This solicitation is for Phase 5 expansion of Houston National Cemetery including construction of additional gravesites, cemetery improvements, and development of approximately 50 acres of land. Work includes over 14,000 preplaced crypt full casket gravesites, 350 oversize pre-placed crypt casket gravesites, approximately 2,000 traditional in-ground cremains, and approximately 8,000 columbarium niches. Also included are a 300-gravesite Hybrid Natural Burial Memorial Wall and Ossuary, new roads, parking, utilities, signage and site furnishings. The project will update and expand the irrigation system with a new well and pump station. Work must be completed within 730 calendar days of receipt of the notice to proceed. The estimated construction cost is between $20-50 million. This requirement is being procured as a 100% Service-Disabled Veteran Owned Small Business set aside. The applicable NAICS code is 237990 and size standard is $39.5 million. Questions regarding this solicitation must be submitted in writing by July 24, 2020. Proposals are due August 10, 2020 by 12:00 PM Eastern Time. Offerors must be registered in Vendor Information Pages as a SDVOSB upon submission.

View the file

Other files

File Type Posted
Houston Revised CLIN Breakdown.pdf PDF
Houston PPI - 2.pdf PDF
Houston PPI - 1.pdf PDF
Houston_ACM Survey_Final_10.10.2018.pdf PDF
Houston_LBP Survey_Final_10.10.2018.pdf PDF
Houston Site Visit Sign-in Sheet.pdf PDF
ATTACHMENT 3 - Houston Pre-Proposal Inquiry (PPI) Form.docx DOCX document
ATTACHMENT 2_PAST PERF QUEST HOUSTON.docx DOCX document
18_211-215_851PC2048_HNC_BD_Plans.pdf PDF
17_206-210_851PC2048_HNC_BD_Plans.pdf PDF
16_196-205_851PC2048_HNC_BD_Plans.pdf PDF
Houston NC_Phase II ESA Report_FINAL_12212018.pdf PDF
Houston National Cemetery Cx Plan - V4 - 5-5-20.pdf PDF
851PC2048_HNC_SWP3_ FULL.PDF PDF
851PC2048_HNC_SWP3_101-191.pdf PDF
851PC2048_HNC_CD2_Submittal Register.pdf PDF
851PC2048_HNC_SWP3_1-100.pdf PDF
Final 36C10F20R0055_3 (7-9-2020).pdf PDF
09_121-130_851PC2048_HNC_BD_Plans.pdf PDF
11_136-140_851PC2048_HNC_BD_Plans.pdf PDF
851PC2048_HNC_BD_Specs Volume 2.pdf PDF
08_106-120_851PC2048_HNC_BD_Plans.pdf PDF
12_141-150_851PC2048_HNC_BD_Plans.pdf PDF
15_181-195_851PC2048_HNC_BD_Plans.pdf PDF
14_166-180_851PC2048_HNC_BD_Plans.pdf PDF
13_151-165_851PC2048_HNC_BD_Plans.pdf PDF
03_31-45_851PC2048_HNC_BD_Plans.pdf PDF
851PC2048_HNC_BD_Specs Volume 1.pdf PDF
10_131-135_851PC2048_HNC_BD_Plans.pdf PDF
02_16-30_851PC2048_HNC_BD_Plans.pdf PDF
Houston - Building Wage Determination.pdf PDF
04_46-60_851PC2048_HNC_BD_Plans.pdf PDF
01_1-15_851PC2048_HNC_BD_Plans.pdf PDF
06_76-90_851PC2048_HNC_BD_Plans.pdf PDF
05_61-75_851PC2048_HNC_BD_Plans.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MENS TOILET

TOOL M

ANAGER

WOMENS

TOILET

MENS

LOCKER

WOMENS

LOCKER

HONOR

GUARD

TOILET

KITCHEN

JANITOR

MENS

SHOWER

BREAKROOM

UPUP

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 BJS ACS

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442

SITE SECURITY PLAN

SE103

LEGEND:

CAMERA #B1

CAMERA #B2

CAMERA #B3

CAMERA #B4

CAMERA #B5

CAMERA #B8

CAMERA #B7

CAMERA #B6

CAMERA #B9

CAMERA #B10

CAMERA #B11

CAMERA #B12

CAMERA #B13

CAMERA #B14

SITE SECURITY NOTES:

AutoCAD SHX Text F

AutoCAD SHX Text

MH

AutoCAD SHX Text

GRAPHICAL SCALE: 1" = 30'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NVR

AutoCAD SHX Text

EXISTING FIXED BULLET CAMERA TO BE REPLACED

AutoCAD SHX Text

NETWORK VIDEO RECORDER & VIDEO DISPLAY EQUIPMENTVIDEO DISPLAY EQUIPMENT

AutoCAD SHX Text

NVR

AutoCAD SHX Text

PROPOSED FIXED BULLET CAMERA

AutoCAD SHX Text

1. SECURITY CONTRACTOR SHALL EXPAND AND/OR PROVIDE NEW SECURITY CONTRACTOR SHALL EXPAND AND/OR PROVIDE NEW SECURITY HARDWARE, DEVICES, POE CAMERAS AND SOFTWARE/CONFIGURATION TO MEET SPECIFICATIONS. SECURITY CONTRACTOR SHALL COORDINATE FINAL SELECTION OF SYSTEM EQUIPMENT WITH NCA SITE PERSONNEL FOR SELECTION OF DOOR HARDWARE. 2. CONTRACTOR TO DEMOLISH EXISTING CAMERAS AND ASSOCIATED CONTRACTOR TO DEMOLISH EXISTING CAMERAS AND ASSOCIATED TRANSMISSION LINES. 3. SEE ELECTRICAL SHEETS FOR PHYSICAL ACCESS CONTROL AND SEE ELECTRICAL SHEETS FOR PHYSICAL ACCESS CONTROL AND SURVEILLANCE SYSTEM DETAILS. CONTRACTOR TO DETERMINE FINAL SECURITY PANELS AND/CABINETS LOCATIONS. 4. SEE ELECTRICAL SHEETS FOR SECURITY/COMMUNICATION CABLE AND SEE ELECTRICAL SHEETS FOR SECURITY/COMMUNICATION CABLE AND CONDUIT SITE PLAN INFORMATION. 5. CAMERA LOCATIONS ARE APPROXIMATE AND SHALL BE FIELD LOCATED CAMERA LOCATIONS ARE APPROXIMATE AND SHALL BE FIELD LOCATED FOR OPTIMUM EFFECTIVENESS. 6. PLANS DEPICT RECORDING BY LOCAL NVR. THE NVR SHALL BE RACK PLANS DEPICT RECORDING BY LOCAL NVR. THE NVR SHALL BE RACK MOUNTED. 7. ALL CAMERAS TO BE CONNECTED TO NVR LOCATED IN ADMINISTRATION ALL CAMERAS TO BE CONNECTED TO NVR LOCATED IN ADMINISTRATION BUILDINGS OPERATIONS ROOM. FINAL LOCATION IN ROOM TO BE FINAL LOCATION IN ROOM TO BE DETERMINED BY CONTRACTOR AND APPROVED BE RE/COR.

EXPANSION

JOINT (TYP.)

TOOLED

CONTRACTION

JOINT (TYP.)

9'

20'

25'

25'

35' 4.12'

EXPANSION

JOINT (TYP.)

70'

3.9'

54'

60'

EXPANSION JOINT AGAINST

EXISTING STRUCTURE AND CONCRETE

20' 20'

20'

25' 15'

14' 20' 20'

20'

4'

5' (TYP.)

5' (TYP.)

4'

5' (TYP.)

5' (TYP.)

5' (TYP.)

5' (TYP.)

5' (TYP.)

CONTRACTOR TO LOCATE U.G.

UTILITIES PRIOR TO COMMENCING

GRADING AND EXCAVATION

ACTIVITIES NEEDED TO INSTALL

THE NEW CONCRETE PAVEMENT.

CONTRACTOR TO ENSURE NO

EXISTING UTILITIES ARE IMPACTED

AS A RESULT OF CONSTRUCTION.

ANY STRUCTURE TOPS WITHIN THE

IMPROVEMENT LIMITS TO BE

ADJUSTED TO FINAL GRADE.

CONTRACTOR SHALL INSTALL EXPANSION

JOINT AT TIE INTO EXISTING PAVEMENT

BEGIN

CONCRETE

PAVEMENT

INSTALLATION

X=3094092.54

Y=13904394.30

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 BJS ACS

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442

SITE SECURITY PLAN

SE104

LEGEND:

SATELLITE MAINTENANCE AREA MAIN ENTRANCE

CHAPEL & HEMICYCLE

CAMERA #C1

CAMERA #D1

CAMERA #D2

CAMERA #E1

CAMERA #E2

SITE SECURITY NOTES:

AutoCAD SHX Text F

AutoCAD SHX Text

4" HDPE (NFV)

AutoCAD SHX Text

MH

AutoCAD SHX Text

GRAPHICAL SCALE: 1" = 10'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING FIXED BULLET CAMERA TO BE REPLACED

AutoCAD SHX Text

NETWORK VIDEO RECORDER & VIDEO DISPLAY EQUIPMENTVIDEO DISPLAY EQUIPMENT

AutoCAD SHX Text

NVR

AutoCAD SHX Text

PROPOSED FIXED BULLET CAMERA

1. SECURITY CONTRACTOR SHALL EXPAND AND/OR PROVIDE NEW SECURITY CONTRACTOR SHALL EXPAND AND/OR PROVIDE NEW SECURITY HARDWARE, DEVICES, POE CAMERAS AND SOFTWARE/CONFIGURATION TO MEET SPECIFICATIONS. SECURITY CONTRACTOR SHALL COORDINATE FINAL SELECTION OF SYSTEM EQUIPMENT WITH NCA SITE PERSONNEL FOR SELECTION OF DOOR HARDWARE. 2. CONTRACTOR TO DEMOLISH EXISTING CAMERAS AND ASSOCIATED CONTRACTOR TO DEMOLISH EXISTING CAMERAS AND ASSOCIATED TRANSMISSION LINES. 3. SEE ELECTRICAL SHEETS FOR PHYSICAL ACCESS CONTROL AND SEE ELECTRICAL SHEETS FOR PHYSICAL ACCESS CONTROL AND SURVEILLANCE SYSTEM DETAILS. CONTRACTOR TO DETERMINE FINAL SECURITY PANELS AND/CABINETS LOCATIONS. 4. SEE ELECTRICAL SHEETS FOR SECURITY/COMMUNICATION CABLE AND SEE ELECTRICAL SHEETS FOR SECURITY/COMMUNICATION CABLE AND CONDUIT SITE PLAN INFORMATION. 5. CAMERA LOCATIONS ARE APPROXIMATE AND SHALL BE FIELD LOCATED CAMERA LOCATIONS ARE APPROXIMATE AND SHALL BE FIELD LOCATED FOR OPTIMUM EFFECTIVENESS. 7. MAIN ENTRANCE, SATELLITE MAINTENANCE AREA, CHAPEL & HEMICYCLE MAIN ENTRANCE, SATELLITE MAINTENANCE AREA, CHAPEL & HEMICYCLE CAMERAS TO CONTAIN INTERNAL MEMORY CARD AND WILL NOT BE CONNECTED TO AN NVR OR DVR.

ASSISTANT

DIRECTOR

DIRECTOR

LOBBY

NEW

OFFICE

CORRIDOR

PROGRAM

ASSISTANT

PROGRAM

CLERK

JANITOR

MENS

RESTROOM

CORRIDOR

WOMENS

RESTROOM

WORKSTATION

WORKSTATION

WORKSTATION

OPERATIONS

CENTER

MECHANICAL

ROOM

MULTIPURPOSE

ROOM

HONOR

GUARD

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 BJS ACS

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442

GPS PLAN

GS100

GPS NOTES:

GPS LEGEND:

BASE STATION

ADMINISTRATION BUILDING

AutoCAD SHX Text

GRAPHICAL SCALE: 1" = 5'

AutoCAD SHX Text

AutoCAD SHX Text 2.5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. ANTENNA IS TO BE PLACED ON A MOUNTING POLE/BRACKET AT A ANTENNA IS TO BE PLACED ON A MOUNTING POLE/BRACKET AT A MINIMUM OF 3 FEET ABOVE THE ROOFLINE OF THE ADMINISTRATION BUILDING. CONTRACTOR SHALL COORDINATE FINAL SELECTION OF SYSTEM EQUIPMENT WITH NCA SITE PERSONNEL. 2. REFER TO SECTION 11 83 00 - GLOBAL NAVIGATION SATELITE SYSTEM REFER TO SECTION 11 83 00 - GLOBAL NAVIGATION SATELITE SYSTEM (GNSS) REFERENCE SYSTEM FOR HARDWARE SPECIFICATIONS.

C

O

N

F

I

R

M

O

N

F

I

R

M

C

O

N

F

I R

M

C

O

N

F

I R

M

O

N

F

I

R

M

R

R

R

R8.00'

R8.00'

R

T

Y

P

END PIER, EXPANSION

JOINTS ALL SIDES

ADJACENT TO

CONCRETE, TYP.

CI703

CI703

CI703

CI703

CI703

CI703

CI703

CI703

CI704

FLOWER WATERING

STATION, TYP.

INTERMEDIATE PIER,

EXPANSION JOINTS ALL SIDES

ADJACENT TO CONCRETE, TYP.

EXPANSION JOINT, TYP.

CONTROL JOINT, TYP.

T

Y

P

T

Y

P

P

P1

P2

P3

P4

P5

P6

P7

T

Y

P

CI704

TACTILE WARNING STRIP,

REFER TO AREA DETAIL 3,

SHEET CT103 FOR ADA CURB

RAMP IMPROVEMENTS

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

CI702

DT503

POTENTIAL FUTURE

COLUMBARIUM, TYP.

SIGN, SEE NEW SITE

SIGNAGE PLANS

CI820-823, TYP.

LIGHT-DUTY CONCRETE, TYP.

BENCH, TYP.

5-NICHE HIGH, DOUBLE SIDED

COLUMBARIUM WALL C-22

5-NICHE HIGH, DOUBLE SIDED

COLUMBARIUM WALL C-23

E

J

EJ

E

J

EJ

EJ

EJ

E

J

E

J

E

J

P

A

N

E

L

S

P

P

A

N

E

L

P

E

Q

N

E

L

S

T

Y

P

R

R

R

R

P.O.C

P

O

C

P

O

T

P

O

C

SIM.

N

E

L

P

A

L

I

G

N

R

R

R

F

A

O

F

I

E

R

F

O

U

N

D

A

T

I

O

N

F

A

E

R

F

O

U

N

D

A

T

I

O

N

C

O

R

N

R

E

R

F

O

U

N

D

A

T

I

O

N

LIMIT OF CONSTRUCTION,

TYP.

L-502

L-502

POINT LAYOUT TABLE

POINT

P1

P2

P3

P4

P5

P6

P7

NORTHING

13903774.6701

13903754.1299

13903775.2321

13903752.3925

13903774.8734

13903796.3379

13903775.7982

EASTING

3093705.1997

3093756.0952

3093805.7551

3093862.3483

3093755.0502

3093805.5626

3093856.4584

KEY MAP

(NOT TO SCALE)S

a v e

D a t

A

M

F i l

N m

G

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C S

C

L

T

E

P

L A

N d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CS401

COLUMBARIUM SITE PLAN

ENLARGEMENT 1

86425 1010 0

Scale: 1" = 10'

LEGEND

CONTROL JOINT

POND EDGE

FLOWER WATERING STATION

EXPANSION JOINT

P1

LAYOUT POINT

LIGHT-DUTY CONCRETE

MATCH LINE: SEE SHEET CS402 MATCH LINE: SEE SHEET CS402

NOTES

1. LAYOUT INFORMATION SHALL BE BASED UPON THE

CENTER LINE CREATED BETWEEN LAYOUT POINTS.

2. DIMENSIONS BETWEEN LAYOUT POINTS AND

DIMENSIONS OF THE CONCRETE FORM LAYOUT

SHALL BE CONFIRMED BY THE SURVEYOR AND

CERTIFICATION PROVIDED TO THE RE/COR PRIOR TO

CONCRETE BEING POURED. SEE SPECIFICATIONS.

3. SEE COLUMBARIUM NUMBERING PLAN CI701.

EJ

LIMIT OF CONSTRUCTION

POINT LAYOUT TABLE

POINT

P9

P8

P10

P11

P12

P13

P14

NORTHING

13903716.6854

13903760.7497

13903697.6574

13903695.8655

13903671.9182

13903622.2650

13903601.7386

EASTING

3093915.4586

3093896.7167

3093962.6507

3093914.9470

3093974.3415

3093995.4595

3094046.3605

KEY MAP

(NOT TO SCALE)

O

N

F

I

R

M

C

O

N

F

I R

M

O

N

F

I

R

M

O

N

F

I

R

M

C

O

N

F

I R

M

T

Y

P

T

Y

P

T

Y

P

R

R

R

R

R

R

R

R

R

R

CI705

CI705

CI704

CI704

CI704

CI704

CI703

CI703

CI703

CI703

BENCH, TYP.

5-NICHE HIGH, DOUBLE SIDED

COLUMBARIUM WALL C-21

5-NICHE HIGH, DOUBLE SIDED

COLUMBARIUM WALL C-20

LIGHT-DUTY CONCRETE, TYP.

EXPANSION JOINT, TYP.

CONTROL JOINT, TYP.

END PIER, EXPANSION

JOINTS ALL SIDES ADJACENT

TO CONCRETE, TYP.

INTERMEDIATE PIER,

EXPANSION JOINTS ALL

SIDES ADJACENT TO

CONCRETE, TYP.

P

P8

P9

P10

P11

P12

P13

P14

R

T

Y

P

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

POTENTIAL FUTURE

COLUMBARIUM, TYP.

SIGN, SEE NEW SITE

SIGNAGE PLANS

CI820-CI823, TYP.

DT503

SIGN, SEE NEW

SITE SIGNAGE

PLANS CI820-823,

TYP.

E

J

SEE SITE LAYOUT PLANS

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

P

A

N

E

L

S

T

Y

P

N

E

L

P

N

E

L

S

R

R

R

PROTECT

EXISTING

FLOWER

WATERING

STATION

SIM.

N

E

L

P

P

A

N

E

L

S

T

Y

P

N

E

L

P

F

A

E

R

F

O

U

N

D

A

T

I

O

N

C

O

R

N

E

R

F

O

U

N

D

A

T

I O

N

F

A

E

R

F

O

U

N

D

A

T

I

O

N

F

A

E

R

F

O

U

N

D

A

T

I

O

N

F

A

E

R

F

O

U

N

D

A

T

I

O

N

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

LIMIT OF CONSTRUCTION, TYP.

FLOWER

WATERING

STATION, SEE

CI201, TYP.

BENCH, SEE CI201, TYP.

L-502

L-502

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C S

C

T

E

P

L A

N d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CS402

COLUMBARIUM SITE PLAN

ENLARGEMENT 2

86425 1010 0

Scale: 1" = 10'

MATCH LINE: SEE SHEET CS401 MATCH LINE: SEE SHEET CS401

LEGEND

CONTROL JOINT

POND EDGE

FLOWER WATERING STATION

EXPANSION JOINT

P1

LAYOUT POINT

LIGHT-DUTY CONCRETE

NOTES

1. SEE NOTES ON CS401.

EJ

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

LIMIT OF CONSTRUCTION

POINT LAYOUT TABLE

POINT

P15

P23

P16

P17

P18

P19

P20

P21

P22

P24

P25

P26

P27

P28

P29

P30

NORTHING

13903498.0719

13903396.3163

13903461.5197

13903405.6519

13903369.1200

13903346.2202

13903324.9127

13903273.0832

13903251.7734

13903383.9996

13903369.2398

13903354.2710

13903389.9565

13903382.1301

13903355.9310

13903359.7342

EASTING

3094089.3558

3094101.0905

3094048.4145

3094045.2502

3094004.2908

3094008.1203

3094058.6975

3094079.8026

3094130.3796

3094110.8297

3094113.5431

3094108.8433

3094089.0509

3094079.1853

3094095.3231

3094083.3159

KEY MAP

(NOT TO SCALE)

P

A

N

E

L

S

P

A

N

E

L

S

P

A

N

E

L

S

P

A

N

E

L

S

E Q

P

L A

Z A

EXPANSION JOINTS

FROM CORNERS OF

WALL

NOTE: JOINTING PATTERN

MIRRORED ALONG

CENTER LINE

JOINTS SHALL MEET RADIAL

WALL PERPENDICULAR TO

CENTER

P

A

N

E

L

S

E Q

O

N

F

I

R

M

C

O

N

F

I R

M

O

N

F

I

R

M

O

N

F

I

R

M

O

N

F

I

R

M

.5

.9

' (C

O N

F

IR

M

P

T

Y

P

T

Y

P

R

R

R

R

R

R .0

R

R

R

R

R

R

R

R

R

R

R

R

R

R

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

CI703

CI703

CI705

CI705

CI703

CI703

CI703

CI703

CI703

CI703

CI705

CI705

BENCH, TYP.

LIGHT-DUTY CONCRETE

PAVEMENT, TYP.

5-NICHE HIGH, DOUBLE SIDED

COLUMBARIUM WALL C-18

5-NICHE HIGH, DOUBLE SIDED

COLUMBARIUM WALL C-19

EXPANSION JOINT, TYP.

CONTROL JOINT, TYP.

P15

P16

P17

P18

P19

P20

P21

P22

P23

P24

P25

P26

P27

P28

P29

P30

.0

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

SIGN, SEE NEW SITE

SIGNAGE PLANS

CI820-CI823, TYP.

DOUBLE SIDED

MEMORIAL WALL

DOUBLE SIDED

MEMORIAL WALL

SINGLE SIDED MEMORIAL

WALL AND OSSUARY

C

O

N

F

I

R

M

C

O

N

F

I

R

M

T

Y

P

SEAT WALL AND

RAISED PLANTER

CI720

CI720

CI720

SIGN, SEE NEW SITE SIGNAGE

PLANS CI820-CI823, TYP.

DT503

END PIER, EXPANSION

JOINTS ALL SIDES ADJACENT

TO CONCRETE, TYP.

INTERMEDIATE PIER,

EXPANSION JOINTS ALL

SIDES ADJACENT TO

CONCRETE, TYP.

U

N

E

L

S

E

Q

U

A L P

A N

E L S

E

Q U

A L P

A N

E L S

C

O

N

F

I

R

M

C

O

N

F

I

R

M

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E J

E J

E

J

E

J

E

J

E

J

E J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

E

J

R

E

Q U

A L P

A N

E L S

E

Q

U

A

L

P

A

N

E

L S

CI721

R .0

SEE INSET, THIS PAGE,

FOR JOINTING DETAIL

R

R

R

R

R

CI727

N

E

L

P

.0

' P

A N

E L S

T Y

P

N

E

L

P

N

E

L

P

P

A

N

E

L

S

T

Y

P

N

E

L

P

F

A

E

R

F

O

U

N

D

A

T

I

O

N

C O

R N

P

I E

R

F O

U N

D A

T I O

N

F

A

E

R

F

O

U

N

D

A

T

I

O

N

C

O

R

N

E

R

F

O

U

N

D

A

T

I O

N

F

A

E

R

F

O

U

N

D

A

T

I

O

N

EXISTING

CONCRETE WALK

FLOWER WATERING

STATION, TYP.

LIMIT OF CONSTRUCTION, TYP.

FLOWER WATERING

STATION, TYP.

R

R

L-502

L-502

L-502

R

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C S

C

T

E

P

L A

N d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CS403

COLUMBARIUM SITE PLAN

ENLARGEMENT 3

86425 1010 0

Scale: 1" = 10'

LEGEND

CONTROL JOINT

POND EDGE

FLOWER WATERING STATION

EXPANSION JOINT

P1

LAYOUT POINT

LIGHT-DUTY CONCRETE

NOTES

1. SEE NOTES ON CS401.

EJ

Scale: 1"=10'

MEMORIAL WALL PLAZA JOINTING INLAY

LIMIT OF CONSTRUCTION

98.94

99.08

99.08

99.08

99.08

99.08

99.08

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

98.94

EX. 98.91

98.94

98.94

99.08

99.08

99.00

99.00

98.86

99.04

99.00

99.00

98.93

98.86

98.86

98.86

99.04

99.04

99.08

99.04

99.04

98.86

99.01

98.94

98.81

99.08

99.00

99.00

99.08

99.08

99.08

98.91

98.95

99.08

99.00

99.00

AREA DRAIN 'A5'

RIM: 98.86

INV. IN (W): 95.02

INV. IN (N): 96.20

INV. IN (S): 96.20

INV. OUT: 94.92

22 LF 8" HDPE @ 1%

AREA DRAIN 'A4'

RIM: 98.86

INV. IN: 95.36

INV. OUT: 95.26

AREA DRAIN 'A3'

RIM: 98.93

INV. IN: 95.64

INV. OUT: 95.54

16 LF 8" HDPE @ 1%

AREA DRAIN 'A2'

RIM: 98.86

INV. IN: 95.92

INV. OUT: 95.82

23 LF 8" HDPE @ 1%

AREA DRAIN 'A1'

RIM: 98.86

INV. OUT: 96.16

COLUMBARIUM UNDER

DRAIN, TYP.

H

99.04

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

98.94

DRIP-STRIP

CLEAN-OUT, TYP.

CI706

16 LF 8" HDPE @ 1%

34 LF 8" HDPE @ 1%

(2) 6 LF SECTIONS 4" HDPE @ 17%

END PIER

UNDER-DRAIN,

TYP.

CI706

INTERMEDIATE PIER

UNDERDRAIN, TYP.

CI706

98.09

98.53

98.44

98.72

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

SEE DRAWINGS CS101-CS109

PLANS FOR PIPE AND

STRUCTURE INFORMATION, TYP.

ENSURE 2% MAX.

CROSS SLOPE

SEE DRAWINGS CS101-CS109

PLANS FOR PIPE AND

STRUCTURE INFORMATION, TYP.

M

I

N

KEY MAP

(NOT TO SCALE)S

a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C G

C O

L

G

R A

D I N

G d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CG401

COLUMBARIUM GRADING PLAN

ENLARGEMENT 1

86425 1010 0

Scale: 1" = 10'

LEGEND

EXISTING MINOR CONTOUR

EXISTING MAJOR CONTOUR

PROPOSED MINOR CONTOUR

PROPOSED MAJOR CONTOUR95

STORM PIPE

AREA DRAIN

MATCH LINE: SEE SHEET CG402 MATCH LINE: SEE SHEET CG402

NOTES

DT504

1. SEE DRAWINGS CG103 AND CG106 FOR MORE

GRADING AND DRAINAGE INFORMATION.

2. CLEAN OUTS WILL BE LOCATED ALONG ALL

UNDER DRAINS.

3. EACH WALL HAS A CONSISTENT TOP OF

FOUNDATION AND TOP OF WALL ELEVATION. SEE

ELEVATIONS ON SHEETS CI703 - CI705.

4. ALL WALK CROSS SLOPES TO BE 2% MAX. ;

CONFIRM

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

KEY MAP

(NOT TO SCALE)

98.59

98.59

98.59

98.26

98.42

98.59

98.12

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

98.45

98.52

98.45

98.45

98.71

98.59

98.55

98.37

98.51

98.55

98.45

98.59

98.55

98.37

98.51

98.59

98.51

98.51

98.38

98.27

98.51

98.36

98.37

AREA DRAIN 'A6'

RIM: 98.37

INV. OUT: 95.67

23 LF 8" HDPE @ 1%

AREA DRAIN 'A7'

RIM: 98.37

INV. IN (E): 95.43

INV. IN (N): 95.70

INV. IN (S): 95.70

INV. OUT: 95.33

EXISTING PIPE, TYP.

98.45

98.45

98.45

98.45

98.45

98.45

98.41

98.42

98.45

98.37

98.45

98.33

98.31

98.33

98.28

98.28

98.32

98.12

98.12

98.19

98.22

98.18

98.21

98.45

DRIP-STRIP

CLEAN-OUT, TYP.

CI706

7 LF SECTION 4" HDPE @ 8%

M

I

N

END PIER

UNDER-DRAIN,

TYP.

CI706

INTERMEDIATE PIER

UNDERDRAIN, TYP.

CI706

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

SEE DRAWINGS CS101-CS109

FOR PIPE AND STRUCTURE

INFORMATION, TYP.

M

A

X

96.86

SEE DRAWINGS CS101-CS109

FOR PIPE AND STRUCTURE

INFORMATION, TYP.

M

I

N

M

I

N

M

I

N

M

I

N

7 LF SECTION 4" HDPE @ 13%

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C G

C O

L

G

R A

D I N

G d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CG402

COLUMBARIUM GRADING PLAN

ENLARGEMENT 2

86425 1010 0

Scale: 1" = 10'

MATCH LINE: SEE SHEET CG401 MATCH LINE: SEE SHEET CG401

LEGEND

EXISTING MINOR CONTOUR

EXISTING MAJOR CONTOUR

PROPOSED MINOR CONTOUR

PROPOSED MAJOR CONTOUR95

STORM PIPE

AREA DRAIN

NOTES

1. SEE NOTES ON CG401.

DT504

AutoCAD SHX Text N

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KEY MAP

(NOT TO SCALE)

97.21

97.04

96.89

96.81

96.14

95.98

96.14

96.56

96.73

96.93

96.73

96.45

96.93

96.77

96.77

96.60

96.77

96.60

96.93

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

96.34

2%

97.05

5% MAX

2%

96.61

96.87

97.37

96.45

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

MEET EXISTING PAVEMENT

FLUSH; PROVIDE EXPANSION

JOINT BETWEEN NEW AND

EXISTING PAVEMENT, TYP.

EXISTING CONCRETE

WALK, TYP.

EXISTING CONCRETE

WALK, TYP.

EXISTING YARD DRAIN

INV. IN: 93.60

EXISTING INV. OUT: 93.60

TYPE A DRAIN INLET 'DI-2

RIM ELEV: 95.70

INV. OUT: 93.25

TYPE A DRAIN INLET 'DI-3'

RIM ELEV: 95.70

INV. IN: 93.10

INV. OUT: 93.10

TYPE A DRAIN INLET 'DI-4'

RIM: 95.60

INV. IN(N): 92.95

INV. IN:(W): 92.95

INV. OUT: 92.95

TYPE A DRAIN INLET 'DI-5'

RIM ELEV: 95.68

INV. IN: 92.59

INV. OUT: 92.59

TYPE A DRAIN INLET 'DI-6'

RIM ELEV: 95.50

INV. IN(N): 92.29

INV. IN(W - EXIST): ±92.40

INV. OUT: 92.29

TYPE A DRAIN INLET 'DI-9'

RIM ELEV: 95.87

(NE) INV. IN: 93.10

(NW) INV. IN: 93.20

(SW) INV. OUT: 93.00

TYPE A DRAIN INLET 'DI-10'

RIM ELEV: 95.50

(NW) INV. IN: 92.60

INV. OUT: 92.50

TYPE A DRAIN INLET 'DI-11'

RIM ELEV: 96.30

(N) INV. IN: 92.68

(NW) INV. IN: 93.80

INV. OUT: 92.68

TYPE A DRAIN INLET 'DI-8'

RIM ELEV: 95.80

INV. OUT: 94.49

H

D

H

D

96.39

EX. 95.81

EX. 95.76

EX. 95.77

EX. 95.83

EX. 95.81

EX. 95.81

EX. 95.86

EX. 95.76

EX. 95.82

EX. 95.75

EX. 95.78

EX. 95.81

EX. 95.89

EX. 95.80

136 LF 12" HDPE @ 0.5%

TYPE A DRAIN INLET 'DI-7'

RIM ELEV: 95.50

INV. IN: 92.06

INV. OUT: 92.06

TYPE A DRAIN INLET 'DI-12'

RIM ELEV: 96.30

INV. IN(N): 92.32

INV. IN(W): 92.32

INV. OUT: 92.32

TYPE A DRAIN INLET 'DI-13'

RIM ELEV: 95.70

INV. IN (N): 92:09

INV. IN (W): 93.00

INV. OUT: 92.09

9 LF HDPE @ .5%

65 LF 12" HDPE @ 0.5%

H

D

EXISTING PIPE, TYP.

EXISTING PIPE, TYP.

EXISTING PIPE, TYP.

97.07

97.07

96.90

96.90

97.00

96.98

97.00

96.98

96.75

96.75

96.84

96.82

96.82

96.84

96.71

96.70

96.71

96.70

96.67

96.67

96.42

96.42

96.25

96.25

96.00

96.00

96.00

96.00

96.15

96.11

96.15

96.11

96.34

96.31

96.34

96.31

96.00

96.00

96.00

96.00

96.45

96.77

96.60

96.61

12 LF 4" HDPE @ 2%

INSTALL EXTENDABLE

BACKWATER VALVE

INSTALL EXTENDABLE

BACKWATER VALVE

INSTALL EXTENDABLE

BACKWATER VALVE

38 LF 4"

HDPE @ 7%

END PIER

UNDER-DRAIN, TYP.

INTERMEDIATE

PIER UNDERDRAIN,

TYP.

CI706

CI706

27 LF 12" HDPE @ 0.5%

97.22

97.74

96.30

97.72

97.89

97.45

95.80

95.95

95.85

95.20

2%

SEE DRAWINGS CS101-CS109

PLANS FOR PIPE AND

STRUCTURE INFORMATION, TYP.

96.46

96.46

2%

34 LF 4"

HDPE @ 7%

UNDER DRAIN

CLEAN-OUT, TYP.

CI706

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C G

C O

L

G

R A

D I N

G d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CG403

COLUMBARIUM GRADING PLAN

ENLARGEMENT 3

86425 1010 0

Scale: 1" = 10'

LEGEND

EXISTING MINOR CONTOUR

EXISTING MAJOR CONTOUR

PROPOSED MINOR CONTOUR

PROPOSED MAJOR CONTOUR95

STORM PIPE

TYPE A GRATE INLET

NOTES

1. SEE NOTES ON CG401.

TYPE A DRAIN INLET 'DI-1'

RIM: 97.39

INV. IN: 93.36

INV. OUT: 93.36

DT504

AutoCAD SHX Text N

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

CO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

W

A

B

A

A

A

A

A

A

A

A

A

K

A

A

J

A

A

A

A

A

A

A

A

A

A

M

A

M

A

A

A

A

A

A

A L L T

Y P

E N

W

A L L T

Y P

E N

WALL C-18

COLUMNS 1-300

1,500 NICHES

WALL C-19

COLUMNS 1-300

1,500 NICHES

WALL C-20

314 COLUMNS

1,570 NICHES

WALL C-21

178 COLUMNS

890 NICHES

WALL C-22

308 COLUMNS

1,540 NICHES

WALL C-23

200 COLUMNS

1,000 NICHES

MEMORIAL WALL M-3

72 MEMORIAL MARKERS

MEMORIAL WALL M-2

72 MEMORIAL MARKERS

MEMORIAL WALL M-1, AND OSSUARY

96 MEMORIAL MARKERS

KEY MAP

(NOT TO SCALE)S

a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C I

C

U M

B d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CI701

COLUMBARIUM WALL

NUMBERING PLAN

10 20 3030 0

Scale: 1" = 30'

NOTES

1. TYPICAL COLUMBARIUM ELEVATION SEE DETAIL 1 CI702

2. WALL TYPE A - F ELEVATIONS SEE CI703

3. WALL TYPE G - L ELEVATIONS SEE CI704

4. WALL TYPE M - P ELEVATIONS SEE CI705

5. MEMORIAL WALL AND OSSUARY ELEVATIONS SEE CI721

AutoCAD SHX Text

FL ELEV: 95.71'

AutoCAD SHX Text

FL ELEV: 95.71'

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

EM

3 8

6"

2" TYP.

3" 3"

6"

2" TYP.

1 4

V A

R I E

S

B

A S

E D

N

I S

H

G

R A

D E

5'-5"

STANDARD BUFF LIMESTONE

CAP, SMOOTH FINISH ALL

FACES, TYP.

CAST BRONZE

IDENTIFICATION PANEL

1/2" STUCCO FINISH -

COLOR AND TEXTURE -TO

MATCH EXISTING PHASE 4

COLUMBARIA, TYP.

STUCCO INSET PANELING

STUCCO FINISH BEGINS 1"

ABOVE FINISH GRADE, TYP.

4" TYP.

C

L

C-18

CI702

CI709

FINISH GRADE, TYP.

FINISHED GRADE VARIES,

SEE GRADING PLANS

TOP OF PIER FOUNDATION

1" ABOVE FINISHED GRADE

1'-8" 1'-8"

C

L

CI702

T

Y P

6"

2" TYP.

6"

1 4

V A

R I E

S

B

A S

E D

N

I S

H

G

R A

D E

2'-11"

FACE OF FOUNDATION

TO FACE OF FOUNDATION

STANDARD BUFF LIMESTONE CAP,

SMOOTH FINISH ALL FACES, TYP.

1/2" STUCCO FINISH -

COLOR AND TEXTURE -TO

MATCH EXISTING PHASE 4

COLUMBARIA, TYP.

INSET STUCCO

PANEL TO MATCH

EXISTING

COLUMBARIUM

STUCCO FINISH BEGINS 1"

ABOVE FINISH GRADE, TYP.

CI702

CAST BRONZE

IDENTIFICATION PANEL

3 8

1 5

GOVERNMENT PROVIDED,

CONTRACTOR INSTALLED,

GRANITE NICHE COVERS, TYP.

CAST BRONZE COLUMN

NUMBER PLAQUE, MATCH

EXISTING

PRECAST NICHE UNIT

EXPOSED CONCRETE FOUNDATION,

FINISH TO BE NATURAL CAST-IN-PLACE

CONCRETE, DO NOT PAINT

CONTRACTOR PROVIDED AND

INSTALLED ROSETTE, TYP.

CAP SETTING

3/8" SEALANT JOINT WITH BACKER ROD,

TYP. SEE DETAIL 4/CI706 FOR JOINT

BETWEEN PIER AND NICHE UNIT

CI709

STANDARD BUFF

LIMESTONE CAP, TYP.

1'-8"

2" TYP.

FINISHED GRADE VARIES,

SEE GRADING PLANS

TOP OF PIER FOUNDATION

1" ABOVE FINISHED GRADE

TOP OF WALL FOUNDATION

(T.O.F.) VARIES,

SEE ELEVATIONS

V A

R I E

S

M

I N

M

A X

CENTER LINE OF CAP SHALL ALIGN

WITH CENTERLINE OF GAP BETWEEN

NICHE COVERS, EXCEPT AT PIERS.

ALLOWABLE TOLERANCE 1/8", TYP.

V A

R I E

S

S

A

D I N

G

P

L A

N

CI708

CI709

3 8

CI702

B

℄ NICHE COVER

E

D

C

5"

A

5"

CAST BRONZE ROW LETTER

PLAQUE, ALIGN CENTER OF ROW

LETTER W/ MID POINT OF NICHE

COVER

NICHE COVER, TYP.

PIER WITH STUCCO FINISH, TYP.

BEGIN LETTERS AT BOTTOM ROW

TO MATCH EXISTING

CI709

FINISH GRADE, TYP.

3 8

6"

TYP.

2" TYP.

1 4

V A

R I E

S

B

A S

E D

N

I S

H

G

R A

D E

3'-7

" ALONG FACE

STANDARD BUFF LIMESTONE

CAP, SMOOTH FINISH ALL

FACES, TYP.

1/2" STUCCO FINISH

TO MATCH EXISTING

COLUMBARIA, TYP.

INSET STUCCO PANEL

TO MATCH EXISTING

COLUMBARIUM

STUCCO FINISH BEGINS 1"

ABOVE FINISH GRADE, TYP.

4" TYP.

C

L

CI702

FINISH GRADE, TYP.

FINISHED GRADE VARIES,

SEE GRADING PLANS

TOP OF PIER FOUNDATION

1" ABOVE FINISHED GRADE

3'-7

" ALONG FACE

POINT OF DEFLECTION

ELEVATION 'A'

2'-4

6"

TYP.

2" TYP.

CI702

3 8

6"

TYP.

2" TYP.

1 4

V A

R I E

S

B

A S

E D

N

I S

H

G

R A

D E

2'-7"

STANDARD BUFF LIMESTONE

CAP, SMOOTH FINISH ALL

FACES, TYP.

1/2" STUCCO FINISH

TO MATCH EXISTING

COLUMBARIA, TYP.

STUCCO INSET PANELING

STUCCO FINISH BEGINS 1"

ABOVE FINISH GRADE, TYP.

4" TYP.

C

L

CI702

FINISH GRADE, TYP.

FINISHED GRADE VARIES,

SEE GRADING PLANS

TOP OF PIER FOUNDATION

1" ABOVE FINISHED GRADE

ELEVATION 'B'

CI702

4A

CI702

4B

CI702

2"

5 8

1/2" STUCCO

FINISH

CONCRETE

CORE

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C I

C

T d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CI702

COLUMBARIUM

WALL ELEVATIONS 1

Scale: 1"=1'-0"

COLUMBARIUM END PIER ELEVATION

Scale: 1"=1'-0"

COLUMBARIUM END PIER AND TYPICAL COLUMBARIUM ELEVATION

Scale: 1"=1'-0"

COLUMBARIUM ROW NUMBERING DETAIL

Scale: 1"=1'-0"

COLUMBARIUM INTERMEDIATE PIER ELEVATIONS

INTERMEDIATE PIER ELEVATION KEY

Scale: NTS

COLUMBARIUM INSET DETAIL

50'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(50 NICHE COLUMNS)

3'-8

10-NICHE UNIT

(CLOSED/CLOSED)

CI706

CI702

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

3'

(OUTSIDE EDGES

STUCCO)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C19: TOF 97.47

C22: TOF 99.58

C23: TOF 99.58

FOUNDATION

CONTINUES,

TYP.

50'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(50 NICHE COLUMNS)

3'

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

CI706

CI702

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C19: TOF 97.47

C22: TOF 99.58

C23: TOF 99.58

FOUNDATION

CONTINUES,

TYP.

50'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(50 NICHE COLUMNS)

3'

3'-8

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

CI706

CI702

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C18: TOF 96.81

C20: TOF 98.93

C23: TOF 99.58

FOUNDATION

CONTINUES,

TYP.

50'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(50 NICHE COLUMNS)

CI706

3'

10-NICHE UNIT

(CLOSED/CLOSED)

CI706

CI702

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C18: TOF 96.81

C20: TOF 98.93

C23: TOF 99.58

FOUNDATION

CONTINUES,

TYP.

48'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(48 NICHE COLUMNS)

3'-8

CI706

CI706

8-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45

C20: TOF 98.93

FOUNDATION

CONTINUES,

TYP.

FOUNDATION

CONTINUES,

TYP.

48'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(48 NICHE COLUMNS)

3'-8

CI7062

CI706

8-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

10-NICHE UNIT

(CLOSED/CLOSED)

1 5 10 15 20 25 30 35 40 45

C22: TOF 99.58

FOUNDATION

CONTINUES,

TYP.

FOUNDATION

CONTINUES,

TYP.

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C I

C

T d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CI703

COLUMBARIUM

WALL ELEVATIONS 2

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE A' ELEVATION (WALLS C19, C22, & C23)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE B' ELEVATION (WALLS C19, C22, & C23)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE C' ELEVATION (WALLS C18, C20, & C23)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE D' ELEVATION (WALLS C18, C20, & C23)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE E' ELEVATION (WALL C20)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE F' ELEVATION (WALL C22)

NOTE: NORTHERN FACE OF WALL DEPICTED. NICHE UNIT CONFIGURATION ON SOUTH-FACING ELEVATION

TO ALLOW JOINTS BETWEEN NICHE UNITS TO ALIGN WITH THOSE OF NORTH-FACING ELEVATION.

NOTE: EASTERN FACE OF WALL DEPICTED. NICHE UNIT CONFIGURATION ON WEST-FACING ELEVATION TO

ALLOW JOINTS BETWEEN NICHE UNITS TO ALIGN WITH THOSE OF NORTH-FACING ELEVATION.

46'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(46 NICHE COLUMNS)

3'

CI706

CI702

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

8-NICHE UNIT

(CLOSED/CLOSED)

8-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C21: TOF 98.92

FOUNDATION

CONTINUES,

TYP.

46'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(46 NICHE COLUMNS)

3'

3'-8

CI706

CI702

CI706

CI706

8-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

8-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C21: 98.92

FOUNDATION

CONTINUES,

TYP.

56'-11

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (5) 3/8" JOINTS BETWEEN NICHE UNITS)

(56 NICHE COLUMNS)

3'

CI706

CI702

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

8-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

8-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C22: TOF 99.58

FOUNDATION

CONTINUES,

TYP.

56'-11

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (5) 3/8" JOINTS BETWEEN NICHE UNITS)

(56 NICHE COLUMNS)

3'

3'-8

CI706

CI702

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

8-NICHE UNIT

(CLOSED/CLOSED)

8-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C22: TOF 99.58

FOUNDATION

CONTINUES,

TYP.

59'-11

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (5) 3/8" JOINTS BETWEEN NICHE UNITS)

(59 NICHE COLUMNS)

3'

3'-8

CI706

CI702

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C20: TOF 98.93

FOUNDATION

CONTINUES,

TYP.

59'-11

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (5) 3/8" JOINTS BETWEEN NICHE UNITS)

(59 NICHE COLUMNS)

3'

CI706

CI702

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

1 5 10 15 20 25 30 35 40 45 50

C20: TOF 98.93

FOUNDATION

CONTINUES, TYP.

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C I

C

T d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CI704

COLUMBARIUM WALL

ELEVATIONS 3

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE I' ELEVATION (WALL C21)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE J' ELEVATION (WALL C21)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE G' ELEVATION (WALL C22)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE H' ELEVATION (WALL C22)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE K' ELEVATION (WALL C20)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE L' ELEVATION (WALL C20)

50'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(50 NICHE COLUMNS)

3'-8

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

C18: TOF 96.81

FOUNDATION

CONTINUES,

TYP.

FOUNDATION

CONTINUES,

TYP.

50'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(50 NICHE COLUMNS)

3'-8

CI706

CI706

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

10-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

C19: TOF 97.47

FOUNDATION

CONTINUES,

TYP.

FOUNDATION

CONTINUES,

TYP.

43'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(43 NICHE COLUMNS)

3'

3'-8

CI706

CI702

CI706

CI706

9-NICHE UNIT

(CLOSED/CLOSED)

7-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

(OUTSIDE EDGES

STUCCO)

(OUTSIDE EDGES

STUCCO)

C21: TOF 98.92

FOUNDATION

CONTINUES,

TYP.

CI706

3'

CI706

CI702

CI706

9-NICHE UNIT

(CLOSED/CLOSED)

7-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

9-NICHE UNIT

(CLOSED/CLOSED)

43'-9

" (INCLUDES (2) 3/8" JOINTS AT ENDS, AND (4) 3/8" JOINTS BETWEEN NICHE UNITS)

(43 NICHE COLUMNS)

(OUTSIDE EDGES

STUCCO)

C21: TOF 98.92

FOUNDATION

CONTINUES,

TYP.

CI706

DECORATIVE

GRAVEL STRIP

4" DIA. HDPE PIPE,

EMBEDDED IN GRAVEL

EDGE OF CONCRETE

WALK

EDGE OF GRAVEL STRIP

CONTINUING BELOW

CONCRETE WALK

4" DIA. HDPE PIPE, EMBEDDED

IN GRAVEL WRAPPED IN

FILTER FABRIC

UNDERDRAIN CLEAN-OUTS

WHERE SHOWN, SEE

CG401-CG403

EDGE OF CONCRETE PIER CORE

CI706

DECORATIVE

GRAVEL STRIP

4" DIA. HDPE PIPE,

EMBEDDED IN GRAVEL

EDGE OF CONCRETE

WALK

UNDERDRAIN CLEAN-OUTS

WHERE SHOWN, SEE

CG401-CG403

EDGE OF GRAVEL STRIP

CONTINUING BELOW

CONCRETE WALK

4" DIA. HDPE PIPE,

EMBEDDED IN GRAVEL

WRAPPED IN FILTER

FABRIC

EDGE OF CONCRETE

PIER CORE

1'

1'-1" 7

CI706

CI706

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C I

C

T d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CI705

COLUMBARIUM WALL

ELEVATIONS 4

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE M' ELEVATION (WALL C18)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE N' ELEVATION (WALL C19)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE O' ELEVATION (WALL C21)

Scale: 1/4"=1'-0"

COLUMBARIUM WALL 'TYPE P' ELEVATION (WALL C21)

Scale: 3/4"=1'-0"

COLUMBARIUM END PIER UNDERDRAIN PLAN

Scale: 3/4"=1'-0"

COLUMBARIUM INTERMEDIATE PIER UNDERDRAIN PLAN

V A

R I E

S

B

A S

E D

N

I S

H

G

R A

D E

1/2" X 5" S.S. PINS; INSTALL

NON-SHRINK-GROUT INTO TOP WEB

AND LOOSE FIT INTO CAP, (2) PINS

PER CAP, TYP.

RECESSED WELD PLATE, TYP.

REINFORCED CONCRETE PIER

WALL, FOUNDATION, AND FOOTING;

SEE STRUCTURAL DRAWINGS, TYP.

1/2" STUCCO FINISH - COLOR AND

TEXTURE -TO MATCH EXISTING

PHASE 4 COLUMBARIA, TYP.

RECESSED STUCCO PANEL TO

MATCH EXISTING COLUMBARIA,

TYP.

END STUCCO FINISH 1" ABOVE

GRADE

1/2" EXPANSION JOINT, TYP.

LAYOUT POINT, SEE COLUMBARIUM LAYOUT PLANS

2'-8

" 2'-8

CI707

STANDARD BUFF LIMESTONE

CAP, SMOOTH FINISH ALL

FACES, TYP.

CI706

CONCRETE FOUNDATION &

FOOTING, SEE STRUCTURAL

DRAWINGS, TYP.

CI702

1/2" X 5" S.S. PINS; INSTALL

NON-SHRINK-GROUT INTO TOP WEB

AND LOOSE FIT INTO CAP, (2) PINS

PER CAP, TYP.

REINFORCED CONCRETE PIER

WALL, FOUNDATION, AND FOOTING;

SEE STRUCTURAL DRAWINGS, TYP.

1/2" STUCCO FINISH - COLOR AND

TEXTURE -TO MATCH EXISTING

PHASE 4 COLUMBARIA, TYP.

RECESSED STUCCO PANEL TO

MATCH EXISTING COLUMBARIA,

TYP.

END STUCCO FINISH 1" ABOVE

GRADE

1/2" EXPANSION JOINT, TYP.

WEEP 24" O.C., SLOPE TO DRAIN,

TYP.

4"

5 8

V A

R I E

S

B

A S

E D

N

I S

H

G

R A

D E

LAYOUT POINT, SEE COLUMBARIUM LAYOUT PLANS

VARIES, SEE PLAN DETAIL

STANDARD BUFF LIMESTONE

CAP, SMOOTH FINISH ALL

FACES, TYP.

CI706

CONTINUOUS DRIP SLOT, TYP.

CAVITY

CONCRETE FOUNDATION &

FOOTING, SEE STRUCTURAL

DRAWINGS, TYP.

3 8

PROVIDE POSITIVE

DRAINAGE AWAY

FROM CENTER, TYP.

CI702

REINFORCED CONCRETE

PIER WALL, FOUNDATION,

AND FOOTING; SEE

STRUCTURAL DRAWINGS,

TYP.

1/2" STUCCO FINISH -

COLOR AND TEXTURE -TO

MATCH EXISTING PHASE 4

COLUMBARIA, TYP.

CAP ABOVE, TYP.

2'-8

90.00°

TYP.

5-NICHE HIGH WALL

CI707

RECESSED WELD

PLATES, TYP.

2'-8

LAYOUT POINT, SEE COLUMBARIUM

LAYOUT PLANS℄

1 2

1 2

3/8" JOINT BETWEEN

PRECAST & BLOCKOUT W/

BACKER ROD & SEALANT

1 2

BLOCKOUT FOR

STUCCO FINISH AT

NICHE UNIT, TYP.

RECESS IN CONCRETE

BELOW, TYP.

90.00°

T

Y

P

2'-7"

1/2" STUCCO FINISH - COLOR AND

TEXTURE -TO MATCH EXISTING

PHASE 4 COLUMBARIA, TYP.

CAP ABOVE, TYP.

P

5-NICHE HIGH WALL

CI707

RECESSED WELD

PLATES, TYP.

REINFORCED CONCRETE PIER

WALL, FOUNDATION, AND FOOTING;

SEE STRUCTURAL DRAWINGS, TYP.

° 1

T

Y

P

LAYOUT POINT, SEE COLUMBARIUM

LAYOUT PLANS

3/8" JOINT BETWEEN

PRECAST & BLOCKOUT W/

BACKER ROD & SEALANT

90.00°

± 135.00°

B

L

O

C

K

O

R

S

T

U

C

N

I

N

I

C

I

P

RECESS IN CONCRETE BELOW, TYP.

3'-8

(TOLERANCE +0"/-1/8")

3 8

M

I N

M

A X

3'-4"1'-1" 1'-1"

1'-8" TYP.

4" TYP.

" TYP.

STANDARD BUFF LIMESTONE CAP,

SMOOTH FINISH ALL FACES, TYP.

1/2" X 5" S.S. PINS; INSTALL

NON-SHRINK-GROUT INTO TOP WEB

AND LOOSE FIT INTO CAP, (2) PINS

PER CAP, TYP.

(2) PRECAST CONCRETE NICHE

UNITS SET BACK TO BACK, TYP.

7" X 1/2" S.S. ANCHOR BOLT.

RECESSED BELOW FLOOR, SEAL

WITH GROUT

DECORATIVE GRAVEL STRIP

REINFORCED CONCRETE

FOUNDATION & FOOTING,

SEE STRUCTURAL

DRAWINGS, TYP.

EPDM MEMBRANE OVER ENTIRE

PRECAST NICHE WALL

FINISH GRADE, TYP.

CI707

CI706

5"

1'-1"

NICHE COVER, TYP.

6" MIN. DEPTH RIVER STONE TO

MATCH EXISTING PHASE 4

COLUMBARIUM, TYP.; 1/2" MAX.

BELOW FINISHED GRADE

COMPACTED SUBGRADE

WASHED #57 STONE

WRAPPED WITH FILTER

FABRIC

4" HDPE 360° PERFORATED

PIPE WRAPPED IN FILTER

FABRIC (NON-WOVEN

4OZ-140N MIRAFI); SEE

DRAINAGE PLANS FOR

CONNECTIONS TO

DRAINAGE SYSTEM

PRE-CAST CONCRETE

COLUMBARIUM NICHE

CONCRETE SIDEWALK, TYP.

1 2

M

I N

1 2

5"

1'-1"

NICHE COVER, TYP.

6" MIN. DEPTH RIVER STONE, TYP.;

1/2" MAX. BELOW FINISHED GRADE

COMPACTED SUBGRADE

WASHED #57 STONE WRAPPED

WITH FILTER FABRIC

4" HDPE 360° PERFORATED PIPE

WRAPPED IN FILTER FABRIC

(NON-WOVEN 4OZ-140N MIRAFI); SEE

DRAINAGE PLANS FOR CONNECTIONS

TO DRAINAGE SYSTEM

PRE-CAST CONCRETE

COLUMBARIUM NICHE

CONCRETE SIDEWALK, TYP.

RECESSED CLEANOUT

W/PLUG; SEE DRAINAGE

PLANS FOR LOCATIONS;

PROVIDE LONG SWEEP

CONNECTIONS TO

UNDERDRAIN PIPE

M

I N

S a t

A

M

F i m

P r o j

H o u s t o n

N a t i o n a l

C e m e t e r y

P h

V A

C F

M I D

I Q

N A

T C

E M

C A

D

C I

C

T d w g

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

HARRIS COUNTY, TEXAS

851PC2048

FEBRUARY 7, 2020 JGS JEB

GordonPROGRAMMING AND PLANNING

CIVIL ENGINEERING

LANDSCAPE ARCHITECTURE

SURVEY AND MAPPING

SECURITY CONSULTING

Dwg. of 215

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

BID DOCUMENTS SUBMISSION

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201

Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

HOUSTON NATIONAL CEMETERY

PHASE 5 DEVELOPMENTThe LA Group

(518) 587-8100 Aqua Engineering, Inc.

(970) 372-6104

OCMI

(202) 607-7575 rvi

(512) 480-0032 AES Group

(303) 841-3922 Gilpin Engineering

(512) 220-8100 Komatsu Inc.

(817) 587-8100

ECS Southwest, LLP 713-955-1980

GIS, Inc.

(205) 941-0442 02/07/2020

CI706

COLUMBARIUM WALL

DETAILS 1

Scale: 1"=1'-0"

COLUMBARIUM END PIER SECTION

Scale: 1"=1'-0"

COLUMBARIUM INTERMEDIATE PIER SECTION

Scale: 1"=1'-0"

COLUMBARIUM END PIER PLAN

Scale: 1"=1'-0"

COLUMBARIUM INTERMEDIATE PIER PLAN

Scale: 1"=1'-0"

5-NICHE HIGHT COLUMBARIUM DOUBLE-SIDED WALL SECTION

Scale: 1 1/2"=1'-0"

COLUMBARIUM DECORATIVE GRAVEL STRIP

Scale: 1 1/2"=1'-0"

COLUMBARIUM UNDERDRAIN CLEANOUT

Sheets and Views
01 COVER SHEET
02 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
03 OVERALL EXISTING CONDITIONS PLAN
04 OVERALL SITE DEVELOPMENT PLAN
05 OVERALL SITE DEVELOPMENT PLAN - ADD ALTERNATES
06 CONSTRUCTION SEQUENCING PLAN
07 MAINTENANCE OF TRAFFIC PLAN
08 SUBSURFACE BORING LOCATION PLAN
09 BORING LOGS
10 BORING LOGS
11 BORING LOGS
12 OVERALL SITE DEMOLITION PLAN
13 SITE DEMOLITION PLAN
14 SITE DEMOLITION PLAN
15 SITE DEMOLITION PLAN - ADD ALTERNATE
16 TEMPORARY CONSTRUCTION FENCING PLAN AREA 1
17 TEMPORARY CONSTRUCTION FENCING PLAN AREA 2
18 EROSION AND SEDIMENT CONTROL PLAN AREA 1
19 EROSION AND SEDIMENT CONTROL PLAN AREA 2
20 EROSION AND SEDIMENT CONTROL NOTES AND DETAILS
21 OVERALL SITE KEY MAP
22 SITE LAYOUT AND UTILITY PLAN AREA 1