This pre-solicitation notice announces an upcoming solicitation for construction services at the VA Puget Sound Healthcare System in Seattle, Washington. The solicitation will be set aside for verified Service-Disabled Veteran-Owned Small Businesses and is estimated to have a value between $500,000 and $1,000,000. Interested firms must register in the System for Award Management and VetBiz databases. An optional site visit will be held approximately two weeks after solicitation posting. Questions about the solicitation should be directed to the points of contact by the specified deadline. The completed work must be finished within 180 days of the notice to proceed.
36C10F19B0006 S02_VA Issued PScompletionproject_DRAWINGS_20180702_.rev.pdf
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKING STRUCTURE AND ENTRY DRIVE
ARCHITECT
Stantec Architecture, INC 901 Market St. #600 San Francisco, CA 94103
STRUCTURAL
Degenkolb Engineers 600 University Street, Suite 720 Seattle, WA 98101
MECHANICAL/PLUMBING
Stantec Consulting Services, INC 1932 First Avenue, Suite 307 Seattle, WA 98101
ELECTRICAL
Sparling Inc 720 Olive Way, Suite 1400 Seattle, WA 98101-1853
ASSOCIATE ARCHITECT
The Design Partnership, LLP 1412 Van Ness Avenue San Francisco, CA 94109
CIVIL
Coughlin Porter Lundeen 413 Pine Street, Suite 300 Seattle, WA 98101
LANDSCAPE
Nakano Associates 3609 So. Mt. Baker Blvd Seattle, WA 98144
SECURITY & INFORMATION TECHNOLOGY
Teecom Design Group 1333 Broadway, Suite 601 Oakland, CA 94612
VERTICAL TRANSPORTATION
Lerch Bates Inc 8089 S. Lincoln Suite 205 Littleton, CA 80122
WAYFINDING/SIGNAGE
Aesthetics, Inc 301 Spruce Street San Diego, CA 92103
SPECIFICATIONS
GEOTECHNICIAL
Geoengineers 8410 154th Avenue Ne Redmond, WE 98052
FIRE PROTECTION
Hughes Associates, Inc 2551 San Ramon Valley Blvd, Suite San Ramon, CA 94583
Gregory P. Luth & Associates, Inc 3350 Scott Blvd. Bldg 48 Santa Clara, CA 95054
Stantec Architecture, Inc.
1201 J Street Studio 100 Sacramento, CA 95814
COST
Davis Langdon 719 Second Avenue, Suite 400 Seattle WA 98104
TRAFFIC & PARKING
William Popp Associates 1440 Bel-Red Rd, Suite 206 Bellevue, WA 98007
SITE SURVEY
PLS, Inc.
317 NW Gilman Blvd. No. 29 Issaquah, WA 98027
VA PROJECT # 663-405A PHASE 1
VAPSHCS SEATTLE DIVISION
VOLUME 2
PARKING STRUCTURE AND ENTRY DRIVE
File: __VAPS-PScompletionproject-DRAWINGS_20180702.pdf, 1 of 38, 28/09/2018
COMPLETION PROJECT - JULY 2, 2018 - REV1
TRANS
TRANS
MW
SL
SP
x x x x x
TRANS
TRANS
TS
E X R E I N F O R C E D T U R F F I R E L A N E
4 " S S P E
S41°10' 58"E 25.01'
Δ =8°17'0 4 R=1960 .00'L=283.40 '
S48° 25' 29"E 150. 08 '
S87°17' 33"E 366.48 '
Δ = 38°52 '04R= 120.00 'L=81.40'
Δ = 38°41 '25R= 180.00 'L= 12 1.55 '
S1 5 °1 3
' 03 "W
4 2.
1 5'
S87°08' 01"E 604.66 '
N10°3 3 '2 8 "W 1 31 9 .82 '
N87°01'02"W 996.66'
347.94
348.26
346.57
346.41
350.22
STOP
STOP
S
TO
P
STOP
NO PARKING
STOP
aa auauau auau aull l au au ll lau ll lau ll l aull l au au au au au ll l au au au au au au au au au au au au au au au n n n e e e e e ee e e e e cs cs cs cs n cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s cs cs cs cs n n n n n n n n n n nn nn n n n n n n n n n n s s s s s s s cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs s s s e e e s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s cs cs cs cs cs s s s s s s s pm pm pm pm cs cs cs cs cs cs cs cs cs cs cs cs cs pm pm l l l cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs rs aa ck rs au au rs au au au au au ck ck ck ck ck ckck ck ck ck ck ck ck ck ck ck ck ckck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ckck ckck ck ck ck ck ckck ck ck ck ck ck ck ck ck ck ck ckck ckck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ckck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck cs pm pm pm pm ck ck ck ck ck ck ck ck ck ck ck ck ck ck ck cs cs l l l l l l l l l l cs l l l ck ck ck ck rsck l l l l l l pm ck l l l ck ck ck pm ck pc rs pc aa pc aa pc pc pc pc pc pc pc pc ck rs pc pc ck ck ck ck ck ck ck e rs ck rs rs rs rs rs rs rs rs rs rs rs rs rs rs ck rs ckck ck ck ck ck ck ck ck rs ck e e ck ck ck ck ck ck ck ck ck ck ck ck s s ck ck ck ck l ck ck l ck ck ck ck ck ck ck ck ck ck ck ck ck ckck ck ck ck ck ck ck ck ck cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs ck ck ck ckck ck ck ck ck ck ck ck ck ckck ck rs ck ck ck ee e e l e e l ck ck ckck l l l ck ckck ck ckck ck ck au au e e e e e e e e ck l rs rs rs s rs s s s s s s s s s s s s rs rs s s s s s s rs l pc l l l l l ll l l l l l l ll l l ll l l l ll l l l l l n ll l n l mc au au au au au au n n nn n n n n n n n n n n n n n n n n n n n n n n n n n n n pc rs mc rs nnn n n n nnn n mc mc mc mc pc mc pc mc pcmc pc n n pc n nn au aa n n n n n n nn au l n l l n l n l l l n n n n l l n n l n n n n l l l nn n n l lck l l n n n ll l n l nn l n l n n n l ck n nn n n nn n n n nn nn n n n n n nn n ck n n ck ck n n n n n n n n n n n n n n n n n n n n n n l l l ll l l l l ck ck cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs cs ck s l
FI
RE
L A N E
N O
P A
RK
IN
G
PROJECT AREA
BEAC
O
N
AVEN
U E
COLOMBIAN W
AY
PROJECT AREA
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
FULLY SPRINKLERED
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F on e e igh t in ch on e f oo t on e q ua rte r in ch on e f oo t thr ee ei gh t in ch on e f oo t on e h alf in ch on e f oo t thr ee qu ar ter in ch on e f oo t on e i nc h = on e f oo t on e a nd on e h alf in ch es on e f oo t thr ee in ch es on e f oo t
6"
6"
6"
6"
Department of Veterans Affairs
987654321
Drawing Scale
VOL. 2
JUNE 05, 2013
CONSTRUCTION DOCUMENT 2
1 : 2700
SCGA
1660 South Columbian Way, Seattle, WA 98105
PS - SHEET INDEX
G001
Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1
VA#663-405A
PROJECT SITE LOCATION MAP PROJECT INFORMATION VA STANDARDS, APPLICABLE CODES &
EXECUTIVE ORDERS - MASTER LIST
1. VA Architectural Design Manual PG-18-10
2. Physical Security Design Manual for VA Facilities - Life-Safety Protected
3. VA Program Guide PG-18-3
4. Handbook H-18-8, VA Seismic Design Requirements
5. VA Sustainable Design and Energy Reduction Manual
6. VA Master Construction Specifications PG-18-1
7. Uniform Federal Accessibility Standards (UFAS)
8. VA Supplement to the UFAS, Barrier Free Design Guide PG-18-13
9. ADA- ABA Accessibility Standards, 2004 Edition 10.All other Directives, Design Guides, Design Manuals and Handbooks, not listed above, located on the VA Technical Information Library (TIL, at <http://www.cfm.va.gov/TIL/>) 11.NFPA 101, Life Safety Code, 2009 Edition 12.NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 900 13.Occupational, Safety and Health Administration (OSHA) Standards 14.National Electrical Code (NEC) 15.National Standard Plumbing Code (NSPC) 16.Safety Code for Elevators and Escalators, ASME A17.1 17.ASME Boiler and Pressure Vessel Code 18.ASME Code for Pressure Piping 19.Building Code Requirements for Reinforced Concrete (ACI 318-2 and ACI318-R2 20.Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, AISC 21.Energy Policy Act of 2005 (EP Act) 22.Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding 23.Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management 24.Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1 - 2004 25.Safety Standard for Refrigeration Systems - ASHRAE Standard 15 - 2007 26.International Building Code (IBC), 2009 Edition 27.Washington State Energy Code, 2006 Edition
Parking Structure Occupancy Classification: S-2, IBC Construction Type: IIB (Both Open and Enclosed Portions), IBC
- Structural frame, columns, girders, trusses 0-Hr. Fire Resistive Rating Req’d
- Bearing Walls, exterior 0-Hr. Fire Resistive Rating Req’d
- Bearing Walls, interior 0-Hr. Fire Resistive Rating Req’d
- Floor Construction 0-Hr. Fire Resistive Rating Req’d
- Roof Construction 0-Hr. Fire Resistive Rating Req’d
Building Classification: Open Parking Structure, (East Wing: Enclosed Parking Structure) Fire Protection: Fully Sprinklered Building Floors: 7 floors Building Area: 411,859 SF
Architectural:
1. VA Architectural Design Manual PG-18-10
2. Physical Security Design Manual for VA Facilities - Life-Safety Protected
3. VA Program Guide PG-18-3
4. Handbook H-18-8, VA Seismic Design Requirements
5. VA Sustainable Design and Energy Reduction Manual
6. VA Master Construction Specifications PG-18-1
7. Uniform Federal Accessibility Standards (UFAS)
8. VA Supplement to the UFAS, Barrier Free Design Guide PG-18-13
9. ADA-ABA Accessibility Standards, 2004 Edition 10.All other Directives, Design Guides, Design Manuals and Handbooks, not listed above, located on the VA Technical Information Library (TIL, at <http://www.cfm.va.gov/TIL/>) 11.NFPA 101, Life Safety Code, 2009 Edition 12.NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 13.Federal Leadership in High Performance and Sustainable Buildings:
Memorandum of Understanding 14.Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1 - 15.International Building Code (IBC), 2009 Edition
Structural:
1. Physical Security Design Manual for VA Facilities - Life-Safety Protected
2. VA Program Guide PG-18-3
3. Handbook H-18-8, VA Seismic Design Requirements
4. VA Sustainable Design and Energy Reduction Manual
5. VA Master Construction Specifications PG-18-1
6. All other Directives, Design Guides, Design Manuals and Handbooks, not listed above, located on the VA Technical Information Library (TIL, at <http://www.cfm.va.gov/TIL/>)
7. Occupational, Safety and Health Administration (OSHA) Standards
8. Building Code Requirements for Reinforced Concrete (ACI 318-2 and
ACI318-R2
9. Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, AISC 10.Federal Leadership in High Performance and Sustainable Buildings:
Memorandum of Understanding 11.Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management 12.International Building Code (IBC), 2009 Edition Mechanical & Plumbing:
1. Physical Security Design Manual for VA Facilities - Life-Safety Protected
2. Handbook H-18-8, VA Seismic Design Requirements
3. VA Sustainable Design and Energy Reduction Manual
4. VA Master Construction Specifications PG-18-1
5. All other Directives, Design Guides, Design Manuals and Handbooks, not listed above, located on the VA Technical Information Library (TIL, at <http://www.cfm.va.gov/TIL/>)
6. NFPA 101, Life Safety Code, 2009 Edition
7. NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 900
8. Occupational, Safety and Health Administration (OSHA) Standards
9. National Standard Plumbing Code (NSPC) 10.ASME Boiler and Pressure Vessel Code 11.ASME Code for Pressure Piping 12.Energy Policy Act of 2005 (EP Act) 13.Federal Leadership in High Performance and Sustainable Buildings:
Memorandum of Understanding 14.Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management 15.Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1 - 2004 16.Safety Standard for Refrigeration Systems - ASHRAE Standard 15 - 2007 17.International Building Code (IBC), 2009 Edition 18.Washington State Energy Code, 2006 Edition
VA STANDARDS,CODES
& EXECUTIVE ORDERS - By Discipline
PROJECT SITE VICINITY MAP Parking Schedule
Description Count Level 1 Tower Typical 147
Level 2 Tower Typical 149
Level 3 Tower Typical 148
Level 4 Tower Typical 85
Level B1 Tower
DAV 5
Typical 123
Level B2 East Wing
ACC. 13
SCI/D 19
SCI/D (VAN) 13
Level B2 Tower
DAV 5
Typical 139
Level B3 East Wing
ACC. 13
SCI/D 19
SCI/D (VAN) 13
Level B3 Tower Typical 123 Grand total: 1014
NORTH
G000 VOLUME 3 COVER PAGE
G001 SHEET INDEX
G002 ABBREVIATIONS
SF068 SITE DETAILS RETAINING WALLS
LEGEND & SCHEDULE
PL002 PLUMBING SCHEDULES
PL110 LEVEL B3 TOWER PLUMBING PLAN
PL120 LEVEL B2 TOWER PLUMBING PLAN
PL130 LEVEL B1 TOWER PLUMBING PLAN
PL140 LEVEL 1 TOWER PLUMBING PLAN
PL150 LEVEL 2 TOWER PLUMBING PLAN
PL160 LEVEL 3 TOWER PLUMBING PLAN
PL170 LEVEL 4 TOWER PLUMBING PLAN
SHEET INDEX (CONTD)
GENERAL INFORMATION
PLUMBING
SHEET INDEX (CONTD)SHEET INDEX (CONTD)SHEET INDEX (CONTD)SHEET INDEX (CONTD)SHEET INDEX (CONTD)
Motorcycle Parking Schedule
Description Count Level 2 Tower Motorcycle 5
Level 3 Tower Motorcycle 5
Level B1 Tower Motorcycle 40 Grand total: 50
Bicycle Parking Schedule
Description Rack Count
LEVEL B1
Bicycles (5 ea rack)
GROUND LEVEL
Bicycles (3 ea rack)
Bicycles (5 ea rack)
Grand Total: 48
STRUCTURAL
FLOOR/CEILING PLANS
AE110 LEVEL B3 TOWER
AE111 LEVEL B3 (TOWER) - RCP
AE112 LEVEL B3 EAST WING
AE113 LEVEL B3 (EAST WING)-RCP
AE120 LEVEL B2 TOWER
AE121 LEVEL B2 (TOWER) - RCP
AE122 LEVEL B2 EAST WING
AE130 LEVEL B1 TOWER
AE131 LEVEL B1 (TOWER)-RCP
AE140 LEVEL 1 TOWER
AE141 LEVEL 1 (TOWER) RCP
AE150 LEVEL 2 TOWER
AE151 LEVEL 2 (TOWER) RCP
AE160 LEVEL 3 TOWER
AE161 LEVEL 3 AND 4 (TOWER) RCP
AE170 LEVEL 4 TOWER
SECTIONS
AE302 BLDG SECTIONS @ TOWER
VERTICAL CIRCULATION
AE702 STAIR #2 PLANS & SECTIONS
AE703 STAIR #3 PLANS & SECTIONS
AE705 STAIR#5 PLANS AND SECTIONS
DETAILS & SCHEDULES
AE871 MISCELLANEOUS DETAILS
AE872 MISCELLANEOUS
1. For Fire Life Safety information, including exit travel distances, occupancy load, fire extinguisher cabinet locations and exit sign see sheets FA811 through FA870
FIRE LIFE SAFETY
PARKING STRUCTURE AND ENTRY DRIVE
COMPLETION PROJECT - JULY 2, 2018
Delta No Date Revision Description
1 01.17.2014 CONFORMED TO BID ADDENDA
2 CO-02 NOT USED BT ARCH
3 02.06.2014 CO-03
4 07/02/2018 COMPLETION PROJECT
File: __VAPS-PScompletionproject-DRAWINGS_20180702.pdf, 2 of 38, 28/09/2018 s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s
FLOOR PLANS
SB110 LEVEL B3 FOUNDATION PLAN (TOWER)
SF120 LEVEL B2 FRAMING PLAN (TOWER)
SF130 LEVEL B1 FRAMING PLAN (TOWER)
SF140 LEVEL 1 FRAMING PLAN (TOWER)
SF150 LEVEL 2 FRAMING PLAN (TOWER)
SF160 LEVEL 3 FRAMING PLAN (TOWER)
COLUMN LINE SYMBOL
EXISTING COLUMN GRID SYMBOL
ROOM IDENTIFIER
FINISH IDENTIFIER
CEILING HEIGHT
DETAIL SYMBOL
ELEVATION/SECTION SYMBOL
ELEVATION OR SECTION CUT
PLAN DETAIL
DETAIL
BUILDING & WALL SECTION
INTERIOR ELEVATION
HEIGHT/ELEVATION SYMBOL
INDICATES HEIGHT FROM GIVEN POINT
MATCHLINE
DOOR SYMBOL
EQUIPMENT/FURNITURE KEY
KEYNOTE SYMBOL
SEE SHEET NOTES FOR REFERENCE
PARTITION TYPE SYMBOL
"B" FOR BACKING TYPE W/O
WINDOW TYPE SYMBOL
SEE DETAIL SHEETS FOR TYPE
GLAZING TYPE SYMBOL
SEE DETAIL SHEETS FOR TYPE
REVISION SYMBOL
GL
CLOUD INDICATES AREA OF REVISION
REVISION NUMBER
ACTUAL ROOM AREA
PROJECTED ROOM AREA
ROOM NAME
FLOOR FINISH TYPE
BASE FINISH TYPE
WALL FINISH TYPE
CEILING HEIGHT (ON RCP)
DOOR NUMBER
DOOR SIZE AND DOOR TYPE
EQUIPMENT NUMBER, SEE EQUIPMENT
LISTEQUIPMENT/FURNITURE NUMBER
DETAIL NUMBER
SHEET LOCATION
DETAIL NUMBER
SHEET LOCATION
ARROW INDICATES DIRECTION OF
COLUMN LINE
COLUMN DESIGNATION
COLUMN LINE
COLUMN DESIGNATION
9'-0" A.F.F.
A101
SIM
A101
SIM
A8.01
A101
SIM
A 2 C 3
A101
1i
XX
XXXX
NEW DOOR
1t
BDRM
130/
CEILING FINISH TYPE
20SZ
3W54A
F
MATCH LINE
SEE
ELECTRICAL & SIGNAL
FLOOR BOX FB
9'-0"
FLOOR PLAN SYMBOL
FLOOR DRAIN, SPD FD
MAIN
ENTRY
MAIN ENTRY SYMBOL
B
SEE DETAIL SHEETS FOR TYPE
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
FULLY SPRINKLERED
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F on e e igh t in ch on e f oo t on e q ua rte r in ch on e f oo t thr ee ei gh t in ch on e f oo t on e h alf in ch on e f oo t thr ee qu ar ter in ch on e f oo t on e i nc h = on e f oo t on e a nd on e h alf in ch es on e f oo t thr ee in ch es on e f oo t
6"
6"
6"
6"
Department of Veterans Affairs
987654321
Drawing Scale
VOL. 2
JUNE 05, 2013
CONSTRUCTION DOCUMENT 2
3/32" = 1'-0"
AuthorChecker
1660 South Columbian Way, Seattle, WA 98105
ABBREVIATIONS
G002
Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1
VA#663-405A
1.
SYMBOLS
1. THESE DRAWINGS, THE PROJECT MANUAL (WHICH INCLUDES GENERAL
CONDITIONS, SUPPLEMENTAL CONDITIONS AND TECHNICAL SPECIFICATIONS),
ADDENDA, AND OTHER DOCUMENTS AS DESCRIBED IN THE PROJECT MANUAL,
TOGETHER ARE COMPLEMENTARY DOCUMENTS (DOCUMENTS), WHICH
DESCRIBE THE DESIGN INTENT AND THE CONSTRUCTION OF THIS PROJECT.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE A COMPLETE
AND FULLY FUNCTIONING PROJECT WHICH MEETS THE DESIGN INTENT, AND IN
ACCORDANCE WITH THE REQUIREMENTS OF THE DOCUMENTS AND ALL
APPLICABLE CODES.
3. THE USE OF SUBCONTRACTORS IS THE ELECTION OF THE CONTRACTOR.
ANY REFERENCE TO OR REQUIREMENT OF THE CONTRACTOR EXTENDS TO
ANY SUBCONTRACTOR THE CONTRACTOR ELECTS TO PARTICIPATE IN THE
REFERENCED PART OF THE PROJECT. HOWEVER, THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR PERFORMANCE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE DOCUMENTS.
4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL
DRAWINGS, PROJECT MANUAL, ADDENDA, ETC. IN ORDER TO ASSURE THE
COORDINATION OF ALL WORK AFFECTING EACH TRADE, AND TO REQUIRE THE
SAME FROM THE ELECTED SUBCONTRACTORS. FAILURE OF ANY
SUBCONTRACTOR TO REVIEW AND COORDINATE THE WORK REQUIRED BY
THE DOCUEMTNS SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING
ALL WORK SO REQUIRED AS PART OF THE CONTRACT.
5. THE CONTRACTOR SHALL LAYOUT AND SEQUENCE THE INSTALLATION OF
THE WORK SO THAT THE DIFFERENT SYSTEMS DO NOT OBSTRUCT THE
INSTALLATION OF SUCCESSIVE WORK. IN GENERAL, SYSTEMS INSTALLED
FIRST SHOULD BE KEPT AS HIGH AND TIGHT TO STRUCTURE AS POSSIBLE SO
AS TO LEAVE SPACE AVAILABLE FOR SYSTEMS WHICH FOLLOW.
6. CONDITIONS AND DIMENSIONS SHOWN ON THESE DRAWINGS AS "EXISTING"
ARE ASSUMED TO BE ACCURATE BASED ON AVAILABLE INFORMATION. PRIOR
TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL VERIFY ALL
EXISTING CONDITIONS AND DIMENSIONS, AND NOTIFY THE RESIDENT
ENGINEER OF ANY DEVIATIONS OR CONFLICTS BETWEEN THESE DRAWINGS
AND ACTUAL CONDTIONS AND DIMENSIONS.
7. THE DRAWINGS INCLUDE, BUT ARE NOT LIMITED TO IDENTIFICATION,
ORGANIZATION, POSITION, ASSEMBLY AND CONSTRUCTION OF MATERIALS,
PRODUCTS AND SYSTEMS USED IN THE PROJECT.
8. THE PROJECT MANUAL INCLUDES, BUT IS NOT LIMITED TO, GENERAL
IMFORMATION, MATERIALS, PRODUCTS, SYSTEMS AND EXECUTION
REQUIREMS OF THE PROJECT.
9. THE DOCUMENTS ARE ORGANIZED FOR CONVENIENCE ONLY, AND DO NOT
INTEND TO DIVIDE THE WORK BETWEEN THE CONTRACTOR AND/OR
SUBCONTRACTORS. DELEGATION OF WORK TO SUBCONTRACTORS IS THE
CHOISE AND RESPONSIBILITY OF THE CONTRACTOR.
10. THE DIVISION OF THE DOCUMENTS INTO ARCHITECURAL, STRUCTURAL,
MECHANICAL, ELECTRICAL AND OTHER CONSTRUCTION DISCIPLINES DOES
NOT IMPLY THAT ALL OF THE WORK FOR THOSE DISCIPLINES IS DESCRIBED
ONLY IN THOSE PORTIONS OF THE DRAWINGS OR TECHNICAL
SPECIFICATIONS.
11. WHERE THE DOCUMENTS IDENTIFY WORK WHICH IS (FOR EXAMPLE) "NOT
IN MECHANICAL WORK," OR "NOT IN ELECTRICAL WORK," IT MEANS THAT THE
WORK IS NOT FURTHER DESCRIBED OR SPECIFIED IN THE "MECHANICAL" OR
"ELECTRICAL" DRAWINGS OR SPECIFCIATIONS.
12. IF DISCREPANCIES ARE FOUND TO EXIST WITHIN THE DRAWINGS, OR
BETWEEN THE DRAWINGS AND THE PROJECT MANUAL, THE CONTRACTOR
SHALL NOTIFY THE RESIDENT ENGINEER AND REQUEST CLARIFICATION.
14. THESE DOCUMENTS DO NOT INTEND TO SHOW EVERY ITEM REQURIED TO
CONSTRUCT THE PROJECT. ITEMS SUCH AS FASTENERS, CONNECTORS,
FILLERS, MISCELLANEOUS CLOSURE ELEMENTS, ANCILLARY CONTROL WIRING
AND POWER WHERE REQUIRED FOR THE CONTROL OR OPERATION OF THE
PROVIDED EQUIPMENT ARE NOT ALWAYS SHOWN BUT ARE CONSIDERED
INCLUDED IN THE SCOPE OF WORK.
15. THE DRAWINGS AND REFERENCED DETAILS HAVE BEEN DIMENSIONED IN
ORDER TO ESTABLISH CONTROL AND GUIDELINES FOR ACCURATE FIELD
LAYOUT. WHERE NO METHOD OF DETERMINING A LOCATION IS GIVEN, THE
CONTRACTOR SHALL NOTIFY THE RESIDENT ENGINEER FOR CLARIFICATION
PRIOR TO INSTALLATION.
16. SEE DIMENSION PLANS FOR DIMENSIONING CRITERIA.
17. WHERE DIMENSIONS ARE NOTED TO BE VERIFIED IN THE FIELD (VIF) THE
DIMENSIONS SHOWN IS THE DESIGN BASIS, BUT MAY DIFFER FROM ACTUAL
CONDITIONS. PRIOR TO PROCEEDING WITH THE WORK THE CONTRACTOR
SHALL VERIFY THESE DIMENSIONS AND NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES BETWEEN THE DESIGN BASIS AND ACTUAL DIMENSIONS.
18. WHERE DIMENSIONS ARE NOTED "+/-" WITHOUT SPECIFIC TOLERANCES
NOTED, CONSTRUCTED DIMENSIONS MAY VARY FROM THE NOTED
DIMENSIONS BY A MAXIMUM OF 50% OF A SINGLE UNIT OF THE LAST-PLACE
DIGIT, OR 50% OF THE FRACTION NOTED. (FOR EXAMPLE:
3"+/- MAY VARY BETWEEN 2 1/2" AND 3 1/2"
3 1/2" +/- MAY VARY BETWEEN 2 1/2" AND 3 3/4"
6'-0"+/- MAY VARY BETWEEN 5'-11" AND 6'-0 1/2")
19. DRAWINGS SHALL NOT BE SCALED.
20. DETAILS ARE KEYED TO LOCATIONS WHICH ARE TYPICAL FOR THE
CONDITIONS REPRESENTED, AND AT SPECIAL CONDITIOSN. DETAILS APPLY TO
ALL LOCATIONS WHICH ARE SIMILAR AND ARE NOT OTHERWISE DETAILED. IF
FURTHER CLARIFICATIONS IS REQUIRED, THE CONTRACTOR SHALL NOTIFY
THE RESIDENT ENGINEER FOR CLARIFICATION PRIOR TO PROCEEDING WITH
THE WORK.
21. FINISHES ARE KEYED TO THE DRAWINGS AT TYPICAL LOCATIONS. THE
FINISHES APPLY TO ALL LOCATIONS WHICH ARE SIMILAR BUT ARE NOT
OTHERWISE NOTED. IF FURTHER CLARIFICATIONS IS REQUIRED, THE
CONTRACTOR SHALL NOTIFY THE RESIDENT ENGINEER FOR CLARIFICATION
PRIOR TO CONSTRUCTION.
GENERAL NOTESSUSP
CLG
SUSPENDED CEILING
SV SHEET VINYL
SW SIDEWALK
SYM SYMBOL
SYMM SYMMETRICAL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TAN TANGENT
TB THROUGH BOLT
TC TERRA COTTA
TE TOP ELEVATION
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
TFA TO FLOOR ABOVE
TFB TO FLOOR BELOW
TFF TOP OF FINISH FLOOR
TH THICK
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOU
T
THROUGHOUT
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TO TOP OF
TO FDN TOP OF FOUNDATION
TO OR
TOIL
TOLIET
TOB TOP OF BEAM
TOC TOP OF CONCRETE OR TOP OF CURB
TOC FTG TOP OF CONCRETE FOOTING
TOC
WALL
TOP OF CONCRETE WALL
TOF TOP OF FLOOR OR TOP OF FOOTING
OR TOP OF FRAME
TOJ TOP OF JOIST
TOL TOLERANCE
TOM TOP OF MASONRY
TOP TOP OF PARAPET OR TOP OF
PAVEMENT
TOPO TOPOGRAPHY
TOS TOP OF SLAB OR TOP OF STEEL
TOT TOP OF TRUSS
TOW TOP OF WALL
TR TOP OF RIM OR TOWEL RACK
TRANS TRANSOM OR TRANSPARENT
TRANS
WD FIN
TRANSPARENT WOOD FINISH
TRTD TREATED
TSTAT THERMOSTAT
TYP TYPICAL
UCR UNDER COUNTER REFRIGERATOR
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UN UNLESS NOTED
UNDERL
AY
UNDERLAYMENT
UNFIN UNFINISH
UNI UNIVERSITY
UNIF UNIFORM
UNIV UNIVERSAL
UON UNLESS OTHERWISE NOTED
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V OR
VAC
VACUUM
VAR VARIES OR VARIATION
VARE VA RESIDENT ENGINEER
VB VAPOR BARRIER OR VINYL BASE
VEH VEHICLE
VERT VERTICAL
VEST VESTIBULE
VG VERTICAL GRAIN
VIB VIBRATION
VIC VICINITY
VIF VERIFY IN FIELD
VNR VENEER
VP VISION PANEL
VR VAPOR RETARDER
VRFY VERIFY
VST VISITING
VWC VINYL WALL COVERING
W WEST OR WIDE
W/ WITH
W/O WITHOUT OR WHERE OCCURS
WB WOOD BASE
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WD WOOD OR WOOD DOOR
WDF WOOD DOOR AND FRAME
WDP WOOD PANELLING
WDW WINDOW
WEA WEATHER
WF WIDE FLANGE
WF BM BEAM, WIDE FLANGE
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WG WALL GUARD
WH WALL HUNG OR WEEP HOLE
WLD WELDED
WO WHERE OCCURS
WP WATERPROOFING OR WEATHERPROOF
OR WORK POINT
WPM WATERPROOF MEMBRANE
WR WATER REPELLENT OR WATER
RESISTANT OR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WSL WEATHER SEAL
WT WATER TABLE OR WATER TIGHT OR
WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
X BRACE CROSS BRACE
X SECT CROSS SECTION
XBRA CROSSBRACING
XFER TRANSFER
YR YEAR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANGLE OR QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RAB RABBETED
RADN RADIATION
RB RESILIENT BASE OR RUBBER BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCPTN RECEPTION
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
RDC REDUCER
RDG INS RIGID INSULATION
REBAR REINFORCING STEEL BARS
REC RECESSED OR RECREATION
REC
ROOM
RECREATION ROOM
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
RECT RECTANGULAR
REF REFERENCE OR REFRIGERATOR
REINF REINFORCE OR REINFORCING
REM REMOVABLE
REP REPAIR
REP REPRESENTATIVE
REPL REPLACE
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RFG ROOFING
RH RIGHT HAND OR ROOF HATCH
RHR RIGHT HAND REVERSE
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
RS ROOF SCUPPER
RST REINFORCING STEEL
RT RIGHT
RTF RUBBER TILE FLOOR
RTG RATING
RV ROOF VENT
RVL REVEAL
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
RWR RECESSED WASTE RECEPTACLE
S SOUTH
S1S SURFACED ONE SIDE
S2S SURFACED TWO SIDES
S4S SURFACED FOUR SIDES
S BM BEAM, STANDARD
SAD SEE ARCHITECTURAL DRAWING
SALV SALVAGE
SB SPLASH BLOCK
SBSTR SUBSTRATE
SCHED SCHEDULE
SCHEM SCHEMATIC
SCI SPINAL CORD INJURY
SCP SCUPPER
SCRN SCREEN
SD SMOKE DETECTOR OR SOAP
DISPENSER
SDBL SANDBLAST
SECT SECTION
SECUR
OR SEC
SECURITY
SED SEE ELECTRICAL DRAWING
SEG SEGMENT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SGD SLIDING GLASS DOOR
SGL SINGLE
SH OR
SHF
SHELF
SHM SECURITY HOLLOW METAL
SHR SHOWER
SHT SHAFT OR SHEET
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT OR SLIP JOINT
SK SINK OR SKETCH
SKLT SKYLIGHT
SLDG SLIDING
SLDR SOLDER
SLNT OR
SEAL
SEALANT
SLV SLEEVE
SM SHEET METAL
SMD SEE MECHANICAL DRAWING
SMLS SEAMLESS
SMS SHEET METAL SCREW
SOV SCHEDULE OF VALUES
SP SALLY PORT OR STANDPIPE
SP EL SPOT ELEVATION
SPD SEE PLUMBING DRAWING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPL SPLINE
SQ SQUARE
SQ IN SQUARE INCH
SS OR
SSK
SERVICE SINK
SSD SEE STRUCTURAL DRAWING
SST STAINLESS STEEL
ST STAIRS OR STREET
STAG STAGGERED
STD OR
STAND
STANDARD
STIF STIFFENER
STL STEEL
STL PL STEEL PLATE
STL RF
DK
STEEL ROOF DECK
STL TR STEEL TRUSS
STOR STORAGE
STR STRAIGHT OR STRIKE OR STRINGER
STRUCT STRUCTURAL
STRUCT
STL
STRUCTURAL STEEL
SUB SUBSTITUTE
SUB FL SUBFLOOR
SUF SUFFICIENT
SUP SUPPLEMENTARY
SUPPL SUPPLEMENT
SUPT SUPPORT
SURF SURFACE
SURR SURROUND
SURV SURVEY
SUSP SUSPENDED
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH OR MONOLITHIC
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODEL OR MODIFY OR MODULE
MON MONITOR
MP MULTI-PURPOSE
MR MOISTURE RESISTANT
MRT MARBLE THRESHOLD
MSTRE MOISTURE
MT MOUNT
MTD MOUNTED
MTG MOUNTING OR MEETING
MULL MULLION
MULT MULTIPLE
MVBL MOVABLE
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
(N) NEW
N NORTH
NA OR
N/A
NOT APPLICABLE
NAR NARROW
NAT NATURAL
NATL NATIONAL
NC NORMALLY CLOSED OR NURSE CALL
NCOMBL NONCOMBUSTIBLE
NE NOT EXCEEDING
NEG NEGATIVE
NF NEAR FACE
NIC NOT IN CONTRACT
NLB NONLOADBEARING
NM NON-METALLIC
NMAG NONMAGNETIC
NO NORMALLY OPEN OR NUMBER
NOM NOMINAL
NON STD NONSTANDARD
NONFLM
B
NONFLAMMABLE
NORM NORMAL
NP NO PAINT
NRP NONREMOVABLE
NS NO SCALE OR NEAR SIDE
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
O/ OVER
OA OVERALL
OBSC OBSCURE
OBSERV OBSERVATION
OBW OBSERVATION WINDOW
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE
DIMENSION
OF OUTSIDE FACE
OFCI OWNER FURNISHED/CONTRACTOR
INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OFOI OWNER FURNISHED/OWNER
INSTALLED
OFS OUTSIDE FACE OF STUDS OR
OVERFLOW ROOF SCUPPER
OGL OBSCURE GLASS
OH OPPOSITE HAND OR OVERHANG
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE
RADIUS
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
PA PUBLIC ADDRESS
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT OR
PT
PATIENT OR PATTERN
PB PANIC BAR OR PUSH BUTTON
PC PIECE
PCC PRECAST CONCRETE
PCT PERCENT
PDF POWDER DRIVEN FASTENERS
PEN PENETRATE OR PENETRANT
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PGBD PEGBOARD
PH PENTHOUSE
PHAR PHARMACY
PHOTO PHOTOGRAPH
PI POINT OF INTERSECTION
PIL PILASTER
PK GAR PARKING GARAGE
PK LOT PARKING LOT
PL PLATE OR PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTIC
PLB PLUMB
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
POL POLISHED
PORT PORTABLE
POS POSITION OR POSITIVE
PP PUSH/PULL
PR PAIR
PRCST PRECAST
PREF PREFERENCE
PREFAB PREFABRICATE
PREFIN PREFINISH
PREFMD PREFORMED
PRELIM PRELIMINARY
PREP PREPARATION
PREV PREVIOUS
PRI PRIMARY
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PS CONC PRESTRESSED CONCRETE
PSL PIPE SLEEVE
PT PAINT OR PNEUMATIC TUBE OR POST
TENTIONED
PTN PARTITION
PWR POWER
HAZ HAZARD
HAZ MAT HAZARDOUS MATERIALS
HD HAND DRYER OR HEAD OR HEAVY
DUTY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HDWL HEADWALL
HEX HEXAGON
HG HORIZONTAL GRAIN
HGT OR
HT
HEIGHT
HLDN HOLDDOWN
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORZ HORIZONTAL
HOSP HOSPITAL
HR HOUR
HS HAND SINK
HSKPG HOUSEKEEPING
HSS HOLLOW STRUCTURAL SECTION
ICU INTENSIVE CARE UNIT
ID IDENTIFICATION OR INSIDE DIAMETER
OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
IF INSIDE FACE
IFS INSIDE FACE OF STUD
IN INCHES
INC INCREASE
INCL INCLUDED
INCR INCREMENT
IND INDEPENDENT
INFO INFORMATION
INSTL INSTALL
INSTR INSTRUMENT
INSUF INSUFFICIENT
INSUL INSULATION
INT INTERIOR
INTER INTERMEDIATE
INTERCO
M
INTERCOMMUNICATION
INTL INTERNATIONAL
IR INSIDE RADIUS
IS INSECT SCREEN
ISO ISOMETRIC
J-BOX JUNCTION BOX
JAN JANITOR
JAN CLO JANITOR CLOSET
JS JANITOR'S SINK
JT JOINT
KD KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KOP KNOCK OUT PANEL
KPL KICKPLATE
L ANGLE
LA LIGHTNING ARRESTER
LAB LABORATORY
LAD LADDER
LAM LAMINATE(D)
LAM GL LAMINATED GLASS
LAND OR
LNDSCP
LANDSCAPE
LAT LATITUDE
LATL LATERAL
LAV LAVATORY
LBS POUND
LCMU LIGHTWEIGHT CONCRETE MASONRY
UNIT
LD BRG LOAD-BEARING
LDG LANDING
LDRP LABOR, DELIVERY, RECOVERY,
POSTPARTUM
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHS LEFT HAND SIDE
LIB LIBRARY
LIN LINEAR
LKNT LOCKNUT
LKR LOCKER(S)
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LL GB LEAD LINED GYPSUM BOARD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LNG LONGITUDE
LOC LOCATION
LONG LONGITUDINAL
LOS LINE OF SIGHT
LT LIGHT
LT SW LIGHT SWITCH
LT WT LIGHTWEIGHT
LTD LIMITED
LTG LIGHTING
LTNG LIGHTNING
LVDR LOUVER DOOR
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LYR LAYER
MACH
RM
MACHINE ROOM
MAG MAGNET
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MBR MEMBER
MD METAL DECK
MDF MEDIUM DENSITY FIBERBOARD
MEAS MEASURE
MECH MECHANICAL
MECH
RM
MECHANICAL ROOM
MED MEDICAL OR MEDICINE OR MEDIUM
MEMB MEMBRANE
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MET OR
MTL
METAL
MEZZ MEZZANINE
MFD MANUFACTURED
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MIC MICROPHONE
MID MIDDLE
MIN MINIMUM OR MINUTE
EL ELEVATION OR EACH LAYER
ELAST ELASTOMERIC
ELEC ELECTRIC OR ELECTRICAL
ELEM ELEMENT
ELEV ELEVATION OR ELEVATOR
EM EXPANDED METAL OR
ELECTROMAGNETIC
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
ENTR ENTRANCE
EOS EDGE OF SLAB
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EACH SIDE
ESC ESCUTCHEON
ESP ESPECIALLY
EST ESTIMATE
ESTB ESTABLISH
ETC ET CETERA
EVAC EVACUATE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EX EXAMPLE
EXAM EXAMINATION
EXCL EXCLUDE
EXP EXPAND OR EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXT EXTERIOR OR EXTERNAL OR
EXTINGUISHER
EXTN EXTENSION
EXTRU EXTRUSION
F1S FINISHED ONE SIDE
F2S FINISH TWO SIDES
F4S FINISH FOUR SIDES
F/F FACE TO FACE
FA FIRE ALARM
FACIL FACILITY
FAR FLOOR AREA RATIO
FAS FASCIA
FAS BD FASCIA BOARD
FAX FACSIMILE
FB FIRE BLANKET OR FLAT BAR
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDCC FIRE DEPARTMENT CONNECTION
CABINET
FDR FIRE DOOR
FDTN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE OR FAR FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FFA FROM FLOOR ABOVE
FFB FROM FLOOR BELOW
FGL FIBERGLASS
FH FIRE HOSE OR FIRE HYDRANT
FH/FEC COMB. FIRE HOSE/FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FHP FULL HEIGHT PARTITION
FHR FIRE HOSE RACK
FIG FIGURE
FIL FILLET
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN WD FINISH WOOD
FIXT FIXTURE
FL OR
FLR
FLOOR OR FLOORLINE
FLAM FLAMMABLE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING OR FLANGE
FLMT FLUSH MOUNT
FLR FILLER
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FN FENCE
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FR FIRE RATED OR FIRE RESISTANT OR
FRAME
FR GL FRITTED GLASS
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRST GL FROSTED GLASS
FRTW FIRE RETARDANT TREATED WOOD
FS FULL SCALE OR FULL SIZE OR FAR SIDE
FSTNR FASTENER
FT FEET OR FOOT OR FIRE TREATED OR
FULLY TEMPERED
FTG FOOTING
FURG FURRING
FURN FURNISH OR FUNITURE
FUT FUTURE
FW FIRE WALL
G GIRDER
GA GAGE OR GUAGE
GALV GALVANIC OR GALVANIZED
GB GRAB BAR
GDR GUARD RAIL
GL GLASS OR GLAZED OR GLAZING OR
GROUND LEVEL
GLU LAM GLUED LAMINATED WOOD
GLZ GLAZING
GP GROUP
GR GRADE
GR BM GRADE BEAM
GR FL GROUND FLOOR
GRAD GRADIENT
GROM GROMMET
GRTG GRATING
GRV GROOVE
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GT GROUT
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
H HATCH (ROOF)
CHFR CHAMFER
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL
JOINT
CL CENTER LINE OR CLASS OR CLEAN OR
CLOSE
CLASS CLASSIFICATION
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLOS CLOSURE
CLR CLEAR OR COLOR
CLT CLEAT
CM CONSTRUCTION MANAGER
CMPST COMPOSITE
CMU CONCRETE MASONRY
UNITS/CONCRETE UNIT MASONRY
CNCL CONCEALED
CND CONDUIT
CNR CORNER
CNTOR CONTACTOR
CNTR COUNTER
CO CASED OPENING OR COMPANY OR
CUTOUT
COEFF COEFFICIENT
COL COLUMN
COM COMMON
COMB COMBINATION
COMM COMMUNICATION
COMP COMPONENT
COMPL COMPLETE
CONC CONCRETE OR CONCENTRIC
CONC
FLR
CONCRETE FLOOR
CONC
OPNG
CONCRETE OPENING
COND CONDITION
CONF CONFERENCE
CONN CONNECT OR CONNECTION
CONSTR CONSTRUCTION
CONSUL
T
CONSULTANT
CONT CONTINUE OR CONTINUOUS
CONTR CONTRACTOR
CONV CONVERT
COORD COORDINATE
COP COPING
COR CHANGE ORDER REQUEST
CORN CORNICE
CORR CORRECT OR CORRIDOR
CORRES CORRESPOND
COV COVER
COV PL COVER PLATE
CPRS COMPRESSIBLE
CPT CARPET
CR CART/CHAIR RAIL
CRCMF CIRCUMFERENCE
CSB CONCRETE SPLASH BLOCK
CSK COUNTERSUNK
CTD COATED
CTG COATING
CTR CENTER OR CONTOUR
CTRL CONTROL
CURT CURTAIN
CUST CUSTODIAN
CW CLOCKWISE
CYL CYLINDER
D DEEP OR DEPTH
D-B DESIGN-BUILD
DAT DATUM
DAV DISABLED AMERICAN VETERAN
DBL DOUBLE
DBL ACT
DR
DOUBLE ACTING DOOR
DBL GLZ DOUBLE GLAZE
DEF DEFINITION
DEG DEGREE
DEL DELETE OR DELIVER OR DELIVERIES
DEMO DEMOLITION
DEPT DEPARTMENT
DES DESIGNATION
DESCR DESCRIBE OR DESCRIPTION
DET OR
DTL
DETAIL
DETN DETENTION
DEV DEVELOPMENT
DF DRINKING FOUNTAIN
DF WL
MTD
DRINKING FOUNTAIN, WALL MOUNTED
DFLCT DEFLECTION
DFR DEFROST
DHM DETENTION HOLLOW METAL
DIA DIAMETER
DIAG DIAGONAL OR DIAGRAM
DIFF DIFFERENCE OR DIFFERENTIAL
DIM DIMENSION
DIR DIRECTION
DISC DISCONNECT
DISP DISPENSER
DIST DISTANCE OR DISTRICT
DIV DIVIDE OR DIVISION
DJ DOUBLE JOIST
DMPF DAMPPROOFING
DN DOWN
DOC DOCUMENT
DOM DOMESTIC
DR DOOR OR DOCTOR OR DRAIN OR
DRESSING ROOM
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR
OPNG
DOOR OPENING
DRH DOOR HOLDER
DRLV DOOR LOUVER
DRST DOOR STOP
DS DOWNSPOUT
DSGN DESIGN
DSP DRY STANDPIPE
DTCH DETACH
DUPL DUPLICATE
DWG DRAWING
(E) EXISTING
E EAST
EA EACH
EE EACH END
EEW EMERGENCY EYE WASH
EEW/ESH COMBINATION EEW & ESH UNIT
EF EACH FACE OR EXTERIOR FINISH
EFF EFFECTIVE
EFS EXTERIOR FINISH SYSTEM
EFT EFFECT
EHD ELECTRIC HAND DRYER
EJ EXPANSION JOINT
# POUND OR NUMBER
& AND
1HR 1 HOUR FIRE-RESISTIVE CONTRUCTION
2HR 2 HOUR FIRE-RESISTIVE
CONSTRUCTION
3HR 3 HOUR FIRE-RESISTIVE
CONSTRUCTION
4HR 4 HOUR FIRE-RESISTIVE
CONSTRUCTION
20MIN 20 MINUTE FIRE-RATED COMPONENT
45MIN 45 MINUTE FIRE-RATED COMPONENT
60MIN 60 MINUTE FIRE-RATED COMPONENT
90MIN 90 MINUTE FIRE-RATED COMPONENT
120MIN 120 MINUTE FIRE-RATED COMPONENT
< LESS THAN
> GREATER THAN
@ AT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABBRV ABBREVIATION
ABNORM
AL
ACOUSTICAL TILE
ABRSV ABRASIVE
AC TILE ACOUSTICAL TILE
ACC ACCESSIBLE
ACOUS
INSUL
ACOUSTICAL INSULATION
ACOUS
PNL
ACOUSTICAL PANEL
ACR ACROSS
ACST ACOUSTIC
ADA ACCESSIBLE OR AMERICANS WITH
DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDM ADDENDUM
ADH ADHESIVE
ADJ ADJACENT OR ADJOINING OR
ADJUSTABLE
ADMIN ADMINISTRATION OR ADMINISTRATIVE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AHJ AUTHORITY HAVING JURISDICTION
ALLOW ALLOWANCE
ALNMT ALIGNMENT
ALT ALTERNATE OR ALTITUDE
ALT NO ALTERNATE NUMBER
ALTRN ALTERATION
ALUM ALUMINUM
ANN ANNUNCIATOR
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APP APPEARANCE
APPD APPROVED
APPROX APPROXIMATE
APPX APPENDIX
AR AS REQUIRED
ARCH ARCHITECT, ARCHITECTURAL, OR
ARCHITECTURE
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASSY ASSEMBLY
ASYM ASYMMETRICAL
ATB ASPHALT TREATED BASE
ATCH ATTACHMENT
ATTN ATTENTION
AUTO AUTOMATIC
AUX AUXILIARY
AVE AVENUE
AVG AVERAGE
AWT ACOUSTICAL WALL TREATMENT
SCI
B PL BASE PLATE
B/B BACK TO BACK
BAT BATTEN
BB BASEBOARD OR BULLETIN BOARD
BC BACK OF CURB OR BETWEEN CENTERS
OR BOOKCASE
BD BOARD
BDRY BOUNDARY
BEV BEVEL
BF BOTH FACES
BFF BELOW FINISH FLOOR
BITUM BITUMINOUS
BKG BACKING
BKGD BACKGROUND
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BLT IN BUILT-IN
BLW BELOW
BM BEAM
BOS BOTTOM OF STEEL
BOT BOTTOM (OF)
BOT F BOTTOM FACE
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BS BAR STOCK OR BOTH SIDES
BSMT BASEMENT
BTR BETTER
BTWN BETWEEN
BU BUILT-UP
BUR BUILT-UP ROOF
C CHANNEL
C TO C CENTER TO CENTER
CALC CALCULATE
CAN CANOPY
CANTIL CANTILEVER
CAV CAVITY
CB CARRIAGE BOLT OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CBC CALIFORNIA BUILDING CODE
CCD CONSTRUCTION CHANGE DIRECTIVE
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS
CEM
PLAS
CEMENT PLASTER
CFCI CONTRACTOR
FURNISHED/CONTRACTOR INSTALLED
CFLG COUNTERFLASHING
CFMF COLD-FORMED METAL FRAMING
CFOI CONTRACTOR FURNISHED/OWNER
INSTALLED
CG CORNER GUARD
CH COAT HOOK
CHEM CHEMICAL
NOT TO SCALE
PARKING STRUCTURE AND ENTRY DRIVE
COMPLETION PROJECT - JULY 2, 2018
Delta No Date Revision Description
1 07/02/2018 COMPLETION PROJECT
File: __VAPS-PScompletionproject-DRAWINGS_20180702.pdf, 3 of 38, 28/09/2018
UP
UP
FD
FDFD
UP
FD
FD
FD
FD
FD
FD
FD
FD
WALL TYPE LEGEND
CONCRETE , SSD
CMU WALL
GUARDRAIL STRAND VEH. BARRIER
FLOOR FINISH LEGEND
SWIRL FINISH
BROOM FINISH
TRAFFIC COATING
ACCESSIBLE LOADING AREAS
STRIPING LEGEND
PAINT INTERIOR OF PARKING STRUCTURE
WHITE; (CLGS, WALLS, AND INT. COLUMNS),
INCLUDING INT. FACES OF EXT. SHEAR WALLS
AND EXT. COLUMNS . EXT. FACE OF COLUMNS
AND EXT. FACE OF SHEAR WALLS TO REMAIN
NATURAL CONCRETE. PAINT ALSO ALL EXPOSED
PIPING AND CONDUITS
REFER TO AG SERIES FOR SIGNAGE LOCATION
AND SHEET AE404 FOR TYPICAL STALL STRIPING
DETAILS
PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON
LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM
VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3
SLABS SLOPE TO FLOOR DRAINS AS SHOWN.
VERIFY FIELD DIMENSIONS PRIOR TO PREPARING
SHOP DRAWINGS, FABRICATING STAIRS OR
OTHER BUILDING SYSTEMS/ ELEMENTS SPANNING
FLOOR LEVELS.
1.
2.
3.
4.
5.FLOOR SLAB WILL BE SEALED WTH A HIGH
PENETRATION SILANE SEALER
REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE
EXTINGUISHER CABINETS
6.
K
J
H
AE210
F1
A
D
G
1 10 11 12 13 14
8765432
B
C
E
F
15 16 17 18 19 20
/1 AE112 /1 AE112
D1
AE301
AE210 C5 AE212C5
AE212
F1
RAMP UP TO LEVEL B2 ABOVE
SLOPE = 4.88%
FIRE RISER
B3A-7
WATER /
FIRE
SPRINKLER
B3A-2
STORAGE
B3A-6
LEVEL B3
B3A-1
ENTRANCE
F1
AE311
F1
AE310
18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"
32' - 0"
390' - 8"
10' - 1"
BACKFILL
AE211 C5
AE211
F1
AE213C5
AE213
F1
AE701
F7
AE703
F7
AE704
F6
STAIR 1
B3A-3
LOBBY
B3A-4
STAIR 3
B3A-5
STAIR 4
B3A-8
WITH
SCREEN
WITH
SCREEN
AE401
F7
AE401
F4
AE401
B4
AE720
F1
SCI/D
SCI/D
ACC.
ACC.
ACC.
F1
AE301
E1
AE304
EMER PREP
STORAGE
B3A-9
F1
AE723
SCI/D
SCI/D
WATER /
FIRE
SPRINKLER
B3A-2
F5
AE310
F3
AE310
F2
AE311
F4
AE312
F5
AE313
F6
AE314
F4
AE314
F3
AE315
F1
AE314
F4
AE316
F1
AE316
F5
AE317
F1
AE317
AE404
D1
9'
8"
F1
AE315
3' - 0"
5'
0"
-34.93
-35.00
-35.00'
-35.00' -29.63'
-35.00'
35.00'
-35'.00'
-35.00'
-35.00' -35.00'
-35.00'
-35.00'
-35.00'
-35.00'
-35.00'
-35.93'
-35.93'
-35.00'-35.93'
-34.93' -34.93
-34.93'
-35.93'
-35.00'
-35.00' -35.00'
-30.56'
-35.43'
-35'.00'
-35'.00'
-35'.00'
F3
AE313
EQ
EQ
2'
6"
812812
AS103 B6
20' - 0"
541541
712 712
712 712
712712712712
SEE AE130
34 INCH ALUMINUM
JOINT COVER
PLATE. POSITION
THE COVER
OFFSET, WITH 2
INCHES ONTO THE
FLAT WALL AFTER
THE BEVEL EDGE
OF THE JOINT
AE871
F4
FIRE CAULK 2.5" PIPE
PENETRATION, BOTH
SIDES, EACH WALL
FIRE CAULK AND INSTALL 2
HOUR RATED HILTI FS ONE FIRE
CAULK (OR EQUAL) WITH TWO
PART METAL ESCUTCHEON
PLATE AROUND PIPE TO COVER
FIRE CAULK, EACH SIDE OF WALL
AT 4" DIA. PIPE INSIDE 6" DIA.
WALL PENETRATION EXISTING IN
THIS WALL
GROUT
SOLID (3)-3"
DIA. HOLES
REMOVE AND REPLACE (E) FIRE
ALARM STROBE. INSTALL NEW
STROBE ON WALL SO AS
BOTTOM OF THE LENS OF THE
STROBE IS 80 TO 82 INCHES
ABOVE FINISHED FLOOR. NEW
STROBE TO MATCHING
EXISTING MFG. AND FUNCTION.
INSTALL IN SURFACE MOUNTED
BOX USING WIRE MOLD TO GET
POWER TO NEW STROBE FROM
EXISTING BOX. USE EXISTING
BOX AS JUNCTION BOX. PAINT
BOX, WIRE MOLD AND METAL
COVER PLATE TO MATCH
ADJACENT WALLS
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
FULLY SPRINKLERED
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F on e e igh t in ch on e f oo t on e q ua rte r in ch on e f oo t thr ee ei gh t in ch on e f oo t on e h alf in ch on e f oo t thr ee qu ar ter in ch on e f oo t on e i nc h = on e f oo t on e a nd on e h alf in ch es on e f oo t thr ee in ch es on e f oo t
6"
6"
6"
6"
Department of Veterans Affairs
987654321
Drawing Scale
SHEET KEY PLAN
PLAN
NORTH
AREA A
NOTES
VOL. 2
JUNE 05, 2013
CONSTRUCTION DOCUMENT 2
As indicated
SCGA
1660 South Columbian Way, Seattle, WA 98105
LEVEL B3 TOWER
AE110
Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1
VA#663-405A
KEY
VALUE KEYNOTE
301 CONCRETE WALL, SSD
309 CONCRETE CAST IN PLACE CONCRETE
STAIRS AND LANDING
310 ARCHITECTURAL CONCRETE (AC-1),
SEE AE870 FOR REVEALS & FORM-TIE
PATTERN
315 6" HIGH CONCRETE ISLAND (FOR
FUTURE ACCESS CONTROL
EQUIPMENT)
507 PERIMETER CONCRETE VEHICLE
BARRIER AND STEEL GUARD RAIL, SEE
E6/AE831
519 STEEL PROTECTION PLATE FASTENED
TO CONCRETE
541 STAINLESS STEEL SECURITY
BOLLARD, SSD. TO PROTECT PIPING.
CO-ORDINATE LOCATIONS WITH FA.
706 CONTROL JOINT W/ COVER, SEE AE871
707 SEISMIC JOINT,SEE AE802
712 DRAINAGE SLEEVE AT SHEAR WALL,
S.S.D.
812 METAL SECURITY GRILL
911 WHITE TRAFFIC ARROW PAINTED ON
CONCRETE, SEE DETAIL F6/AE404
2201 OIL WATER SEPARATOR. SEE
STRUCTURAL DRAWINGS
Level B3 (Tower) Auto Parking Stalls
Description Stall Count Typical 123 Grand total: 123
1/16" = 1'-0"1 B3 TOWER
PARKING STRUCTURE AND ENTRY DRIVE
COMPLETION PROJECT - JULY 2, 2018
Delta No Date Revision Description
06.05.2013 CONSTRUCTION DOCUMENTS -CD2
1 01.17.2014 CONFORMED TO BID ADDENDA
2 07.23.2014 CO-04
3 07/02/2018 COMPLETION PROJECT
File: __VAPS-PScompletionproject-DRAWINGS_20180702.pdf, 4 of 38, 28/09/2018
K
L
J
H
A
D
G
1 10 11 12 13 1498765432
B
C
E
F
15 16 17 18 19 20
/1 AE113/1 AE113
WATER /
FIRE
SPRINKLER
B3A-2
STORAGE
B3A-6
FIRE RISER
B3A-7
STAIR 4
B3A-8
STAIR 3
B3A-5
LEVEL B3
B3A-1
EMER PREP
STORAGE
B3A-9
EQ
EQ
EQ
EQ
EQ
EQ EQ
EQEQEQEQEQEQEQEQEQEQEQ
EQEQ
EQ
EQEQ EQ
EQ EQ 2202
TYP
TYP
TYP
5' - 4"
AE410
F6
(E) 2" THK SEISMIC JOINT
BE LOCATED WITHIN THIS 2'-0" AREA
ALL SPRINKLER SYSTEM PIPING,
SEISMIC SEPARATION ASSEMBLY MUST
BE LOCATED WITHIN THIS 2'-0" AREA
ALL SPRINKLER SYSTEM PIPING,
SEISMIC SEPARATION ASSEMBLY MUST
FIELD LOCATE ALL 2-INCH AND 4-INCH SPRINKLER MAINS
THAT CROSS OCER MOVEMENT AND SEISMIC JOINTS
AND PROVIDE A FLEXIBLE ASSEMBLY WITHIN 24-INCHES
OF THE JOINT IN CONFORMANCE WITH 2010 NFPA 13,
SECTION 9.3.2.3, ITEM 4, FOR FLEXIBLE COUPLINGS; AND
2010 NFPA 13, SECTION 9.3.3 FOR SEISMIC SEPARATION
ASSEMBLIES. THE FLEXIBLE ASSEMBLY SHALL ALLOW
FOR 100-PERCENT +/- MOVEMENT OF THE JOINT WIDTH
INDICATED.
ROOM B3A-9 & B3A6: BEAD
BLAST (E) CEILING
CRACKS, FILL WITH
SILICONE SEALANT,
REPAINT CEILING AND
PORTIONS OF WALLS
AFFECTED
AE871
F4
34 INCH ALUMINUM JOINT
COVER PLATE. POSITION
THE COVER OFFSET, WITH
2 INCHES ONTO THE FLAT
WALL AFTER THE BEVEL
EDGE OF THE JOINT
ADD TWO OF THE FOLLOWING PER LIGHT
FIXTURE, APPROX 9" FROM EACH END: A 1-1/2"
P1000, 6" LONG, AFFIXED PERPENDICULAR TO
TOP OF F33 FIXTURE WITH A P2539 FIXTURE
HANGER. BRACE AT 30 TO 60 DEGREES WITH
3/16" SPS CABLE TO A LB410 BRACKET WITH A
1/2" CONCRETE ANCHOR INTO CONCRETE
ABOVE, ANCHOR TO AVOID PT PER STRUCTURAL
DRAWING REQUIREMENTS. ALL UNISTRUT (OR
EQUAL PRODUCT) TO BE G90 FINISHED AND ALL
FIELD CUTS AND SCRATCHES ARE TO BE REPAIR
COATED WITH FIELD APPIED G90 EQUIVALENT
ZINC PAINT. THESE LIGHTS ARE THE F33
FIXTURES AND SUBMITTAL CUT SHEET INFO IS
LOCATED ON SHEET AE111 FOR INFORATION.
ALL ELECTRICAL AND CONTROL CONNECTIONS
TO REMAIN. INSTALL NEW LIGHT WHERE
REMOVED ON LEVEL 4 OVER STAIR 4.
ADD TWO OF THE FOLLOWING PER LIGHT
FIXTURE, APPROX 9" FROM EACH END: A 1-1/2"
P1000, 6" LONG, AFFIXED PERPENDICULAR TO
TOP OF F33 FIXTURE WITH A P2539 FIXTURE
HANGER. BRACE AT 30 TO 60 DEGREES WITH
3/16" SPS CABLE TO A LB410 BRACKET WITH A
1/2" CONCRETE ANCHOR INTO CONCRETE
ABOVE, ANCHOR TO AVOID PT PER STRUCTURAL
DRAWING REQUIREMENTS. ALL UNISTRUT (OR
EQUAL PRODUCT) TO BE G90 FINISHED AND ALL
FIELD CUTS AND SCRATCHES ARE TO BE REPAIR
COATED WITH FIELD APPIED G90 EQUIVALENT
ZINC PAINT. THESE LIGHTS ARE THE F33
FIXTURES AND SUBMITTAL CUT SHEET INFO IS
LOCATED ON SHEET AE111 FOR INFORATION.
ALL ELECTRICAL AND CONTROL CONNECTIONS
TO REMAIN. INSTALL NEW LIGHT WHERE
REMOVED ON LEVEL 4 OVER STAIR 4.
THE INTNET OF THIS WORK IS TO BRACE PENDANT MOUNTED EXIT SIGNS
EFFECTED BY WEATHER/WIND. THERE ARE APPROXIMATELY 16 EXIT SIGNS
MAXIMUM PER FLOOR (FIELD VERIFY COUNT). ADD TWO OF THE FOLLOWING PER
EXIT SIGN APPROX 2" FROM EACH END: A 1-1/2" P1000, 6" LONG, AFFIXED
PERPENDICULAR TO TOP OF THE FIXTURE WITH A P2539 FIXTURE HANGER.
BRACE AT 30 TO 60 DEGREES WITH 3/16" SPS CABLE TO A LB410 BRACKET WITH A
1/2" CONCRETE ANCHOR INTO CONCRETE ABOVE, ANCHOR TO AVOID PT PER
STRUCTURAL DRAWING REQUIREMENTS. ALL UNISTRUT (OR EQUAL PRODUCT)
TO BE G90 FINISHED AND ALL FIELD CUTS AND SCRATCHES ARE TO BE REPAIR
COATED WITH FIELD APPLIED G90 EQUIVALENT ZINC PAINT. ALL ELECTRICAL AND
CONTROL CONNECTIONS TO REMAIN. REORIENT SIGNS AS NEEDED PER
ORIGINAL PROJECT APPROVED DESIGN SUBMITAL.
CEILING LEGEND
PENDANT FLUORESCENT
LIGHTING EXIT SIGNS
POLE MOUNTED FIXTURE
ROUND RECESS FIXTURE
ROUND SURFACE MOUNTED FIXTURE
SURFACE MOUNTED LIGHTING
CHAIN HUNG LIGHTING
WALL MOUNTED LIGHTING
PAINT INTERIOR OF PARKING STRUCTURE WHITE;
CEILINGS, WALLS, AND COLUMNS, INCLUDING
INTERIOR FACES OF EXTERIOR SHEAR WALLS.
EXTERIOR COLUMNS TO REMAIN NATURAL
CONCRETE. PAINT ALSO ALL EXPOSED
PIPING ,CONDUITS AND DUCTWORK
REFER TO ELECTRICAL DRAWINGS FOR LIGHTING
FIXTURE TYPE
CO-ORDINATE FINAL LOCATION OF LIGHTING WITH
ELECTRICAL AND SIGNAGE DRAWINGS.
1.
2.
3.
REFER TO FIRE LIFE SAFETY DRAWINGS FOR EXIT
SIGN DIRECTIONS
4.
WALL TYPE LEGEND
CONCRETE , SSD
CMU WALL
GUARDRAIL STRAND VEH. BARRIER
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
FULLY SPRINKLERED
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F on e e igh t in ch on e f oo t on e q ua rte r in ch on e f oo t thr ee ei gh t in ch on e f oo t on e h alf in ch on e f oo t thr ee qu ar ter in ch on e f oo t on e i nc h = on e f oo t on e a nd on e h alf in ch es on e f oo t thr ee in ch es on e f oo t
6"
6"
6"
6"
Department of Veterans Affairs
987654321
Drawing Scale
SHEET KEY PLAN
PLAN
NORTH
NOTES
VOL. 2
JUNE 05, 2013
CONSTRUCTION DOCUMENT 2
As indicated
SCGA
1660 South Columbian Way, Seattle, WA 98105
LEVEL B3 (TOWER) - RCP
AE111
Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1
VA#663-405A
KEY
VALUE KEYNOTE
307 CONCRETE COLUMN, SSD
308 CONCRETE BEAM, SSD
310 ARCHITECTURAL CONCRETE (AC-1),
SEE AE870 FOR REVEALS & FORM-TIE
PATTERN
706 CONTROL JOINT W/ COVER, SEE AE871
707 SEISMIC JOINT,SEE AE802
904 COMPOSITE HIGH PRESSURE PANELS
2202 EXPOSED FIRE SPRINKLER /PLUMBING
PIPING AND ELEC CONDUITS
ABOVE,TYP. SLEEVE THROUGH
BEAMS TO MAINTAIN REQ VERT
CLEARANCE. SEE
ELECTRICAL,PLUMBING AND FIRE
ALARM DWGS FOR LOCATIONS.
1/16" = 1'-0"1 LEVEL B3
PARKING STRUCTURE AND ENTRY DRIVE
COMPLETION PROJECT - JULY 2, 2018
Delta No Date Revision Description
File: __VAPS-PScompletionproject-DRAWINGS_20180702.pdf, 5 of 38, 28/09/2018
FD
FD
FD
FD
K
L
M
N
P
J
Q
H
R
F1
AE303
G
1 432
/1 AE110 /1 AE110
C1
AE303
32' - 0"
32' - 0"
32' - 0"
32' - 0"
32' - 0"
33' - 0"
22' - 0"
30' - 11"
33' - 8"
30' - 11"
21' - 2"
215' - 0"
LEVEL B3
EAST WING
B3B-1
ELEV.
MACHINE
ROOM
B3B-2
EXHAUST
SHAFT
LOBBY
B3A-4
STAIR 5
B3B-3
LOBBY
B3B-4
AE705
6F
AE403
C1
ACC.
ACC.
SCI/D
SCI/D
ACC.
SCI/D
SCI/D
ACC.
ACC.
ACC.
32' - 0"
32' - 0"
32' - 0"
32' - 0"
33' - 0"
22' - 0"
2' - 0"
SCI/D
(VAN)
SCI/D
(VAN)
SCI/D
SCI/D
SCI/D
(VAN)
SCI/D
SCI/D
(VAN)
SCI/D
SCI/D
(VAN)
SCI/D
SCI/D
(VAN)
SCI/D
SCI/D
SCI/D
(VAN)
SCI/D
ACC.
ACC.
ACC.
ACC.
ACC.
ACC.
SCI/D
SCI/D
SCI/D
(VAN)
SCI/D
SCI/D
(VAN)
SCI/D
SCI/D
(VAN)
SCI/D
SCI/D
(VAN)
SCI/D
ACC.
AE404
D2
9'
8"
7' - 0"
8' - 0"
-35'.00'
-35.00'
-35.64'
-35'.00'
-35'.00'
-35'.64'
-35'.00'
-35'.00'
-35'.00'
-35'.00'
-35'.00'
-35'.00'
-35'.00'
-35'.00'
4' - 2" 4' - 9 13/16"
4' - 8 13/16"
SCI/D
(VAN)
SCI/D
SCI/D
(VAN)
AE305
AE305
EXAUST FAN
ROOM
B3B-5
34 INCH ALUMINUM
JOINT COVER
PLATE. POSITION
THE COVER
OFFSET, WITH 2
INCHES ONTO THE
FLAT WALL AFTER
THE BEVEL EDGE
OF THE JOINT
AE871
F4
REMOVE AND REPLACE (E) FIRE
ALARM STROBE. INSTALL NEW
STROBE ON WALL SO AS
BOTTOM OF THE LENS OF THE
STROBE IS 80 TO 82 INCHES
ABOVE FINISHED FLOOR. NEW
STROBE TO MATCHING EXISTING
MFG. AND FUNCTION. INSTALL IN
SURFACE MOUNTED BOX USING
WIRE MOLD TO GET POWER TO
NEW STROBE FROM EXISTING
BOX. USE EXISTING BOX AS
JUNCTION BOX. PAINT BOX, WIRE
MOLD AND METAL COVER PLATE
TO MATCH ADJACENT WALLS
WALL TYPE LEGEND
CONCRETE , SSD
CMU WALL
GUARDRAIL STRAND VEH. BARRIER
FLOOR FINISH LEGEND
SWIRL FINISH
BROOM FINISH
TRAFFIC COATING
ACCESSIBLE LOADING AREAS
STRIPING LEGEND
PAINT INTERIOR OF PARKING STRUCTURE
WHITE; (CLGS, WALLS, AND INT. COLUMNS),
INCLUDING INT. FACES OF EXT. SHEAR WALLS
AND EXT. COLUMNS . EXT. FACE OF COLUMNS
AND EXT. FACE OF SHEAR WALLS TO REMAIN
NATURAL CONCRETE. PAINT ALSO ALL EXPOSED
PIPING AND CONDUITS
REFER TO AG SERIES FOR SIGNAGE LOCATION
AND SHEET AE404 FOR TYPICAL STALL STRIPING
DETAILS
PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON
LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM
VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3
SLABS SLOPE TO FLOOR DRAINS AS SHOWN.
VERIFY FIELD DIMENSIONS PRIOR TO PREPARING
SHOP DRAWINGS, FABRICATING STAIRS OR
OTHER BUILDING SYSTEMS/ ELEMENTS SPANNING
FLOOR LEVELS.
1.
2.
3.
4.
5.FLOOR SLAB WILL BE SEALED WTH A HIGH
PENETRATION SILANE SEALER
REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE
EXTINGUISHER CABINETS
6.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
FULLY SPRINKLERED
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F on e e igh t in ch on e f oo t on e q ua rte r in ch on e f oo t thr ee ei gh t in ch on e f oo t on e h alf in ch on e f oo t thr ee qu ar ter in ch on e f oo t on e i nc h = on e f oo t on e a nd on e h alf in ch es on e f oo t thr ee in ch es on e f oo t
6"
6"
6"
6"
Department of Veterans Affairs
987654321
Drawing Scale
SHEET KEY PLAN
PLAN
NORTHAREA B
NOTES
VOL. 2
JUNE 05, 2013
CONSTRUCTION DOCUMENT 2
As indicated
SCGA
1660 South Columbian Way, Seattle, WA 98105
LEVEL B3 EAST WING
AE112
Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1
VA#663-405A
1/16" = 1'-0"1 B3 EAST WING
KEY
VALUE KEYNOTE
004 EAST WING PAVILLION ABOVE
115 FUTURE PAYSTATION LOCATION
307 CONCRETE COLUMN, SSD
310 ARCHITECTURAL CONCRETE (AC-1),
SEE AE870 FOR REVEALS & FORM-TIE
PATTERN
517 METAL PAN STAIRS, WITH CONCRETE
INFILL TREADS AND LANDING
911 WHITE TRAFFIC ARROW PAINTED ON
CONCRETE, SEE DETAIL F6/AE404
2201 OIL WATER SEPARATOR. SEE
STRUCTURAL DRAWINGS
Level B3 (East Wing) Auto Parking Stalls
Description Stall Count
ACC. 13
SCI/D 19
SCI/D (VAN) 13
Grand total: 45
PARKING STRUCTURE AND ENTRY DRIVE
COMPLETION PROJECT - JULY 2, 2018rr
Delta No Date Revision Description
06.05.2013 CONSTRUCTION DOCUMENTS -CD2
1 07.23.2014 CO-04
2 07/02/2018 COMPLETION PROJECT
File: __VAPS-PScompletionproject-DRAWINGS_20180702.pdf, 6 of 38, 28/09/2018
L
M
N
P
J
Q
H
R
G
/1 AE111 /1 AE111
ELEV.
MACHINE
ROOM
B3B-2
STAIR 5
B3B-3
LOBBY
B3B-4
EXHAUST
SHAFT
LEVEL B3
EAST WING
B3B-1
EQEQEQEQ EQ
EQ
EQ
EQ
EQ
E…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .