16-Attachment A – Proposal Addenda Acknowledgement.pdf

PDF 15 KB Posted

Attached to
CSP - Isom Stormwater Detention Basin for the Harris County Flood Control District (Estimated Budget $10, 747, 981) (CDBG-DR)
Solicitation number
26/0086
Issued by
Harris County, Texas

About this file

This is a Competitive Sealed Proposal (CSP) Acknowledgment form for the Harris County Flood Control District in Texas related to the Isom Stormwater Detention Basin project, with an estimated budget of $10,747,981 funded through Community Development Block Grant – Disaster Recovery (CDBG-DR) resources. The form serves as a certification document that must be signed by a corporate officer, partner, or proprietor and requires submission with the proposal package. The acknowledgment certifies that the proposal is submitted without prior understanding or collusion with other bidders and confirms the offeror's authorization to submit the bid and commitment to comply with all CSP conditions and provisions.

The form requires bidders to provide company information including the authorized representative's name, company name and address, DUNS number, telephone, fax, and email contact information. Bidders must attest that they have read and understood all CSP documents in their entirety, that all pricing provided is accurate and complete, and that all statements made in the proposal are true and correct. The acknowledgment includes a space for internal County use for acceptance notation and date. No specific pricing terms, set-asides, or renewal options are detailed within this particular acknowledgment form; rather, it functions as a prerequisite certification document required to validate proposal submission for the stormwater detention basin construction project.

View the file

Other files

File Type Posted
23-Attachment H - Performance Bond for Public Works over 100,000.pdf PDF
21-Attachment NN - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
6-Attachment J - Payment Bond.pdf PDF
27-Attachment LL - Report Files.pdf PDF
8-Attachment Z – MWBE Trucking Procedure Compliance Packet.pdf PDF
3-Attachment F - References.pdf PDF
5-Attachment M - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
24-Attachment P - Section 3 Bid Requirements.pdf PDF
7-Attachment D - Statement of Offeror Qualifications.pdf PDF
13-Attachment EE - Bid Bond and Bid Check Authorization Form.pdf PDF
11-Bid Guaranty and Performance.pdf PDF
20-Attachment JJ - Harris County Contractor and Worksite Safety Policies.pdf PDF
26-Attachment FF - Drawings.pdf PDF
22-Attachment OO - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
1-Attachment B - Pricing Form.pdf PDF
10-Attachment CC - Harris County Minimum Wage Policy and Certification.pdf PDF
9-Attachment G - Contractor Profile.pdf PDF
32-Federal CSP General Requirements and Specifications.pdf PDF
12-Attachment X – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
17-Attachment II - Bid Guaranty and Performance Bond Information and Requirements.pdf PDF
31-Attachment N - Required Contract Provisions.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
30-Attachment K - Certification of Compliance with Federal Standards Requirements .pdf PDF
15-Attachment Q – Davis Bacon Current Wage Decision.pdf PDF
28-Attachment MM - Project Sign Dimensions.pdf PDF
14-Attachment HH - Harris County Contractor Minimum Wage Policy - FAQ.pdf PDF
4-Attachment L - Minimum Insurance Requirements for Flood Control District.pdf PDF
19-Attachment U - GLO Compliance Package.pdf PDF
25-Attachment GG - Project Manual.pdf PDF
18-Attachment KK - Heat Protection Safety Requirement.pdf PDF
29-Attachment Y – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMPETITIVE SEALED PROPOSAL ACKNOWLEDGMENT

This acknowledgment shall be signed, in ink, by a corporate officer, partner, or proprietor:

I certify that this Proposal is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a Proposal for the same construction, service, or material and is in all respects fair and without collusion or fraud. I am authorized to sign this offer for the Offeror and agreed to abide by all conditions of this

Competitive Sealed Proposal (CSP) and certify that I have read and understand the CSP documents in their entirety.

In signing this acknowledgement, I attest that under this offer I shall provide the goods and/or services requested in this CSP according to the published provisions of this CSP. I confirm the pricing provided to the County under this

CSP and certify that all statements made are true, complete and correct.

Project Job No.:

Project Description:

Authorized Signature Date

Authorized Representative Name (First & Last):

Company Name:

Company Address:

Bidder DUNS Number:

Telephone:________________________ Fax:____________________e-mail:_____________________________

FOR INTERNAL USE

Accepted by:__________________________________________ Date:__________________________

HARRIS COUNTY JUDGE LINA HIDALGO

Project Job No:
Project Description:
undefined:
undefined_2:
Authorized Representative Name First Last:
undefined_3:
Company Address:
Bidder DUNS Number:
Telephone:
Fax:
email:

File details come from the government source that posted it. Updated .