About this file

This pre-solicitation notice seeks proposals from verified Service Disabled Veteran Owned Small Businesses for construction services associated with parking garage corrections and completion of the mental health and research building at the VA Puget Sound Healthcare System in Seattle, Washington. The estimated value of the contract is between $500,000 and $1,000,000. Interested firms must be registered in the System for Award Management and verified as a Service Disabled Veteran Owned Small Business in the Vendor Information Pages database. The solicitation will be available on November 7, 2019 via FedBizOpps. An optional site visit will be held approximately two weeks later. Proposals are due thirty days after solicitation posting. The selected contractor must complete all work within 180 calendar days of notice to proceed. The Department of Veterans Affairs Office of Construction and Facilities Management will administer the contract under NAICS code 236220 and in accordance with FAR Parts 14, 36, and provisions for set asides.

36C10F19B0006 Entrance Mat SOW with attachments.pdf

View the file

Other files

File Type Posted
36C10F19B0006-A00008002.pdf PDF
36C10F19B0006-A00008003.pdf PDF
36C10F19B0006-A00008001.pdf PDF
36C10F19B0006-A00008000.docx DOCX document
36C10F19B0006-A00007001.docx DOCX document
36C10F19B0006-A00006000.docx DOCX document
36C10F19B0006-A00005000.docx DOCX document
36C10F19B0006-A00005001.pdf PDF
36C10F19B0006-A00005003.pdf PDF
36C10F19B0006-A00005002.pdf PDF
36C10F19B0006-A00004000.docx DOCX document
36C10F19B0006-A00003001.pdf PDF
36C10F19B0006-A00003000.docx DOCX document
36C10F19B0006-A00002000.docx DOCX document
36C10F19B0006-A00001019.docx DOCX document
36C10F19B0006-A00001020.pdf PDF
36C10F19B0006-A00001021.pdf PDF
36C10F19B0006-A00001022.pdf PDF
36C10F19B0006-006.pdf PDF
36C10F19B0006-007.pdf PDF
36C10F19B0006-003.pdf PDF
36C10F19B0006-001.docx DOCX document
36C10F19B0006-004.pdf PDF
36C10F19B0006-002.pdf PDF
36C10F19B0006-002.pdf PDF
36C10F19B0006-004.pdf PDF
36C10F19B0006-003.pdf PDF
36C10F19B0006-006.pdf PDF
36C10F19B0006-007.pdf PDF
36C10F19B0006-001.docx DOCX document
36C10F19B0006-005.pdf PDF
36C10F19B0006-000.docx DOCX document
36C10F19B0006-000.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Entrance Mat Statement of Work

1. Remove and dispose of existing entrance mat tiles located at the 1st floor entrance of the Mental

Health and Research Building.

2. Provide submittal for replacement entrance mat tiles to be reviewed and accepted by the RE office.

3. Provide and install approved entrance mat tiles. Installation shall be symmetrical with edge tiles cut to fit existing depressed slab frame.

4. Entrance tile product and installation to conform to attached specification 12 93 00. Extent of entrance mat work shown via red clouded sections on attached drawings.

VA Puget Sound Health Care System Phase 2 / Mental Health and Research Building Project No: 663-405B

12 48 13 - 1

ENTRANCE FLOOR MATS AND FRAMES

09/03/2019

SECTION 124813

ENTRANCE FLOOR MATS & FRAMES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General Conditions and Division 01

Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: Entrance floor mats in existing recessed frames.

1.3 RELATED WORK

1.4 REFERENCED STANDARDS

A. ASTM International:

1. ASTM B 221-08 Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

2. ASTM D 2047-04: Standard Test Method for Static Coefficient of Friction of Polish-Coated

Flooring Surfaces as Measured by the James Machine

B. International Code Council:

1. ICC A117.103: Accessible and Usable Buildings and Facilities (ANSI)

C. U.S. Architectural & Transportation Barriers Compliance Board:

1. Americans with Disabilities Act (ADA), Accessibility Guidelines for Buildings and Facilities

(ADAAG). Adopted in 1991; continual revisions.

1.5 SUBMITTALS

A. General: Comply with Division 01 Section "Submittal Procedures".

B. Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.

C. Shop Drawings: Show the following:

1. Divisions between mat sections.

D. Samples: For each type of product indicated.

1. Floor Mat: 12-inch-square, assembled sections of floor mat.

2. Tread Rail: 12-inch-long sample of each type and color.

Project No: 663-405B

12 48 13 - 2

E. Maintenance Data: For floor mats and frames to include in maintenance manuals.

1.6 QUALITY ASSURANCE

A. Source Limitations: Obtain floor mats through one source from a single manufacturer.

B. Accessibility Requirements: Provide installed floor mats that comply with Section 4.5 in the U.S.

Architectural & Transportation Barriers Compliance Board's "Americans with Disabilities Act

(ADA), Accessibility Guidelines for Buildings and Facilities (ADAAG)" and Sections 302 and 303 in ICC A117.1.

1.7 PROJECT CONDITIONS

A. Field Measurements: Indicate measurements on Shop Drawings.

B. Floor mats to be replaced are currently located at the main entrance of the active Mental Health and Research Building. Removal of existing mat and installation of new floor mat must be coordinated with the medical center through the Resident Engineer so that building operation is maintained during working hours (7:00am-5:00pm). Off hour work may be necessary for demolition and install work.

PART 2 - PRODUCTS

2.1 ENTRANCE FLOOR MATS AND FRAMES

A. Materials:

1. Top Surface: Manufactured from T-304 stainless steel alloy materials. Inserts 0.90 inch (2.3

mm) wide stainless steel bars with a 0.145 inch (3.7 mm) gap in quantities and arrangement as detailed.

2. Standard Module: Provides 57.5% free area for fall through potential. Stainless steel perimeter band 0.090 inch (2.3 mm) thick with horizontal drain feature. All components tack welded. Module surface removable and replaceable. Module finish is mill.

B. Floor Mats/Grids:

1. Module Size: 18 by 18 inches by 3/4 inch (457.2 mm x 457.2mm x 19.6mm).

2. Stainless steel banded edges on all sides of each individual tile.

3. Geometric Option: Module surface cut to custom design or as selected from standard geometry by Resident Engineer.

4. Stainless steel banded edges on all sides of each individual tile.

5. Module Finish: Mill.

6. Certified by the NFSI as safe walking surface meets 0.6 wet SCOF.

7. Class I Fire Rated.

8. Considered permanent grille or grate as recommended in LEED IAQ Credit 5.

C. Adhesive: Thin spread floor tile adhesive as recommended by entrance floor mat manufacturer.

Project No: 663-405B

12 48 13 - 3

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and floor conditions for compliance with requirements for location, sizes, and other conditions affecting installation of floor mats and frames.

B. Verification of Conditions: Recesses to receive products of this section are correct size, are within square tolerances and level tolerances.

C. Surface Preparation: Remove debris from recesses to receive floor mat; sweep recesses clean.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Install recessed-type units to comply with manufacturer's written instructions at locations indicated; coordinate with entrance locations and traffic patterns.

B. Anchor fixed frame members to floor as recommended by manufacturer.

3.3 PROTECTION

A. After removing the existing floor mat, provide temporary filler of plywood or fiberboard in recesses and cover frames with plywood protective flooring if the removal of the existing entrance mats are not immediately followed by the installation of the new entrance mats.

END OF SECTION

C G

C G

C G

C G

C G

C G

C G

C G

C G

C G

A

C JD KGFB

E H

OPEN TO

ABOVE

AI415

C5

AI217

C2

AI218

B2

M A

T C

H L

IN

E

S E

E

A I1

M A

T C

H L

IN

E

S E

E

A I1

AI210

AI217

C2

E1

E3

REF3

N.I.C.

REF3

N.I.C.

GROUP

1W89

610 /

GROUP

1W84

260 /

GROUP

1W20

260 /

RECP

1W07A

100 /

9 CUBICLES

1W07

576 /

EXAM

1W31

120 /

CONF

1W85

400 /

GROUP

1W88

260 /

WAIT

1W91

100 /

COPY

1W87

150 /

OFF

1W21

120 /

OFF

1W53

120 /

OFF

1W39

120 /

WAIT

1W11

200 /

OFF

1W47

120 /

TEAM

1W52

240 /

OFF

1W54

120 /

OFF

1W55

120 /

INTV

1W63

120 /

OFF

1W58

120 /

OFF

1W38

120 /

OFF

1W56

120 /

OFF

1W57

120 /

OFF

1W59

120 /

OFF

1W49

120 /

OFF

1W35

120 /

OFF

1W42

120 /

OFF

1W40

120 /

OFF

1W50

120 /

OFF

1W45

120 /

INTV

1W61

120 /

OFF

1W43

120 /

OFF

1W37

120 /

CHIEF

1W65

150 /

OFF

1W36

120 /

OFF

1W15

120 /

DISPENSING

1W25A

200 /

TEAM

1W80

240 /

LOUNGE

1W69

210 /

GROUP

1W10

400 /

EXAM

1W33

120 /

OFF

1W51

120 /

OFF/EXAM

1W34

160 /

OFF/EXAM

1W30

160 /

OFF

1W41

120 /

LOBBY

1W01

2000 /

TLT

1W08

285 /

FAM. TLT.

1W94

0 /

TLT

1W76

50 /

TLT

1W21A

100 /

MECH SHAFT

1W97

IDF

1W64

ELEC

1W46

TLT

1W17

115 /

TLT

1W19

115 /

WAIT

1W24

200 /

TLT

1W78

50 /

HAC

1W95

ELEV 3

E3

ELEV 2

E2

ELEV 1

E1

STOR

1W75

140 /

DISP OFF

1W25

200 /

ELEC

1W32

ELEC

1W60

STAIR 1

1W27

ELEC

1W93

SIGNAL

1W66

ELEVATOR LOBBY

1W04

ELEC

1W23

EXTERIOR COURTYARD

OPEN TO BELOW

INTERIOR

COURTYARD

OPEN TO ABOVE

HALLWAY

1H10

HALLWAY

1H15

MECH SHAFT

1W28

OBSR

1W29

120 /

A'

B'

C'

D'

E'

F' G'

J'

AI468

F7

AI467

F7

AI760

F3

AI210

F2

AI411

F1

AI213

C1

B1

B3

WCH STOR

1W01A

100 /

SECURITY

INFO/VOL

1W05

130 /

1.3

7.8

AI211

D3

D6

54S

1W20

54S

1W10

54S

1H40A

CR

54S

1H20

CR

54S

1W11B

CR

54S

1W21

54S

1W15 S

1W11A

CR

61S

1W45

61S

1W52

61S

1W47

61S

1W49

61S

1W51

61S

1W53

61S

1W55

61S

1W57

61S

1W59

61S

1W61

61S

1W63

61S

1W65

61S

1W58

61S

1W56

61S

1W54

61S

1W50

61S

1W43

61S

1W41

61S

1W42

61S

1W40

61S

1W39

61S

1W37

61S

1W38

61S

1W36

61S

1W35

61S

1W29

61S

1W88

61S

1W84

61S

1W80

19U

1W34

19U

1W30

19U

1W31

19U

1W33

9U

1W46

CR

1S

1W76

1S

1W78

11U

1W64

CR

1X

1W75

11U

1W66

CR

61S

1W85

1aSS

1H40B

61S

1W89A

61S

1W89B

1U

1W95

19S

1W17

1S

1W25A

CR

36S

1W25

CR,MS

1S

1W21A

54S

CT2C

CR,DE

1S

1W07A

CR

1S

1W07B

CR

10T

1W27

CR

1aS

1W07C

CR

61S

1W69

1SS

1W32

1SS

1W60

1SS

1W93

1SS

1W23

54S

CT2D

CR,DE

1SS

1E38

AI413

F5

COURTYARD

CT2

TLT

1W96

285 /

HALLWAY

1H30

HALLWAY

1H40

H A

L L

W A

Y

H

1S

1W94

1S

1W96

54S

1W08

AI468

B6

AI413

C3

AI413

F3

AI415

F5

54X

CT2A 54X

CT2B

AI214

E1

AI213

F1

AI215

C2

AI215

E2

AI215

C1

AI215

E1

AI214

F3

AI215

A2

AI218

AI219

00560056

TYP

TYP

TYP

TYP

AI526

F1

E5

F2

AI219

B1

B5 B7

F5 F7

AI219

C1

C2

C3

C4

AI217

C7 C5

E7

AI219

E2

AI219

E7

E1

E6

AI219

E3

E5

AI211

F6 AI525

F8

AI525

F2

AI710

C6

13 13

00590059 0059

F2

AI543

54S

1H10

CR

1W03

VESTIBULE

1W03

0 /

10T

1E09A

CR

10T

1E09A

CR

10T

1E09A

CR

MAIN ENTRY

AI211

F3

0972 0972

097209720972

UP

DN

UP

AI480

F5

B6

H'

AI546

B1

TYP.

F3

AI502

2302 2302

FIRE RESISTIVE RATED WALLS,

1 HOUR

FIRE RATED SMOKE BARRIER

WALLS, 1 HOUR

FIRE RESISTIVE RATED WALLS,

2 HOUR

WALL LEGEND

NON RATED WALLS

VV ITEM - VA SUPPLIED &

INSTALLED

VC ITEM - VA SUPPLIED &

CONTRACTOR INSTALLED

1. RADIAL DIMENSIONS ARE CORD LENGTHS.

2. SEE OTHER DISCIPLINE DRAWINGS FOR REQUIRED

WORK NOT SHOWN HERE.

3. PRESENT ANY DISCOVERED CONFLICTING

REQUIREMENTS TO THE RESIDENT ENGINEER FOR

RESOLUTION PRIOR TO PERFORMING WORK.

4. REFER TO DIMENSIONAL PLAN AI1XXD FOR TYPICAL

PARTITION TYPES SHOWN MAY BE SUPPLANTED BY BACKING

PLATE REQUIREMENT.

5. TYPICAL CONDITIONS MAY NOT BE KEYED. REFER TO

TYPICAL DETAILS.

6. NON-TYPICAL CONDITIONS WHERE SPECIAL DETAILS ARE

NOT AVAILABLE OR HAVE NOT BEEN KEYED WILL BE

GOVERNED BY SIMILAR DETAILS.

7. TYPICAL DIMENSIONING APPLIES TO TYPICAL

CONDITIONS. NON-TYPICAL CONDITIONS WILL BE

GOVERNED BY DETAILED REQUIREMENTS.

8. OWNER’S FINAL FURNITURE PLAN MAY DICTATE EXACT

LOCATION OF EMBEDED OR FLOOR-MOUNTED DEVICES.

VERIFY WITH RESIDENT ENGINEER PRIOR TO PERFORMING

WORK.

9. MOBILE EQUIPMENT HAS BEEN SHOWN FOR OWNER’S

CONVENIENCE. REFER TO EQUIPMENT LISTS ON AI495 TO

AI499 FOR CONTRACTOR REQUIRED WORK RELATED TO

CLINICAL EQUIPMENT.

10. FOR BUILDING SECTION CUTS, SEE "AE" PLANS.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r in ch o ne fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of

Veterans Affairs

987654321

Drawing Scale

PLAN

NORTH

KEY PLAN

KEY NOTESNO.

A

NOTES

CONSTRUCTION DOCUMENT 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT CD2 06.05.2013 Volume 2a

BID DOCUMENTS 05.30.2014

1660 South Columbian Way, Seattle, WA 98105As indicated

7/ 9/

1 4

:3

0:

P M

VA# 663-405B

B101 Mental Health Services

ZMAL

Building 101 Mental Health Services VAPSHCS Seattle Division - Phase 2

MENTAL HEALTH AND RESEARCH BUILDING

AI111

MH&R - LEVEL 1, SECTOR A FLOOR PLAN

1/8" = 1'-0"1

LEVEL 1, SECTOR A FLOOR PLAN

0052 DEEP RECESSED NICHE WITH STAINLESS STEEL TRIM, WHERE

OCCURS - SEE F3, F6/AI543. PROVIDE DATA, POWER (SED),

(SEE TELECOM DWG), AND BLOCKING FOR TV/MESSAGE

BOARD (VV).

0055 PROVIDE POWER FOR REFRIGERATOR. REFRIGERATOR NOT

IN CONTRACT. SEE ELECTRICAL DRAWINGS

0056 WASTE / RECYCLING RECEPTACLES VV

0059 KIOSK VV

0061 PROVIDE POWER AND DATA FOR SURFACE MOUNTED

TV/MESSAGE BOARD. TV/MESSAGE BOARD VV

0552 ARCHITECTURAL EXPOSED STRUCTURAL STEEL (AESS), SEE

STRUCTURAL DRAWINGS

0858 GLAZING, SEE FINISH SCHEDULE AF100

0958 PHENOLIC PANELS, PERFORATED SEE FINISH PLANS AND

SCHEDULE

0959 FINISH AS SCHEDULED

0972 WINDOW SHELF AT BRB, TYP. SEE DETAIL F5/AI505

1051 RECESSED FIRE EXTINGUISHER CABINET, SEE DETAILS ON

AI591

1069 SIGNAGE, SEE SIGNAGE DRAWINGS

1158 BOLLARD FOR ACCESSIBLE ELECTRICAL AND DATA SUPPLY AT

NON-PARTITION LOCATION

1253 WORK SURFACE, FINISH AS SCHEDULED, SEE CASEWORK

SHEETS

2302 FIN TUBE RADIATOR RECESSED IN FLOOR, SEE MECHANICAL

DRAWINGS. PROVIDE 2HR RATED ENCLOSURE BELOW SLAB

FOR FIRE DAMPER INSTALLATION AND WHERE FLOOR FIRE

RATING IS COMPROMISED BY RADIATOR. SEE F3/AI502

2652 FLOOR BOX, SEE ELECTRICAL DRAWINGS, SEE TELECOM

DRAWINGS

LEVEL 1

AMENDMENT A00004 07.14.2014

vacoosberb Polygon vacoosberb Underline vacoosberb Text Box Walk Off Mat

FB

J K

1.3

AI212F1 C1

7" TALL CONC. CURB

AT PLANTER. SLOPE

PLANTER TO DRAIN

CL

AI211

D1

7 FULL TILES

5 FULL TILES

TILES

2 FULL

TILES

2 FULL

6 FULL TILES

TILES

3 FULL

4 FULL TILES

8 FULL TILES

FU

LL

T

IL

ES

FU

LL

T

IL

ES

F

U

LL

T

IL

ES

F U

LL

T

IL

ES

3'

0"

FU

L L

T

IL

E

3'

PROVIDE MATCHING TILE THRESHOLD

TO EQUAL WIDTH OF ADJACENT SHOE, TYP FU

LL

T

IL

E

3'

/8

EQ

EQ

2'

1/

2"

PROVIDE NOTCH IN

TILE WHERE GLASS

FIN OCCURS, TYP.

2'

0"

F1

AI591

F1

AI591

EQ EQ

EQ EQ

EQ

EQ

EQ EQ

EQ EQ

7.8

AI211

F6

AI525

F4

AI525

F4

VESTIBULE

1W03

0 /

2302 2302

MAIN ENTRY

H'

AI555

D5

A B

AI217

F4

F5

F6

F8

OFF

1W41 120 /

CLK1

VV

M

AI219 F4F5

VIDEO CONF

1E04 300 /

7.8

9' - 0"

VESTIBULE

1W03

H' D5

AI525

A B

9' - 0"

OFF

1W41

M

10' - 0"

VIDEO CONF

1E04

LEGEND

6"

6"

ACOUSTICAL

INTEGRATED

CEILING

SYSTEM,

AT-1

ACOUSTICAL

INTEGRATED

CEILING

SYSTEM,

AT-2

ACOUSTICAL

INTEGRATED

CEILING

SYSTEM,

AT-3

WOOD

CEILING,

AT-8

FLOURESCENT

LIGHT FIXTURE

DATA

POWER

GYP BD

CEILING

WOOD

CEILING,

AT-5

WINDOW SHADE

SEE DETAIL

B7/AI538, E7/AI538

TYP. U.O.N.

ROUND PENDANT

LIGHT

RECESSED ROUND

CAN

4" X 4' RECESSED

STRIP (LAB AREAS

ONLY)

LINEAR PENDANT

LIGHT

2x2 SUPPLY

REGISTER, SMD

2x2 RETURN

REGISTER, SMD

2x2 SPECIAL

EXHAUST, SMD

UTILITY PANEL

(LAB AREAS ONLY)

2X4 RECESSED

FLUORESCENT

ACTIVE BEAM, SIZE

VARIES, SMD

2X4 RECESSED

LENSED TROFFER

36" DIA. RECESSED

FLUORESCENT

FLUORESCENT

STRIP

RECESSED SQUARE

CAN

RECESSED SQUARE

CAN WALL WASHER

PIPE DROP

ENCLOSURE (LAB

SINKS ONLY)

CAMERA

6'

0" 6"

2'

0" 6"

6'

0" 6"

4X4

ACOUSTICAL

INTEGRATED

CEILING

SYSTEM,

AT-44'

0"

ACOUSTICAL

SPECIAL

CEILING

AT-6

CEILING MOUNTED

FIRE STROBE

CEILING MOUNTED

EXIT SIGN

WALL MOUNTED FIRE

STROBE

SECURITY CAMERA -

FIXED

SECURITY CAMERA -

ZOOM

WOOD

PANEL

WALL MOUNT FLUO.

(STAIRS)

BOTTOM OF

SHAFT

LOCATION. SEE

C1/AI502

1. FOR LIST OF EQUIPMENT FOR NON-LAB CLINICAL SPACES SEE

SHEETS AE495, AE496, AE497, AE498 & AE499.

2. FOR EQUIPMENT IN LAB SPACES ON GROUND LEVEL AND LEVEL 3,

SEE LAB CONSULTANT DRAWINGS - QL SERIES.

3. REFER TO 1/8" SCALE PLANS FOR PARTITION TYPES - SEE AE100

SERIES.

4. PROVIDE BACKING PLATES FOR WALL MOUNTED EQUIPMENT

WHERE REQUIRED. SEE ELEVATIONS FOR MOUNTING HEIGHTS. SEE

C1/AE502 FOR BACKING PLATE HEIGHTS FOR CASEWORK, MONITORS,

MARKER/BULLETIN BOARDS.

5. KEY TO EQUIPMENT LOGISTICS CATEGORIES:

CC = CONTRACTOR FURNISHED/INSTALLED

VC = GOVT FURNISHED/CONTRACTOR INSTALLED

VV = GOVT FURNISHED AND INSTALLED

6. REFER TO SHEET AI545 FOR TYPICAL RULES FOR REFLECTED

CEILING PLAN LAYOUTS.

7. ALL DIMNSIONS OF PARTITIONS ARE BASED ON OUTSIDE OF

PARTITION.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e e igh t in ch on e f oo t on e q ua rte r in ch on e f oo t thr ee ei gh t in ch on e f oo t on e h alf in ch on e f oo t thr ee qu ar ter in ch on e f oo t on e i nc h = on e f oo t on e a nd on e h alf in ch es on e f oo t thr ee in ch es on e f oo t

6"

6"

6"

6"

Department of Veterans Affairs

987654321

Drawing Scale

KEY NOTESNO.

NOTES

CONSTRUCTION DOCUMENT 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT CD2 06.05.2013 Volume 2a

BID DOCUMENTS 05.30.2014

1660 South Columbian Way, Seattle, WA 98105As indicated

5/2 8/2

4 3

:22 :37

P M

VA# 663-405B

B101 Mental Health Services

LTAL

Building 101 Mental Health Services VAPSHCS Seattle Division - Phase 2

MENTAL HEALTH AND RESEARCH BUILDING

AI413

MH&R - LEVEL 1, ENLARGED PLANS

1/4" = 1'-0"F5 ENLARGED INTERIOR COURTYARD - LEVEL 1

1/4" = 1'-0"F3 ENLARGED VESTIBULE 1W01

1/4" = 1'-0"C3 ENLARGED OFFICE 1W41

1/4" = 1'-0"B3 ENLARGED VIDEO CONF 1E04

1/4" = 1'-0"F1 ENLARGED VESTIBULE RCP 1W01

1/4" = 1'-0"C1 ENLARGED OFFICE RCP 1W41

1/4" = 1'-0"B1 ENLARGED VIDEO CONF RCP 1E04

0051 DRY PLACED STONE

0052 DEEP RECESSED NICHE WITH STAINLESS STEEL TRIM,

WHERE OCCURS - SEE F3, F6/AI543. PROVIDE DATA,

POWER (SED), (SEE TELECOM DWG), AND BLOCKING FOR

TV/MESSAGE BOARD (VV).

0056 WASTE / RECYCLING RECEPTACLES VV

0962 TILE, SEE FINISH PLANS AND SCHEDULE

1066 BULLETIN BOARD, CC, PROVIDE BACKING

2302 MECHANICAL EQUIPMENT, SEE MECHANICAL DRAWINGS

2651 ELECTRICAL FIXTURE, SEE ELECTRICAL DRAWINGS

NOTE: TILE LAYOUT SHOWN IS DIAGRAMATIC TO

ILLUSTRATE START POINTS , END POINTS AND MAKEUP

PIECES.

vacoosberb Polygon vacoosberb

Walk Off Mat

FACE OF GYP BOARD

RESILIENT BASE AS SCHEDULED

CARPET

TOP OF SLAB

DIM PT

T.O. BASE

TOP OF SLAB

DOOR FRAME BEYOND, W.O.

DOOR, W.O.

CENTER LINE OF DOOR & METAL

EDGE STRIP. SEE FINISH PLAN

FOR LOCATION AT OPENINGS W/O

DOORS.

CARPET

METAL EDGE STRIP

TERRAZZO FLOOR

CL

REMOVABLE MODULE

TOP SURFACE FOR

FIELD CLEANING.

STOP STRIP

FLOORING

ADHESIVE

TOP OF SLAB

0'-0"

ADHESIVE

BONDED MUD

PLATE

/8

PORCELAIN TILE

UNCOUPLING AND

WATERPROOFING

MEMBRANE SET INTO THIN-

SET MORTAR

INTERIOR OF VESTIBULE EXTERIOR OF

BUILDING

DOOR FRAME BEYOND

THRESHOLD

SET IN CAULK

BED

CONCRETE

SLAB

TOP OF SLAB

0'-0"

/8

CL

PORCELAIN

FLOOR TILE

DOOR, W.O.

DOOR FRAME

BEYOND, W.O.

CARPET

ALIGN

TOP OF SLAB

SOLID SURFACING

THRESHOLD

TOP OF SLAB

FACE OF GYP BOARD

WALL TILE OR OTHER FINISH - SEE

FINISH SCHEDULE

BASE TILE

HIGH HUMIDITY FINISH

BOARD ON PLUMBING

WALLS ONLY

FLOOR TILE

DIM PT

T.O. BASE

DIM PT

TOP OF SLAB

DOOR FRAME BEYOND, W.O.

DOOR, W.O.

GROUT

RESILIENT FLOOR

CL

SOLID SURFACE THRESHOLD

PORCELAIN FLOOR TILE

ALIGN

/4

3/8"

TOP OF SLAB

DOOR FRAME BEYOND, W.O.

DOOR, W.O.

RESILIENT FLOOR

CL

RESILIENT EDGE STRIP,

ALIGN WITH FRAME STOP

TOP OF SLAB

DOOR FRAME BEYOND, W.O.

DOOR, W.O.

CARPET

CL

RESILIENT FLOORING EDGE

STRIP, ALIGN WITH DOOR STOP

TOP OF BASE

DIM PT

GYP BOARD WITH SCHEDULED

WALL FINISH

TERRAZZO TERMINATION BAR

DOOR FRAME, SEE SCHEDULE

TERRAZZO BASE

SANITARY SEALANT (GREY)

ALLOW REVEAL BETWEEN

FRAME AND TERRAZZO BASE

TERRAZZO

TOP OF SLAB

1/4"

TOP OF BASE

DIM PT

TERRAZZO

TERMINATION BAR

TERRAZZO

5/8" GLASMAT

BOARD

TOP OF SLAB

FACE OF GYP BOARD

2"

R

/8

TOP OF SLAB

DOOR FRAME BEYOND, W.O.

DOOR, W.O.

RESILIENT FLOOR

CL

SUBFLOOR LEVELER

CENTER LINE OF DOOR

TERRAZZO

METAL EDGE STRIP

1'-0"

SUBFLOOR LEVELER

TOP OF BASE

6" AFF

PORCELAIN

TILE

FINISH

FLOOR

D

IM

P T

F A

C E

O F

G Y

P B

D

GYPSUM WALLBOARD

PARTITION. SEE PLAN

PORCELAIN TILE,

WHERE OCCURS. SEE

ELEVATION.

TILE BACKER BOARD

TYPICAL @ TILE LOCATIONS.

SEE ELEVATION.

PORCELAIN TILE

UNCOUPLING AND

WATERPROOFING MEMBRANE

SET INTO THIN-SET MORTAR.

SLOPE TOWARD DRAIN.

J O

IN

T

/8

" ALUMINUM TRIM

WATERPROOF MEMBRANE, MIN 2" ABOVE JOINT

SOLID SURFACING WALL PANEL

GYP. BD. - WATER RESISTANT

SEALANT RUN MIN 1/2" UP BEHIND WALL PANEL

1/8" SEALANT BUTT JOIN WATER TIGHT

METAL SCREED

INTEGRAL COVE BASE

SEALANT

FLOOR DRAIN, SPD

METAL DECKING, SSD

FIRE STOPPING DETAIL

M

IN

0' - 0"

1-1/2"

-5

/8

M

IN

1/4"/FT. MIN.

1/4"/FT. MIN.

1/4"/FT. MIN.

FILL MATERIAL BY

FLOOR COATING

MANUFACTURER

WATERPROOF

MEMBRANE

FLUID APPLIED

FLOOR COATING

SYSTEM

0' - 0"

1-1/2"

SEALANT

HOLLOW

METAL FRAME

GROUT

DOOR FRAME

WIDTH BEYOND

1"

SOLID SURFACING

THRESHOLD SADDLE

DOOR STOP

DOOR

T Y

P

/2

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6"

6"

Department of

Veterans Affairs

987654321

Drawing Scale

NOTES

CONSTRUCTION DOCUMENT 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT CD2 06.05.2013 Volume 2a

1660 South Columbian Way, Seattle, WA 98105As indicated

6/ /2 0 1 :5 7:

A M

VA# 663-405B

B101 Mental Health Services

PCAL

Building 101 Mental Health Services VAPSHCS Seattle Division - Phase 2

MENTAL HEALTH AND RESEARCH BUILDING

AI555

MH&R - TYPICAL FLOOR TRANSITION DETAILS

6" = 1'-0"F7

CARPET / BASE DETAIL @ GYP BD WALL

6" = 1'-0"E7

CARPET-TERRAZZO FLOORING

6" = 1'-0"D5

DETAIL @ WALK-OFF MAT A

6" = 1'-0"D7

DETAIL @ WALK-OFF MAT B

6" = 1'-0"F2

PORCELAIN TILE - CARPET

6" = 1'-0"E2

PORCELAIN TILE WALL & FLOOR

6" = 1'-0"D2

PORECLAIN TILE-RESILIENT FLOORING

6" = 1'-0"F5

RESILIENT EDGE @ DOOR

6" = 1'-0"E5

RESILIENT FLOORING-CARPET

6" = 1'-0"B5

TERRAZZO BASE @ DOOR FRAME

6" = 1'-0"B7

TERRAZZO BASE @ GYP BD WALL

6" = 1'-0"E1

TERRAZZO-RESILIENT FLOORING

3" = 1'-0"F1

SECTION @ PUBLIC TOILET TILE BASE

3" = 1'-0"B1

SECTION @ SHOWER DRAIN

BID DOCUMENTS 05.30.2014

vacoosberb Polygon vacoosberb

Note: Walk off mat work limited to the removal of existing removable walk off mat tiles and replacement with new walk off mat tiles.

Entrance Mat Statement of Work
12 93 00 Entrance Mat Spec Revised
Walk off mat drawings
MHR-Dwg_Vol2A_BIDSET_COMPILED as of 20140709_ADD_04

File details come from the government source that posted it. Updated .