36C10F19B0006-A00005002.pdf
PDF Posted
- Solicitation number
- 36C10F19B0006
About this file
This pre-solicitation notice seeks proposals from verified Service Disabled Veteran Owned Small Businesses for a construction project at the VA Puget Sound Healthcare System in Seattle, Washington. The project includes parking garage corrections items and completion of mental health and research building items, with an estimated construction cost between $500,000 and $1,000,000. Interested firms must be registered in the System for Award Management and verified as a SDVOSB in VetBiz. The solicitation will be available on November 7, 2019 on FedBizOpps. An optional site visit will be held approximately two weeks later. Proposals are due thirty days after solicitation posting. The selected contractor must complete all work within 180 days of notice to proceed. The Department of Veterans Affairs Office of Construction and Facilities Management will evaluate proposals and make award using sealed bidding procedures according to the Federal Acquisition Regulation Part 14.
36C10F19B0006 A00005 MHR PP200 Drawing.pdf
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DCW REDUCED PRESSURE
BACKFLOW PRVENTER
FILTERED STORM DRAIN TO TANK
20,000 GAL STEEL
RAIN WATER TANK
20,000 GAL STEEL
RAIN WATER TANK
DOMESTIC COLD
WATER TO ABOVE
RWH TO ABOVE
6" DOMESTIC WATER SUPPLY TO BUILDING
6" FORCED MAIN
6" HOLDING TANK PUMP OUT
CONNECTION
C D FB E H
A
1.6
G J
PP310
PP310
PP310
30,000 GAL
STEEL FIRE
WATER TANK
30,000 GAL STEEL
FIRE WATER
TANK
4" O
F
4" OF
8" S
AN101-SP-1B
101-SP-1A
101-SP-2A
101-SP-2B
TRANSITION
MANHOLE/TEST PORT
SEE
A
C JD GFB
E H
1.6
4" OF
4" S
D 4"
S D
I.E.=318.9' FOR
CONTINUATION SEE CIVIL
DRAWINGS
RIM=326'-0"±
COORDINATE W/ CIVIL
GRADING. INSTALL PER
SPEC SECTION 33 30 00.
I.E.= 319' - 0 1/16"
I.E.= 319' - 2 11/16"
5' - 0"
312' - 0 3/64"
8' - 0"
4'
5/
8"
3" OF
3" OF
3" S
D
101-SP-3A/3B
101-DBP-2A/2B
101-DBP-1A/1B
101-RWP-1A/1B
101-RWP-2A/2B
101-FD-V-2"
101-FD-B-3"
101-FD-B-3"
101-FD-R-3"
101-FD-B-3"
RAIN WATER
FILTER
RAIN WATER
FILTER101-FD-V-2"
1" R
W H
4" SD
8" S
D
8" S
AN
4" SAN
4" RWH
10" SD
FILTERED
10" SD
10" SD
6" DCW
2" SAN
3" OF
8" SAN3" SAN
3"
8" SAN
8" SAN
8" SAN
6"
6" SANV 6" SANV
6" S
AN
V
6" S
AN
V
3" S
AN
6" SAN6" SAN
6" SD6"
S
AN
8" S
D
3-1/2" RISE
TO CLEAN OUT
" S
D
RISE TO
IRRIGATION
101-FD-V-2"
101-RWP-1A/B
101-RWP-2A/B
1/
2" S
AN
V
3" SAN
4" SD
CO
CO
CO
20,000 GAL
SEWAGE HOLDING TANK
20,000 GAL
SEWAGE HOLDING TANK
COCO
20,000 GAL
DOMESTIC WATER TANK
20,000 GAL
DOMESTIC WATER TANK
101-DBP-1A/B 101-DBP-2A/B
CONTROL
PANEL
CONTROL
PANEL
CONTROL
PANEL
CONTROL
PANEL
3" SD
CO
FCO
1 1/2" SANV
1/
2" S
AN
V
1 1/2" SANV
1/
2" S
AN
V
TERMINATE 4" OVERFLOW
THROUGH WALL WITH NOZZEL
18" AFF
TERMINATE 4" OVERFLOW
THROUGH WALL WITH NOZZEL
18" AFF
FAN COIL UNIT OH, SEE
MECHANICAL.
SEWAGE TANK VENT
1"D SPILL
OVER FD W/
AIRGAP
101-CP-1
101-CT-1
101-FF-1
8" SAN
1" D
RPBP FOR
RWH MAKEUP
SOLENOID VALVE
FOR RWH MAKEUP
SOLENOID VALVE
FOR RWH MAKEUP
D
D
D
D D
SAN
SAN
2" DCW6" DCW
6" D
C W
6" D
C W
6" D
C W
6" DCW
9-30-15
RE
ENI
GNE
LANOISSEFORPDERETSIGER
S T AT E OF CA L I F ORN IA
No. M19508
MECHANICAL
MICHAEL J.
TATOYAN
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Project Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
FULLY SPRINKLERED
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F on e e igh t in ch on e f oo t on e q ua rte r in ch on e f oo t thr ee ei gh t in ch on e f oo t on e h alf in ch on e f oo t thr ee qu ar ter in ch on e f oo t on e i nc h = on e f oo t on e a nd on e h alf in ch es on e f oo t thr ee in ch es on e f oo t
6"
6"
6"
6"
Department of Veterans Affairs
987654321
Drawing Scale
CONSTRUCTION DOCUMENT 2
JUNE 05, 2013
CONSTRUCTION DOCUMENT CD2 06.05.2013 Volume 2c
B101 Mental Health Services
Stantec Consulting 100 California Street, Suite 1000 San Francisco, CA 94111 T: 415.882.9500 F: 415.882.9523 05.30.2014
BID DOCUMENTS 05.30.2014
1660 South Columbian Way, Seattle, WA 98105 1/4" = 1'-0"
5/2 9 /2
4 9
:21 :31
P M
VA# 663-405B
CSdMJT
Building 101 Mental Health Services VAPSHCS Seattle Division
MENTAL HEALTH AND RESEARCH BUILDING
PP200
MH&R - PLUMBING ENLARGED PLAN - BASEMENT
1/4" = 1'-0"1 ENLARGED BASEMENT PLAN
| MHR-Dwg_Vol2C-20140602 1 |
| MHR-Dwg_Vol2C-20140602 2 |
| MHR-Dwg_Vol2C-20140602 3 |
| MHR-Dwg_Vol2C-20140602 4 |
| MHR-Dwg_Vol2C-20140602 5 |
| MHR-Dwg_Vol2C-20140602 6 |
| MHR-Dwg_Vol2C-20140602 7 |
| MHR-Dwg_Vol2C-20140602 8 |
| MHR-Dwg_Vol2C-20140602 9 |
| MHR-Dwg_Vol2C-20140602 10 |
| MHR-Dwg_Vol2C-20140602 11 |
| MHR-Dwg_Vol2C-20140602 12 |
| MHR-Dwg_Vol2C-20140602 13 |
| MHR-Dwg_Vol2C-20140602 14 |
| MHR-Dwg_Vol2C-20140602 15 |
| MHR-Dwg_Vol2C-20140602 16 |
| MHR-Dwg_Vol2C-20140602 17 |
| MHR-Dwg_Vol2C-20140602 18 |
| MHR-Dwg_Vol2C-20140602 19 |
| MHR-Dwg_Vol2C-20140602 20 |
| MHR-Dwg_Vol2C-20140602 21 |
| MHR-Dwg_Vol2C-20140602 22 |
| MHR-Dwg_Vol2C-20140602 23 |
| MHR-Dwg_Vol2C-20140602 24 |
| MHR-Dwg_Vol2C-20140602 25 |
| MHR-Dwg_Vol2C-20140602 26 |
| MHR-Dwg_Vol2C-20140602 27 |
| MHR-Dwg_Vol2C-20140602 28 |
| MHR-Dwg_Vol2C-20140602 29 |
| MHR-Dwg_Vol2C-20140602 30 |
| MHR-Dwg_Vol2C-20140602 31 |
| MHR-Dwg_Vol2C-20140602 32 |
| MHR-Dwg_Vol2C-20140602 33 |
| MHR-Dwg_Vol2C-20140602 34 |
| MHR-Dwg_Vol2C-20140602 35 |
| MHR-Dwg_Vol2C-20140602 36 |
| MHR-Dwg_Vol2C-20140602 37 |
| MHR-Dwg_Vol2C-20140602 38 |
| MHR-Dwg_Vol2C-20140602 39 |
| MHR-Dwg_Vol2C-20140602 40 |
| MHR-Dwg_Vol2C-20140602 41 |
| MHR-Dwg_Vol2C-20140602 42 |
| MHR-Dwg_Vol2C-20140602 43 |
| MHR-Dwg_Vol2C-20140602 44 |
| MHR-Dwg_Vol2C-20140602 45 |
| MHR-Dwg_Vol2C-20140602 46 |
| MHR-Dwg_Vol2C-20140602 47 |
| MHR-Dwg_Vol2C-20140602 48 |
| MHR-Dwg_Vol2C-20140602 49 |
| MHR-Dwg_Vol2C-20140602 50 |
| MHR-Dwg_Vol2C-20140602 51 |
| MHR-Dwg_Vol2C-20140602 52 |
| MHR-Dwg_Vol2C-20140602 53 |
| MHR-Dwg_Vol2C-20140602 54 |
| MHR-Dwg_Vol2C-20140602 55 |
| MHR-Dwg_Vol2C-20140602 56 |
| MHR-Dwg_Vol2C-20140602 57 |
| MHR-Dwg_Vol2C-20140602 58 |
| MHR-Dwg_Vol2C-20140602 59 |
| MHR-Dwg_Vol2C-20140602 60 |
| MHR-Dwg_Vol2C-20140602 61 |
| MHR-Dwg_Vol2C-20140602 62 |
| MHR-Dwg_Vol2C-20140602 63 |
| MHR-Dwg_Vol2C-20140602 64 |
| MHR-Dwg_Vol2C-20140602 65 |
| MHR-Dwg_Vol2C-20140602 66 |
| MHR-Dwg_Vol2C-20140602 67 |
| MHR-Dwg_Vol2C-20140602 68 |
| MHR-Dwg_Vol2C-20140602 69 |
| MHR-Dwg_Vol2C-20140602 70 |
| MHR-Dwg_Vol2C-20140602 71 |
| MHR-Dwg_Vol2C-20140602 72 |
| MHR-Dwg_Vol2C-20140602 73 |
| MHR-Dwg_Vol2C-20140602 74 |
| MHR-Dwg_Vol2C-20140602 75 |
| MHR-Dwg_Vol2C-20140602 76 |
File details come from the government source that posted it. Updated .