About this file
This document includes a request for proposal and related federal contract opportunity for building envelope repairs at the Hirshhorn Museum and Sculpture Garden. The Smithsonian Institution is seeking proposals for improvements to the energy performance and waterproofing of the museum's exterior wall and roof assemblies, including removing existing materials, installing new insulation and waterproofing, fabricating and installing precast concrete wall panels to match existing panels, replacing the balcony curtain wall, and demolishing and replacing the roof. Proposals are due by August 31, 2020 and shall include technical and cost proposals submitted separately. The technical proposal shall include descriptions of relevant experience and past performance, plans for accomplishing the work and project schedule, key personnel and subcontractors, and qualifications for precast concrete fabrication and installation. The cost proposal shall provide a schedule of values and total contract price. Subcontracting goals include 23% for small businesses, with subsets for small disadvantaged, veteran-owned, HUBZone, and women-owned small businesses.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank bid summary
| Title : | HMSG Building Envelope Repairs | Prepared by : |
| Facility : | HMSG | Date : |
| Project Number : | 1821115 | Company: |
| Base Bid | ||||
| BASE BID: All work associated with repairs to the building envelope at HMSG as described in the specifications and drawings both dated March 12, 2020. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | ||||
| BASE BID SUBTOTAL | $ - 0 | |||
| $ - 0 | ||||
| Overhead and Profit | $ - 0 | |||
| Performance Bond | $ - 0 |
Total $ - 0
| BASE BIDTotal | $ - 0 | ||
| Title : | HMSG Repair Building Envelope | Prepared by : | |
| Facility : | HMSG | Date : | |
| Project Number : | 1821115 | Company: |
| ALTERNATE 1 | ||||
| Alternate 1 / STONEY CREEEK: all costs associated with the use of Stoney Creek as an altenate aggregate for precast panels and balcony pavers as described in the specification and drawings both dated March 12, 2020. | ||||
| Description | Material | Labor | Equipment | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | ||||
| BASE BID SUBTOTAL | $ - 0 | |||
| $ - 0 | ||||
| Overhead and Profit | $ - 0 | |||
| Performance Bond | $ - 0 |
Total $ - 0
| Alternate / Total | $ - 0 | ||
| Title : | HMSG Repair Building Envelope | Prepared by : | |
| Facility : | HMSG | Date : | |
| Project Number : | 1821115 | Company: | |
| Provide as separate pricing for the following items: | TOTAL | ||
| Submission and Smithsonian Approval of Coordination Drawings as defined in Section 01000. | $ - 0 | ||
| Submission and Smithsonian Approval of Record Submittals as defined in Section 01000. | $ - 0 | ||
| Submission and Smithsonian Approval of the Operation and Maintenance Manuals as defined in Section 01000 | $ - 0 | ||
| * The Smithsnonian Institution is not responsible for any mathmatical errors or miscalculation on this form |