This request for proposal from the Smithsonian Institution solicits technical and cost proposals for building envelope repairs at the Hirshhorn Museum and Sculpture Garden in Washington, DC. Key aspects of the solicitation include replacing the building's insulation, waterproofing, and precast concrete wall panels to match the historic facade, as well as replacing the balcony curtain wall and roofing system. Proposals are due by August 31, 2020 and should include the offeror's experience and past performance, plan for accomplishing the work within 670 calendar days, key personnel and subcontractors, and qualifications of precast concrete fabricators. The technical proposal will be weighted equally to the cost proposal in evaluation. The solicitation sets small business and subcontracting goals including 23% overall with at least 5% each for small disadvantaged, veteran-owned, HUBZone, and women-owned small businesses.

View the file

Other files

File Type Posted
HMSG Design for Building Envelope Repairs RFI 2020-09-11.pdf PDF
33330220RF0010034 Amendment 6.pdf PDF
HMSG Repair Building Envelope Bid Sheet 9-9-20.xlsx XLSX spreadsheet
Availability of Funding_BID SHEET Rev 9-9-2020.pdf PDF
33330220RF0010034 Amendment 5.pdf PDF
HMSG Repair Building Envelope Bid Sheet 9-9-20.pdf PDF
HMSG Building Envelope Repairs RFI 172-181.pdf PDF
HMSG ENVELOPE CONSTRUCTABILITY STUDY.pdf PDF
33330220RF0010034 Amend 4.pdf PDF
RFI 155-SGH SK-1.pdf PDF
33330220RF0010034 Amendment 3.pdf PDF
HMSG RFI 166-171.pdf PDF
Availability of Funding_BID SHEET Rev 8-27-2020.pdf PDF
HMSG ENVELOPE CALC CUT SHEET-100CD FINAL BACKCHECK-1821115.pdf PDF
Precast Panel Shop Drawings.pdf PDF
HMSG Building Testing Report Appendix D Photos.pdf PDF
33330220RF0010034 Adendum 2.pdf PDF
3-6A Roof Plan.pdf PDF
9E-9A Third Floor condensed.pdf PDF
A-2 - 1992 roof replacement.pdf PDF
HMSG Design for Building Envelope Repairs RFIs Part I (1-165).pdf PDF
Capabiliteis Statement Revised 8-27-2020.pdf PDF
HMSG ENVELOPE BOD-100CD FINAL BACKCHECK-1821115.pdf PDF
33330220RF0010034 Amendment 1.pdf PDF
Solicitation 33330220RF0010034.pdf PDF
Construction Qualification Statement.pdf PDF
Availability of Funding_BID SHEET.pdf PDF
HMSG ENVELOPE SPECIFICATIONS.pdf PDF
HMSG ENVELOPE DRAWINGS.pdf PDF
Solicitation 33330220RF0010034.pdf PDF
Contractor COVID-19 Prevention and Control Plan Guidelines .pdf PDF
Pre-Bid Virtual Walk Through CC.mp4 MP4 file
Wage Determination DC20200002 07-10-2020.txt TXT text file
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Question Response

182 Reference E1-A-103 - Interior Finish Schedule on E1-A-103 indicates CPT-01 as TBD. Please provide basis of design product or advise material allowance to be carried in the bid

Basis of Design: Interface Menagerie II

183 Reference E1-A-103 - Interior Finish Schedule on E1-A-103 indicates PT-03 is to match existing. Please advise what the existing paint type is.

PPG Industries, Aquapon WB Component B, Semi-Gloss, 2-part epoxy floor paint

184 Reference E1-A-103 - Please confirm it is the intent to paint the entire floor in the Lerner Room with PT-03 and install CPT-01 on top of the painted floor as suggested by Key Note 21 on E1-A-

103. If not, please clarify design intent.

Confirmed.

185 Reference responses to RFIs #143 and 185 - Is small business participation a goal or a requirement on the project?

Requirement

186 The 1992 drawing issued with Bid Amendment 2 states there is

Tapered Insulation under the existing roof system and sloped concrete slab. The current drawings (sheet E1-A-105) show slope an existing structural slab only. How is the slope being handled with new roofing system?

The new roofing system will rely on the slope of the existing concrete slab, only. The approximate expected extent of the slope is shown on E1-A-105. Profile of the existing roof slab is a concealed condition. GC shall demo existing roofing system and survey existing roof slab profile. Refer to Specification Section 075556 Para.

1.6.C regarding a Level Survey to determine existing slope and required amount of cementitious repair to ensure positive slope-to-drain.

187 What is the composition of main existing roof? The design team’s understanding of the existing roof is outlined on Page 9 of the Basis of Design report by

CRTKL dated 13 January 2020 and approximately consists of the following: asphaltic vapor retarder, polyiso insulation, perlite cover board, and four-ply asphalt built-up roofing with gravel surfacing.

188 It is not possible to pump Hot Fluid from the ground to the main roof. Hot Fluid is “Melted” not direct fired like hot ASPHALT.

The roofing subcontractors have hoisted “Melters” on roofs in the DC Area including at the National Gallery of Art. Please confirm, we can hoist the Melter on the roof.

OSHEM will not allow flame or large (fuel) containers on the roof.

189 We have additional questions about the organization of the proposal, referring back to instructions provided in Q&A # 102

“Qualification statement requires the four parts only (Part I -

General Information, Part II - Entity’s Background, Part III -

Experience/Performance, and Part IV – Capabilities). The technical response should reference (1. Firm's Experience and

Past Performance 2. Plan of Accomplishment and Contract Time

3. Key Personnel and Subcontractors 4. Precast Concrete

Fabricators and Installers. The qualification statement is a separate tab.”

There should be five (5) tabs. One Tab for the

“Qualification Statement” that requires the four parts

(Part I - General Information, Part II - Entity’s

Background, Part III - Experience/Performance, and

Part IV – Capabilities). Then the four (4) Tabs as part of the “Technical Response” that include (1. Firm's

Experience and Past Performance 2. Plan of

Accomplishment and Contract Time 3. Key Personnel and Subcontractors 4. Precast Concrete Fabricators and

Installers). It is permissible to reference where the item has been answered if you think the information is clear.

1821115 - HMSG Design for Building Envelope Repairs RFI Response

190 Please confirm that where there are duplicates of requirements whether it is permissible to reference where the item has been answered, or whether the information should be provided in both sections. Specifically: Part IV. Organization of the

Qualification Statement states that the response to this section should be provided in Tab 7. The same information (resumes, org chart, etc.) would also be provided in the Technical

Response, Tab 3. Key Personnel and Subcontractors. Should it be duplicated or only provided in the Technical Response?

Similarly, the Qualification Questionnaire states to provide

Comparable and Non-Comparable Projects in Tabs 5 and 6 of the Qualification Statement. Should this information be duplicated in the Technical Response for Tab 1. Firm's

Experience?

There should be five (5) tabs. One Tab for the

“Qualification Statement” that requires the four parts

(Part I - General Information, Part II - Entity’s

Background, Part III - Experience/Performance, and

Part IV – Capabilities). Then the four (4) Tabs as part of the “Technical Response” that include (1. Firm's

Experience and Past Performance 2. Plan of

Accomplishment and Contract Time 3. Key Personnel and Subcontractors 4. Precast Concrete Fabricators and

Installers). It is permissible to reference where the item has been answered if you think the information is clear.

191 Spec section 084418 part 2.1 - manufacturers indicates (6) companies that are not curtainwall suppliers. Please confirm if the curtainwall system can be supplied by alternate manufacturers as long as the system meet the performance requirements indicated in the spec section.

The specification lists 6 custom steel curtain wall fabricators with an established track record to provide design and construction for a custom curtain wall system to meet project requirements. GC may propose an alternative custom steel curtain wall fabricator with an established track record to provide a system per

SOW requirements.

192 The response to RFI #2 indicates that SI would entertain the use of mast climbing scaffolding in lieu of framed scaffolding at the building perimeter. The use of mast climbers would make the installation of a decorative scrim, as described in specification section 010000-27.6, problematic. Would SI consider alternatives to a decorative scrim which covered the entire height and circumference of the scaffolding?

If alternatives are proposed that affect other parts of the project, the assumptions and issues should be clearly stated as part of the proposal.

193 RFI Response # 102 indicates the Qualification Statement should have 4 parts (Part I - General Information, Part II -

Entity's Background, Part III - Experience/Performance and Part

IV - Capabilities). Further, the Technical Response should have

4 parts (1. Firm's Experience and Past Performance, 2. Plan of

Accomplishment and Contract Time, 3. Key Personnel and

Subcontractors, and 4. Precast Personnel and Subcontractors).

The firm's past experience appears twice in this list (Part III of the Qualification Statement and Part 1. of the Technical

Response) but there are not two separate requirements in the

RFP. Part III Experience/Performance clearly requires the

Comparable and Non-Comparable Project Forms. What should be included in Part 1. Firm's Experience and Past Performance?

There should be five (5) tabs. One Tab for the

“Qualification Statement” that requires the four parts

(Part I - General Information, Part II - Entity’s

Background, Part III - Experience/Performance, and

Part IV – Capabilities). Then the four (4) Tabs as part of the “Technical Response” that include (1. Firm's

Experience and Past Performance 2. Plan of

Accomplishment and Contract Time 3. Key Personnel and Subcontractors 4. Precast Concrete Fabricators and

Installers). It is permissible to reference where the item has been answered if you think the information is clear.

Given that the file size uploaded to the Dropbox link will be very large, please confirm it is acceptable to submit 4 separate PDFs:

1. Price Proposal 2. Technical Proposal 3. Appendixes to the

Technical Proposal 4. Financial Statements

There is not a requirement of how many files you upload

195 Please provide the bid forms in Excel format if possible. See attached revised bid form dated 9-9-2020

51 15.5.1 of Spec Section 010000 states that the “The interior shall be protected as necessary” in reference to the sequence of work for re-roofing. Due to the numerous pieces of priceless art stored on the 4th floor, would the SI plan on relocating such artwork while the re-roofing is taking place? If not, is there a preferred method of protection or would that be left up to the

Contractor to determine?

The art will not be moved from 4th floor collection storage. The building will remain operational. Artwork cannot be fully protected in place due to the existing painting rack system. Interior protection of affected areas will be required during drain replacement. Refer to 15.5 of Spec Section 010000 for full requirements including coordination required with the museum.

Clarification of the answer previously issued to question #51: Protection of the building interior is the contractor’s responsibility in the areas affected by the replacement of the roof drains. Protection of the artwork stored in the building is the responsibility of the museum, but please refer to 15.5 of Spec Section

010000 for requirements including coordination with the museum staff as work is done above the art storage areas.