26M075CN Multiple Building BEQ Lock Repairs Phase V PD.pdf
PDF 219 KB Posted
- Solicitation number
- N4008526R9029
About this file
This document is a Project Description for a federal construction contract at Camp Lejeune, North Carolina.
The contractor is required to replace existing lock-sets on all living area doors with new swipe locks across 31 Barracks for Enlisted Quarters (BEQ) buildings. The scope includes providing bit lists, cores, and matching keys—four sets per building—incorporating a Master-key, Grand Master, and sub-Master key system. The facility will remain operational throughout the entire construction period, and the contractor must minimize interference with normal operations. The contractor is responsible for moving furniture and other objects in the project area as needed. Supervision requirements allow one qualified person to serve concurrently as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that individual meets all qualifications defined in the project specification.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DESCRIPTION
This scope of work is to be accomplished multiple BEQ buildings located on Camp Lejeune, North Carolina. Contractor shall Provide the following:
Replace existing lock-sets on all living area doors with new swipe locks in
(31) BEQ’s. (See attachment). Bit list, Cores, and matching keys: four (4) ea., include Master-key, Grand master, sub-Master key system.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity. The furniture and other objects in the project area are to be moved by the contractor if required.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.