About this file

This pre-solicitation notice describes an upcoming solicitation for construction services. The Department of Veterans Affairs will solicit bids from verified Service Disabled Veteran Owned Small Businesses for construction work associated with parking garage corrections items, mental health completion items, and research completion items at the VA Puget Sound Healthcare System in Seattle, Washington. The estimated value of the contract is between $500,000 and $1,000,000. Interested parties should monitor www.fbo.gov after November 7, 2019 for full solicitation documents. A pre-proposal site visit will be held approximately two weeks after posting. Questions about the solicitation should be directed to the points of contact by the specified deadlines. Bids are due 30 days after solicitation posting and work must be completed within 180 days of notice to proceed. Offerors must have active SAM registration and be verified as SDVOSBs. The contract will be awarded using sealed bidding procedures pursuant to FAR Part 14.

36C10F19B0006 A00001 TOC Rev 01.pdf

View the file

Other files

File Type Posted
36C10F19B0006-A00008002.pdf PDF
36C10F19B0006-A00008003.pdf PDF
36C10F19B0006-A00008001.pdf PDF
36C10F19B0006-A00008000.docx DOCX document
36C10F19B0006-A00007001.docx DOCX document
36C10F19B0006-A00006000.docx DOCX document
36C10F19B0006-A00005000.docx DOCX document
36C10F19B0006-A00005001.pdf PDF
36C10F19B0006-A00005003.pdf PDF
36C10F19B0006-A00005002.pdf PDF
36C10F19B0006-A00004000.docx DOCX document
36C10F19B0006-A00003001.pdf PDF
36C10F19B0006-A00003000.docx DOCX document
36C10F19B0006-A00002000.docx DOCX document
36C10F19B0006-A00001019.docx DOCX document
36C10F19B0006-A00001020.pdf PDF
36C10F19B0006-A00001021.pdf PDF
36C10F19B0006-006.pdf PDF
36C10F19B0006-007.pdf PDF
36C10F19B0006-003.pdf PDF
36C10F19B0006-001.docx DOCX document
36C10F19B0006-004.pdf PDF
36C10F19B0006-002.pdf PDF
36C10F19B0006-005.pdf PDF
36C10F19B0006-002.pdf PDF
36C10F19B0006-004.pdf PDF
36C10F19B0006-003.pdf PDF
36C10F19B0006-006.pdf PDF
36C10F19B0006-007.pdf PDF
36C10F19B0006-001.docx DOCX document
36C10F19B0006-005.pdf PDF
36C10F19B0006-000.docx DOCX document
36C10F19B0006-000.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7/2/2018 VA Puget Sound Health Care System Phase 1 / Parking Structure – COMPLETION PROJECT

DEPARTMENT OF VETERAN AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 – SPECIAL SECTIONS DATE

00 01 10 Table Of Contents 7/2/2018

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 08-10 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 2-15 01 33 23 Shop Drawings, Product Data and Samples 11-08M 01 35 26 Safety Requirements 01 42 19 Reference Standards 11-08M 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 01 74 19 Construction Waste Management 09-10

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 11-08M

DIVISION 03 – CONCRETE

03 30 00 Cast-In-Place Concrete 10-12 03 33 00 Architectural Concrete 03 35 00 Concrete Finishing For Pavement

DIVISION 05 – METALS

05 01 20 Common Standards For Ferrous Metal Finishes 10-13 05 12 00 Structural Steel Framing 11-12 05 50 00 Metal Fabrications 10-07M 05 52 13 Pipe And Tube Railings 05 70 00 Ornamental Metal

00 01 10 - 1

TABLE OF CONTENTS

Stantec 07/02/2018 file: __VAPS-PScompletionproject-SPEC_20180702.pdf, 28/09/2018, Page 3 of 521

Parking Structure – COMPLETION PROJECT

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 13 26 Below Grade Sheet Waterproofing 07 14 16 Cold Fluid-Applied Waterproofing 07 42 43 Composite Ceiling Panels 07 60 00 Flashing And Sheet Metal 04-08M 07 84 00 Firestopping 08-08M 07 92 00 Joint Sealants 08-08M 07 95 13 Expansion Joint Cover Assemblies 10-07M

DIVISION 09 – FINISHES

09 91 00 Painting 04-09M

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements For Non-Structural Components 09-09

DIVISION 21 – FIRE SUPPRESSION

21 05 11 Common Work Results for Fire Suppression 09-09 21 12 00 Fire Suppression Dry Standpipe System 09-09 21 13 14 Dry Pipe Sprinkler Systems 09-09

DIVISION 22 - PLUMBING

22 05 11 Common Work Results For Plumbing 04-11 22 05 23 General-Duty Valves For Plumbing Piping 12-09 22 13 00 Facility Sanitary And Vent Piping 12-09 22 14 00 Facility Storm Drainage 12-09

00 01 10 -2

TABLE OF CONTENTS

Stantec file: __VAPS-PScompletionproject-SPEC_20180702.pdf, 28/09/2018, Page 4 of 521

Parking Structure – COMPLETION PROJECT

DIVISION 26 – ELECTRCIAL

26 05 11 Requirements for Electrical Installations 09-10 26 05 21 Low-Voltage Electrical Power Conductors And Cables (600 Volts

And Below) 09-10

26 05 26 Grounding And Bonding For Electrical Systems 09-10 26 05 33 Raceways And Boxes For Electrical Systems 09-10 26 08 00 Commissioning Of Electrical Systems 07-09 26 09 23 Lighting Controls 09-10 26 56 00 Exterior Lighting 09-10

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 13 Security System Cabling 09-11 28 08 00 Security Acceptance Testing 09-11 28 31 00 Fire Detection And Alarm 09-09

DIVISION 31 - EARTHWORK

31 20 00 Earth Moving 09-09

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and concrete for Exterior Improvements 09-09 32 17 23 32 17 23 Pavement Markings 09-09 32 91 13 32 91 13 Soil Preparation 32 92 23 Turf and Grasses

DIVISION 33 – UTILITIES

33 46 13 Foundation Drainage 09-09

Original Parking Structure Project Specifications are available for further reference from the VA.

END OF TABLE OF CONTENTS

00 01 10 - 3

TABLE OF CONTENTS

Stantec file: __VAPS-PScompletionproject-SPEC_20180702.pdf, 28/09/2018, Page 5 of 521

File details come from the government source that posted it. Updated .