36C10F19B0006-A00001022.pdf
PDF Posted
- Solicitation number
- 36C10F19B0006
About this file
This pre-solicitation notice describes an upcoming solicitation for construction services. The Department of Veterans Affairs will solicit bids from verified Service Disabled Veteran Owned Small Businesses for construction work associated with parking garage corrections items, mental health completion items, and research completion items at the VA Puget Sound Healthcare System in Seattle, Washington. The estimated value of the contract is between $500,000 and $1,000,000. Interested parties should monitor www.fbo.gov after November 7, 2019 for full solicitation documents. A pre-proposal site visit will be held approximately two weeks after posting. Questions about the solicitation should be directed to the points of contact by the specified deadlines. Bids are due 30 days after solicitation posting and work must be completed within 180 days of notice to proceed. Offerors must have active SAM registration and be verified as SDVOSBs. The contract will be awarded using sealed bidding procedures pursuant to FAR Part 14.
36C10F19B0006 A00001 TOC Rev 01.pdf
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7/2/2018 VA Puget Sound Health Care System Phase 1 / Parking Structure – COMPLETION PROJECT
DEPARTMENT OF VETERAN AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 – SPECIAL SECTIONS DATE
00 01 10 Table Of Contents 7/2/2018
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 08-10 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 2-15 01 33 23 Shop Drawings, Product Data and Samples 11-08M 01 35 26 Safety Requirements 01 42 19 Reference Standards 11-08M 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 01 74 19 Construction Waste Management 09-10
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 11-08M
DIVISION 03 – CONCRETE
03 30 00 Cast-In-Place Concrete 10-12 03 33 00 Architectural Concrete 03 35 00 Concrete Finishing For Pavement
DIVISION 05 – METALS
05 01 20 Common Standards For Ferrous Metal Finishes 10-13 05 12 00 Structural Steel Framing 11-12 05 50 00 Metal Fabrications 10-07M 05 52 13 Pipe And Tube Railings 05 70 00 Ornamental Metal
00 01 10 - 1
TABLE OF CONTENTS
Stantec 07/02/2018 file: __VAPS-PScompletionproject-SPEC_20180702.pdf, 28/09/2018, Page 3 of 521
Parking Structure – COMPLETION PROJECT
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 13 26 Below Grade Sheet Waterproofing 07 14 16 Cold Fluid-Applied Waterproofing 07 42 43 Composite Ceiling Panels 07 60 00 Flashing And Sheet Metal 04-08M 07 84 00 Firestopping 08-08M 07 92 00 Joint Sealants 08-08M 07 95 13 Expansion Joint Cover Assemblies 10-07M
DIVISION 09 – FINISHES
09 91 00 Painting 04-09M
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements For Non-Structural Components 09-09
DIVISION 21 – FIRE SUPPRESSION
21 05 11 Common Work Results for Fire Suppression 09-09 21 12 00 Fire Suppression Dry Standpipe System 09-09 21 13 14 Dry Pipe Sprinkler Systems 09-09
DIVISION 22 - PLUMBING
22 05 11 Common Work Results For Plumbing 04-11 22 05 23 General-Duty Valves For Plumbing Piping 12-09 22 13 00 Facility Sanitary And Vent Piping 12-09 22 14 00 Facility Storm Drainage 12-09
00 01 10 -2
TABLE OF CONTENTS
Stantec file: __VAPS-PScompletionproject-SPEC_20180702.pdf, 28/09/2018, Page 4 of 521
Parking Structure – COMPLETION PROJECT
DIVISION 26 – ELECTRCIAL
26 05 11 Requirements for Electrical Installations 09-10 26 05 21 Low-Voltage Electrical Power Conductors And Cables (600 Volts
And Below) 09-10
26 05 26 Grounding And Bonding For Electrical Systems 09-10 26 05 33 Raceways And Boxes For Electrical Systems 09-10 26 08 00 Commissioning Of Electrical Systems 07-09 26 09 23 Lighting Controls 09-10 26 56 00 Exterior Lighting 09-10
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 13 Security System Cabling 09-11 28 08 00 Security Acceptance Testing 09-11 28 31 00 Fire Detection And Alarm 09-09
DIVISION 31 - EARTHWORK
31 20 00 Earth Moving 09-09
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and concrete for Exterior Improvements 09-09 32 17 23 32 17 23 Pavement Markings 09-09 32 91 13 32 91 13 Soil Preparation 32 92 23 Turf and Grasses
DIVISION 33 – UTILITIES
33 46 13 Foundation Drainage 09-09
Original Parking Structure Project Specifications are available for further reference from the VA.
END OF TABLE OF CONTENTS
00 01 10 - 3
TABLE OF CONTENTS
Stantec file: __VAPS-PScompletionproject-SPEC_20180702.pdf, 28/09/2018, Page 5 of 521
File details come from the government source that posted it. Updated .