ATTACHMENT L - VA Tyler Construction Schedule 6.18.20.pdf

PDF 320 KB Posted

Attached to
Q702--North Texas VA Health Care System Tyler Clinic (VA-20-00049175) INITIAL OUTFITTING, TRANSITION, AND ACTIVATION (IOT&A) SERVICES
Solicitation number
36A77620Q0299
Issued by

About this file

This pre-solicitation notice seeks quotes for non-personal initial outfitting, transition, and activation services in support of a new outpatient clinic within the North Texas VA Health Care System in Tyler, Texas. Services will include project management, interior design and space planning, furniture fixtures and equipment planning support, acquisition services, concept of operations and transition planning, relocation and installation, training and simulation, strategic communications support, and biomedical planning, execution, and quality assurance. The period of performance is estimated at 18 months, with the Day One clinical services date of September 2021. This requirement is set aside 100% for verified service-disabled veteran-owned small businesses. The solicitation is anticipated to post on or about June 15, 2020, with a closing date of July 10, 2020.

View the file

Other files

File Type Posted
ATTACHMENT Q - DELIVERABLE SCHEDULE - Revised 7102020.pdf PDF
ATTACHMENT A -Performance Work Statement Tyler - Revised 7102020.pdf PDF
Solicitation Questions and Responses - 36A77620Q0299.pdf PDF
36A77620Q0299 0001.docx DOCX document
ATTACHMENT O - Pricing Worksheet Tyler - Revised 07102020.xlsx XLSX spreadsheet
ATTACHMENT C - Tyler Room Contents List - Excel Format.xlsx XLSX spreadsheet
ATTACHMENT R - ARCHITECTURAL - DEPARTMENTAL COLOR PLAN (NEW).pdf PDF
ATTACHMENT P - Furniture IDIQ Templates.pdf PDF
ATTACHMENT J - PDAT SUMMARY - TYLER.pdf PDF
ATTACHMENT N - Wage Determination SCA Tyler.pdf PDF
ATTACHMENT C - Tyler Room Contents List.pdf PDF
ATTACHMENT H - Contract Staff Roster.pdf PDF
ATTACHMENT I - VSC Security Request Forms.pdf PDF
ATTACHMENT G - QASP - Tyler.pdf PDF
36A77620Q0299_1.docx DOCX document
ATTACHMENT D - Procurement Package Templates.pdf PDF
ATTACHMENT M - Tyler Program For Design.pdf PDF
ATTACHMENT B - TRAVEL AUTHORIZATION REQUEST.pdf PDF
ATTACHMENT K - JSN Responsibility Matrix.xlsx XLSX spreadsheet
ATTACHMENT O - Pricing Worksheet Tyler.xlsx XLSX spreadsheet
ATTACHMENT L - VA Tyler Construction Schedule.pdf PDF
ATTACHMENT A -Performance Work Statement Tyler.pdf PDF
ATTACHMENT Q - DELIVERABLE SCHEDULE.pdf PDF
ATTACHMENT E - Meeting Minutes template.pdf PDF
ATTACHMENT F - 6500.6 Appendix A.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Activity ID Activity Name Orig Dur

Rem Dur

Start Finish Total Float

VA TylerVA Tyler - Field Use - 6.18.20 475 280 19-Sep-19 A 14-Jul-21 0

VA PROCVA PROCESSES 82 0 19-Sep-19 A 10-Jan-20 A

A1000 Inital Offer / Notice To Proceed 0 0 19-Sep-19 A A1010 VA Lease Award / Formal Notice to Proceed 12 0 19-Sep-19 A 04-Oct-19 A A1020 Project Protest Timeline 68 0 09-Oct-19 A 10-Jan-20 A

Site andSite and Shell Design Development 159 0 19-Sep-19 A 20-Apr-20 A

D1 Civil PD1 Civil Package 107 0 19-Sep-19 A 14-Feb-20 A A2100 Prepare Site Plan for P&Z Submission 7 0 19-Sep-19 A 27-Sep-19 A A2310 Submit Civil Layout to P&Z 0 0 30-Sep-19 A A2080 P&Z Meeting (To be Determined) 0 0 05-Nov-19 A A2090 City Council Meeting 0 0 14-Nov-19 A A2300 Develop D1 IFC Documents 10 0 30-Dec-19 A 10-Jan-20 A A2390 BLHI Review D1 IFC Documents 5 0 13-Jan-20 A 17-Jan-20 A A2395 Submit Civil Design for Pricing 15 0 20-Jan-20 A 07-Feb-20 A A2140 Receive Parking Lot Permit 20 0 20-Jan-20 A 14-Feb-20 A

D2 FoundD2 Foundation, Tilt Wall / Steel Package 77 0 13-Jan-20 A 20-Apr-20 A A2110 Develop D2 90% Design Package 20 0 13-Jan-20 A 07-Feb-20 A A2350 BLHI Review D2 90% Design Package 3 0 10-Feb-20 A 12-Feb-20 A A2170 Submit D2 Design for Pricing 17 0 13-Feb-20 A 06-Mar-20 A A2360 Receive Pricing Document Comments from S 5 0 09-Mar-20 A 13-Mar-20 A A2130 Submit D2 90% Design Package for Permittin 30 0 18-Mar-20 A 20-Apr-20 A

D3 BuildinD3 Building Shell Package 77 0 13-Jan-20 A 20-Apr-20 A A2120 Develop D3 60% Shell Design Package 20 0 13-Jan-20 A 07-Feb-20 A A2320 BLHI Review D3 60% Design Package 5 0 10-Feb-20 A 14-Feb-20 A A2400 Issue D3 60% for Pricing 10 0 17-Feb-20 A 28-Feb-20 A A2330 Develop D3 90% Shell Design Package 22 0 17-Feb-20 A 17-Mar-20 A A2370 BLHI Review D3 90% Design Package 5 0 18-Mar-20 A 24-Mar-20 A A2160 Issue for Construction D2 and D3 Package 0 0 07-Apr-20 A A2180 Submit to the City for Permitting 30 0 18-Mar-20 A 20-Apr-20 A

VA TenaVA Tenant Build Out 218 31 01-Oct-19 A 30-Jul-20 249

A2190 Project Kick-off and Initial User Group Meeti 3 0 01-Oct-19 A 03-Oct-19 A A2200 Incorporate User Group Space Plan Comment 4 0 04-Oct-19 A 09-Oct-19 A A2203 Submit Floor Plan and Meeting Minutes to VA 2 0 13-Jan-20 A 14-Jan-20 A A2213 VA Review and Comment 5 0 15-Jan-20 A 21-Jan-20 A A2205 Incorporate User Group Space Plan Comme 8 0 22-Jan-20 A 31-Jan-20 A A2210 Submit TIA Design Package to VA 2 0 03-Feb-20 A 04-Feb-20 A A2220 VA Review and Comment on DID 1 Design P 10 0 05-Feb-20 A 18-Feb-20 A A2228 Page Review Comments 5 0 19-Feb-20 A 25-Feb-20 A A2225 DID 1 Meeting 3 0 26-Feb-20 A 28-Feb-20 A A2340 Lock Floor Plan 1 0 02-Mar-20 A 02-Mar-20 A A2295 Submit 40% TIA Package to City for Permitin 0 0 18-Mar-20 A A2230 Finalize TIA Construction Documents 30 0 03-Mar-20 A 17-Apr-20 A A2235 Submit 40% TIA Package to City for Permitin 30 0 23-Mar-20 A 20-Apr-20 A A2290 Submit TIA CD Package to VA 3 0 20-Apr-20 A 21-Apr-20 A A2250 Issue TIA Construction Documents out for B 17 0 17-Apr-20 A 11-May-20 A A2240 VA Review and Comment on Construction Do 15 0 22-Apr-20 A 12-May-20 A

0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 ruary March April May June July August S October N D January February March April May June July

2020 2021 oceed Protest Timeline ined)

D1 IFC Documents Review D1 IFC Documents Submit Civil Design for Pricing

Receive Parking Lot Permit

Develop D2 90% Design Package BLHI Review D2 90% Design Package

Submit D2 Design for Pricing Receive Pricing Document Comments from Subs

Submit D2 90% Design Package for Permitting

Develop D3 60% Shell Design Package BLHI Review D3 60% Design Package

Issue D3 60% for Pricing Develop D3 90% Shell Design Package

BLHI Review D3 90% Design Package Issue for Construction D2 and D3 Package

Submit to the City for Permitting

Meetings Comments Floor Plan and Meeting Minutes to VA eview and Comment corporate User Group Space Plan Comments Resumed

Submit TIA Design Package to VA VA Review and Comment on DID 1 Design Package

Page Review Comments DID 1 Meeting Lock Floor Plan

Submit 40% TIA Package to City for Permiting with D2/D3 Package Finalize TIA Construction Documents Submit 40% TIA Package to City for Permiting with D2/D3 Package Submit TIA CD Package to VA

Issue TIA Construction Documents out for Bidding VA Review and Comment on Construction Documents

VA Tyler - Field Use - 6.18.20 Project ID: VA-T-13-03 Data Date: 18-Jun-20 Print Date: 22-Jun-20 14:49

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone

TASK filter: All Activities

Rem Dur

Start Finish Total Float

A2245 Incorporate Comments from VA 5 0 18-May-20 A 28-May-20 A A2260 Submit Preliminary TIA Budget to VA 7 0 12-May-20 A 28-May-20 A A2380 Finalize TIA Pricing Based on VA Comments 15 1 27-May-20 A 18-Jun-20 23 A2410 Submit Final TIA Proposal to VA 7 7 19-Jun-20 29-Jun-20 23 A2280 Submit TI Design Package to City for Permit 40 25 28-May-20 A 22-Jul-20 6 A2270 Review/Negotiate TIA Bid Proposals with VA 31 31 18-Jun-20 30-Jul-20 0 A2420 VA Notice to Proceed 0 0 30-Jul-20 0

Major PrMajor Procurement Items 201 108 10-Feb-20 A 16-Nov-20 172

A1300 Buyout Sitework Package 20 0 10-Feb-20 A 06-Mar-20 A A1310 Buyout Structural Package (Steel and Tilt Up 25 0 18-Mar-20 A 06-May-20 A A1320 Buyout Shell and Core Package 25 17 09-Jun-20 A 13-Jul-20 38 A2050 Issue Contracts for TIA Contractors 20 20 31-Jul-20 27-Aug-20 0 A1350 Major MEP Equipment Submittals and Lead T 90 90 14-Jul-20 16-Nov-20 77

Submittal Submittal Process 73 20 06-Apr-20 A 15-Jul-20 21 A1510 Foundation Rebar Shop Drawings 10 0 06-Apr-20 A 17-Apr-20 A A1520 Tilt Panel Shop Drawings 15 0 06-Apr-20 A 23-Apr-20 A A1530 Foundation Rebar Shop Drawings Review 5 0 21-Apr-20 A 27-Apr-20 A A1500 Structural Steel Shop Drawings 25 0 06-Apr-20 A 05-May-20 A A1540 Structural Steel Submittal Review 10 0 05-May-20 A 27-May-20 A A1550 Tilt Panel Submittal Review 14 0 29-Apr-20 A 27-May-20 A A1870 Curtainwall/Punch Window Shop Drawings 25 10 28-May-20 A 01-Jul-20 21 A2850 Curtainwall/Punch Window Submittal Review 10 10 02-Jul-20 15-Jul-20 21

Material PMaterial Procurement 45 45 08-Jun-20 A 19-Aug-20 21 A1610 Structural Steel Fabrication 25 15 08-Jun-20 A 08-Jul-20 6 A2860 Curtainwall/Punch Window Procurement 25 25 16-Jul-20 19-Aug-20 21

ConstrucConstruction 353 280 09-Mar-20 A 14-Jul-21 0

Major MileMajor Milestones 127 127 20-Aug-20 15-Feb-21 107 A2660 Structure Topped Out 0 0 20-Aug-20 234 A2670 Building Dry In 0 0 12-Oct-20 197 A2680 Permanent Power 0 0 15-Feb-21 107 A2690 Conditioned Air 0 0 15-Feb-21 107

SiteworkSitework 298 225 09-Mar-20 A 28-Apr-21 53 A1360 Site Mobilization 10 0 09-Mar-20 A 10-Mar-20 A A1370 Install Erosion Control and SWPPP 10 0 10-Mar-20 A 11-Mar-20 A A1380 Clearing and Grubbing 3 0 12-Mar-20 A 16-Mar-20 A A1385 Mass Grading 15 0 17-Mar-20 A 08-Apr-20 A A1390 Establish Building Pad 10 0 09-Apr-20 A 07-May-20 A A1400 Site Utilities, Primary Service Ductbank 20 0 22-Apr-20 A 08-May-20 A A1490 Install Utility Meter, RPZ 5 5 18-Jun-20 24-Jun-20 200 A1460 Fine Grade Site 5 5 07-Aug-20 13-Aug-20 169 A1450 Misc. Site Electrical and Pole Bases 5 5 14-Aug-20 20-Aug-20 169 A1410 Curb and Gutter 10 10 21-Aug-20 03-Sep-20 169 A1480 Concrete Paving 20 20 04-Sep-20 01-Oct-20 169 A1420 Hardscape/Sidewalks 13 13 13-Oct-20 29-Oct-20 162 A2040 Landscaping 15 15 30-Oct-20 19-Nov-20 162 A1430 Concrete Pavement Striping 5 5 22-Apr-21 28-Apr-21 53

0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 ruary March April May June July August S October N D January February March April May June July

2020 2021

Incorporate Comments from VA Submit Preliminary TIA Budget to VA

Finalize TIA Pricing Based on VA Comments Submit Final TIA Proposal to VA

Submit TI Design Package to City for Permitting Review/Negotiate TIA Bid Proposals with VA VA Notice to Proceed

Buyout Sitework Package Buyout Structural Package (Steel and Tilt Up Walls)

Buyout Shell and Core Package Issue Contracts for TIA Contractors

Major MEP Equipment Submittals and Lead Times

Foundation Rebar Shop Drawings Tilt Panel Shop Drawings Foundation Rebar Shop Drawings Review

Structural Steel Shop Drawings Structural Steel Submittal Review Tilt Panel Submittal Review

Curtainwall/Punch Window Shop Drawings Curtainwall/Punch Window Submittal Review

Structural Steel Fabrication Curtainwall/Punch Window Procurement

Structure Topped Out Building Dry In

Permanent Power Conditioned Air

Site Mobilization Install Erosion Control and SWPPP

Clearing and Grubbing Mass Grading

Establish Building Pad Site Utilities, Primary Service Ductbank

Install Utility Meter, RPZ Fine Grade Site

Misc. Site Electrical and Pole Bases Curb and Gutter

Concrete Paving Hardscape/Sidewalks

Landscaping Concrete Pavement S

VA Tyler - Field Use - 6.18.20 Project ID: VA-T-13-03 Data Date: 18-Jun-20 Print Date: 22-Jun-20 14:49

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Rem Dur

Start Finish Total Float

FoundatioFoundations 65 13 01-May-20 A 04-Aug-20 17 A1465 Mobilize Concrete Contractor 3 0 01-May-20 A 01-May-20 A A1475 Perimeter Foundations South/East 7 0 04-May-20 A 07-May-20 A A1485 Perimeter Foundations North/West 8 0 08-May-20 A 12-May-20 A A1495 Spread Footings Sequence A (approx. 24 ea) 9 0 12-May-20 A 15-May-20 A A1505 Spread Footings Sequence B (approx. 20 ea) 7 0 15-May-20 A 19-May-20 A A1595 Entry Canopy Foundations (10 ea) 5 5 17-Jul-20 23-Jul-20 5 A1605 Loading Dock Foundations/Ret. Wall 8 8 24-Jul-20 04-Aug-20 17

Tilt PanelsTilt Panels/SOG 93 78 19-May-20 A 05-Oct-20 0 A1515 Framing Casting Beds North/West 6 0 19-May-20 A 22-May-20 A A1525 Framing Casting Beds East/South 7 0 26-May-20 A 29-May-20 A A1635 Frame/Pour Tilt Panels North/West 6 0 28-May-20 A 17-Jun-20 A A1645 Frame/Pour Tilt Panels East/South 5 1 15-Jun-20 A 18-Jun-20 9 A1655 Panel Cure Time North/West 7 7 18-Jun-20 26-Jun-20 5 A1665 Panel Cure Time East/South 7 7 19-Jun-20 29-Jun-20 9 A1675 Mobilize Panel Erector 1 1 29-Jun-20 29-Jun-20 5 A1575 Erect Tilt Panels North/West 4 4 30-Jun-20 03-Jul-20 5 A1585 Erect Tilt Panels East/South 3 3 06-Jul-20 08-Jul-20 5 A1615 Demo/Haul Off Casting Beds South/East 3 3 09-Jul-20 13-Jul-20 5 A1625 Demo/Haul Off Casting Beds North/West 3 3 14-Jul-20 16-Jul-20 5 A1440 MPE Underground R/I 18 18 28-Aug-20 22-Sep-20 0 A1470 Prep and Poure SOG 9 9 23-Sep-20 05-Oct-20 0

StructuralStructural Steel/Deck 34 34 06-Jul-20 20-Aug-20 5 A1750 Mobilize Structural Steel Contractor 4 4 06-Jul-20 09-Jul-20 5 A2150 Erect Structural Steel Seq. A 10 10 10-Jul-20 23-Jul-20 5 A2430 Erect Structural Steel Seq. B 10 10 24-Jul-20 06-Aug-20 5 A2440 Joist and Decking Seq. A 5 5 07-Aug-20 13-Aug-20 5 A2450 Joist and Decking Seq. B 5 5 14-Aug-20 20-Aug-20 5

Building SBuilding Skin 191 191 07-Aug-20 30-Apr-21 53 A1580 Facade Masonry North Elevation (Sticky Ston 5 5 07-Aug-20 13-Aug-20 20 A2460 Facade Masonry East Elevation (Sticky Stone) 5 5 14-Aug-20 20-Aug-20 20 A2470 Facade Masonry South Elevations (Sticky Sto 5 5 21-Aug-20 27-Aug-20 24 A2540 Overhead Doors 5 5 21-Aug-20 27-Aug-20 52 A1590 Curtainwall/Punch Windows North Elevation 9 9 21-Aug-20 02-Sep-20 20 A2480 Facade Masonry West Elevation (Sticky Stone) 5 5 28-Aug-20 03-Sep-20 24 A2490 Curtainwall/Punch Windows East Elevation 5 5 03-Sep-20 09-Sep-20 20 A1560 Roofing 15 15 21-Aug-20 10-Sep-20 37 A2500 Curtainwall/Punch Windows South Elevation 5 5 10-Sep-20 16-Sep-20 20 A1570 Prefinished Metal Coping 5 5 11-Sep-20 17-Sep-20 37 A2510 Curtainwall/Punch Windows West Elevation 8 8 17-Sep-20 28-Sep-20 20 A2550 Sunshades 5 5 29-Sep-20 05-Oct-20 202 A1600 Dry-in 0 0 12-Oct-20 20 A2520 Clerestory Windows 10 10 29-Sep-20 12-Oct-20 20 A2530 Metal Liner Panels 5 5 13-Oct-20 19-Oct-20 192 A2560 Prefinished Aluminum Canopies 5 5 22-Apr-21 28-Apr-21 55 A2570 Composite Column Wraps and Canopy Panels 7 7 22-Apr-21 30-Apr-21 53

Build-OutBuild-Out 157 157 06-Oct-20 12-May-21 0

0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 ruary March April May June July August S October N D January February March April May June July

2020 2021

Mobilize Concrete Contractor Perimeter Foundations South/East

Perimeter Foundations North/West Spread Footings Sequence A (approx. 24 ea) Spread Footings Sequence B (approx. 20 ea)

Entry Canopy Foundations (10 ea) Loading Dock Foundations/Ret. Wall

Framing Casting Beds North/West Framing Casting Beds East/South

Frame/Pour Tilt Panels North/West Frame/Pour Tilt Panels East/South

Panel Cure Time North/West Panel Cure Time East/South Mobilize Panel Erector Erect Tilt Panels North/West

Erect Tilt Panels East/South Demo/Haul Off Casting Beds South/East Demo/Haul Off Casting Beds North/West

MPE Underground R/I Prep and Poure SOG

Mobilize Structural Steel Contractor Erect Structural Steel Seq. A

Erect Structural Steel Seq. B Joist and Decking Seq. A

Joist and Decking Seq. B

Facade Masonry North Elevation (Sticky Stone) Facade Masonry East Elevation (Sticky Stone)

Facade Masonry South Elevations (Sticky Stone) Overhead Doors

Curtainwall/Punch Windows North Elevation Facade Masonry West Elevation (Sticky Stone)

Curtainwall/Punch Windows East Elevation Roofing

Curtainwall/Punch Windows South Elevation Prefinished Metal Coping

Curtainwall/Punch Windows West Elevation Sunshades

Dry-in Clerestory Windows

Metal Liner Panels Prefinished Aluminum Composite Column W

VA Tyler - Field Use - 6.18.20 Project ID: VA-T-13-03 Data Date: 18-Jun-20 Print Date: 22-Jun-20 14:49

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Rem Dur

Start Finish Total Float

Area D/CArea D/C 122 122 06-Oct-20 24-Mar-21 20 A1630 Interior Framing 18 18 13-Oct-20 05-Nov-20 0 A1620 Mechanical Overhead R/I 30 30 06-Oct-20 16-Nov-20 0 A2580 Electrical Overhead R/I 25 25 13-Oct-20 16-Nov-20 20 A2590 Plumbing Overhead R/I 25 25 13-Oct-20 16-Nov-20 20 A2600 Fire Sprinkler Overhead R/I 25 25 13-Oct-20 16-Nov-20 20 A1650 LV Cabeling 10 10 06-Nov-20 19-Nov-20 7 A2610 In Wall MEP R/I 20 20 27-Oct-20 23-Nov-20 0 A2650 Rough Carpentry and Blocking 10 10 10-Nov-20 23-Nov-20 15 A1640 Hang and Finish Sheetrock 25 25 10-Nov-20 14-Dec-20 0 A2700 Set Mechanical and Electrical Equipment 15 15 24-Nov-20 14-Dec-20 17 A2630 Prime and First Coat 20 20 24-Nov-20 21-Dec-20 10 A1660 Acoustical Ceiling Grid 12 12 08-Dec-20 23-Dec-20 10 A1730 Floor and Wall Tile - Bathrooms, Halls etc. 20 20 01-Dec-20 28-Dec-20 35 A1670 Casework 15 15 22-Dec-20 11-Jan-21 10 A2640 MEPF Trim Out 25 25 15-Dec-20 18-Jan-21 19 A2800 Toilet Partitions and Accessories 15 15 29-Dec-20 18-Jan-21 35 A1680 Flooring - LVT, WSF etc. 20 20 29-Dec-20 25-Jan-21 20 A1690 Plumbing Fixtures 15 15 12-Jan-21 01-Feb-21 25 A1720 Drop Tile 15 15 19-Jan-21 08-Feb-21 27 A1700 Doors, Hardware, Accessories & Specialties 10 10 26-Jan-21 08-Feb-21 20 A1830 Interior Signage 5 5 11-Feb-21 17-Feb-21 20 A1710 Final Paint 8 8 09-Feb-21 18-Feb-21 20 A2750 Construction Clean 5 5 18-Feb-21 24-Feb-21 20 A2760 Internal QC Punchlist 5 5 25-Feb-21 03-Mar-21 20 A1740 Final Punch & Work-Off 15 15 04-Mar-21 24-Mar-21 20

Area A/BArea A/B 127 127 17-Nov-20 12-May-21 0 A1790 LV Cabeling 10 10 20-Nov-20 03-Dec-20 7 A1770 Interior Framing 15 15 24-Nov-20 14-Dec-20 0 A1760 Mechanical Overhead R/I 20 20 17-Nov-20 14-Dec-20 0 A2060 Electrical Overhead R/I 20 20 17-Nov-20 14-Dec-20 20 A2070 Plumbing Overhead R/I 20 20 17-Nov-20 14-Dec-20 20 A2710 Fire Sprinkler Overhead R/I 20 20 17-Nov-20 14-Dec-20 20 A2620 In Wall MEP R/I 20 20 01-Dec-20 28-Dec-20 0 A2720 Rough Carpentry and Blocking 10 10 15-Dec-20 28-Dec-20 10 A1780 Hang and Finish Sheetrock 20 20 15-Dec-20 11-Jan-21 0 A2730 Prime and First Coat 15 15 29-Dec-20 18-Jan-21 30 A1800 Acoustical Ceiling Grid 12 12 12-Jan-21 27-Jan-21 0 A2810 Floor/Wall Tile - Bathrooms, Lobby etc. 20 20 05-Jan-21 01-Feb-21 30 A2740 MEPF Trim Out 20 20 19-Jan-21 15-Feb-21 19 A2820 Toilet Partitions and Accessories 10 10 02-Feb-21 15-Feb-21 30 A1810 Casework 30 30 26-Jan-21 08-Mar-21 0 A1860 Drop Tile 18 18 16-Feb-21 11-Mar-21 19 A1820 Flooring - Terrazzo. LVT 30 30 02-Feb-21 15-Mar-21 0 A1840 Doors, Hardware, Accessories & Specialties 10 10 16-Mar-21 29-Mar-21 0 A2830 Plumbing Fixtures 15 15 09-Mar-21 29-Mar-21 7 A2840 Rubber Sheet Flooring 10 10 16-Mar-21 29-Mar-21 0

0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 ruary March April May June July August S October N D January February March April May June July

2020 2021

Interior Framing Mechanical Overhead R/I Electrical Overhead R/I Plumbing Overhead R/I Fire Sprinkler Overhead R/I LV Cabeling In Wall MEP R/I Rough Carpentry and Blocking

Hang and Finish Sheetrock Set Mechanical and Electrical Equipment

Prime and First Coat Acoustical Ceiling Grid

Floor and Wall Tile - Bathrooms, Halls etc.

Casework

MEPF Trim Out Toilet Partitions and Accessories

Flooring - LVT, WSF etc.

Plumbing Fixtures

Drop Tile Doors, Hardware, Accessories & Specialties

Interior Signage Final Paint

Construction Clean Internal QC Punchlist

Final Punch & Work-Off

LV Cabeling Interior Framing Mechanical Overhead R/I Electrical Overhead R/I Plumbing Overhead R/I Fire Sprinkler Overhead R/I

In Wall MEP R/I Rough Carpentry and Blocking

Hang and Finish Sheetrock Prime and First Coat

Acoustical Ceiling Grid Floor/Wall Tile - Bathrooms, Lobby etc.

MEPF Trim Out Toilet Partitions and Accessories

Casework Drop Tile Flooring - Terrazzo. LVT

Doors, Hardware, Accessories Plumbing Fixtures Rubber Sheet Flooring

VA Tyler - Field Use - 6.18.20 Project ID: VA-T-13-03 Data Date: 18-Jun-20 Print Date: 22-Jun-20 14:49

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Rem Dur

Start Finish Total Float

A2780 Construction Clean 5 5 30-Mar-21 05-Apr-21 2 A2770 Interior Signage 5 5 01-Apr-21 07-Apr-21 0 A1850 Final Paint 8 8 30-Mar-21 08-Apr-21 0 A2790 Internal QC Punchlist 10 10 08-Apr-21 21-Apr-21 0 A1880 Final Punch & Work-Off 15 15 22-Apr-21 12-May-21 0

EquipmentEquipment 132 132 17-Nov-20 19-May-21 40 A1890 Set Rooftop Equipment 15 15 17-Nov-20 07-Dec-20 77 A1900 Install MEP Equipment 15 15 08-Dec-20 28-Dec-20 77 A1920 Permanent Power 0 0 15-Feb-21 42 A1910 Circulate Conditioned Air 0 0 15-Feb-21 42 A1940 Major Clinical Equipment (Exam Lights & Boo 20 20 16-Feb-21 15-Mar-21 87 A1970 Clinical Equipment 10 10 30-Mar-21 12-Apr-21 67 A1950 Equipment with Service Connections 20 20 16-Mar-21 12-Apr-21 67 A1960 Architecturally Insignificant Equipment 15 15 30-Mar-21 19-Apr-21 62 A1930 Radiology Equipment 20 20 22-Apr-21 19-May-21 40

InspectionInspections 107 107 16-Feb-21 14-Jul-21 0 A1980 Test & Balance 25 25 16-Feb-21 22-Mar-21 42 A1990 Commissioning 20 20 23-Mar-21 19-Apr-21 42 A2020 VA Occupancy 0 0 16-Jun-21 20 A2010 Substantial Completion & Certifcate of Occup 0 0 16-Jun-21 0 A2000 Final Certifications & Acceptance 25 25 13-May-21 16-Jun-21 0 A2030 Final Completion 20 20 17-Jun-21 14-Jul-21 0

0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 ruary March April May June July August S October N D January February March April May June July

2020 2021

Construction Clean Interior Signage Final Paint

Internal QC Punchlist Final Punch & Wo

Set Rooftop Equipment Install MEP Equipment

Permanent Power Circulate Conditioned Air

Major Clinical Equipment (Exam Lig Clinical Equipment Equipment with Service Co

Architecturally Insignifica Radiology Equip

Test & Balance Commissioning

VA Occ Substa Final Ce

VA Tyler - Field Use - 6.18.20 Project ID: VA-T-13-03 Data Date: 18-Jun-20 Print Date: 22-Jun-20 14:49

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work