18-Attachment KK - Heat Protection Safety Requirement.pdf

PDF 51 KB Posted

Attached to
CSP - Isom Stormwater Detention Basin for the Harris County Flood Control District (Estimated Budget $10, 747, 981) (CDBG-DR)
Solicitation number
26/0086
Issued by
Harris County, Texas

About this file

This is a Heat Protection Safety Requirement guidance document applicable to the Isom Stormwater Detention Basin project for the Harris County Flood Control District in Texas. The document establishes mandatory weather-related safety provisions that the Prime Contractor must incorporate into the project Safety Plan to protect workers from extreme heat, cold, and other adverse weather conditions. At minimum, the Safety Plan must include provisions for preventing heat-related and cold-related illnesses during work execution. When temperatures or heat index values exceed 90 degrees, the contractor must develop a project-specific Heat Awareness Plan that includes acclimatization measures, water provision, rest periods, and shade accommodations. During extended periods of adverse weather, the Prime Contractor is required to provide additional worker accommodations as deemed necessary.

All vendors submitting Competitive Sealed Proposals for this project acknowledge and agree to comply with these heat protection safety requirements upon signature of the proposal acknowledgement at time of submission. This requirement applies to the stormwater detention basin project with an estimated budget of $10,747,981, which is funded through CDBG-DR (Community Development Block Grant - Disaster Recovery) sources.

View the file

Other files

File Type Posted
23-Attachment H - Performance Bond for Public Works over 100,000.pdf PDF
21-Attachment NN - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
6-Attachment J - Payment Bond.pdf PDF
27-Attachment LL - Report Files.pdf PDF
8-Attachment Z – MWBE Trucking Procedure Compliance Packet.pdf PDF
3-Attachment F - References.pdf PDF
5-Attachment M - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
24-Attachment P - Section 3 Bid Requirements.pdf PDF
7-Attachment D - Statement of Offeror Qualifications.pdf PDF
13-Attachment EE - Bid Bond and Bid Check Authorization Form.pdf PDF
11-Bid Guaranty and Performance.pdf PDF
20-Attachment JJ - Harris County Contractor and Worksite Safety Policies.pdf PDF
26-Attachment FF - Drawings.pdf PDF
16-Attachment A – Proposal Addenda Acknowledgement.pdf PDF
22-Attachment OO - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
1-Attachment B - Pricing Form.pdf PDF
10-Attachment CC - Harris County Minimum Wage Policy and Certification.pdf PDF
9-Attachment G - Contractor Profile.pdf PDF
32-Federal CSP General Requirements and Specifications.pdf PDF
12-Attachment X – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
17-Attachment II - Bid Guaranty and Performance Bond Information and Requirements.pdf PDF
31-Attachment N - Required Contract Provisions.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
30-Attachment K - Certification of Compliance with Federal Standards Requirements .pdf PDF
15-Attachment Q – Davis Bacon Current Wage Decision.pdf PDF
28-Attachment MM - Project Sign Dimensions.pdf PDF
14-Attachment HH - Harris County Contractor Minimum Wage Policy - FAQ.pdf PDF
4-Attachment L - Minimum Insurance Requirements for Flood Control District.pdf PDF
19-Attachment U - GLO Compliance Package.pdf PDF
25-Attachment GG - Project Manual.pdf PDF
29-Attachment Y – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Competitive Sealed Proposal Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.

File details come from the government source that posted it. Updated .