26-Attachment FF - Drawings.pdf

PDF 100 MB Posted

Attached to
CSP - Isom Stormwater Detention Basin for the Harris County Flood Control District (Estimated Budget $10, 747, 981) (CDBG-DR)
Solicitation number
26/0086
Issued by
Harris County, Texas

About this file

This file comprises attachment drawings for the Isom Stormwater Detention Basin project being developed by the Harris County Flood Control District in Texas. The project, estimated at $10,747,981 and funded through Community Development Block Grant – Disaster Recovery (CDBG-DR) resources, includes detailed engineering drawings that depict the stormwater detention basin design, site layout, and infrastructure specifications necessary for construction and implementation. The drawings serve as technical documentation to establish the project scope, site conditions, and construction requirements for qualified contractors bidding on this capital improvement initiative.

The drawings constitute an essential bid document component that provides visual representations of the detention basin's configuration, grading plans, utility locations, and structural details required for accurate cost estimation and project execution. These technical plans ensure that all potential bidders have access to standardized project specifications and can submit competitive proposals based on comprehensive understanding of the work scope and site conditions associated with the Harris County stormwater management improvement.

View the file

Other files

File Type Posted
23-Attachment H - Performance Bond for Public Works over 100,000.pdf PDF
21-Attachment NN - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
6-Attachment J - Payment Bond.pdf PDF
27-Attachment LL - Report Files.pdf PDF
8-Attachment Z – MWBE Trucking Procedure Compliance Packet.pdf PDF
3-Attachment F - References.pdf PDF
5-Attachment M - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
24-Attachment P - Section 3 Bid Requirements.pdf PDF
7-Attachment D - Statement of Offeror Qualifications.pdf PDF
13-Attachment EE - Bid Bond and Bid Check Authorization Form.pdf PDF
11-Bid Guaranty and Performance.pdf PDF
20-Attachment JJ - Harris County Contractor and Worksite Safety Policies.pdf PDF
16-Attachment A – Proposal Addenda Acknowledgement.pdf PDF
22-Attachment OO - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
1-Attachment B - Pricing Form.pdf PDF
10-Attachment CC - Harris County Minimum Wage Policy and Certification.pdf PDF
9-Attachment G - Contractor Profile.pdf PDF
32-Federal CSP General Requirements and Specifications.pdf PDF
12-Attachment X – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
17-Attachment II - Bid Guaranty and Performance Bond Information and Requirements.pdf PDF
31-Attachment N - Required Contract Provisions.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
30-Attachment K - Certification of Compliance with Federal Standards Requirements .pdf PDF
15-Attachment Q – Davis Bacon Current Wage Decision.pdf PDF
28-Attachment MM - Project Sign Dimensions.pdf PDF
14-Attachment HH - Harris County Contractor Minimum Wage Policy - FAQ.pdf PDF
4-Attachment L - Minimum Insurance Requirements for Flood Control District.pdf PDF
19-Attachment U - GLO Compliance Package.pdf PDF
25-Attachment GG - Project Manual.pdf PDF
18-Attachment KK - Heat Protection Safety Requirement.pdf PDF
29-Attachment Y – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .