36C10F19B0006-A00006000.docx
DOCX document Posted
- Solicitation number
- 36C10F19B0006
About this file
This document provides details of a federal solicitation for construction services. The Department of Veterans Affairs seeks a Service Disabled Veteran Owned Small Business contractor to complete parking garage correction and mental health research building items at the VA Puget Sound Healthcare System in Seattle, Washington. Work includes testing and repairs to the parking garage structure, entrance mat replacement, road paving, installation of medical gas and alarm systems, and other listed construction line items. The total project cost range is between $500,000 and $1,000,000. The solicitation number is 36C10F19B0006 and will be available on November 7, 2019. The response deadline is thirty days after posting. Interested vendors must register in the System for Award Management and Veteran Business pages. A pre-proposal site visit will be held approximately two weeks after posting.
36C10F19B0006 A00006 36C10F19B0006 A00006.docx
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Amendment SF30 of Block# 14 (continued) Project No. 663-405 Solicitation No. 36C10F19B0006 Project Description: Parking Garage Correction Items & Mental Health Research Building Completion Items Location: VA Puget Sound Health Care System, Seattle Division Campus, 1660 S. Columbian Way, Seattle, WA 98108.
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) A00006 01-16-2020 663-405 Y 36C10F Department of Veterans Affairs Office of Construction and Facilities Management (003C4E) 400 Mare Island way Suite 100 Vallejo CA 94590 Y 36C10F Department of Veterans Affairs Office of Construction and Facilities Management (003C4E) 400 Mare Island way Suite 100 Vallejo CA 94590 To all Offerors/Bidders
36C10F19B0006 11-07-2019
X x
01/24/2020 2:00pm PST.
Solicitation Amendment A00006 on 36C10F19B0006, Project Number: 663-405, Parking Garage Correction Items Mental Health Research Building Completion Items at the VA Seattle Puget Sound Health Care System, 1660 S. Columbian Way, Seattle, WA 98108-1597.
The purpose of this solicitation amendment is to respond to the request for information question #11 with regards to the Parking Garage Correction Items.
The Government hereby adds an additional CLIN to the Parking Garage Correction Items. Please see the continuation page block #14 of SF30 for additional language.
The Item Numbers has been updated, all other CLINs language remains unchanged. All prospective bidders shall incorporate the updated "B.1 Price/Cost S chedule" in their bid for evaluation.
Ronald Ferrer Contracting Officer
B.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Parking Garage Correction Items
00001
| 1.00 |
| JB |
| __________________ |
| __________________ |
Testing & Laboratory Services, Reinforcement Location and Marking.
00002
| 1.00 |
| JB |
| __________________ |
| __________________ |
Traffic Control and Signage.
00003
| 1.00 |
| JB |
| __________________ |
| __________________ |
Add Slab Alignment Lugs.
00004
| 1.00 |
| JB |
| __________________ |
| __________________ |
Add Fire Sprinkler Pipe Expansion Joints.
00005
| 1.00 |
| JB |
| __________________ |
| __________________ |
Expansion Joint Cover / Drainage Trough Replacement.
00006
| 1.00 |
| JB |
| __________________ |
| __________________ |
Reduce Ponding on Level 4 / Floor Drains.
00007
| 1.00 |
| JB |
| __________________ |
| __________________ |
Expansion Joint / Drainage Trough / Floor Drain Piping.
00008
| 1.00 |
| JB |
| __________________ |
| __________________ |
Repair Concrete Wall Joints Level B3, Grid Line H/4 and Level B2 Grid Lines G/23 and G/4.
00009
| 1.00 |
| JB |
| __________________ |
| __________________ |
Add Cover Plates at Wall Joints at Level B2 and B3, Grid Lines G & H.
00010
| 1.00 |
| JB |
| __________________ |
| __________________ |
Add Joint Seal and Cover Plate Level B1, Grid Line 12.5.
00011
| 1.00 |
| JB |
| __________________ |
| __________________ |
Repair Concrete Beam Spall, Ceiling of Level B3, Grid Line H.
00012
| 1.00 |
| JB |
| __________________ |
| __________________ |
Correct Runoff into Stairs 2, 3, 4.
00013
| 1.00 |
| JB |
| __________________ |
| __________________ |
Fix Leaking Ceilings at Stair 5, at Level B2 (the Floor Above Storage Room B3-A-9) and at Level B3 (Ceiling of Storage Room B3A-9).
00014
| 1.00 |
| JB |
| __________________ |
| __________________ |
Add Planter and Waterproofing at Stair
00015
| 1.00 |
| JB |
| __________________ |
| __________________ |
Correct Storage Room Concrete Roof leaks
00016
| 1.00 |
| JB |
| __________________ |
| __________________ |
Add Pipe Railing in Exhaust Shaft Vicinity of Level B, Grid Line R / 24 & 25.
00017
| 1.00 |
| JB |
| __________________ |
| __________________ |
Add Handrail Seismic Joint at Level B1, Grid Line 12.5.
00018
| 1.00 |
| JB |
| ____________________ |
| __________________ |
Removal and replacement of fire alarm strobe lights Alterations to pendant and exit lighting Additional lighting Relocation of a security camera
Mental Health Research Building Completion Items
00019
| 1.00 |
| JB |
| __________________ |
| __________________ |
Entrance Mat Statement of Work 1.Remove and dispose of existing entrance mat tiles located at the 1st floor entrance of the Mental Health and Research Building.
2.Provide submittal for replacement entrance mat tiles to be reviewed and accepted by the RE office.
3.Provide and install approved entrance mat tiles. Installation shall be symmetrical with edge tiles cut to fit existing depressed slab frame.
4.Entrance tile product and installation to conform to attached specification 12 93 00. Extent of entrance mat work shown via red clouded sections on attached drawings.
00020
| 1.00 |
| JB |
| __________________ |
| __________________ |
West Loop Road Asphalt Paving Statement of Work and Supplemental Information
1.Construct north end West Loop Road curb & gutter along east side (Ref attached CP101, CP-200). Regrade and compact subgrade for curb & gutter. Work to be in accordance with attached specifications 312000 & 320523.
2.Construct asphalt thickened edge section along east side of West Loop Rd (Ref attached CP101, CP102, CP200). Cut back and demolish existing asphalt edge. Prepare and compact existing base. Minimum ambient temperature to be 40F & rising. Work to be in accordance with attached specifications 312000 & 321216.
3.Complete West Loop Rd paving. Provide 2” asphalt surface course over existing asphalt, w/ tack coat & sealer on W Loop Rd (Ref attached CP101, CP102, CP200).
Existing asphalt surface to be dry and thoroughly cleaned by sweeping prior to tack coat application. Existing asphalt surface temperature to be minimum 35F and minimum ambient temperature to be 40F & rising. Work to be in accordance with attached specification 321216.
4.Prior to providing work in item 3 above, raise all catch basins, manholes, and valve boxes in the section of road to receive the 2” asphalt lift so that the covers or grates are flush with finished asphalt elevation.
5.Provide independent testing laboratory services per attached specification 01 45 29 for the following work only:
a. Concrete testing for curb and gutter work outlined in item 1 above.
b. Subgrade compaction testing for thickened edge work outlined in item 2 above.
c. Asphalt paving testing for work outlined in item 3 above.
00021
| 1.00 |
| JB |
| __________________ |
| __________________ |
Medical Gas Shutoff Zone Valve Cabinet
1.Provide and install a medical gas zone valves and zone valve cabinet in hallway 5H65 in the Mental Health and Research Building (MHR). Zone valve cabinet shall have pressure gages installed on piping downstream of the valves. Valves shall isolate the medical gases from the riser to the patient observation rooms. Valves to be installed on Medical Air, Vacuum, and Oxygen piping serving the 5th floor. All work to be in compliance with NFPA 99 and applicable sections of attached specifications 22 62 00 and 22 63 00.
2.Contractor to provide certification that all work was done in accordance with NFPA 99.
00022
| 1.00 |
| JB |
| __________________ |
| __________________ |
Laboratory and Medical Gas Alarm Panels
1.Provide and Install wireless laboratory and medical gas alarms to coordinate with the existing medical center’s mad gas alarm system in compliance with NFPA 99. Basis of design is Tri-Tech Medical Inc. Equipment.
2.Provide and Install local sending panel in GE08 to send the points identified on attached Medical and Laboratory Gas Alarm Panel Schedule (PS000).
3.Provide and Install repeaters as needed for alarm points to reach the Telephone Operator’s Room and the Boiler Plant Control Office. These locations are shown on attached drawing PS100. A utility tunnel connects the MHR to both locations. For bidding purposes, include 4 repeaters.
4.Provide and install a set of Mater Alarm Panels and Receiving Panels at the Telephone Operator’s Room and the Boiler Plant Control Office. 1 set is required at each location.
5.All work to be installed in accordance with NFPA 99 and applicable sections of attached specifications 22 62 00 and 22 63 00.
6.Contractor to provide certification that all work was done in accordance with NFPA 99.
00023
| 1.00 |
| JB |
| __________________ |
| __________________ |
Medical Gas Zone Alarm 1.Provide and install a zone alarm at the observation desk located at 5E36. Zone valve shall report points identified on attached Medical and Laboratory Gas Alarm Panel Schedule (PS000).
2.All work to be installed in accordance with NFPA 99 and applicable sections of attached specifications 22 62 00 and 22 63 00.
Note- Supplemental specifications are included in this package and are applicable only as referenced in section 1.2 of specifications 22 62 00 and 22 63 00.
| GRAND TOTAL |
| ____________ |
DEDUCT ALTERNATES
Deduct Alternate No. 1: Delete the addition of a raised planter area including demolition of existing concrete, new waterproofing topsoil and plant materials. All work enumerated on Drawing Sheet AE872.
DEDUCT ALTERNATES: CLIN 00014, LUMP SUM: ($_____________________________)
End of Document