Houston_LBP Survey_Final_10.10.2018.pdf

PDF 2 MB Posted

Attached to
Y1PC--Houston National Cemetery Phase 5 Expansion
Solicitation number
36C10F20R0055
Issued by

About this file

This solicitation is for Phase 5 expansion of the Houston National Cemetery located in Houston, Texas. The Department of Veterans Affairs seeks to construct approximately 14,000 preplaced crypt full casket gravesites, 350 oversize pre-placed crypt casket gravesites, approximately 2,000 traditional in-ground cremains, approximately 8,000 columbarium niches, a 300-gravesite Hybrid Natural (Green) Burial Memorial Wall and Ossuary, new entrance gate, roads, parking, utilities and other site improvements. Work must be completed within 730 calendar days of receipt of the notice to proceed. The magnitude of construction cost is estimated between $20 million to $50 million. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses with a size standard of $39.5 million. Questions regarding the solicitation are due by July 24, 2020 and proposals are due August 10, 2020 by 12:00 PM Eastern Time.

View the file

Other files

File Type Posted
Houston Revised CLIN Breakdown.pdf PDF
Houston PPI - 2.pdf PDF
Houston PPI - 1.pdf PDF
Houston_ACM Survey_Final_10.10.2018.pdf PDF
Houston Site Visit Sign-in Sheet.pdf PDF
ATTACHMENT 3 - Houston Pre-Proposal Inquiry (PPI) Form.docx DOCX document
ATTACHMENT 2_PAST PERF QUEST HOUSTON.docx DOCX document
18_211-215_851PC2048_HNC_BD_Plans.pdf PDF
17_206-210_851PC2048_HNC_BD_Plans.pdf PDF
16_196-205_851PC2048_HNC_BD_Plans.pdf PDF
Houston NC_Phase II ESA Report_FINAL_12212018.pdf PDF
Houston National Cemetery Cx Plan - V4 - 5-5-20.pdf PDF
851PC2048_HNC_SWP3_ FULL.PDF PDF
851PC2048_HNC_SWP3_101-191.pdf PDF
851PC2048_HNC_CD2_Submittal Register.pdf PDF
851PC2048_HNC_SWP3_1-100.pdf PDF
Final 36C10F20R0055_3 (7-9-2020).pdf PDF
09_121-130_851PC2048_HNC_BD_Plans.pdf PDF
11_136-140_851PC2048_HNC_BD_Plans.pdf PDF
851PC2048_HNC_BD_Specs Volume 2.pdf PDF
08_106-120_851PC2048_HNC_BD_Plans.pdf PDF
12_141-150_851PC2048_HNC_BD_Plans.pdf PDF
15_181-195_851PC2048_HNC_BD_Plans.pdf PDF
14_166-180_851PC2048_HNC_BD_Plans.pdf PDF
07_91-105_851PC2048_HNC_BD_Plans.pdf PDF
13_151-165_851PC2048_HNC_BD_Plans.pdf PDF
03_31-45_851PC2048_HNC_BD_Plans.pdf PDF
851PC2048_HNC_BD_Specs Volume 1.pdf PDF
10_131-135_851PC2048_HNC_BD_Plans.pdf PDF
02_16-30_851PC2048_HNC_BD_Plans.pdf PDF
Houston - Building Wage Determination.pdf PDF
04_46-60_851PC2048_HNC_BD_Plans.pdf PDF
01_1-15_851PC2048_HNC_BD_Plans.pdf PDF
06_76-90_851PC2048_HNC_BD_Plans.pdf PDF
05_61-75_851PC2048_HNC_BD_Plans.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEAD BASED PAINT SCREENING REPORT

HOUSTON NATIONAL CEMETERY

BUILDINGS 2501 AND 3006

1621 ALDINE WESTERN ROAD

HOUSTON, TEXAS 77039

VACANT BUILDINGS DUE DILIGENCE

ZONE 1

DEPARTMENT OF VETERANS AFFAIRS

PREPARED BY:

TTL ASSOCIATES, INC.

1915 NORTH 12th STREET

TOLEDO, OHIO 43604

(419) 324-2222

(419) 241-1808 FAX

OCTOBER 2018

Teamwork - Trust - Leadership Since 1927

1915 North 12th Street Toledo, OH 43604-5305

T 419-324-2222 F 419-241-1808 www.ttlassoc.com

October 5, 2018 TTL Project No. 1637601

Lead Based Paint Screening Houston National Cemetery 1621 Aldine Western Road

Houston, TX 77039

TTL Associates, Inc. (TTL), a Service-Disabled Veteran-Owned Small Business (SDVOSB), under contract to Concourse Federal Group (Concourse), performed a Lead Based Paint (LBP) screening at the Houston National Cemetery (HNC) on April 18, 2018. The LBP screening was conducted for two specific HNC buildings (i.e. 2501, 3006) and the full LBP screening report for these two buildings is enclosed. As documented in the report, and based on the paint chip sample results, LBP was identified in one building (i.e. 2501). TTL’s estimated LBP encapsulation and abatement costs, for the HNC building are as follows:

HNC Building Encapsulation Cost Abatement Cost 2501 $1,236.00 $1,236.00

If any building will be transferred to another owner, TTL recommends paint stabilization and clean up by a licensed lead abatement contractor. However, if the proposed disposition is demolition, TTL recommends that LBP remediation is not necessary as lead abatement requirements and standards do not apply to demolition project that impact LBP materials.

TTL appreciates the opportunity to provide Concourse, the VA Office of Asset Enterprise Management (OAEM) and the HNC with our environmental consulting and testing services and we look forward to working with you in the future. Should you have any questions concerning this report, please contact Ms.

Sara Vogelpohl at (419) 214-5090.

Sincerely, TTL Associates, Inc.

Sara Vogelpohl, CIH Veronica Allen, P.E., PMP Manager, Asbestos and Hazardous Materials Services Manager, Federal Services

Attachments

Department of Veterans Affairs October 2018 TTL Project No. 1637601 Page i

TABLE OF CONTENTS

1.0 EXECUTIVE SUMMARY

2.0 LEAD SURVEY RESULTS

2.1 Project Purpose and Objective

2.2 Inspection

2.3 Inspection Results

3.0 CONCLUSIONS/RECOMMENDATIONS

4.0 LIMITATIONS

5.0 ATTACHMENTS

ATTACHMENTS

ATTACHMENT A: Lead Inspector/Risk Assessor Certifications ATTACHMENT B: Summary of Painted Components ATTACHMENT C: Laboratory Analytical Reports ATTACHMENT D: Photo Log of Painted Components ATTACHMENT E Cost Estimates for LBP Encapsulation and Abatement

TTL Project No. 1637601 Page 1

1.0 EXECUTIVE SUMMARY

TTL Associates, Inc. (TTL), conducted a Lead Based Paint (LBP) screening on April 18, 2018 at the Houston National Cemetery (HNC) located at 1621 Aldine Wester Road in Houston, Texas. As directed by Concourse and VA’s Office of Asset Enterprise Management (OAEM), the LBP screening was conducted for two specific HNC buildings (i.e. 2501, 3006).

TTL’s scope of work included the following:

• Provide accredited licensed building Lead Inspectors/Risk Assessors,

• Conduct a lead screening for each respective subject property,

• Conduct a visual inspection to establish similarly painted components and substrates,

• Submit all samples to an American Industrial Hygiene Association (AIHA) and State accredited analytical laboratory for analysis, and

• Provide a detailed cost estimate of remediation of LBP for each respective building.

The LBP screening was a summary of painted components, versus a surface by surface investigation.

Representative paint chip samples were collected in the building to determine lead content of representative painted components. LBP is defined by the United States Environmental Protection Agency (U.S. EPA) and Housing and Urban Development (HUD) as containing more than 0.5% by weight of lead.

Paint chip samples were collected from each building. Based on the paint chip sample results, LBP was identified in one HNC building (i.e. 2501). The following table identifies the LPB in the building.

Building 2501

Component Substrate Color Condition (Intact/Non-Intact) Quantity

Soffits & Fascia Wood White Non Intact 376 SF Column Metal Black Intact 45 SF

SF = square feet

The VA proposed disposition of Building 2501 is demolition. The VA proposed disposition of Building 3006 is undetermined. If the proposed disposition is demolition, TTL recommends that LBP remediation is not necessary as lead abatement requirements and standards do not apply to demolition project that impact LBP materials. If a building will be transferred to another owner, TTL recommends paint stabilization and clean up by a licensed lead abatement contractor.

In addition, the Occupational Safety and Health Administration (OSHA) states that any amount of lead present in paint can pose an exposure hazard to employees upon disturbance. Therefore, any demolition or renovation activities to Building 2501 must adhere with specific Lead worker safety rules under OSHA’s Safety and Health Regulations for Construction codified at 29 CFR 1926.62.

Building 2501 is a residential structures built before 1978, therefore if the planned disposition changes and the building will be renovated and the LBP disturbed, renovation activities will be need to be performed by a licensed contractor who is trained according to the U.S. EPA Renovation, Repair, and Painting (RRP) Program. The EPA RRP Program states that any firms and individuals who are paid to

TTL Project No. 1637601 Page 2 perform renovation, repair, and painting projects that disturb paint in pre-1978 housing and child-occupied facilities be trained according to the EPA RRP Program. This includes home improvement contractors, maintenance workers, painters and other specialty trades.

The estimated LBP encapsulation and abatement cost for the building is as follows:

HNC Building Encapsulation Cost Abatement Cost 2501 $1,236.00 $1,236.00

TTL Project No. 1637601 Page 3

2.0 LEAD SURVEY RESULTS

OAEM seeks to determine disposal methods and reuse alternatives for certain VA vacant buildings inventory through a Vacant Buildings Reduction Initiative. VA requires due diligence support services involving the preparation of reports related to environmental conditions of the buildings. As part of the due diligence activities, TTL conducted this LBP screening for two specific HNC buildings (i.e. 2501, 3006).

The LBP screening was a summary of painted components and not a surface by surface investigation.

Representative paint chip samples of component/substrate/color combination were collected in each building to determine lead content of painted components. LBP is defined by the United States Environmental Protection Agency (U.S. EPA) and Housing and Urban Development (HUD) as paint containing more than 0.5% by weight of lead.

At the HNC, the proposed disposition of the six buildings surveyed is as follows:

• Building 2501: Demolition

• Building 3006: Undetermined

A description of the two buildings is as follows:

Building No.

Building Use Building Size (square feet) Description

2501 Residential Structure 1,237 One-story vacant residential structure

3006 Agricultural Shed 320 One story shed

2.1 Project Purpose and Objective

The objective of this project was to collect the environmental due diligence data necessary to support the VA’s Vacant Buildings Reduction Initiative.

The color, component, substrate and condition of interior and exterior painted surfaces in each of the buildings were noted. For the purposes of this screening, it was assumed that each color of paint was applied during the same time period. Representative samples of each color of paint on the component/substrate combination identified in each building were collected.

The paint chip samples were placed into clean and unused sealable bags marked with unique sample identification numbers. The samples of suspect LBP were transported to EMSL Analytical, Inc. (EMSL) laboratory for analysis by flame atomic absorption spectrometry (AAS) according to EPA Method SW-846 3050B/7000B). EMSL is certified by the Environmental Lead Laboratory Accreditation (ELLAP) program which is administered by the American Industrial Hygiene Association (AIHA).

2.2 Inspection

The screening was completed by a Lead Inspector/Risk Assessor certified by the State of Texas Department

TTL Project No. 1637601 Page 4 of State Health Services. Mr. Jose A. Moriel (Certificate number 2060921) collected the paint chip samples in each of the buildings. A copy of Mr. Moriel’s State of Texas certification is included in Attachment A.

2.3 Inspection Results

Paint chip samples were collected from each component/substrate/color combination in each building.

LBP was identified in one HNC building (i.e. 2501). No LBP was identified in one HNC building (i.e. 3006).

The following table documents the paint that TTL considers LBP according to HUD and U.S. EPA definitions.

Component Substrate Color Condition (Intact/Non-Intact) Quantity

Soffits & Fascia Wood White Non Intact 376 SF Column Metal Black Intact 45 SF

SF = square feet

Attachment B contains a summary of painted components and locations of building paint chip samples collected. Attachment C contains the paint chip sample laboratory analytical reports and Attachment D contains a photo log of building painted components.

TTL Project No. 1637601 Page 5

3.0 CONCLUSIONS/RECOMMENDATIONS

The VA proposed disposition of Building 2501 is demolition. The VA proposed disposition of Building 3006 is undetermined. Based on the paint chip sampling results, LBP was identified in one HNC building (i.e.

2501). If the proposed disposition is demolition, TTL recommends that LBP remediation is not necessary as lead abatement requirements and standards do not apply to demolition project that impact LBP materials. If a building will be transferred to another owner, TTL recommends paint stabilization and clean up by a licensed lead abatement contractor.

In addition, the Occupational Safety and Health Administration (OSHA) states that any amount of lead present in paint can pose an exposure hazard to employees upon disturbance. Therefore, any demolition or renovation activities to Building 2501 must adhere with specific Lead worker safety rules under OSHA’s Safety and Health Regulations for Construction codified at 29 CFR 1926.62.

Building 2501 is a residential structures built before 1978, therefore if the planned disposition changes and the building will be renovated and the LBP disturbed, renovation activities will be need to be performed by a licensed contractor who is trained according to the U.S. EPA Renovation, Repair, and Painting (RRP) Program. The EPA RRP Program states that any firms and individuals who are paid to perform renovation, repair, and painting projects that disturb paint in pre-1978 housing and child-occupied facilities be trained according to the EPA RRP Program. This includes home improvement contractors, maintenance workers, painters and other specialty trades.

The estimated LBP encapsulation and abatement costs for the building are as follows:

HNC Building Encapsulation Cost Abatement Cost 2501 $1,236.00 $1,236.00

A budgetary cost estimate, including a detailed price breakdown, for LBP encapsulation and abatement for each building is provided in Attachment E. Note that projected LBP remediation costs may vary between contractors. TTL utilized the 2018 RS Mean Values to determine the cost estimate.

TTL Project No. 1637601 Page 6

4.0 LIMITATIONS

TTL has made reasonable efforts to identify and quantify LBP based upon the standard of care in the environmental industry existing at the time of the survey. This survey only summarizes the potential presence and estimated quantities of visually observed LBP.

Additional material disturbed during renovation or demolition activities should be evaluated on a case-by-case basis, especially materials that were previously hidden, obscured, or inaccessible, to determine if the material is included in this survey. If a given material is not described in this survey or cannot be identified as LBP, the material should be assumed to contain LBP and renovation and/or demolition activities should be halted until sampling and analysis can be accomplished. Parties conducting renovation and/or demolition activities should follow all applicable federal, state, and local regulations in handling identified and suspect LBP.

The information contained in this report was based upon specific parameters and regulations in force at the time of the survey. TTL accepts no responsibility for the use, interpretation, or reliance by other parties on the information contained herein, nor does this report represent an instrument of regulatory compliance or LBP specification.

TTL Project No. 1637601 Page 7

5.0 ATTACHMENTS

See attached Appendices to reference the following:

• ATTACHMENT A: Lead Inspector/Risk Assessor Certifications

• ATTACHMENT B: Summary of Painted Components

• ATTACHMENT C: Laboratory Analytical Reports

• ATTACHMENT D: Photo Log of Painted Components

• ATTACHMENT E: Cost Estimates for LBP Encapsulation and Abatement

ATTACHMENT A

LEAD INSPECTOR/RISK ASSESSOR CERTIFICATIONS

ATTACHMENT B

SUMMARY OF PAINTED COMPONENTS

Summary of Painted Components

Houston National Cemetery 1621 Aldine Western Road

Houston, Texas

TTL Project No. 1637601 Page 1 of 1

Building Name VA Location

Room Component Substrate Color Condition (Intact/Non Intact)

Number of Doors

Number of Windows

Sample Number Quantity

001-2501 Soffits & Fascia Wood White Non Intact 1621 H-06 376 SF

002-2501 Column Metal Black Intact 1621 H-07 45 SF

Houston, TexasBuilding 2501

ATTACHMENT C

LABORATORY ANALYTICAL REPORTS

Client Sample Description ConcentrationLab ID Analyzed Weight Lead

Collected

EMSL Analytical, Inc.

200 Route 130 North, Cinnaminson, NJ 08077 Phone/Fax: (856) 303-2500 / (856) 786-5974 http://www.EMSL.com cinnaminsonleadlab@emsl.com

Attn: Sara Vogelpohl TTL Associates, Inc.

1915 North 12th Street Toledo, OH 43604

Received: 05/14/18 10:15 AM

1621 Aldine Western Rd / Bldg 2501 Houston, Texas

Fax: (419) 321-6252 Phone: (419) 324-2222

Project:

4/18/2018Collected:

Test Report: Lead in Paint Chips by Flame AAS (SW 846 3050B/7000B)*

201805174 CustomerID: TTL63 CustomerPO: 012598 ProjectID:

EMSL Order:

0.2571 Site: Wall & Ceiling- Living Room / White

201805174-00011621H-01 <0.0080 % wt5/15/2018 g4/18/2018

0.2556 Site: Doors & Frames- Bedroom 3 / White

201805174-00021621H-02 0.19 % wt5/15/2018 g4/18/2018

0.2577 Site: Windows & Frames- Bedroom 2 / White

201805174-00031621H-03 0.13 % wt5/15/2018 g4/18/2018

0.2581 Site: Wall- Bedroom 1 / Yellow

201805174-00041621H-04 <0.0080 % wt5/15/2018 g4/18/2018

0.2557 Site: Wall- Bathroom / Pink

201805174-00051621H-05 0.088 % wt5/15/2018 g4/18/2018

0.2578 Site: Soffit & Fascia- Exterior / White

201805174-00061621H-06 0.81 % wt5/15/2018 g4/18/2018

0.2551 Site: Column- Exterior / Black

201805174-00071621H-07 0.81 % wt5/15/2018 g4/18/2018

0.0513 Site: Wall- Exteior / Gray

201805174-00081621H-08 <0.039 % wt5/15/2018 g4/18/2018

0.2524 Site: Doors & Frames- Storage / White

201805174-00091621S-01 0.10 % wt5/15/2018 g4/18/2018

0.0601 Site: CMU Wall- Storage / White

201805174-00101621S-02 <0.033 % wt5/15/2018 g4/18/2018

Phillip Worby, Lead Laboratory Manager or other approved signatory

Test Report ChmSnglePrm/nQC-7.32.3 Printed: 5/16/2018 9:15:49 AM

*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies that the analyte was not detected at or above the reporting limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements unless specifically indicated otherwise.

Definitions of modifications are available upon request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NELAP Certifications: NJ 03036, NY 10872, PA 68-00367, AIHA-LAP, LLC ELLAP 100194, A2LA 2845.01

Initial report from 05/16/2018 09:15:49 http://www.EMSL.com mailto:cinnaminsonleadlab@emsl.com

OrderID: 201805174

ATTACHMENT D

PHOTO LOG OF PAINTED COMPONENTS

PHOTO LOG OF PAINTED COMPONENTS

Houston National Cemetery, Houston, Texas June 2018 TTL Project No. 1637601 Page 1

Photo #1: Wood Soffits and Fascia

Photo #2: Metal Column

ATTACHMENT E

COST ESTIMATES FOR LBP ENCAPSULATION AND ABATEMENT

Building 2501 Quantity Units Rate Estimate Rate Estimate

Soffits & Fascia 376 SF 2.93$ 1,101.68$ 2.93$ 1,101.68$ Column 45 SF 2.98$ 134.10$ 2.98$ 134.10$

Total 1,236.00$ Total 1,236.00$

SF=Square Feet

Cost estimate based on 2018 RS Means values

Encapsulation Removal

COST ESTIMATES FOR LBP ENCAPSULATION AND ABATEMENT

1.0 EXECUTIVE SUMMARY
2.0 LEAD SURVEY RESULTS
2.1 Project Purpose and Objective
2.2 Inspection
2.3 Inspection Results
3.0 CONCLUSIONS/RECOMMENDATIONS
4.0 LIMITATIONS