28-Attachment MM - Project Sign Dimensions.pdf

PDF 1 MB Posted

Attached to
CSP - Isom Stormwater Detention Basin for the Harris County Flood Control District (Estimated Budget $10, 747, 981) (CDBG-DR)
Solicitation number
26/0086
Issued by
Harris County, Texas

About this file

This is a project specification document from the Harris County Flood Control District, detailing signage requirements for the Isom Stormwater Detention Basin project. The document identifies key county officials including County Judge Lina Hidalgo and Executive Director Dr. Tina Petersen, P.E., along with commissioners representing the four county precincts. The project specification establishes that signage dimensions for the basin are 96 inches by 48 inches, providing contractors and vendors with standardized specifications for project materials and installations.

The Isom Stormwater Detention Basin project, with an estimated budget of $10,747,981, is funded through the Texas General Land Office via Community Development Block Grant - Disaster Recovery (CDBG-DR) Program funds allocated by the United States Department of Housing and Urban Development. These funds support the restoration of infrastructure for communities impacted by Hurricane Harvey. The signage specification document functions as an attachment to the broader project contract opportunity, ensuring that all project components, including directional and identification signage, meet established county standards and are properly coordinated with the overall stormwater management infrastructure improvements.

View the file

Other files

File Type Posted
23-Attachment H - Performance Bond for Public Works over 100,000.pdf PDF
21-Attachment NN - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
6-Attachment J - Payment Bond.pdf PDF
27-Attachment LL - Report Files.pdf PDF
8-Attachment Z – MWBE Trucking Procedure Compliance Packet.pdf PDF
3-Attachment F - References.pdf PDF
5-Attachment M - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
24-Attachment P - Section 3 Bid Requirements.pdf PDF
7-Attachment D - Statement of Offeror Qualifications.pdf PDF
13-Attachment EE - Bid Bond and Bid Check Authorization Form.pdf PDF
11-Bid Guaranty and Performance.pdf PDF
20-Attachment JJ - Harris County Contractor and Worksite Safety Policies.pdf PDF
26-Attachment FF - Drawings.pdf PDF
16-Attachment A – Proposal Addenda Acknowledgement.pdf PDF
22-Attachment OO - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
1-Attachment B - Pricing Form.pdf PDF
10-Attachment CC - Harris County Minimum Wage Policy and Certification.pdf PDF
9-Attachment G - Contractor Profile.pdf PDF
32-Federal CSP General Requirements and Specifications.pdf PDF
12-Attachment X – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
17-Attachment II - Bid Guaranty and Performance Bond Information and Requirements.pdf PDF
31-Attachment N - Required Contract Provisions.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
30-Attachment K - Certification of Compliance with Federal Standards Requirements .pdf PDF
15-Attachment Q – Davis Bacon Current Wage Decision.pdf PDF
14-Attachment HH - Harris County Contractor Minimum Wage Policy - FAQ.pdf PDF
4-Attachment L - Minimum Insurance Requirements for Flood Control District.pdf PDF
19-Attachment U - GLO Compliance Package.pdf PDF
25-Attachment GG - Project Manual.pdf PDF
18-Attachment KK - Heat Protection Safety Requirement.pdf PDF
29-Attachment Y – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMISSIONERS:

EXECUTIVE DIRECTOR: Dr. Tina Petersen, P.E.

COUNT Y JUDGE: Lina Hidalgo

ISOM STORMWATER

DETENTION BASIN

Rodney Ellis Precinct 1

Adrian Garcia Precinct 2

Tom S. Ramsey, P.E.

Precinct 3

Lesley Briones Precinct 4

This project is funded by the Texas General Land Office of the State of Texas to provide for the restoration of infrastructure for communities impacted by Hurricane Harvey. The funds have been allocated by the United States Department of Housing and Urban Development through the Community Development Block Grant – Disaster Recovery Program.

Sign dimensions 96" x 48"

LISA.TAUSER

Highlight

File details come from the government source that posted it. Updated .