26 05 73 POWER STUDIES.pdf

PDF 5 MB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813726R0026
Issued by

About this file

This is a technical specification document (Section 26 05 73) for Power System Studies at Tinker Air Force Base. The specification establishes requirements for contractors to perform comprehensive electrical system analysis and documentation to ensure safe and reliable operation of facility power systems.

The contractor must furnish short-circuit, protective device coordination, and arc flash hazard analysis studies reflecting as-built conditions, utilizing EasyPower software and Tinker Air Force Base Electrical Standards (January 2024). Key deliverables include field examination plans, arc flash label formats, test reports, system analyzer certificates, model files, load flow studies, fault current studies, system coordination studies, and arc flash hazard studies—all requiring government approval with "G" or "S" classifications. The System Analyzer must be a registered professional electrical engineer with minimum three years of power system studies experience. The specification mandates compliance with IEEE standards (1584, 1584.1, 3002.2, 3002.3, C2), NFPA standards (70E, 70B), and UFC 3-560-01. Studies must encompass the switchboard's main protective device to all new downstream equipment, include single-line diagrams with accurate device identification, load flow analysis per IEEE 3002.2, fault current calculations per IEEE 3002.3, system coordination demonstrations, and arc flash studies per IEEE 1584.1 with recommendations to reduce hazards exceeding 8 cal/cm² to 4 cal/cm². Arc flash warning labels must be thermal transfer type, 3.5" x 5" to 4" x 6", machine-printed without field markings, and remain legible for five years, with placement scheduled five business days before installation.

View the file

Other files

File Type Posted
250063_Pre-Bid RFI_Responses Round 2 COR.pdf PDF
250063_ATT02_Drawings_Amend_01.pdf PDF
250063_Prebid RFI Responses.pdf PDF
Site Visit Sign in Sheet - WWYK250063.jpg JPG image
Solicitation - FA813726R0026.pdf PDF
Site Visit Meet Up Location.png PNG image
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 01_Appointment of Security Representative Template 496.docx DOCX document
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx XLSX spreadsheet
23 05 15.pdf PDF
21 13 13.pdf PDF
09 67 23.15.pdf PDF
26 51 00 INTERIOR LIGHTING.pdf PDF
08 81 00.pdf PDF
06 41 16.00 10.pdf PDF
10 22 13.pdf PDF
23 05 93.pdf PDF
05 05 23.16.pdf PDF
00 70 00.pdf PDF
01 45 00.00 10.pdf PDF
00 80 05.pdf PDF
afi48-104.pdf PDF
image (1).png PNG image
Mechanical Schedules.xls XLS spreadsheet
Door_Window_Schedule.xlsx XLSX spreadsheet
Room finish schedule.xlsx XLSX spreadsheet
DESV_Submittal.pdf PDF
z415-bz1.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
4500-S.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
250063_ATT 9_SOW.pdf PDF
250063_ATT 11_Drawings.pdf PDF
WWYK250063-04March2026.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
22 00 00.pdf PDF
28 31 76.pdf PDF
23 09 23.02.pdf PDF
07 14 00.pdf PDF
08 51 23.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 72 00.pdf PDF
00 71 00.pdf PDF
01 78 00.pdf PDF
01 33 00.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .