HMSG Building Testing Report Appendix D Photos.pdf

PDF 2 MB Posted

Attached to
Hirshhorn Museum and Sculpture Garden Building Envelope Repairs (SF Project No. 1821115)
Solicitation number
333302-20RF-0010034
Issued by

About this file

This request for proposal from the Smithsonian Institution solicits design services for building envelope repairs at the Hirshhorn Museum and Sculpture Garden. Offerors are invited to submit technical and cost proposals by August 31, 2020 to repair and improve the energy performance and waterproofing of the museum's exterior walls and roof. The scope of work involves removing existing materials, installing new insulation and waterproofing, fabricating and installing precast concrete wall panels to match historic ones, replacing balcony curtain walls, and demolishing and replacing the roof. The technical proposal should demonstrate experience with similar projects, safety qualifications, and plans for project management, quality control, schedule, and key personnel. The cost proposal requires a schedule of values in CSI format. Subcontracting goals include 23% for small businesses with subsets for small disadvantaged, veteran-owned, HUBZone, and women-owned firms.

View the file

Other files

File Type Posted
HMSG Design for Building Envelope Repairs RFI 2020-09-11.pdf PDF
33330220RF0010034 Amendment 6.pdf PDF
HMSG Building Envelope Repairs RFI 182-195.pdf PDF
HMSG Repair Building Envelope Bid Sheet 9-9-20.xlsx XLSX spreadsheet
Availability of Funding_BID SHEET Rev 9-9-2020.pdf PDF
33330220RF0010034 Amendment 5.pdf PDF
HMSG Repair Building Envelope Bid Sheet 9-9-20.pdf PDF
HMSG Building Envelope Repairs RFI 172-181.pdf PDF
HMSG ENVELOPE CONSTRUCTABILITY STUDY.pdf PDF
33330220RF0010034 Amend 4.pdf PDF
RFI 155-SGH SK-1.pdf PDF
33330220RF0010034 Amendment 3.pdf PDF
HMSG RFI 166-171.pdf PDF
Availability of Funding_BID SHEET Rev 8-27-2020.pdf PDF
HMSG ENVELOPE CALC CUT SHEET-100CD FINAL BACKCHECK-1821115.pdf PDF
Precast Panel Shop Drawings.pdf PDF
33330220RF0010034 Adendum 2.pdf PDF
3-6A Roof Plan.pdf PDF
9E-9A Third Floor condensed.pdf PDF
A-2 - 1992 roof replacement.pdf PDF
HMSG Design for Building Envelope Repairs RFIs Part I (1-165).pdf PDF
Capabiliteis Statement Revised 8-27-2020.pdf PDF
HMSG ENVELOPE BOD-100CD FINAL BACKCHECK-1821115.pdf PDF
33330220RF0010034 Amendment 1.pdf PDF
Solicitation 33330220RF0010034.pdf PDF
Construction Qualification Statement.pdf PDF
Availability of Funding_BID SHEET.pdf PDF
HMSG ENVELOPE SPECIFICATIONS.pdf PDF
HMSG ENVELOPE DRAWINGS.pdf PDF
Solicitation 33330220RF0010034.pdf PDF
Contractor COVID-19 Prevention and Control Plan Guidelines .pdf PDF
Pre-Bid Virtual Walk Through CC.mp4 MP4 file
Wage Determination DC20200002 07-10-2020.txt TXT text file
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SGH Project 150597 / August 2016

Photo D.30

Panel Outer-I-6-L

Local spall from installation of temporary lifting anchor.

Photo D.31

Previous unreinforced concrete repair in exterior elevation backup wall.

Typical in backup behind all small panels. Photo at backup wall behind panel Outer-I-4-J.

Photo D.32

Panel Outer-I-4-L

Backup wall locally chipped to accommodate anchorage.

Photo D.33

Panel Outer-I-4-M

Backup wall locally chipped to accommodate anchorage.

Photo D.34

Corroded anchor abandoned in-place. Similar holes often filled with mortar or sealant (red arrow). Condition typical in backup behind panels at exterior elevation. Wood debris embedded in wall (green arrow). Photo at backup wall behind panel Outer-I-6-L.

Photo D.35

Panel Outer I-3-J

Relieving angle that supports bottom left of large panel.

The welded reinforcing bar has been removed to facilitate proof load testing.

Photo D.36

Angle R1A

Outstanding angle leg has 4

in. long 1/2 in. dia. bar welded to it with intermittent surface corrosion. Leg is flame cut to length.

Photo D.37

1/2 in. thick shim stack with corrosion at left side of angle. Panel bears on only a small portion of the shim stack.

Photo D.38

The panel does not bear on the right side of the relieving angle.

Photo D.57

Localized areas of backup wall behind panel Outer-I-3-K intentionally chipped to accommodate panel anchorage.

Photo D.58

Angle R2A

Outstanding angle leg has reinforcing bar welded to it with surface corrosion. There are no shims and panel bears on approximately 3 in.

of outstanding leg. Leg is flame cut to length.

Photo D.59

Angle R2A

Bottom edge of the panel is cracked near the bearing point on the relieving angle.

Photo D.69

Vertical crack in edge of in-place balcony panel adjacent to panel Outer-IV-4B-N.

Photo D.70

Spall in CIP backup behind panel Outer-IV-4B-N.

Photo D.71

Abandoned form tie hole in concrete backup behind panel Outer-IV-4B-N.

Hirshhorn Art Museum

SGH

150597-HMSG

8/23/2016 ALDondrea

IMAGE D.4 – EO-PTL – BACKUP OUTER-I-6-L

3/4" dia. bar with 2-3/16" clear cover.

1-1/4" dia. bar with 3" clear cover at edge of opening. Bar hooks back into wall behind vertical reinforcement.

1/2" dia. bar with 3-5/16" clear cover.

1/2" dia. bar with 1" clear cover.

3/4" dia. bar with 1" clear cover.

1/2" dia. bar with 1-3/4" clear cover

Cast-in wedge insert anchored to CIP backup with 3/8" dia. bar.

1- 1/

4" 1-

3/ 4"

2- 1/

2"

2-1/8" 4-7/8"

4-1/4"

5-1/4"

2- 1/

4"Hirshhorn Art Museum

SGH

150597-HMSG

8/23/2016 ALDondrea IMAGE D.5 – EO-PTL – BACKUP OUTER-I-6-L

3/4" dia. bar with 1-3/16" clear cover.

1-3/8" dia. bar with 2-5/16" clear cover.

1-3/8" dia. bar with 2-1/8" clear cover.

1/2" dia. bar with 3-5/8" clear cover.

1/2" dia. bar with 1-1/8" clear cover.

3/8" dia. bar (cut to remove wedge insert). Anchors cast-in wedge insert to CIP backup.

3"

1- 3/

4"

1-1/4"

Hirshhorn Art Museum

SGH

150597-HMSG

8/23/2016 ALDondrea

IMAGE D.6 – EO-PTL – BACKUP OUTER-I-6-L

11/16" dia bar with 3-3/4" clear cover. Weld residue near mid-height of exposed bar where wedge insert was tack welded prior to concrete placement.

11/16" dia. bar with 4-3/8" clear cover

3/8" dia. bar (cut to remove wedge insert). Anchors cast-in wedge insert to CIP backup.

Partially exposed bar (unknown dia.) with 3-5/8" clear cover.

Right wedge insert for large panel relieving angle.

1-5/8" 2-1/2"