-YR WSE=90.90
TOP ELEV=91.50
' B
EN
CH
:1
SL
OP
E
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 1
CG101
KEY MAP
(NOT TO SCALE)
1 2
7 8A
9A 9B
8B
9C
REINFORCED GRASSED
SPILLWAY ARMORING
GRAPHIC LEGEND:
LIMITS OF WORK
PRE-PLACED CRYPTS
NEW STORM SEWER
CRYPT UNDER DRAIN
PROPOSED GROUND
ELEVATION*
MATCH EXISTING
GROUND ELEVATION*
PROPOSED TOP
OF CURB ELEVATION
MATCH EXISTING TOP
OF CURB ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
*WHEN SHOWN LABELING CURB AND GUTTER, THIS
ELEVATION DENOTES THE FLOW LINE ELEVATION.
GRADING NOTES:
SECTION 16
1,000 IN-GROUND
CREMAINS SITES
(4'X4' PLOTS)
9+00
10+00
4:1 MAX
4:1 MAX
NEW WELL/PUMP
(REFER TO IRRIGATION
DRAWINGS)
ADJUST STRUCTURE RIM TO
FINAL GRADE/FLUSH WITH
NEW CONCRETE PAVEMENT
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 2
CG102
KEY MAP
(NOT TO SCALE)
1 2
7 8A
9A 9B
8B
9C
REINFORCED GRASSED
SPILLWAY ARMORING
GRAPHIC LEGEND:
LIMITS OF WORK
PRE-PLACED CRYPTS
NEW STORM SEWER
CRYPT UNDER DRAIN
PROPOSED GROUND
ELEVATION*
MATCH EXISTING
GROUND ELEVATION*
PROPOSED TOP
OF CURB ELEVATION
MATCH EXISTING TOP
OF CURB ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
*WHEN SHOWN LABELING CURB AND GUTTER, THIS
ELEVATION DENOTES THE FLOW LINE ELEVATION.
MATERIAL STORAGE YARD - NEW CONCRETE PAVEMENT AREA DETAIL
EXPANSION
JOINT (TYP.)
CONTROL
JOINT (TYP.)
TRANSITION FROM
FULL HT. CURB TO
DEPRESSED CURB
TRANSITION FROM
FULL HT. CURB TO
DEPRESSED CURB
DEPRESSED
CURB
TIE INTO
COLUMBARIUM
GRADING
ADJUST TOP TO
FINAL GRADE
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
THE COLUMBARIUM COMPLEX
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 3
CG103
KEY MAP
(NOT TO SCALE)
1 2
7 8A
9A 9B
8B
9C
REINFORCED GRASSED
SPILLWAY ARMORING
GRAPHIC LEGEND:
LIMITS OF WORK
PRE-PLACED CRYPTS
NEW STORM SEWER
CRYPT UNDER DRAIN
PROPOSED GROUND
ELEVATION*
MATCH EXISTING
GROUND ELEVATION*
PROPOSED TOP
OF CURB ELEVATION
MATCH EXISTING TOP
OF CURB ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
*WHEN SHOWN LABELING CURB AND GUTTER, THIS
ELEVATION DENOTES THE FLOW LINE ELEVATION.
ON-STREET PARKING AREA DETAIL
MEMORIAL DRIVE EXTENSION
CONTRACTOR LAYDOWN
/STAGING AREA
1+00
2+00
EXPANDED POND
AREA
NORMAL
WSE=86.79
NORMAL
WSE=86.79
POND A
BOTTOM ELEV=82.00
NORMAL WSE=86.79
100-YR WSE=90.90
TOP ELEV=91.50
POND A
BOTTOM ELEV=82.00
NORMAL WSE=86.79
100-YR WSE=90.90
TOP ELEV=91.50
30'
BENCH
@10:
1 SLO
PE
' B
EN
CH
:1
SL
OP
E
4:1
4:1
4:1
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 4
CG104
KEY MAP
(NOT TO SCALE)
1 2
7 8A
9A 9B
8B
9C
REINFORCED GRASSED
SPILLWAY ARMORING
GRAPHIC LEGEND:
LIMITS OF WORK
PRE-PLACED CRYPTS
NEW STORM SEWER
CRYPT UNDER DRAIN
PROPOSED GROUND
ELEVATION*
MATCH EXISTING
GROUND ELEVATION*
PROPOSED TOP
OF CURB ELEVATION
MATCH EXISTING TOP
OF CURB ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
*WHEN SHOWN LABELING CURB AND GUTTER, THIS
SECTION 12
2,944 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(3'X8' PLOTS)
SECTION 13
2,832 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(3'X8' PLOTS)
SECTION 19
2,992 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(3'X8' PLOTS)
SECTION 20
2,376 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(3'X8' PLOTS)
MEMORIAL DRIVE EXTENSION
ME
MO
RI
AL
DR
IV
E
EX
TE
NS
IO
N
MEMORIAL DRIVE
EXTENSION
10+00
11+00
12+00
13+00
14+00
15+00
16+00
+0
+ 0
4:1 MAX
4:1 MAX
4 :1 MAX
4 :1 MAX
4:1 MAX
4:1
MAX
4:1
MAX
NORMAL
WSE=86.79
30' BENCH
@10:1 SLOPE
4:1
4:1
4" PERF.
HDPE UNDRN
(TYP.)
4" PERF. HDPE
UNDRN (TYP.)
4" PERF.
HDPE
UNDRN
4" PERF.
HDPE UNDRN
(TYP.)
4" PERF.
HDPE UNDRN
(TYP.)
4" PERF.
HDPE UNDRN
(TYP.)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 5
CG105
REINFORCED GRASSED
SPILLWAY ARMORING
GRAPHIC LEGEND:
LIMITS OF WORK
PRE-PLACED CRYPTS
NEW STORM SEWER
CRYPT UNDER DRAIN
PROPOSED GROUND
ELEVATION*
MATCH EXISTING
GROUND ELEVATION*
PROPOSED TOP
OF CURB ELEVATION
MATCH EXISTING TOP
OF CURB ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
*WHEN SHOWN LABELING CURB AND GUTTER, THIS
ELEVATION DENOTES THE FLOW LINE ELEVATION.
GRADING NOTES:
GRADING KEY NOTE LEGEND:
KEY NO. DESCRIPTION DETAIL/PG
CONTRACTOR TO PROVIDE
30' TRANSITION CURVE AROUND RIDGE LINE1
0+00
CONTRACTOR PROVIDE A
SMOOTH TRANSITION AT
TIE-IN TO EX. PAVEMENT
4" HDPE
4"
HD
PE
4" HDPE
4" HDPE
REMOVE EXISTING
STORM SEWER AND
REPLACE WITH CLASS
III RCP STORM SEWER
CONTRACTOR TO
MATCH EXISTING
INVERT ELEVATION.
CONTRACTOR TO
MATCH EXISTING
INVERT ELEVATION.
INSTALL TRASH
RACK (SEE SPECS)
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
THE COLUMBARIUM COMPLEX
REFER TO COMMITTAL SHELTER
C CONCRETE REPLACEMENT
AREA DETAIL, SHEET CT104
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 6
CG106
KEY MAP
(NOT TO SCALE)
1 2
7 8A
9A 9B
8B
9C
REINFORCED GRASSED
SPILLWAY ARMORING
GRAPHIC LEGEND:
LIMITS OF WORK
PRE-PLACED CRYPTS
NEW STORM SEWER
CRYPT UNDER DRAIN
PROPOSED GROUND
ELEVATION*
MATCH EXISTING
GROUND ELEVATION*
PROPOSED TOP
OF CURB ELEVATION
MATCH EXISTING TOP
OF CURB ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
*WHEN SHOWN LABELING CURB AND GUTTER, THIS
NEW ROAD 'A'
0+00
1+00 2+00
3+00 4+00
5+00 6+00
7+00
PROVIDE A
NSITION AT
PAVEMENT
WSE
NORMAL
WSE=86.79
POND A
BOTTOM ELEV=82.00
NORMAL WSE=86.79
100-YR WSE=90.90
TOP ELEV=91.50
30' BENCH
@10:1 SLOPE
30' BENCH
10:1 SLOPE
4:1
4:1
CONTRACTOR TO LOCATE THE EXISTING 24"
PIPE AND PLACE NEW 36" DUAL EQUALIZATION
PIPES PARALLEL TO THE EXISTING PIPE AND
MAINTAIN 10' OF CLEARANCE FROM THE EX. PIPE
TO THE PR. PIPE. NEW 36" PIPES TO EXTEND TO
THE SAME LENGTH AS THE EX. 24" PIPE.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg. of 215
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved:
Phase
Project Director
Building Number
CONSTRUCTION DOCUMENTS 2 SUBMISSION
CONSTRUCTION
DOCUMENTS 2
321 4 5 6 7 8 9 10
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
Phone: 304-725-8456 www.gordon.us.com
HOUSTON NATIONAL CEMETERY
PHASE 5 DEVELOPMENT
GRADING AND DRAINAGE PLAN
AREA 7
CG107
KEY MAP
(NOT TO SCALE)
1 2
7 8A
9A 9B
8B
9C
REINFORCED GRASSED
SPILLWAY ARMORING
GRAPHIC LEGEND:
LIMITS OF WORK
PRE-PLACED CRYPTS
NEW STORM SEWER
CRYPT UNDER DRAIN
PROPOSED GROUND
ELEVATION*
MATCH EXISTING
GROUND ELEVATION*
PROPOSED TOP
OF CURB ELEVATION
MATCH EXISTING TOP
OF CURB ELEVATION
NEW STORM STRUCTURE
DRAINAGE FLOW ARROW
*WHEN SHOWN LABELING CURB AND GUTTER, THIS
SECTION 11
2,856 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(3'X8' PLOTS)
SECTION 10
350 OVERSIZED
DOUBLE-DEPTH
PRE-PLACED CRYPTS
(4'X10' PLOTS)
ME
MO
RI
AL
DR
IV
E
EX
TE
NS
IO
N
NEW ROAD 'A'
NEW
TRAFFIC
CIRCLE
+0
+0
+5
8+00 9+00
10+00 11+00 12+00
0+00
1+
2+00
3+00
4+
5+
6+0026+28
4 :1 MAX
4:1 MAX
4:1 MAX
4:1 MAX
4:1
MA
X
8' WIDE EMBANKMENT
TOP OF EMBANKMENT
ELEV.=91.5
POND B
BOTTOM ELEV=82.00
NORMAL WSE=86.79
100-YR WSE=90.84
TOP ELEV=91.50
NORMAL
WSE=86.79
@10:1 SLOPE
4:1 4:1
4" PERF.
HDPE
UNDRN
(TYP.)
4" PERF.
HDPE UNDRN
(TYP.)
4" PERF.
HDPE UNDRN
(TYP.)
8'
8' WIDE EMBANKMENT
TOP OF EMBANKMENT
ELEV.=91.5
POND C
BOTTOM ELEV=82.00
NORMAL WSE=86.79
100-YR WSE=90.71
TOP ELEV=91.50
CONTRACTOR TO LOCATE THE EXISTING 24"
PIPE AND PLACE NEW 36" DUAL EQUALIZATION
PIPES PARALLEL TO THE EXISTING PIPE AND
MAINTAIN 10' OF CLEARANCE FROM THE EX. PIPE
TO THE PR. PIPE. NEW 36" PIPES TO EXTEND TO
THE SAME LENGTH AS THE EX. 24" PIPE.
8'
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
851PC2048
NOVEMBER 6, 2019 BJS ACS Dwg.