This solicitation is for Phase 5 expansion of Houston National Cemetery. The project will construct additional gravesites and cemetery improvements including approximately 14,000 preplaced crypt full casket gravesites, 350 oversize pre-placed crypt casket gravesites, approximately 2,000 traditional in-ground cremains and approximately 8,000 columbarium niches. Work will also include a 300-gravesite Hybrid Natural (Green) Burial Memorial Wall and Ossuary, new gate entrance, roads, parking, utilities, site improvements, signage and site furnishings. The scope further incorporates updated and new irrigation system, well, pump station and irrigation pond, and an improved drainage system. Work must be completed within 730 calendar days of receipt of Notice to Proceed. The estimated cost is between $20-50 million. The solicitation is set aside as 100% SDVOSB and proposals are due by August 10, 2020. The Department of Veterans Affairs Office of Construction and Facilities Management issues this solicitation.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOUSTON NATIONAL CEMETERY
PHASE V DEVELOPMENT
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
TO APPR TO
AUTH/ CONTR/
DATE RCD DATE RCD
NEEDED NEEDED OF FROM TO OTHER FROM OTH OF FRM APPR
BY BY ACTION CONTR REVIEWER REVIEWER ACTION AUTH
(a) (b) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)
3.1A 3.1B 3.1C 3.1D 3.1E 3.1F 3.1G 1.2 1.4A 1.4C 3.2B 3.2C 3.10D 3.11C 3.12C 1.6A 1.6B 1.5B 1.5C 1.5D 1.1A 1.5B 1.5C 1.5D 1.5E 1.5F 1.5G 1.5H 1.13A 1.13B 1.13C 1.13D 1.13E 1.13F 1.13G 1.13H 1.13I 1.4A 1.4B
Quality Control Submittal01 45 00
Soil Amendment Recommendations
Written Laboratory Reports
Operation and Maintenance Data01 78 23
T R A N S M I T T A L
N O
A C T I V I T Y
N O
HOUSTON NATIONAL CEMETERY
CONTRACTOR
SUBMITTAL REGISTER CONTRACT NO. 851PC2048
TITLE AND LOCATION
REMARKS
(c.) (d) (r)
DATE FWD DATE RCD
A C T I O N
C O D E
DATE
MAILED
CONTRACTOR: SCHEDULE DATES CONTRACTOR ACTION APPROVING AUTHORITY
SUBMIT
APPROVAL MATERIAL
A C T I O N
C O D E
DATE
DATE FWD
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
Project Materials Cost Data Spreadsheet Low Pollutant‐Emitting Materials Tracking Spreadsheet Construction Indoor Air Quality (IAQ) Management Plan
Product Submittals Sustainable Construction Progress Reports
Closeout Submittals
Shear Connector Stud Report and Certification Environmental Protection Plan
Approval/Response to Comprehensive Environmental Protection Plan Demolition Debris Management Plan
Designated Manager Montly Summary of Construction and Demolition
01 32 16.13 Independent CPM Consultant Qualifications
Sustainability Action Plan
Preliminary Commissioning Plan Submittal Final Commissioning Plan Submittal
Systems Functional Performance Test Procedure Pre‐Functional Checklists
Test and Inspection Reports Corrective Action Documents
Preliminary Commissioning Report Submittal Final Commissioning Report Submittal
Data for Commissioning Preconstruction Documentation
Removal and Dismantling Historic Treatment Program
01 81 13
01 91 00
02 42 96
01 57 19
01 74 19
01 45 29 Certificate of Accreditation
Topsoil Laboratory Test Report
Stuctural Steel Inspection Reports Steel Decking Inspection Report and Certification
Initial Day 1 Schedule Submittal VA Response to Initial Schedule Submittal
VA Responses to Computer Produced Schedule Submittals First Update Schedule Submittal
Periodic Progress and Payment Submittals
Computer Produced Schedules
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
1.4C 1.4D 1.5.1 1.5.2a 1.5.2b 1.5.2c 1.5.2d 1.5.3 1.5B.3 1.7B 1.7C 1.7D 1.3B 1.3D 1.5A 1.5B 1.5C 1.5D 1.5E 1.5F 1.5G 1.5H 1.4B.1 1.4B.3 1.6A 1.9A 1.9C 1.9D 1.5B.1 1.5B.3 1.8A.1 1.8A.2 1.8A.3 1.8A.4 1.8A.5 1.8A.6 1.8A.7 1.8A.8 1.8A.9 1.8A.10 1.8A.11 1.6B.1 1.6B.3 1.8A.1 1.8A.2 1.8A.3 1.8A.4a 1.8A.4b 1.5B.1 1.5B.3 1.7A.1 1.7A.2 1.7A.3 1.7A.4a 1.7A.4b 1.5B 1.5C 1.5D
Trial Sample
Sequence, Method, and Equipment Plan Samples
Qualification Data Material Test Reports
Certificates Laboratory Test Results
Manufacturer's Literature and Data
04 05 13
Product Data Material Manufacturer Certificates
Safety Data Sheets Material Producer Certificates
Purchase orders/Shipping Tickets Restoration Program
Concrete Mix Quantities
03 13 30
Shop Drawings Manufacturer's Certificates
03 45 00
03 30 53
Columbarium Unit Samples Adhesive and Grout Samples
Concrete Repair/Patching Samples Shop Drawings
Concrete Mix Design
Crypt Samples Shop Drawings
Product Design Data Concrete Mix Design
Concrete Mix Quantities Fastening System Samples
Certificate of Compliance
Product Data Design Mixes Shop Drawings
Material Certificates Concrete Mix Design
Concrete Mix Quantities NPCA Plant Certification
03 48 24
03 48 21
Production Drawings Erection Drawings
Manufacturer's Literature and Data Manufacturer's Qualification Certificate
Installer's Qualification Certificate Precast Niche Manufacturer's Certificate
Concrete Mix Design Concrete Mix Quantities
03 48 28
03 48 26
Concrete Mix Quantities Fastening and Mounting Samples
Shop Drawings Manufacturer's Literature and Data
Fastening and Mounting Samples Shop Drawings
Manufacturer's Literature and Data Manufacturer's Qualification Certificate
Installer's Qualification Certificate Concrete Mix Design
Manufacturer's Qualification Certificate Installer's Qualification Certificate
List of Items Indicated To Be Salvaged Inventory of Salvaged Items
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
1.3A 1.3B 1.3C 1.3D 1.3E 1.4A 1.5.1 1.5.2a 1.5.2b 1.5.2c 1.5.2d 1.5.3 3.3A 1.4A 1.4B 1.4C 1.4A 1.4B 1.4C 1.4D 1.4E 1.7B 1.7C 1.7D 1.7E 1.7F 1.7G 1.7H 1.7I 1.7J 1.7K.1 1.7K.2 1.6B 1.6C 1.4B 1.4C 1.4D 3.1A 1.5B 1.5C 1.5D 1.5B 1.5C 1.5D 1.2A 1.2B 1.2C.1 1.2C.2 1.2D 1.2E 1.5B 1.5C 1.5D 1.4A 1.4B 1.4C 1.4D 1.5A
Certificates Warranty
Maintenance Manuals Installer and Manufacturer Signed Warranty
Field Reports of Roofing Inspection Construction Photographs Temporary Protection Plan
08 71 00
Supervisor and Inspector Qualifications
Nail and Fastener Samples Shop Drawings
Shop Drawings, Product Data and Samples Documentation of Conformance w/Requirements
Shop Drawings Showing Connection Details Shop Drawings, Product Data and Samples
Manufacturer's Literature and Data
Manufacturer Warranty Product Data
07 18 13
Coat and Finish Samples Installer Qualifications
06 10 00
04 40 10
04 41 50
Product Data Samples For Initial Selection Samples for Verification
List of Materials Used in Constructing Mockups Qualification Data
Quality Requirement Documentation Product Data
Patching Material Manufacturer Certificate Material Safety Data Sheets Material Producer Certificates
Purchase orders/Shipping Tickets Restoration Program
07 60 00
07 84 00
07 92 00
08 11 13
08 29 50
07 54 19
Shop Drawings and Narrative04 73 10
09 03 20
Shop Drawings Certificates
Detail Drawings and Manufacturer's Descripitve Data Specified Requirement Certificates
Manufacturer's Representative Certification Product Data and Installation Instructions Manufacturer's Installation Instructions Cured Samples of Each Sealant Color Manufacturer's Literature and Data Manufacturer's Literature and Data
Shop Drawings Supplier Schedule
Replication Shop Drawings
Wood Consolidant Sample Wood Patching Compound Sample
Preconstruction Wood Evaluation Report Scope of Work Survey Hardware Schedule
Samples and Manufacturer's Literature Certificate of Compliance and Test Reports
Product Data Shop Drawings
Samples for Initial Selection Samples for Verification
Qualification Data
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
1.3A 1.3B 1.4B 1.4C 1.4D 1.4B 1.4C 1.4D 1.4E 1.4F 1.4A 1.4B 1.4C 1.5B 1.5C 1.5D 1.5A 1.5B 1.5C 1.5D 1.3A 1.3B 1.3C 1.3D 1.3E 1.3F 1.4A 1.4B 1.4C 1.4D 1.4E 1.4F 1.4B 1.4C 1.4D 1.4E 1.4F 1.4G 1.4H 1.4B 1.4C 1.4D 1.4E 1.5B 1.5C 1.5D 1.5B 1.5C 1.5D 1.5E 1.5F 1.5G 1.6A 1.6B 1.4A 1.4B 1.4C 1.4D
Manufacturer's Literature and Data09 22 16 Shop Drawings Test Results
09 06 00 Quadruplicate Samples for Color Approval
09 23 00
09 24 00
09 29 00
09 30 13
09 40 10
09 45 10
Color Schedule
Sustainable Design Submittal Shop Drawings
Manufacturer's Literature and Data Manufacturer's Certificates
Samples Shop Drawings, Product Data and Samples
Manufacturer's Literature and Data Accessory and Panel Samples
Manufacturer's Literature and Data Shop Drawings
Samples Shop Drawings
Samples Product Data
Manufacturer's Certification Product Data
Samples for Verification Mock Ups
Qualification Data Material Certificates Maintenance Data
Product Data Grout Samples for Initial Selection Stone Samples for Verification Grout Samples for Verification
Qualification Data Maintenance Data
09 51 00
09 68 00
09 91 00
10 14 00
11 08 00
11 83 00
Submittal Drawings Manufacturer's Literature and Data
Samples Sustainable Construction Submittals
Certificates Qualifications
Operation and Maintenance Data Product Data Samples
Shop Drawings Maintenance Data
Manufacturer's Literature and Data Samples
Manufacturer's Certificates Samples (3 Sets) Shop Drawings
Sign Panel Full Size Layout Manufacturer's Literature and Data
Manufacturer's Certificates Samples of Signs with Features
List of Submittals of Systems to be Commissioned Submittal Requirements per Section 01 91 00 Manufacturer's Literature and Specifications
Shop and Installation Drawings Product Information, O&M Manuals and Paperwork
List of Troubleshooting Items
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
3.3A 1.4C 1.4D 1.4E 1.4F 1.4G 1.4H 1.4I 1.4J 1.5B 1.4C 1.4D 1.4C 1.4D 1.4C 1.4D 1.4C 1.4D 1.4C 1.4D 1.4E 1.4F 1.4G 1.4C 1.4D 1.6B 1.4B 1.4C 1.4D 1.4E 1.4F 1.4G 1.4H 1.4I 1.4J 1.4K 1.4C 1.4D 1.4E 1.4F 1.4G 1.4H 1.4C 1.4D 1.4E 1.4F 1.4G 1.4C 1.4D 1.4E 1.4F 1.4G.1 1.4G.2 1.4G.3 1.4G.4 1.4G.5 1.4G.6 1.4G.7
22 05 23
22 07 11
11 83 02 22 05 11
Training Materials and Methods Field Measurements to Meet Cntract Requirements
Associated System Drawings Manufacturer Certification of Drawings/Specs
List of Previous Installations Manufacturer's Literature and Data Complete Package of Shop Drawings
Coordination Drawings
Welding Compliance Certificate Manufacturer's Literature and Data
Complete Operating and Maintenance Manuals Manufacturer's Literature and Data
Shop Drawings
22 40 00
22 11 00
22 13 00
22 33 00
Manufacturer's Literature and Data Complete Operating and Maintenance Manuals
Manufacturer's Literature and Data Detailed Shop Drawings
Manufacturer's Literature and Data Hot Water Heater Characteristics
Maintenance Date and Operating Instructions
Shop Drawings Documentation of Compliance with Requirements Complete Operating and Maintenance Manuals
Manufacturer's Literature and Data Operating Instructions
23 05 11
23 05 41
Operation and Maintenance Data Welder Certificates
Field Measurements and Investigations Associated System Drawings
Manufacturer Certification of Drawings/Specs Coordination Drawings
List of Previous Installations Interdependent Item Shop Drawings Manufacturer's Literature and Data
HVAC Maintenance Data and Operating Instructions Copies of Approved HVAC Equipment Submittals
Manufacturer's Literature and Data Shop Drawings
Complete Operating and Maintenance Manuals Motor Certification
Completed System Readiness Checklist Training Plans and Instructor Qualifications
Manufacturer's Literature and Data
23 05 93
23 05 12
Load Calculations Complete Operating and Maintenance Manuals
Completed System Readiness Checklist Training Plans and Instructor Qualifications
Manufacturer's Literature and Data TAB Report Forms
Names and Qualifications of Tab Agency/Specialists AABC, NEBB, or TABB/SMACNA Publication
Contract Documents Review Report Systems Inspection Report Duct Air Leakage Test Report Systems Readiness Report
Intermediate and Final Certified TAB Reports Uncorrected Installation Deficiencies
Strategies and Procedures Plan
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
1.4G.8 1.4C 1.4D 1.4E 1.6A 1.6B 1.4C 1.4D 1.4E 1.4F 1.4G 1.4H 1.4C 1.4D 1.4E 1.4F 1.4G 1.4C 1.4D 1.4E 1.4F 1.4G 1.4C 1.4D 1.4E 1.4F 1.4G 1.4C 1.4D 1.4E 1.4F 1.4G 1.4C 1.4D 1.4E 1.4F 1.4G 1.4H 1.4C 1.4D 1.4E 1.4F 1.4G 1.4H 1.4C 1.4D 1.4E 1.4F 1.12B 1.12C 1.12E 1.12F 1.4A.1 1.4A.2 1.4A.1 1.4A.2 1.4A.3 1.4A.1
Certification Shop Drawings
26 05 26
26 05 33
Completed System Readiness Checklist Training Plans and Instructor Qualifications
Manufacturer's Literature and Data Shop Drawings and AHRI Certification
Catalog Selection Data Complete Operating and Maintenance Manuals
Completed System Readiness Checklist Training Plans and Instructor Qualifications
Manufacturer's Literature and Data Complete Operating and Maintenance Manuals
Completed System Readiness Checklist Training Plans and Instructor Qualifications
Equipment and Material Government Approval Descriptive Literature, Catalog Cuts, and Shop Drawings
Manufacturer Info, Shop Drawings, Wiring Diagrams, Parts List Maintenance and Operation Manuals
Shop Drawings Certificates
Shop Drawings Test Reports
26 05 11
26 05 19
23 81 43
23 82 16
Sample Report Forms Manufacturer's Literature and Data
Shop Drawings 23 07 11
Completed System Readiness Checklist List of Submittals of Systems to be Commissioned Submittal Requirements per Section 01 91 00
Manufacturer's Literature and Data Product Certificates
As Built Control Drawings Complete Operating and Maintenance Manuals
23 34 00
23 37 00
23 31 00
Manufacturer's Literature and Data
Complete System Readiness Checklist Training Plans and Instructor Qualifications
23 81 00
Shop Drawings Complete Operating and Maintenance Manuals
Completed System Readiness Checklist Training Plans and Instructor Qualifications
Manufacturer's Literature and Data Coordination Drawings
Complete Operating and Maintenance Manuals Completed System Readiness Checklist
Training Plans and Instructor Qualifications Manufacturer's Literature and Data Certified Fan Performance Curves
Complete Operating and Maintenance Manuals Completed System Readiness Checklist
Training Plans and Instructor Qualifications Manufacturer's Literature and Data
Complete Operating and Maintenance Manuals Completed System Readiness Checklist
Training Plans and Instructor Qualifications Manufacturer's Literature and Data
AHRI Certification Catalog Selection Data
Complete Operating and Maintenance Manuals
Coordination Drawings
23 23 00
23 08 00
23 09 23
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
1.4A.2 1.4A.1 1.4A.2a 1.4A.2b 1.4A.1 1.4A.2 1.4A.3 1.4B 1.6A 1.6B 3.2A 1.4A.1 1.4A.2 1.4A.3 1.3.B 1.3.C 1.3.D 1.4A.1 1.4A.2 1.4A.3 1.4A.1 1.4A.2 1.4A.3 1.4A.1 1.4A.2 1.4A.3 1.4A.1 1.4A.2 1.4A.3 1.5A.1 1.5A.2 1.5A.3 1.5A.4 1.5A.5 1.5A.6 1.5A.7 1.4A.1 1.4A.2 1.4A.3 1.4A.1 1.4A.2 1.4A.1 1.4A.2 1.4A.3 1.4A.1 1.4A.2 1.4A.3 1.6A 1.6B 3.2A 1.5A.1 1.5B 1.5C 1.5D 1.5E 1.5F 1.5G 1.5H
System Operational Description Manufacturer's Literature and Data
Equipment Lists Manufacturer's Certifciation of UL LLC
Qualifications Delegated Design Drawings and Calculations
Certifications Product Data, Details, and Diagrams Maintenance and Operating Manuals
Certifications List of Submittals of Systems to be Commissioned Submittal Requirements per Section 01 91 00
Pre‐Functional Checklists and Equipment Startup Reports Submittal Drawings and As‐Built Drawings
Technical Data Calculations
Maintenance and Operating Manuals Test Reports Certifications Shop Drawings
26 51 00
28 08 00
28 10 00
26 36 23
26 43 13
Maintenance and Operating Manuals Certifications
Shop Drawings Maintenance and Operating Manuals
Shop Drawings Maintenance and Operation Manuals and Diagrams
Certifications Shop Drawings
Diagrams
Certification Shop Drawings
Material Certification Installation Certification
Product Data Required Study Certification
Shop Drawings List of Submittals of Systems to be Commissioned Submittal Requirements per Section 01 91 00
Pre‐Functional Checklists and Equipment Startup Reports Shop Drawings
Maintenance and Operation Manuals Certification
Shop Drawings Maintenance and Operation Manuals
Certifications Shop Drawings
Maintenance and Operation Manuals Certifications Shop Drawings
Maintenance and Operation Manuals and Diagrams Certifications
26 29 13
26 29 21
26 32 13
26 09 23
26 24 16
26 27 26
26 05 41
26 05 73
26 08 00
Shop Drawings26 22 00 Maintenance and Operation Manuals
Certification
Shop Drawings Certifications
26 41 00
Submittal Drawings
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
1.5I 1.5J 1.5K 1.5L 1.5M 1.5N 1.5O 1.4A 2.1H 1.4A 1.7A 1.7B 1.7C 1.7D 1.7E 1.5B 1.5C 1.5D 1.5E 1.5F 1.5G 1.6A 1.6B 3.2A 1.4B 1.4C 1.4D 1.4E 1.4B 1.4C 1.4D 1.4E 1.4F 1.3A 1.3B 1.3C 1.3D 1.3E 1.7A.1 1.7A.2 1.7A.3 1.4B 1.4C 1.4B 1.4C 1.4D 1.4E 1.4F 1.4A.1 1.4A.2 1.4A.3 1.4A.4 1.4A.5 1.4A.6 1.4A.7 1.4A.8 1.5B 1.5CSamples
Record Documentation Materials List
Manufacturer's Data
32 90 00
Shop Drawings Testing Documents and Report
Maintenance and Operation Instructions Colored Irrigation Controller Charts
Record Drawings Manufacturer's Literature and Data
Manufacturing Location of Equipment
32 33 00
32 17 23
Certifications Qualifications
TXDOT Standard Specifications for Construction and Maintenance of Highways… Submittal Drawings
Manufacturer's Literature and Data Samples
Certificates
Maintenance Instructions
Submittal Drawings Manufacturer's Literature and Data
Submittal Drawings Manufacturer's Literature and Data
Samples Qualifications
32 84 00
32 31 13
List of Submittals of Systems to be Commissioned
32 05 23
32 08 00
28 20 00
28 31 00 31 20 00
Field Representative Field Quality Control Reports
As‐Built Drawings Shop Drawings, Product Data and Samples per Section 01 33 23
Shop Drawings, Product Data, and Samples per Section 01 33 23 Shop Drawings, Product Data, and Samples per Section 01 33 23
Submittal Drawings Excavated Area Scale Plan
Test Reports Delegated Design Drawings and Calculations
Submittal Drawings Manufacturer's Literature and Data
Test Reports Certificates
Qualifications Subbase Job‐Mix Design
Field Conditions Report Field Survey Report Acceptance Test Plan
Site Changes Report
Operation and Maintenance Data
Submittal Requirements per Section 01 91 00
Qualifications 32 17 26 Product Data
Samples
Material Test Reports Shop Drawings
32 23 00 Product Data Templates and Measurements
Color and Finish Samples
Pre‐Functional Checklists and Equipment Startup Reports Test Reports32 12 16
PROJECT NO. 851PC2048
NOVEMBER 2019
CONSTRUCTION DOCUMENTS 2
1.5D 1.5E 1.5F 1.5G 1.6A 1.6B 1.6C 1.6D 1.6E 3.1H 1.4A 1.4C 1.4D 1.4F 1.4G 1.4H 1.4G 1.4C 1.4D
Test Reports Certificates
Notarized Planting Certificates Maintenance Data
Manufacturer's Literature and Data Complete Operating and Maintenance Manuals
33 40 00
32 10 10 Qualifications Product Data
Methodology and Site Considerations Test Pumping and Water Quality Data
Project Record Documents Copies of Drilling Logs and Soil Analysis
32 10 20 Contractor Qualifications Materials List
Manufacturer's Data Shop Drawings
Testing Documents and Report Maintenance and Operation Instructions
Record Drawings